ATTACHMENT 1E - Drawings-Fire Protection.pdf
PDF 2 MB Posted
- Solicitation number
- 36C26224B0007
About this file
This document package includes construction drawings and specifications for a fire alarm and fire suppression system upgrade project at the Raymond G. Murphy VA Medical Center in Albuquerque, New Mexico. The project scope involves renovating the existing Sterile Processing Service area and upgrading the fire alarm and fire suppression systems within this area. Key project details include installing new fire alarm devices, circuits and conduit; upgrading the fire suppression system piping and sprinkler locations; and providing a fire alarm and suppression system for a temporary Sterile Processing Service trailer. The solicitation number listed is 36C26224B0007 for Project #501-21-101 to repair the Sterile Processing Service area and upgrade the equipment space. The opportunity type is a pre-solicitation for work to be conducted at the Raymond G. Murphy VAMC located in Albuquerque, New Mexico, under the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FIRE ALARM LEGEND
S NEW SMOKE DETECTOR - SPOT TYPE
OUT OF SCOPE AREA
SPD EXISTING SURGE PROTECTIVE DEVICE
FACU EXISTING FIRE ALARM CONTROL UNIT
WF EXISTING WATERFLOW DEVICE
VS EXISTING VALVE SUPERVISORY SWITCH
S NEW SPEAKER
AIM EXISTING ADDRESSABLE INPUT MODULE
NEW SPEAKER STROBE
NEW STROBE
SYMBOL MODIFIERS
CANDELA RATING
WATT TAP
ncd nW
IN SCOPE, EXISTING TO REMAIN
GENERAL:
1. THE CONTRACTOR SHALL CAREFULLY REVIEW ALL APPLICABLE
DESIGN CRITERIA, THESE DRAWINGS, AND THE PROJECT
SPECIFICATIONS FOR IMPORTANT QUALIFICATION, DEFINITION,
SUBMITTAL, PRODUCT, INSTALLATION, AND TESTING
REQUIREMENTS.
2. ALL SUBMITTALS, INSTALLATION, AND TESTING SHALL BE
COMPLETED IN A NEAT, WORKMAN-LIKE MANNER.
3. BEFORE WORK BEGINS, THE CONTRACTOR IS RESPONSIBLE FOR
DETERMINING THE AVAILABLE CAPACITY OF THE EXISTING FIRE
ALARM PANEL, INCLUDING SECONDARY POWER. IF AVAILABLE
CAPACITY IS NOT ADEQUATE FOR THE EXPECTED DEVICES THE
CONTRACTOR SHALL ALERT THE COR FOR FURTHER DIRECTION.
APPLICABLE CODES AND STANDARDS:
1. VA FIRE PROTECTION DESIGN MANUAL EIGHTH EDITION - JUNE 2021
2. NFPA 70 NATIONAL ELECTRIC CODE (2020)
3. NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE (2022)
4. NFPA 101 (2021)
5. INTERNATIONAL BUILDING CODE (2021)
AUDIBILITY DESIGN:
1. BECAUSE OF UNPREDICTABLE BACKGROUND NOISES AND PROJECT
CONDITIONS, THE AUDIBILITY DESIGN GOALS SHALL BE CONFIRMED
BY MEASUREMENT WITH CALIBRATED TEST EQUIPMENT. IF RESULTS
INDICATE THAT ADDITIONAL NOTIFICATION APPLIANCES ARE
REQUIRED, THE CONTRACTOR SHALL ADD THEM AT NO ADDITIONAL
COST.
2. PATIENT ROOMS AND OR ROOMS, AS INDICATED ON THE DESIGN
DRAWINGS, WILL BE DESIGNED TO MEET PRIVATE-MODE
NOTIFICATION IN ACCORDANCE WITH NFPA 72.
3. INTELLIGIBILITY OF THE OCCUPANT NOTIFICATION SHALL BE TESTED
IN ACCORDANCE WITH NFPA 72 AND THE VA FIRE PROTECTION
DESIGN MANUAL. QUALITATIVE TESTING IS ALLOWED.
4. TAP SETTINGS SHOWN ON FIRE ALARM SHEET MAY NEED TO BE
ADJUSTED TO MEET MINIMUM AUDIBILITY REQUIREMENTS BASED ON
WALL AND DOOR CONSTRUCTIONS.
VISUAL NOTIFICATION DESIGN:
1. CLEAR STROBES SHALL BE PROVIDED WHERE INDICATED ON THE
APPROVED DESIGN.
2. STROBES MAY BE FIELD-LOCATED WITHIN 3 FT OF THE LOCATION
INDICATED ON THE APPROVED DESIGN WITHOUT CONSULTING THE
ENGINEER. CONSULT WITH ENGINEER PRIOR TO RELOCATING
STROBES MORE THAN 3 FT.
INITIATING DEVICES:
1. INITIATING DEVICES MAY BE FIELD-LOCATED WITHIN 3 FT OF THE
LOCATION INDICATED ON THE APPROVED DESIGN WITHOUT
CONSULTING THE ENGINEER. CONSULT WITH ENGINEER PRIOR TO
RELOCATING INITIATING DEVICES MORE THAN 3 FT.
CIRCUITS AND CONDUIT:
1. ALL CIRCUITS SHALL BE PROVIDED IN CONDUIT IN ACCORDANCE
WITH NFPA 70 AND THE CONDUIT LISTING.
2. NEW SIGNALING LINE CIRCUITS AND NOTIFICATION APPLIANCE
CIRCUITS SHALL BE ARRANGED SO THAT A SINGLE FAULT DOES NOT
CAUSE THE LOSS OF ADDRESSABLE DEVICES ON MORE THAN ONE
SMOKE COMPARTMENT.
3. WIRING SHALL BE INSTALLED IN METAL RACEWAY. PER VA DESIGN
MANUAL THIS IN COMBINATION WITH BUILDINGS PROTECTED
THROUGHOUT BY SPRINKLERS SHALL BE CONSIDERED TO MEET THE
REQUIREMENTS FOR PATHWAY SURVIVABILITY LEVEL 2 IN
ACCORDANCE WITH NFPA 72 AND VA AUTHORITY HAVING
JURISDICTION.
4. SPEAKERS AND STROBES SHALL BE ARRANGED TO OPERATE ON
SEPARATE CIRCUITS.
INSTALLATION:
1. ALL EQUIPMENT SHALL BE INSTALLED TIGHT TO THE BUILDING
STRUCTURE AND SHALL BE INSTALLED PARALLEL OR
PERPENDICULAR TO THE BUILDING STRUCTURE UNLESS NOTED
OTHERWISE.
2. THE CONTRACTOR SHALL NOT APPRECIABLY DEVIATE FROM THE
APPROVED DESIGN WITHOUT WRITTEN APPROVAL FROM THE
ENGINEER.
TESTING:
1. UNLESS SPECIFICALLY NOTED OTHERWISE, THE CONTRACTOR
SHALL PERFORM ALL ACCEPTANCE TESTING IN ACCORDANCE WITH
THE APPLICABLE DESIGN CRITERIA AND THE EQUIPMENT
MANUFACTURER'S INSTRUCTIONS.
2. UNLESS SPECIFICALLY NOTED OTHERWISE, THE CONTRACTOR
SHALL PERFORM TESTING AND PROVIDE DOCUMENTATION PRIOR TO
REQUESTING ENGINEER'S PRESENCE TO WITNESS TESTING.
FIRE ALARM GENERAL NOTES
1. TEMPORARY SPS SYSTEM SHALL BE PROTECTED BY
FIRE ALARM SYSTEM.
2. TEMPORARY SPS TRAILER SYSTEM MUST BE DESIGNED
AND INSTALLED IN ACCORDANCE WITH THE APPLICABLE
CODES AND STANDARDS FOR THIS PROJECT.
3. AUDIBLE AND VISUAL NOTIFICATION SHALL COMPLY
WITH NFPA 72 AND THE VA FIRE PROTECTION DESIGN
MANUAL.
4. FIRE PROTECTION CONTRACTOR TO COORDINATE THE
LOCATION OF AND PROVIDE DEDICATED FIRE ALARM
SYSTEM FOR THE TEMPORARY SPS TRAILER.
CONTRACTOR TO COORDINATE WITH THE VA ON
CONNECTION. REFER TO SHEET CS300 FOR
UNDERGROUND UTILITY PLAN.
5. TRAILER TO BE MONITORED IN ACCORDANCE WITH NFPA
72. PER DIRECTION FROM THE VA, THE TEMPORARY SPS
TRAILERS ARE TO BE MONITORED VIA ADDRESSABLE
MODULES BY THE FACP LOCATED IN BUILDING 45.
CONTRACTOR TO PROGRAM THE SYSTEM SO THAT THE
TEMPORARY SPS TRAILERS ARE SEPARATE FIRE ZONES.
TEMPORARY SPS TRAILER NOTES
FACU
SPD
LEVEL 1
NOTES:
1. TO DEDICATED 120VAC BRANCH CIRCUIT
2. EXISTING FIRE ALARM CONTROL UNIT, LOCATED IN MECHANICAL ROOM 1067. THE AVAILABLE
CAPACITY IS ASSUMED TO BE ADEQUATE FOR THE PURPOSED NEW WORK, CONTRACTOR IS
RESPONSIBLE FOR DETERMINING ACTUAL AVAILABLE CAPACITY.
3. THIS RISER DIAGRAM IS INTENDED ONLY TO CAPTURE THE SYSTEM DESIGN INTENT, PANEL
CONNECTIONS, AND GENERAL CIRCUIT ROUTING REQUIREMENTS. EXACT QUANTITIES AND
TYPES OF DEVICES NECESSARY TO ACCOMPLISH THE DESIGN GOALS ARE NOT INDICATED.
THE INTENT OF THIS RISER DIAGRAM IS TO INDICATE THE GENERAL SYSTEM CONFIGURATION
AFTER SUCCESSFUL COMPLETION OF THE PROJECT.
4. EXISTING SIGNALING LINE CIRCUIT.
5. EXISTING NOTIFICATION APPLIANCE CIRCUIT.
2 3
BASEMENT
WF VS
AIM AIMSS
FACU
SPD
NOTES:
1. TO DEDICATED 120VAC BRANCH CIRCUIT.
2. PANEL TO BE MONITORED VIA WIRED CONNECTION TO FACP LOCATED IN BUILDING 45. REFER
TO SHEET CS300 FOR UNDERGROUND UTILITY PLAN.
3. NEW FIRE ALARM CONTROL UNIT, LOCATED IN SPS TRAILER. THE AVAILABLE CAPACITY IS TO
BE ADEQUATE FOR THE PURPOSED NEW WORK, CONTRACTOR IS RESPONSIBLE FOR
DETERMINING ACTUAL AVAILABLE CAPACITY.
4. THIS RISER DIAGRAM IS INTENDED ONLY TO CAPTURE THE SYSTEM DESIGN INTENT, PANEL
CONNECTIONS, AND GENERAL CIRCUIT ROUTING REQUIREMENTS. EXACT QUANTITIES AND
TYPES OF DEVICES NECESSARY TO ACCOMPLISH THE DESIGN GOALS ARE NOT INDICATED.
THE INTENT OF THIS RISER DIAGRAM IS TO INDICATE THE GENERAL SYSTEM CONFIGURATION
AFTER SUCCESSFUL COMPLETION OF THE PROJECT.
5. NEW SIGNALING LINE CIRCUIT.
6. NEW NOTIFICATION APPLIANCE CIRCUIT.
3 4
LEVEL 1
WF VS
AIM AIM S P
SIGNALS TO
BUILDING 45
FACU
4 CONTROL VALVE SUPERVISORY SWITCH X X X X 4
11 ANY OTHER SYSTEM TROUBLE X X X X 11
SUPERVISORY CONDITIONS A B C D E F G H I J K
SYSTEM OUTPUTS
SYSTEM INPUTS
F A
C U
A N
N U
N C
IA
T
IO
N
A C
T
IV
A T
E C
O M
M O
N A
L A
R M
S
IG
N A
L I
N D
IC
A
T O
R
A C
T
IV
A T
E A
U D
IB
L E
A L A
R M
S
IG
N A
L
A C
T
IV
A T
E C
O M
M O
N S
U P
E R
V
IS
O R
Y S
IG
N
A L I
N D
IC
A
T O
R
A C
T
IV
A T
E A
U D
IB
L E
S U
P E
R V
IS
O
R Y
S
IG
N A
L
A C
T
IV
A T
E C
O M
M O
N T
R O
U B
L E
S
IG
N A
L I
N D
IC
A
T O
R
A C
T
IV
A T
E A
U D
IB
L E
T R
O U
B L E
S
IG
N A
L
D
IS
P L A
Y /P
R
IN
T C
H A
N G
E O
F S
T A
T U
S
N O
T
IF
IC
A
T
IO
N
A C
T
IV
A T
E T
E M
P O
R A
L
A L E
R T
T O
N E
A N
D S
T R
O B
E S
T H
R O
U G
H O
U T
T H
E
A S
S O
C
IA
T E
D Z
O N
E
T R
A N
S M
IT
A
L A
R M
S
IG
N A
L T
O B
U
IL
D
IN
G
F
A C
U
B Y
D E
V
IC
E T
Y P
E
T R
A N
S M
IT
G
E N
E R
A L S
U P
E R
V
IS
O R
Y S
IG
N
A L T
O B
U
IL
D
IN
G
F
A C
U
T R
A N
S M
IT
G
E N
E R
A L T
R O
U B
L E
S
IG
N A
L T
O B
U
IL
D
IN
G
F
A C
U
ALARM CONDITIONS A B C D E F G H I J K
1 MANUAL PULL STATION X X X X X 1
2 SMOKE DETECTOR - SPOT TYPE X X X X X 2
3 WATERFLOW/PRESSURE SWITCH X X X X X 3
A B C D E F G H I J K
X PERFORM OPERATION/REPORT DEVICE STATUS
NOTE: THIS MATRIX REPRESENTATIVE OF THE SCOPE OF WORK
FOR THIS PROJECT. ALL EXISTING PROGRAMING FOR BUILDING
NOT BE MODIFIED UNLESS REQUIRED BY SOW FOR THIS
PROJECT.
TROUBLE CONDITIONS A B C D E F G H I J K
5 AC POWER FAILURE X X X X 5
6 LOW BATTERY X X X X 6
7 OPEN CIRCUIT X X X X 7
8 GROUND FAULT X X X X 8
9 NOTIFICATION APPLIANCE CIRCUIT SHORT X X X X 9
10 REMOTE POWER SUPPLY COMMON TROUBLE X X X X 10
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR SBBL COLLABORATIVE JN, INC.
100 N. STONE AVE STE 1102
TUCSON, AZ 85701-1524
(520) 620-0255
NM ARCH - SETH CAVIN #005667 EXP. 12/31/2023
NM MECH - JAMES R. MYLES #25930 EXP. 12/31/2024
NM ELEC - EVANS SORDIASHIE #22917 EXP. 12/31/2023
CIVIL / STRUCTURAL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVE
KANSAS CITY, MO 64108
(913) 369-7200
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
HEALTHCARE PLANNER
THE INNOVA GROUP
3196 NORTH SWAN ROAD
TUCSON, AZ 85712
(520) 886-8650
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/8
/2
:3
:5
A
M
FIRE ALARM GENERAL NOTES, LEGEND,
AND DIAGRAMS
SAB 39 79BLS
BID DOCUMENTS
REPAIR SPS SEWER AND
UPGRADE EQUIPMENT AREA
08/11/2023
501-21-101
RAYMOND G. MURPHY VAMC
1501 SAN PEDRO DRIVE SE
ALBUQUERQUE, NM 87108
FA001
SPUR #: 1993.10
FIRE ALARM RISER DIAGRAM1FIRE ALARM RISER DIAGRAM - TRAILER2
No. REVISION DESCRIPTION DATE
FACU MATRIX - TRAILER3
T-1
T-2
T-3
T-46
T-62
T-60
T-61
T-59
S
N
P
ED
R O
DR
I V E
DR
IV
E
R
I DG
EC RE
ST
T-51
5 350
5 350
3 5
5 340
5348.7
5348.5
5347.2
5337.2
5345.6
5348.6
5347.8
5346.9
5328.7
5347.0
5347.2
5347.4
5346.8
5348.6
5348.4
5348.4
5348.3
5348.1
5348.2
5348.2
5348.2
5347.3
5346.8
5349.0
5348.7 5348.2
5347.2
5347.2
5346.6
5345.2
5346.5
5346.6 5347.0
5345.2
5340.7
5337.1
5340.4
5342.7
5338.4 5335.6
5339.4 5339.1
5340.1
5336.3
5342.9
5345.6
5340.8
5327.1
5322.8
5324.4
5328.4
5323.2
5322.7
5320.8
5320.5
5340.5
5339.6 5340.7 5342.8
5348.8 5350.1
5348.2
5349.4
5349.8
5351.2
5350.2
5340.8
5348.5
5348.3
5344.5
5346.6
5346.7
5344.6
5340.3
5342.4
5342.7
5347.2
5346.4
5348.6
5346.5
5345.4
5345.2
5344.4 5346.5
5344.2
5342.8
5345.2
5340.2
5340.9
5338.6
5337.8
5342.85340.9
5340.9 5342.7
5344.4
5344.4
5344.8
5345.2 5345.2
5346.7
5346.7
5348.4
5346.5
5346.5 5346.6 5347.1
5348.8
5348.3
5348.2
5347.7
5349.0
5350.6
5349.0
5326.8
5326.5
5355.0
5350.8
5348.7
5344.8
5346.4
5348.4
5332.4
5342.8
5344.7
5349.6
5340.6
5340.1
5348.5
5336.5
5339.0
5352.4
5330.4
5326.3
5328.2
5350.9
5348.4
5346.6
5341.1 5344.9
5345.3
5347.3
5343.5
5346.2
5346.7
5344.9
5349.1
5338.8
5340.6
5341.2
5338.6
5336.6
5337.1
5334.6
5334.6
5328.7
5328.2
5327.0
5326.7
5325.2
5324.5
W
ALL
C O U
RT
C OU RT
C OU RT
W A
LL
WALK
EN CLOSED
WALK
EN CLOSED
W
ALL
E N
CL
OS ED
W
ALK
W
ALL
W
ALL
W A
LL
W A
LL
W A
LL
W
ALL
W
ALL
W A
LL
W
AL LS
W A
LL
W A
LL
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
REQUIRED AUDIBILITY LEGEND
54dB AMBIENT SPL 69dB EXPECTED SPL (BUSINESS OCCUPANCIES)
30dB AMBIENT SPL 45dB EXPECTED SPL (STORAGE OCCUPANCIES)
OUT OF SCOPE
IN SCOPE, EXISTING TO REMAIN
2 3 4 5 6 7
G
H
BC-115D
EQUIP
TEST &
STORAGE
BC-115D
BC-111
STERILIZATION
PREPARATION
BC-111
BC-110
SOILED
RECV &
DECONTAMINATION
BC-110
BC-110B
HLD
DECON
BC-110B
BC-125D
BIOMED
WORK
SPACE
BC-125D
BC-115C
WORK
AREA &
STOR
BC-115C
BC-115B
BREAKDOWN
BC-115B
BC-103
SPS
CHANGE
AREA
BC-103
BC-114
CART
WASH
BC-114
BC-115F
MECH
BC-115F
BC-119
STOR
BC-119
BC-103A
HALL
BC-103A
BC-115G
TLT (F)
BC-115G BC-103B
BREAK
ROOM
BC-103B
CB-16
CORRIDOR
CB-16
BC-104
TLT
BC-104
BC-105
TLT
BC-105
BC-102
LOCKERS
BC-102
BC-115A
HAC
BC-115A
BC-121B
MED
SUPPLY
TECH
BC-121B BC-123
OFFICE
BC-123
BC-121A
RECEPTION
BC-121A
BC-115
STAFF
WORK
AREA
BC-115
BC-115E
OFFICE
BC-115E
BC-118
STOR
BC-118
S11
FACILTY
ACCESS
STAIRWELL
S11
BC-102A
TLT
BC-102A
X1
DUMBWAITER
X1
BC-110C
HLD
ALCOVE
BC-110C
BC-110A
HLD
ANTEROOM
BC-110A
SPS DEPARTMENT
BUILDING 41
BASEMENT LEVEL, QUAD C
TEMPORARY SPS FACILITY
SE LOT NEAR BUILDING 45
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR SBBL COLLABORATIVE JN, INC.
100 N. STONE AVE STE 1102
TUCSON, AZ 85701-1524
(520) 620-0255
NM ARCH - SETH CAVIN #005667 EXP. 12/31/2023
NM MECH - JAMES R. MYLES #25930 EXP. 12/31/2024
NM ELEC - EVANS SORDIASHIE #22917 EXP. 12/31/2023
CIVIL / STRUCTURAL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVE
KANSAS CITY, MO 64108
(913) 369-7200
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
HEALTHCARE PLANNER
THE INNOVA GROUP
3196 NORTH SWAN ROAD
TUCSON, AZ 85712
(520) 886-8650
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/8
/2
:3
:5
A
M
FIRE ALARM AUDIBILITY PLAN
SAB 40 79BLS
BID DOCUMENTS
REPAIR SPS SEWER AND
UPGRADE EQUIPMENT AREA
08/11/2023
501-21-101
RAYMOND G. MURPHY VAMC
1501 SAN PEDRO DRIVE SE
ALBUQUERQUE, NM 87108
FA101
SPUR #: 1993.10
N
1/8" = 1'-0"
FIRE ALARM AUDIBILITY PLAN1
RAYMOND G. MURPHY VA MEDICAL CENTER CAMPUS
0.5W75cd
.5
W c d
.5
W c d
0.25W 15cd 0.25W 15cd
S
0.25W0.25W 30cd
.2
W c d
.2
W c d
.2
W c d
0.25W75cd
15cd
0.25W75cd
.5
W c d
T-1
T-2
T-3
T-46
T-62
T-60
T-61
T-59
S
V E
DR
IV
E
R
I DG
EC RE
ST
T-51
5 350
5 350
3 5
5 340
5348.7
5348.5
5347.2
5337.2
5345.6
5348.6
5347.8
5346.9
5328.7
5347.0
5347.2
5347.4
5346.8
5348.6
5348.4
5348.4
5348.3
5348.1
5348.2
5348.2
5348.2
5347.3
5346.8
5349.0
5348.7 5348.2
5347.2
5347.2
5346.6
5345.2
5346.5
5346.6 5347.0
5345.2
5340.7
5337.1
5340.4
5342.7
5338.4 5335.6
5339.4 5339.1
5340.1
5336.3
5342.9
5345.6
5340.8
5327.1
5322.8
5324.4
5328.4
5323.2
5322.7
5320.8
5320.5
5340.5
5339.6 5340.7 5342.8
5348.8 5350.1
5348.2
5349.4
5349.8
5351.2
5350.2
5340.8
5348.5
5348.3
5344.5
5346.6
5346.7
5344.6
5340.3
5342.4
5342.7
5347.2
5346.4
5348.6
5346.5
5345.4
5345.2
5344.4 5346.5
5344.2
5342.8
5345.2
5340.2
5340.9
5338.6
5337.8
5342.85340.9
5340.9 5342.7
5344.4
5344.4
5344.8
5345.2 5345.2
5346.7
5346.7
5348.4
5346.5
5346.5 5346.6 5347.1
5348.8
5348.3
5348.2
5347.7
5349.0
5350.6
5349.0
5326.8
5326.5
5355.0
5350.8
5348.7
5344.8
5346.4
5348.4
5332.4
5342.8
5344.7
5349.6
5340.6
5340.1
5348.5
5336.5
5339.0
5352.4
5330.4
5326.3
5328.2
5350.9
5348.4
5346.6
5341.1 5344.9
5345.3
5347.3
5343.5
5346.2
5346.7
5344.9
5349.1
5338.8
5340.6
5341.2
5338.6
5336.6
5337.1
5334.6
5334.6
5328.7
5328.2
5327.0
5326.7
5325.2
5324.5
W
ALL
C O U
RT
C OU RT
C OU RT
W A
LL
WALK
EN CLOSED
WALK
EN CLOSED
W
ALL
E N
CL
OS ED
W
ALK
W
ALL
W
ALL
W A
LL
W A
LL
W A
LL
W
ALL
W
ALL
W A
LL
W
AL LS
W A
LL
W A
LL
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
2 3 4 5 6 7
G
H
BC-115D
EQUIP
TEST &
STORAGE
BC-115D
BC-111
STERILIZATION
PREPARATION
BC-111
BC-110
SOILED
RECV &
DECONTAMINATION
BC-110
BC-110B
HLD
DECON
BC-110B
BC-125D
BIOMED
WORK
SPACE
BC-125D
BC-115C
WORK
AREA &
STOR
BC-115C
BC-115B
BREAKDOWN
BC-115B
BC-103
SPS
CHANGE
AREA
BC-103
BC-114
CART
WASH
BC-114
BC-115F
MECH
BC-115F
BC-119
STOR
BC-119
BC-103A
HALL
BC-103A
BC-115G
TLT (F)
BC-115G BC-103B
BREAK
ROOM
BC-103B
CB-16
CORRIDOR
CB-16
BC-104
TLT
BC-104
BC-105
TLT
BC-105
BC-102
LOCKERS
BC-102
BC-115A
HAC
BC-115A
BC-121B
MED
SUPPLY
TECH
BC-121B BC-123
OFFICE
BC-123
BC-121A
RECEPTION
BC-121A
BC-115
STAFF
WORK
AREA
BC-115
BC-115E
OFFICE
BC-115E
BC-118
STOR
BC-118
BC-102A
TLT
BC-102A
S11
FACILTY
ACCESS
STAIRWELL
S11
X1
DUMBWAITER
X1
BC-110C
HLD
ALCOVE
BC-110C
BC-110A
HLD
ANTEROOM
BC-110A
SPS DEPARTMENT
BUILDING 41
BASEMENT LEVEL, QUAD C
TEMPORARY SPS FACILITY
SE LOT NEAR BUILDING 45
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR SBBL COLLABORATIVE JN, INC.
100 N. STONE AVE STE 1102
TUCSON, AZ 85701-1524
(520) 620-0255
NM ARCH - SETH CAVIN #005667 EXP. 12/31/2023
NM MECH - JAMES R. MYLES #25930 EXP. 12/31/2024
NM ELEC - EVANS SORDIASHIE #22917 EXP. 12/31/2023
CIVIL / STRUCTURAL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVE
KANSAS CITY, MO 64108
(913) 369-7200
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
HEALTHCARE PLANNER
THE INNOVA GROUP
3196 NORTH SWAN ROAD
TUCSON, AZ 85712
(520) 886-8650
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/8
/2
:3
:5
A
M
FIRE ALARM PLAN
SAB 41 79BLS
BID DOCUMENTS
REPAIR SPS SEWER AND
UPGRADE EQUIPMENT AREA
08/11/2023
501-21-101
RAYMOND G. MURPHY VAMC
1501 SAN PEDRO DRIVE SE
ALBUQUERQUE, NM 87108
FA102
SPUR #: 1993.10
N
1/8" = 1'-0"
FIRE ALARM PLAN1
RAYMOND G. MURPHY VA MEDICAL CENTER CAMPUS
T-1
T-2
T-3
T-46
T-62
T-60
T-61
T-59
S
V E
DR
IV
E
R
I DG
EC RE
ST
T-51
5 350
5 350
3 5
5 340
5348.7
5348.5
5347.2
5337.2
5345.6
5348.6
5347.8
5346.9
5328.7
5347.0
5347.2
5347.4
5346.8
5348.6
5348.4
5348.4
5348.3
5348.1
5348.2
5348.2
5348.2
5347.3
5346.8
5349.0
5348.7 5348.2
5347.2
5347.2
5346.6
5345.2
5346.5
5346.6 5347.0
5345.2
5340.7
5337.1
5340.4
5342.7
5338.4 5335.6
5339.4 5339.1
5340.1
5336.3
5342.9
5345.6
5340.8
5327.1
5322.8
5324.4
5328.4
5323.2
5322.7
5320.8
5320.5
5340.5
5339.6 5340.7 5342.8
5348.8 5350.1
5348.2
5349.4
5349.8
5351.2
5350.2
5340.8
5348.5
5348.3
5344.5
5346.6
5346.7
5344.6
5340.3
5342.4
5342.7
5347.2
5346.4
5348.6
5346.5
5345.4
5345.2
5344.4 5346.5
5344.2
5342.8
5345.2
5340.2
5340.9
5338.6
5337.8
5342.85340.9
5340.9 5342.7
5344.4
5344.4
5344.8
5345.2 5345.2
5346.7
5346.7
5348.4
5346.5
5346.5 5346.6 5347.1
5348.8
5348.3
5348.2
5347.7
5349.0
5350.6
5349.0
5326.8
5326.5
5355.0
5350.8
5348.7
5344.8
5346.4
5348.4
5332.4
5342.8
5344.7
5349.6
5340.6
5340.1
5348.5
5336.5
5339.0
5352.4
5330.4
5326.3
5328.2
5350.9
5348.4
5346.6
5341.1 5344.9
5345.3
5347.3
5343.5
5346.2
5346.7
5344.9
5349.1
5338.8
5340.6
5341.2
5338.6
5336.6
5337.1
5334.6
5334.6
5328.7
5328.2
5327.0
5326.7
5325.2
5324.5
W
ALL
C O U
RT
C OU RT
C OU RT
W A
LL
WALK
EN CLOSED
WALK
EN CLOSED
W
ALL
E N
CL
OS ED
W
ALK
W
ALL
W
ALL
W A
LL
W A
LL
W A
LL
W
ALL
W
ALL
W A
LL
W
AL LS
W A
LL
W A
LL
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
PARKING
HAZARD CLASSIFICATION LEGEND
ORDINARY HAZARD 2
(0.20 GPM/FT² OVER 1,500 FT² WITH
250 GPM EXTERIOR HOSE DEMAND)
OUT OF SCOPE AREA
EXISTING FIRE SPRINKLERS TO REMAIN
1. THE DESIGN AND INSTALLATION OF THE FIRE PROTECTION,
FIRE SUPPRESSION SYSTEM MUST BE IN ACCORDANCE WITH
U.S. DEPARTMENT OF VETERANS AFFAIRS FIRE PROTECTION
DESIGN MANUAL, EIGHTH EDITION, JUNE 2021; NFPA 13:
STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS,
2022 EDITION.
2. SCOPE OF WORK FOR THIS PROJECT IS RENOVATION OF THE
EXITING SPS AREA. MODIFICATIONS EXPECTED IN SCOPE OF
WORK AREA ARE SPRINKLER LOCATION AND PIPING. EXISTING
CONTROL VALVES, CHECK VALVES, TAMPER AND FLOW
SWITCHES ARE NOT EXPECTED TO BE MODIFIED.
3. THIS INFORMATION HAS BEEN PREPARED TO PROVIDE
GUIDANCE FOR BIDDING. THE FIRE PROTECTION CONTRACTOR
SHALL BE FULLY RESPONSIBLE FOR PROVIDING A COMPLETE
AND FULLY OPERABLE SYSTEM WHICH SHALL BE IN STRICT
ACCORDANCE WITH PROJECT SPECIFICATIONS AND
APPLICABLE CODES AND STANDARDS. THE WORK THAT IS
INDICATED IN THIS DOCUMENT IS AN OVERVIEW OF THE
PROJECT, INTENDED TO ESTABLISH THE MINIMUM SCOPE
REQUIREMENTS FOR THE PROJECT AS WELL AS THE
CONTRACTOR’S RESPONSIBILITIES.
4. THE CONTRACTOR SHALL SUBMIT A COMPLETE SET OF
WORKING DRAWINGS, ANNOTATED DATA SHEETS, AND
CALCULATIONS THAT HAVE BEEN SIGNED SEALED BY A
LICENSED ENGINEER TO THE OWNER’S REPRESENTATIVE AND
AHJ FOR REVIEW AND APPROVAL PRIOR TO FABRICATION AND
INSTALLATION.
5. THE CONTRACTOR SHALL PERFORM ALL ACCEPTANCE TESTING
IN ACCORDANCE WITH NFPA 13, NFPA 25, THE VA FIRE
PROTECTION DESIGN MANUAL AND ALL APPLICABLE DESIGN
CRITERIA AND THE MANUFACTURER'S INSTRUCTIONS.
6. SPRINKLER CONTRACTOR SHALL COORDINATE LOCATIONS OF
FIRE PROTECTION COMPONENTS INCLUDING PIPING, ALARMS,
DRAINS, SPRINKLERS, TEST POINTS, ETC., WITH ALL
ARCHITECTURAL, STRUCTURAL, MECHANICAL, AND ELECTRICAL
COMPONENTS.
7. OBSTRUCTIONS TO SPRINKLER DISCHARGE SHALL BE
CONSIDERED DURING INSTALLATION. DO NOT INSTALL
SPRINKLER PIPING BELOW EQUIPMENT OR WITHIN CLEARANCE
SPACES FOR MECHANICAL AND ELECTRICAL EQUIPMENT.
SPRINKLERS SHALL BE INSTALLED UNDER OBSTRUCTIONS IN
ACCORDANCE WITH NFPA 13.
8. THE SPRINKLER SYSTEM MUST BE ZONED BY SMOKE
COMPARTMENTS AND PROPERLY IDENTIFIED. PROVIDE EACH
ZONE WITH A SEPARATE FLOW SWITCH, ISOLATION VALVE,
TAMPER SWITCH, AND PRESSURE GAUGE.
9. MATERIALS AND ACCESSORIES NECESSARY MUST BE
INSTALLED IN ACCORDANCE WITH THE APPLICABLE NFPA
CODES AND STANDARDS, PROJECT SPECIFICATIONS, AND BE UL
LISTED OR FM APPROVED FOR FIRE PROTECTION USE, UNLESS
OTHERWISE NOTED.
10. ALL VALVES INSIDE TO BE PROVIDED WITH ELECTRONIC
TAMPER SWITCHES WIRED TO THE FACU. VALVES IN NORMAL
CLOSED POSITION SHALL BE PROVIDED WITH TAMPER TO
ACTIVATE IN THREE TURNS OR LESS.
11. ALL HANGERS AND SUPPORTS MUST BE PROVIDED AND
INSTALLED IN ACCORDANCE WITH NFPA 13 AND PROJECT
SPECIFICATIONS.
12. THE SEISMIC DESIGN CATEGORY FOR THIS PROJECT IS D,
PLEASE REFER TO THE STRUCTURAL DESIGN SHEETS FOR
MORE INFORMATION. PROVIDE SEISMIC PROTECTION IN
ACCORDANCE WITHE NFPA 13.
13. APPLICABLE UL CONSTRUCTION DETAILS AND SYSTEMS SHALL
BE USED WHERE FIRE RATED BARRIERS ARE PENETRATED BY
SPRINKLER PIPING.
14. ALL VALVES (DRAINS, INSPECTOR'S TEST, CONTROL) MUST BE
IDENTIFIED AS REQUIRED BY NFPA 13.
15. PIPING MUST BE ARRANGED FOR FLUSHING. READILY
REMOVABLE FITTINGS MUST BE PROVIDED AT THE END OF ALL
CROSS MAINS.
16. ALL PENDENT SPRINKLERS MUST BE INSTALLED IN THE CENTER
OF THE CEILING TILES.
17. ALL SPRINKLER SYSTEM ALARM INITIATING AND SUPERVISORY
DEVICES MUST BE CONNECTED TO THE FIRE ALARM SYSTEM.
18. ADDITIONAL SPRINKLERS MAY BE REQUIRED UNDER DUCT
WORK TO PROVIDE ADEQUATE COVERAGE PER NFPA 13.
19. THIS BUILDING WILL HAVE A WET PIPE AUTOMATIC SPRINKLER
SYSTEM WHICH WILL REQUIRE ALL AREAS OF THE BUILDING TO
BE MAINTAINED ABOVE 40 DEGREES F.
20. PROVIDE SPRINKLER PROTECTION WITHIN ALL COMBUSTIBLE
CONCEALED SPACES.
21. UTILITY CONTRACTOR TO COORDINATE THE LOCATION OF FIRE
PROTECTION LEAD-IN FOR THE TEMPORARY SPS TRAILER'S
PRE-ENGINEERED SPRINKLER SYSTEM WITH THE VA. REFER TO
CIVIL DRAWINGS FOR LOCATIONS OF EXISTING UTILITIES.
FIRE SUPPRESSION GENERAL NOTES
2 3 4 5 6 7
G
H
BC-115D
EQUIP
TEST &
STORAGE
BC-115D
BC-111
STERILIZATION
PREPARATION
BC-111
BC-110
SOILED
RECV &
DECONTAMINATION
BC-110
BC-110B
HLD
DECON
BC-110B
BC-125D
BIOMED
WORK
SPACE
BC-125D
BC-115C
WORK
AREA &
STOR
BC-115C
BC-115B
BREAKDOWN
BC-115B
BC-103
SPS
CHANGE
AREA
BC-103
BC-114
CART
WASH
BC-114
BC-115F
MECH
BC-115F
BC-119
STOR
BC-119
BC-103A
HALL
BC-103A
BC-115G
TLT (F)
BC-115G BC-103B
BREAK
ROOM
BC-103B
CB-16
CORRIDOR
CB-16
BC-104
TLT
BC-104
BC-105
TLT
BC-105
BC-102
LOCKERS
BC-102
BC-115A
HAC
BC-115A
BC-121B
MED
SUPPLY
TECH
BC-121B BC-123
OFFICE
BC-123
BC-121A
RECEPTION
BC-121A
BC-115
STAFF
WORK
AREA
BC-115
BC-115E
OFFICE
BC-115E
BC-118
STOR
BC-118
BC-102A
TLT
BC-102A
S11
FACILTY
ACCESS
STAIRWELL
S11
X1
DUMBWAITER
X1
BC-110C
HLD
ALCOVE
BC-110C
BC-110A
HLD
ANTEROOM
BC-110A
SPS DEPARTMENT
BUILDING 41
BASEMENT LEVEL, QUAD C
TEMPORARY SPS FACILITY
SE LOT NEAR BUILDING 45
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
CONSULTANTS:
Drawing # OF
VA Health Care System Approval:
ARCHITECT:
SPUR SBBL COLLABORATIVE JN, INC.
100 N. STONE AVE STE 1102
TUCSON, AZ 85701-1524
(520) 620-0255
NM ARCH - SETH CAVIN #005667 EXP. 12/31/2023
NM MECH - JAMES R. MYLES #25930 EXP. 12/31/2024
NM ELEC - EVANS SORDIASHIE #22917 EXP. 12/31/2023
CIVIL / STRUCTURAL ENGINEER
H2B, INC.
1225 N. LOOP WEST, SUITE 800
HOUSTON, TX 77008
(713) 864-2900
MECH / ELEC / PLUMB / TECH ENGINEER
SPUR DESIGN
2519 MADISON AVE
KANSAS CITY, MO 64108
(913) 369-7200
FIRE PROTECTION ENGINEER
POOLE FIRE PROTECTION, INC.
19910 WEST 161ST STREET
OLATHE, KANSAS 66062
(913) 829-8690
FULLY SPRINKLERED
HEALTHCARE PLANNER
THE INNOVA GROUP
3196 NORTH SWAN ROAD
TUCSON, AZ 85712
(520) 886-8650
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
STAMP:
Drawing Number
Building Number
/8
/2
:3
:0
A
M
FIRE SUPPRESSION HAZARD
CLASSIFICATION PLAN
SAB 42 79BLS
BID DOCUMENTS
REPAIR SPS SEWER AND
UPGRADE EQUIPMENT AREA
08/11/2023
501-21-101
RAYMOND G. MURPHY VAMC
1501 SAN PEDRO DRIVE SE
ALBUQUERQUE, NM 87108
FX101
SPUR #: 1993.10
N
1/8" = 1'-0"
FIRE SUPPRESSION HAZARD CLASSIFICATION PLAN1
RAYMOND G. MURPHY VA MEDICAL CENTER CAMPUS
SHEET KEYNOTES
MARK KEYNOTE
1 SPRINKLERS WITHIIN 7'0" OF EITHER SIDE OF THE CART
WASH TO BE HIGH-TEMPERATURE RATING.
File details come from the government source that posted it. Updated .