This document outlines site information and safety requirements for a roof replacement and lightning protection project at the Veterans Affairs Loma Linda Medical Center located in Loma Linda, California. Key details include potential locations for crane operations, material laydown areas, dumpsters, and covered walkways during roof work. The contractor will be responsible for safety barriers, fall protection, scaffolding design, and protecting landscaping and irrigation systems. Hazardous work areas like hospital rooftop penthouses are identified. Coordination with the contracting officer's representative is required for locations, schedules, and safety plans.

The related federal contract opportunity is a solicitation for the roof replacement and lightning protection project at the Veterans Affairs Loma Linda Medical Center. Work includes replacing an existing PVC roof system with a new TPO roof on the main hospital building. The contractor must provide all labor, equipment, certifications, supervision, and materials to complete the project while the hospital remains operational. Submittals, change orders, meetings, and infection control measures are among the requirements. Work shall follow the specifications, statement of work, design, schedule, and other supporting documents.

View the file

Other files

File Type Posted
Award Notice_36C26224C0134.pdf PDF
Amendment 0003_Attachment M. RFI Attachment for Question 61 (Temp AC Unit).pdf PDF
Amendment 0003_Attachment AE. 100P DESIGN FOR CONSTRUCTION- 2012.05.16.pdf PDF
Amendment 0003_Attachment O. RFI Attachment for Question 62 (Cell Site 2).pdf PDF
Amendment 0003_Attachment AF. RFI Attachment for Question 58 (Abandoned Post).pdf PDF
Amendment 0003_Attachment L. RFI Attachment for Question 60 (Antenna Structure).pdf PDF
Amendment 0003_Attachment Q. RFI Attachment for Question 65 (Sat Dish 2).pdf PDF
Amendment 0003_Attachment I. RFI Responses.pdf PDF
Amendment 0003_Attachment AA. RFI Attachment for Question 113 (Retactable Skylight 1).pdf PDF
Amendment 0003_Attachment AB. RFI Attachment for Question 113 (Retractable Skylight 2).pdf PDF
Amendment 0003_Attachment S. RFI Attachment for Question 66 (Expansion Joint 2).pdf PDF
Amendment 0003_Attachment N. RFI Attachment for Question 62 (Cell Site 1).pdf PDF
Amendment 0003_Attachment V. RFI Attachment for Question 83 (PH Rooftop Equipment 1).pdf PDF
Amendment 0003_Attachment U. RFI Attachment for Question 82 (Mech Equipment 2).pdf PDF
Amendment 0003_Attachment AC. RFI Attachment for Question 113 (Retactable Skylight 3).pdf PDF
Solicitation Amendment 0003 (SF30)_36C26224B0001 0003.pdf PDF
Amendment 0003_Attachment K. Roof Analysis Report.pdf PDF
Amendment 0003_Attachment P. RFI Attachment for Question 64 (Sat Dishes).pdf PDF
Amendment 0003_Attachment X. RFI Attachment for Question 59 (Old Chiller Unit at Grid K3).pdf PDF
Amendment 0003_Attachment AD. 100P DESIGN FOR CONSTRUCTION- CUT SHEETS - 2012.05.10.pdf PDF
Amendment 0003_Attachment R. RFI Attachment for Question 66 (Expansion Joint 1).pdf PDF
Amendment 0003_Attachment T. RFI Attachment for Question 82 (Mech Equipment 1).pdf PDF
Amendment 0003_Attachment Z. RFI Attachment for Question 114 (CLC Lower Roof).pdf PDF
Amendment 0003_Attachment W. RFI Attachment for Question 83 (PH Rooftop Equipment 2).pdf PDF
Solicitation Amendment 0002 (SF30)_36C26224B0001 0002.pdf PDF
Amendment 0002_Attachment H. Site Visit Sign-In Sheet_02.02.2024.pdf PDF
Amendment 0001_Attachment G. Electrical Drawings.pdf PDF
Solicitation Amendment 0001 (SF30)_36C26224B0001 0001.pdf PDF
Attachment A - Statement of Work_Roof Replacement and Lightning Protection.pdf PDF
Solicitation (SF1442)_36C26224B0001.pdf PDF
Attachment E - Davis-Bacon Wage Determination - GDN CA20240026_01.12.2024.pdf PDF
Attachment C - Arch Drawings.pdf PDF
Attachment D - Gen Drawings.pdf PDF
Attachment F - Site Visit Information.pdf PDF
Attachment B - Project Specifications_Roof Replacement and Lightning Protection_Revised.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2 3

1 2

2 4

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1 /2

:2

:4

P M

C U s e rs

\o m a n ts c h \D o c u m e n ts

\R e v it L o c a l\ A

G I_

-3

-V

A L o m a L in d a R e p la c e

R o o f_ o m a n ts c h

.r v t

GC100

GENERAL SITE INFORMATION

3 3OKM

ROOF REPLACEMENT AND

LIGHTNING PROTECTION

VA LOMA LINDA HEALTHCARE SYSTEM

11201 BENTON ST, LOMA LINDA,

CA 92357 DECEMBER 20, 2023

100% BID DOCUMENTS

605-20-41121-330-Q31

TM

N

KEY PLAN

SCALE: NO SCALE

1 POSSIBLE LOCATION OF CRANE FOR LIFTING

SUPPLIES TO THE ROOF, OR REMOVING DEBRIS

FROM ROOF.

2 POSSIBLE LOCATION OF DUMPSTERS AND TRASH

CHUTES, COORDINATE WITH COR PRIOR TO

LOCATING ITEMS.

3 POSSIBLE SUPPLY LAY DOWN AREA FOR

CONTRACTOR.

4 AREAS OF EXISTING BUILDINGS TO BE REROOFED

AS PART OF THIS PROJECT, SEE ROOF

DEMOLITION PLANS AD-101 AND AD-102 FOR

SPECIFIC AREAS OF ROOF WORK.

A. CONTRACTOR TO COORDINATE LOCATION AND

SCHEDULING OF CRANE TO LIFT SUPPLIES ONTO

ROOF WITH COR PRIOR TO CRANE OPERATIONS

STARTING. MINIMUM TWO WEEKS PRIOR TO

CRANE ARRIVAL. PROVIDE CRANE LIFT PLAN TO

THE COR PRIOR TO START OF CONSTRUCTION

FOR REVIEW.

B. CONTRACTOR WILL PERFORM CRANE OPERATION

AT HOSPITAL MINIMAL OPERATIONAL TIMES,

MAINLY WEEKENDS, COORDINATED EXACT

TIMES/DATES AND DURATIONS WITH COR PRIOR

TO COMMENCING CRANE OPERATIONS.

C. CONTRACTOR RESPONSIBLE TO PROTECT ALL

PAVING, CONCRETE, LANDSCAPE, ETC IN AREAS

WHERE CRANE WILL BE LOCATED. INDLUDING

CRANE TRANSIT ON SITE TO AND FROM THOSE

LOCATIONS.

D. CONTRACTOR SHALL REPAIR ALL DAMAGE

CAUSED AS A RESULT OF CONSTRUCTION WORK

ASSOCIATED WITH THIS PROJECT TO THIS SITE ,

LANDSCAPING, BUILDINGS OR ANY OTHER AREA

BACK TO ORIGINAL CONDITION.

E. CONTRACTOR SHALL ENSURE PROPER SAFETY

BARRIERS AND ENCLOSURES ARE PROVIDED AT

ALL ENTRY/EXIT POINTS FROM BUILDING OR

PATHWAYS BELOW WHERE WORK IS BEING

PERFORMED ABOVE. SAFETY BARRIER TO

INCLUDE COVERED WALKWAYS BELOW AREAS

WHERE ROOF WORK IS BEING PERFORMED.

SIGNAGE AND BARRIERS TO RESTRICT

PEDESTRIAN TRAFFIC IN AREAS WHERE WORK IS

BEING PERFORMED AND ANY PROTECTIVE

MEASURES REQUIRED TO PROTECT PATIENTS,

STAFF, VISITOR OR OTHER PERSONNEL FROM

THE ROOF WORK BEING PERFORMED.

F. CONTRACTOR TO SET UP AND MAINTAIN

TEMPORARY GUARDS AT EDGE OF ROOF WHERE

WORK IS BEING PERFORMED AND ALL

PERSONNEL TO WEAR PROPER SAFETY

DEVICES/FALL PROTECTION PER OSHA

STANDARDS.

G. CONTRACTOR SHALL PROVIDE SCAFFOLDING

FOR ROOF ACCESS AS NECESSARY TO PERFORM

WORK. FINAL LOCATION TO BE COORDINATED

WITH COR. IF REQUIRED, ROOF ACCESS IS

AVAILABLE.

H. CONTRACTOR SHALL ENSURE SCAFFOLDING AND

PROTECTIVE MEASURES COMPLY WITH ALL OSHA

REQUIREMENTS. CONTRACTOR SHALL BE

RESPONSIBLE FOR DESIGN AND ENGINEERING OF

SCAFFOLDING AND PROTECTIVE MEASURES.

I. DUMPSTER AND TRASH CHUTE LOCATIONS ARE

TO BE COORDINATED WITH THE COR PRIOR TO

LOCATION ON SITE. SEE SHEET GC101 FOR

SUGGESTED LOCATIONS OF LAY DOWN AREAS.

J. CONTRACTOR SHALL PROTECT THE LANDSCAPE

IRRIGATION SYSTEM IN THE CONSTRUCTION

AREA FROM DAMAGE. CONTRACTOR TO REPAIR

ANY DAMAGE TO IRRIGATION SYSTEM AND

ADJUST ALL HEADS AFFECTED BY

CONSTRUCTION.

K. CONTRACTOR SHALL PREPARE A PLAN SHOWING

LAY DOWN AREA, SECURITY FENCE, DUMPSTER,

LOCATION, SCAFFOLDING AND ACCESS FOR COR

REVIEW AND APPROVAL.

L. CONTRACTOR SHALL ENSURE ALL SCAFFOLDING

IS LOCKED AT ALL TIMES WHEN IT IS NOT IN USE

BY THE CONTRACTOR.

M. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL

WORK AT AREAS NOTED AS HAZARDOUS OR

RADIATION HAZARD AREAS. THERE IS A

RADIATION HAZARD FOR WORKERS WORKING ON

TOP OF ALL SEVEN (7) PENTHOUSES LOCATED ON

TOP OF THE MAIN HOSPITAL ROOF. THE

CONTRACTOR SHALL COORDINATE WITH THE

COR AND FACILITY SAFETY PERSON FOR ALL

REQUIREMENTS FOR WORK IN THESE AREAS.

DocuSign Envelope ID: 6043734F-C02F-4C86-A533-C1342BFCF722

12/22/2023

D2 User Rectangle

D2 User Rectangle

D2 User Callout Crane, scaffolding & trash chute

D2 User Callout Covered walk way w/ lighting

D2 User Callout This spot won't work, it is the delivery dock and semi trucks come daily.

D2 User Callout This won't work, this is a steep slope

D2 User Rectangle

D2 User Typewritten Text

CLC

D2 User Polygon

D2 User Rectangle

D2 User Callout CLC crane location

D2 User Callout CLC dumpster location

D2 User Callout This won't work, it is too far away from the building and that is a handicap parking lot .