Attachment D - Gen Drawings.pdf

PDF 4 MB Posted

Attached to
Replace Roof and Install Lightning Protection, Project No. 605-20-411
Solicitation number
36C26224B0001_1
Issued by

About this file

This document package includes drawings and specifications for a roof replacement and lightning protection project. The project involves replacing the existing PVC roofing system with a new TPO roofing system at the Veterans Affairs Loma Linda Medical Center located in Loma Linda, California. Work will be performed at the main hospital building and will include roof demolition, installation of a new roof system, and installation of a new lightning protection system. Bidders are required to provide all labor, equipment, materials, and supervision to complete the project in accordance with the design drawings and specifications. The project is to be completed while the hospital remains operational, requiring infection control measures and coordination of utility shutdowns.

View the file

Other files

File Type Posted
Award Notice_36C26224C0134.pdf PDF
Amendment 0003_Attachment M. RFI Attachment for Question 61 (Temp AC Unit).pdf PDF
Amendment 0003_Attachment AE. 100P DESIGN FOR CONSTRUCTION- 2012.05.16.pdf PDF
Amendment 0003_Attachment O. RFI Attachment for Question 62 (Cell Site 2).pdf PDF
Amendment 0003_Attachment AF. RFI Attachment for Question 58 (Abandoned Post).pdf PDF
Amendment 0003_Attachment L. RFI Attachment for Question 60 (Antenna Structure).pdf PDF
Amendment 0003_Attachment Q. RFI Attachment for Question 65 (Sat Dish 2).pdf PDF
Amendment 0003_Attachment I. RFI Responses.pdf PDF
Amendment 0003_Attachment AA. RFI Attachment for Question 113 (Retactable Skylight 1).pdf PDF
Amendment 0003_Attachment AB. RFI Attachment for Question 113 (Retractable Skylight 2).pdf PDF
Amendment 0003_Attachment S. RFI Attachment for Question 66 (Expansion Joint 2).pdf PDF
Amendment 0003_Attachment N. RFI Attachment for Question 62 (Cell Site 1).pdf PDF
Amendment 0003_Attachment V. RFI Attachment for Question 83 (PH Rooftop Equipment 1).pdf PDF
Amendment 0003_Attachment U. RFI Attachment for Question 82 (Mech Equipment 2).pdf PDF
Amendment 0003_Attachment J. RFI Attachment for Questions 49-51.pdf PDF
Amendment 0003_Attachment AC. RFI Attachment for Question 113 (Retactable Skylight 3).pdf PDF
Solicitation Amendment 0003 (SF30)_36C26224B0001 0003.pdf PDF
Amendment 0003_Attachment K. Roof Analysis Report.pdf PDF
Amendment 0003_Attachment P. RFI Attachment for Question 64 (Sat Dishes).pdf PDF
Amendment 0003_Attachment X. RFI Attachment for Question 59 (Old Chiller Unit at Grid K3).pdf PDF
Amendment 0003_Attachment AD. 100P DESIGN FOR CONSTRUCTION- CUT SHEETS - 2012.05.10.pdf PDF
Amendment 0003_Attachment R. RFI Attachment for Question 66 (Expansion Joint 1).pdf PDF
Amendment 0003_Attachment T. RFI Attachment for Question 82 (Mech Equipment 1).pdf PDF
Amendment 0003_Attachment Z. RFI Attachment for Question 114 (CLC Lower Roof).pdf PDF
Amendment 0003_Attachment W. RFI Attachment for Question 83 (PH Rooftop Equipment 2).pdf PDF
Solicitation Amendment 0002 (SF30)_36C26224B0001 0002.pdf PDF
Amendment 0002_Attachment H. Site Visit Sign-In Sheet_02.02.2024.pdf PDF
Amendment 0001_Attachment G. Electrical Drawings.pdf PDF
Solicitation Amendment 0001 (SF30)_36C26224B0001 0001.pdf PDF
Attachment A - Statement of Work_Roof Replacement and Lightning Protection.pdf PDF
Solicitation (SF1442)_36C26224B0001.pdf PDF
Attachment E - Davis-Bacon Wage Determination - GDN CA20240026_01.12.2024.pdf PDF
Attachment C - Arch Drawings.pdf PDF
Attachment F - Site Visit Information.pdf PDF
Attachment B - Project Specifications_Roof Replacement and Lightning Protection_Revised.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

PROJECT IMAGE

/1 /2

:2

:4

P M

C U s e rs

\o m a n ts c h \D o c u m e n ts

\R e v it L o c a l\ A

G I_

-3

-V

A L o m a L in d a R e p la c e

R o o f_ o m a n ts c h

.r v t

G-001

COVER SHEET

1 3OKM

ROOF REPLACEMENT AND

LIGHTNING PROTECTION

VA LOMA LINDA HEALTHCARE SYSTEM

11201 BENTON ST, LOMA LINDA,

CA 92357 DECEMBER 20, 2023

100% BID DOCUMENTS

605-20-41121-330-Q31

ROOF REPLACEMENT AND LIGHTNING

PROTECTION

VA LOMA LINDA HEALTHCARE SYSTEM

11201 BENTON ST, LOMA LINDA,

CA 92357

VA PROJECT #: 605-20-411

TM

VA MEDICAL CENTER

DRAWING LIST

GENERAL

G-001 COVER SHEET 1 3

G-002 GENERAL INFORMATION 2 3

GC100 GENERAL SITE INFORMATION 3 3

ARCHITECTURAL

AG001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 10

AD101 ROOF DEMOLITION PLAN - MAIN BUILDING 2 10

AD102 ROOF DEMOLITION PLAN - CLC & ANNEX 3 10

AE101 ROOF PLAN - MAIN BUILDING 4 10

AE102 ROOF PLAN - CLC & ANNEX 5 10

AE401 PHOTOS MAIN HOSPITAL BUILDING 6 10

AE402 PHOTOS ANNEX BUILDING 7 10

AE403 PHOTOS CLC BUILDING 8 10

AE501 TYPICAL ROOF DETAILS 9 10

AE502 TYPICAL ROOF DETAILS 10 10

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 7

ED101 ELECTRICAL ROOF DEMOLITION PLAN 2 7

ED102 ROOF ELECTRICAL DEMOLITION PLANS - CLC & ANNEX 3 7

EG101 ROOF ELECTRICAL - LIGHTNING PROTECTION PLAN 4 7

EG102 ROOF ELECTRICAL - LIGHTNING PROTECTION PLAN - CLC & ANNEX 5 7

E-401 ELECTRICAL ENLARGEMENTS 6 7

E-501 ELECTRICAL LIGHTNING PROTECTION DETAILS 7 7

VA MEDICAL

CENTER

DocuSign Envelope ID: 6043734F-C02F-4C86-A533-C1342BFCF722

12/22/2023

WALL SECTION

SYMBOL

INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

ROOF SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

VIEW NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS

FACE OF EXISTING

WALL)

XX.X

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

NORTHNORTH

0 4 8 16

PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN

VOLUNTARY STANDARD BODIES.

GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND

STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

VA SUSTAINABLE DESIGN MANUAL, AUGUST 2017

VA SITE DEVELOPMENT DESIGN MANUAL, FEBRUARY 2013

VA VHA DIRECTIVE 1061, FEBRUARY 2021

VA FIRE PROTECTION DESIGN MANUAL, 2021

VA PLUMBING DESIGN MANUAL, MAY 2021

VA HVAC DESIGN MANUAL, MARCH 2022

VA PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL, 2022

VA LIGHTING DESIGN MANUAL, DECEMBER 2022

VA ELECTRICAL DESIGN MANUAL, DECEMBER 2019

VA INTERIOR DESIGN MANUAL, NOVEMBER 2020

VA OFFICE OF INFORMATION & TECHNOLOGY DESIGN GUIDE, FEBRUARY 2019

VA INFRASTRUCTURE STANDARD FOR TELECOMMUNICATIONS SPACES DESIGN GUIDE, AUGUST 2020

• PG 18-13 VA BARRIER FREE DESIGN STANDARD, FEBRUARY 2022

• PG 18-4 VA STANDARD DETAILS AND SPECIFICATIONS

• INTERNATIONAL BUILDING CODE (IBC) 2021 (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES

BELOW).

• INTERNATIONAL MECHANICAL CODE 2021

• INTERNATIONAL PLUMBING CODE 2021

• INTERNATIONAL FUEL GAS CODE 2021

• ADA STANDARDS FOR ACCESSIBLE DESIGN 2010

• NFPA 99, HEALTH CARE FACILITIES CODE, 2021

• NFPA 90A, INSTALLATION OF AIR CONDITIONING AND VENTILATING SYSTEMS, 2021

• NFPA 13, INSTALLATION OF SPRINKLER SYSTEMS, 2022

• NFPA 72, NATIONAL FIRE ALARM CODE 2022

• NFPA 101 LIFE SAFETY CODE 2021 (SEE NOTES BELOW)

• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

• VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• NFPA 70 NATIONAL ELECTRICAL CODE (NEC) 2020

• SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.

• ASME BOILER AND PRESSURE VESSEL CODE

• ASME CODE FOR PRESSURE PIPING

• BUILDING SERVICES PIPING, ASME B31.9

• ANSI/TIA/EIA 568-2019 COMMERCIAL BUILDING CABLING STANDARDS

• ANSI/TIA/EIA 569-C-2015 COMMERCIAL BUILDING STANDARDS FOR TELECOMMUNICATIONS PATHWAYS AND SPACES

• ANSI/TIA-1179-2017, TELECOMMUNICATION SPACES FOR HEALTHCARE FACILITIES

• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

STANDARD (PG-18-13)

• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)

• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH- RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.

• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE

VA MASTER CONSTRUCTION SPECIFICATION.

• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1- 2019.

• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2019.

• VENTILATION FOR HEALTH CARE FACILITIES – ASHRAE STANDARD 170- 2021

• ENERGY STANDARDS FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL BUILDINGS – ASHRAE 90.1 – 2019

• ASHRAE HANDBOOKS, 2017 FUNDAMENTALS, 2019 HVAC APPLICATIONS, 2020 HVAC SYSTEMS AND EQUIPMENT

• INTERNATIONAL STANDARDS FOR HEMATOPOIETIC CELLULAR THERAPY THERAPY PRODUCT COLLECTION, PROCESSING, AND

ADMINISTRATION, EIGHTH EDITION

• ILLUMINATING ENGINEERING SOCIETY (IES) LIGHTING HANDBOOK, 10TH EDITION

• FACILITIES GUIDELINES INSTITUTE: GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF HOSPITALS, 2018

• SMACNA, HVAC DUCT CONSTRUCTION STANDARDS, METAL AND FLEXIBLE

• SMACNA, HVAC AIR DUCT LEAKAGE TEST MANUAL

• BICSI, TELECOMMUNICATIONS DISTRIBUTIONS METHODS MANUAL, 2014

• FEDERAL INFORMATION PROCESSING STANDARDS-FIBS-201-1: PERSONAL IDENTITY VERIFICATION (PIV) OF FEDERAL

EMPLOYEES AND CONTRACTORS

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.

NOTES:

1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING

JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

REMOVE ALL WORK ASSOCIATED WITH REPAINTING OF STEEL HANDRAILS AROUND THE FOUR COURTYARD AREAS ON TOP OF MAIN HOSPITAL ROOF AND THE TWO

COURTYARD AREAS OF THE CLC BUILDING ROOF.

REMOVE THE LIGHTNING PROTECTION REPLACEMENT FROM CONTRACTOR'S SCOPE OF WORK.

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1 /2

:2

:4

P M

C U s e rs

\o m a n ts c h \D o c u m e n ts

\R e v it L o c a l\ A

G I_

-3

-V

A L o m a L in d a R e p la c e

R o o f_ o m a n ts c h

.r v t

G-002

GENERAL INFORMATION

2 3OKM

ROOF REPLACEMENT AND

LIGHTNING PROTECTION

VA LOMA LINDA HEALTHCARE SYSTEM

11201 BENTON ST, LOMA LINDA,

CA 92357 DECEMBER 20, 2023

100% BID DOCUMENTS

605-20-41121-330-Q31

TM

GENERAL SYMBOL LEGEND CODE STANDARDS AND EXECUTIVE ORDERS

DEDUCTIVE ALTERNATES

2 3

1 2

2 4

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1 /2

:2

:4

P M

C U s e rs

\o m a n ts c h \D o c u m e n ts

\R e v it L o c a l\ A

G I_

-3

-V

A L o m a L in d a R e p la c e

R o o f_ o m a n ts c h

.r v t

GC100

GENERAL SITE INFORMATION

3 3OKM

ROOF REPLACEMENT AND

LIGHTNING PROTECTION

VA LOMA LINDA HEALTHCARE SYSTEM

11201 BENTON ST, LOMA LINDA,

CA 92357 DECEMBER 20, 2023

100% BID DOCUMENTS

605-20-41121-330-Q31

TM

N

KEY PLAN

SCALE: NO SCALE

1 POSSIBLE LOCATION OF CRANE FOR LIFTING

SUPPLIES TO THE ROOF, OR REMOVING DEBRIS

FROM ROOF.

2 POSSIBLE LOCATION OF DUMPSTERS AND TRASH

CHUTES, COORDINATE WITH COR PRIOR TO

LOCATING ITEMS.

3 POSSIBLE SUPPLY LAY DOWN AREA FOR

CONTRACTOR.

4 AREAS OF EXISTING BUILDINGS TO BE REROOFED

AS PART OF THIS PROJECT, SEE ROOF

DEMOLITION PLANS AD-101 AND AD-102 FOR

SPECIFIC AREAS OF ROOF WORK.

A. CONTRACTOR TO COORDINATE LOCATION AND

SCHEDULING OF CRANE TO LIFT SUPPLIES ONTO

ROOF WITH COR PRIOR TO CRANE OPERATIONS

STARTING. MINIMUM TWO WEEKS PRIOR TO

CRANE ARRIVAL. PROVIDE CRANE LIFT PLAN TO

THE COR PRIOR TO START OF CONSTRUCTION

FOR REVIEW.

B. CONTRACTOR WILL PERFORM CRANE OPERATION

AT HOSPITAL MINIMAL OPERATIONAL TIMES,

MAINLY WEEKENDS, COORDINATED EXACT

TIMES/DATES AND DURATIONS WITH COR PRIOR

TO COMMENCING CRANE OPERATIONS.

C. CONTRACTOR RESPONSIBLE TO PROTECT ALL

PAVING, CONCRETE, LANDSCAPE, ETC IN AREAS

WHERE CRANE WILL BE LOCATED. INDLUDING

CRANE TRANSIT ON SITE TO AND FROM THOSE

LOCATIONS.

D. CONTRACTOR SHALL REPAIR ALL DAMAGE

CAUSED AS A RESULT OF CONSTRUCTION WORK

ASSOCIATED WITH THIS PROJECT TO THIS SITE ,

LANDSCAPING, BUILDINGS OR ANY OTHER AREA

BACK TO ORIGINAL CONDITION.

E. CONTRACTOR SHALL ENSURE PROPER SAFETY

BARRIERS AND ENCLOSURES ARE PROVIDED AT

ALL ENTRY/EXIT POINTS FROM BUILDING OR

PATHWAYS BELOW WHERE WORK IS BEING

PERFORMED ABOVE. SAFETY BARRIER TO

INCLUDE COVERED WALKWAYS BELOW AREAS

WHERE ROOF WORK IS BEING PERFORMED.

SIGNAGE AND BARRIERS TO RESTRICT

PEDESTRIAN TRAFFIC IN AREAS WHERE WORK IS

BEING PERFORMED AND ANY PROTECTIVE

MEASURES REQUIRED TO PROTECT PATIENTS,

STAFF, VISITOR OR OTHER PERSONNEL FROM

THE ROOF WORK BEING PERFORMED.

F. CONTRACTOR TO SET UP AND MAINTAIN

TEMPORARY GUARDS AT EDGE OF ROOF WHERE

WORK IS BEING PERFORMED AND ALL

PERSONNEL TO WEAR PROPER SAFETY

DEVICES/FALL PROTECTION PER OSHA

STANDARDS.

G. CONTRACTOR SHALL PROVIDE SCAFFOLDING

FOR ROOF ACCESS AS NECESSARY TO PERFORM

WORK. FINAL LOCATION TO BE COORDINATED

WITH COR. IF REQUIRED, ROOF ACCESS IS

AVAILABLE.

H. CONTRACTOR SHALL ENSURE SCAFFOLDING AND

PROTECTIVE MEASURES COMPLY WITH ALL OSHA

REQUIREMENTS. CONTRACTOR SHALL BE

RESPONSIBLE FOR DESIGN AND ENGINEERING OF

SCAFFOLDING AND PROTECTIVE MEASURES.

I. DUMPSTER AND TRASH CHUTE LOCATIONS ARE

TO BE COORDINATED WITH THE COR PRIOR TO

LOCATION ON SITE. SEE SHEET GC101 FOR

SUGGESTED LOCATIONS OF LAY DOWN AREAS.

J. CONTRACTOR SHALL PROTECT THE LANDSCAPE

IRRIGATION SYSTEM IN THE CONSTRUCTION

AREA FROM DAMAGE. CONTRACTOR TO REPAIR

ANY DAMAGE TO IRRIGATION SYSTEM AND

ADJUST ALL HEADS AFFECTED BY

CONSTRUCTION.

K. CONTRACTOR SHALL PREPARE A PLAN SHOWING

LAY DOWN AREA, SECURITY FENCE, DUMPSTER,

LOCATION, SCAFFOLDING AND ACCESS FOR COR

REVIEW AND APPROVAL.

L. CONTRACTOR SHALL ENSURE ALL SCAFFOLDING

IS LOCKED AT ALL TIMES WHEN IT IS NOT IN USE

BY THE CONTRACTOR.

M. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL

WORK AT AREAS NOTED AS HAZARDOUS OR

RADIATION HAZARD AREAS. THERE IS A

RADIATION HAZARD FOR WORKERS WORKING ON

TOP OF ALL SEVEN (7) PENTHOUSES LOCATED ON

TOP OF THE MAIN HOSPITAL ROOF. THE

CONTRACTOR SHALL COORDINATE WITH THE

COR AND FACILITY SAFETY PERSON FOR ALL

REQUIREMENTS FOR WORK IN THESE AREAS.

Sheets
G-001 - COVER SHEET
G-002 - GENERAL INFORMATION
GC100 - GENERAL SITE INFORMATION
2023-12-22T11:04:23-0800
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .