This Invitation for Bid (IFB) solicits construction services to replace an existing roof and install lightning protection at the Veterans Affairs Loma Linda Medical Center in Loma Linda, California. The contractor shall furnish all labor, equipment, materials, and supervision to replace the existing PVC roofing system with a new TPO roofing system at the main building. Additional work includes installing 33 roof drains, 340 linear feet of railings, and a new lightning protection system. The contractor must perform work in accordance with specifications, schedules, and supporting documents while the hospital remains operational. The contractor will also be responsible for submittals, change orders, site visits, meeting minutes, phasing and scheduling, utility shutdowns, and infection control measures. Bids are due by the date specified in the solicitation issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
DEMOLITION KEYNOTE
WINDOW TYPE
TOILET ACCESSORY
ROOF PITCH SYMBOL
DOOR NUMBER
TYPICAL KEYNOTE CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
1 #
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING PRODUCT DIMENSIONS AND DETAILS FROM BASIS OF DESIGN PRODUCT.
PRODUCTS MAY CHANGE IN DIMENSION AND DETAIL BEFORE THEY ARE INCORPORATED INTO
WORK. PRODUCTS FROM OTHER MANUFACTURER’S ARE ALSO ACCEPTABLE. DIMENSIONS AND DETAILS FOR ALTERNATE PRODUCTS MAY VARY FROM BASIS OF DESIGN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED INTO WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS REPONSIBLE FOR ACCOMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO
BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER
QUANTITY OF WORK.
5. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE
DRAWINGS AND SPECIFICATIONS.
6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT, FOR EACH PHASE. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND
ACTUAL FIELD CONDITIONS, NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL
GOVERN.
8. PROVIDE SEALANT AT ALL INTERSECTIONS BETWEEN DIFFERENT MATERIALS.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. REFER TO ALL OTHER TRADE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS
PROJECT.
11. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS
REQUIRED FOR COMPLETION OF THE WORK.
12. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED
FACE OF EXISTING WALL SURFACE.
13. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT
PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO
PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS. COORDINATE
WITH COR.
4. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, FOR ADDITION AND RENOVATION PROJECTS: THE CONSTRUCTION AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS, AND QUALITY.
5. COORDINATE WORKING HOURS ALLOWED FOR DEMOLITION AND WASTE REMOVAL WITH COR.
6. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH
EXISTING.
7. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOTION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES, (IF DAMAGED REPAIR, RE-PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.)
REPAIR OR REPLACE ITEMS DAMAGED DURING CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST.
8. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE PROJECT.
9. DO NOT ENCROACH ON ADJACENT OCCUPIED AREAS NOT IDENTIFIED WITHIN THE SCOPE OF WORK.
10. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF ELECTRICAL
SYSTEMS.
11. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW, OR OUTSIDE THE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE PROJECT.
12. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERING FROM THOSE INDICATED OR THAT
ARE NOT IDENTIFIED, SHALL BE REPORTED TO THE COR.
13. AFTER REMOVAL OF EXISTING SOLID CONCRETE MASONRY WALL, FILL FLOOR VOIDS UP TO FINISH CONCRETE
LEVEL AND PERFORM FLOOR LEVELING FOR ENTIRE AREA OF RENOVATION.
14. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR AND ARCHITECT OF ANY
CONFLICTS PRIOR TO PROCEEDING WITH DEMOLITION.
15. ALL ITEMS BEING SALVAGED OR REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER UNTIL CONFIRMATION HAS BEEN MADE AS TO WHETHER THE OWNER WILL RETAIN SUCH ITEMS. ALL ITEMS NOT BEING RETAINED BY THE OWNER OR DESIGNATED ON THE DRAWINGS, ARE TO BE RELOCATED OR
REINSTALLED FROM THE SITE BY CONTRACTOR IN APPROVED MANNER.
16. CONTRACTOR SHALL NOTIFY COR OF ANY AREA REQUIRING DEMOLITION OTHER THAN SHOWN IN THESE DRAWINGS DUE TO UNFORSEEN CONDITIONS, TO ACCOMMODATE INSTALLATION OF ALL OTHER TRADES (INCLUDING ROOF PENETRATIONS). AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE
MATERIALS AND FINISHES TO MATCH EXISTING.
17. COORDINATE WITH COR FOR CONSTRUCTION ACCESS ROUTE AND LOCATIONS OF DUMPSTER AREA.
COORDINATE WITH COR FOR SCHEDULE OF USE OF ACCESS ROUTE FOR WASTE REMOVAL AND CONTRACTOR
USE OF FREIGHT ELEVATOR (AS REQUIRED).
18. CONTRACTOR SHALL RECYCLE ALL SOLAR PANELS, CONDUIT, EQUIPMENT, ETC AND PROVIDE CERTIFICATION
OF RECYCLED MATERIAL TO THE COR.
ALL QUANTITIES FOR ITEMS LISTED IN THE "REPAIR ITEMS AND QUANTITIES" TABLE
ABOVE ARE THE MINIMAL QUANTITIES NOTED REQUIRED AND THE CONTRACTOR IS
REQUIRED TO SURVEY THE SITE PRIOR TO SUBMITTING THEIR BID TO VERIFY CORRECT
QUANTITIES OF WORK REQUIRED.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2 /2
:2
:3
A M
C U s e rs
\o m a n ts c h \D o c u m e n ts
\R e v it L o c a l\ A
G I_
-3
-V
A L o m a L in d a R e p la c e
R o o f_ o m a n ts c h
.r v t
AG001
ARCHITECTURAL SYMBOLS,
ABBREVIATIONS AND NOTES
1 10OKM
ROOF REPLACEMENT AND
LIGHTNING PROTECTION
VA LOMA LINDA HEALTHCARE SYSTEM
11201 BENTON ST, LOMA LINDA,
CA 92357 DECEMBER 20, 2023
100% BID DOCUMENTS
605-20-41121-330-Q31
TM
ABBREVIATIONS
ARCHITECTURAL SYMBOL LEGEND GENERAL NOTES
DEMOLITION NOTES
RAILINGS ON ROOF AROUND INT COURT 340 LF
ROOF/OVERFLOW DRAINS 33 EACH 4" DIAMETER DRAINS TYPICAL
INSTALL EXPANSION JOINT COVER OVER EXISTING EXPANSION JOINT
AS INDICATED 70 LF EXISTING EXPANSION JOINT TO BE REPLACED WITH METAL EXPANSION JOINT COVER
ITEM/DESCRIPTION QUANTITY UNIT REMARKS/NOTES
CLC 1 BUILDING
ROOF HATCH REPLACEMENT 1 EACH REPLACE ROOF AT UPPER LEVEL ROOF OF ANNEX BUILDING
ROOF/OVERFLOW DRAINS 15 EACH 4" DIAMETER DRAINS TYPICAL
REFINSH HAND RAILS ON ROOF AROUND INTERNAL COURT YARDS 100 LF 36" HIGH HANDRAILS, STRIP TO METAL AND REFINSH WITH PAINT COLOR MATCHING...
VERTICAL CONTROL JOINTS IN STUCCO PARAPET WALLS 80 EACH 3' HIGH REMOVE AND INSTALL NEW SEALANT
HORIZONTAL SEALANT AT TOP OF FLASHING IN STUCCO PARAPET
WALL 800 LF
REMOVE SEALANT AT TOP OF FLASHING JOINT COMPLETELY AND INSTALL NEW SEALANT
JOINT.
ITEM/DESCRIPTION QUANTITY UNIT REMARKS/NOTES
ANNEX BUILDING
REPLACE FLASHING AND SEALANT @ PENTHOUSES, BELOW SPLIT
FACES CMU 200 LF REPLACE AS NECESSARY BASE FLASHING AND SEALANT @ PENTHOUSE 2 + 6
ROOF HATCH 9 EACH REPLACE ROOF HATCH @ TOP OF PENTHOUSES
REFINSH HAND RAILS ON ROOF AROUND INTERNAL COURTYARDS 900 LF
36" HIGH HANDRAILS, STRIP TO METAL AND REFINSH WITH PAINT COLOR MATCHING
EXISTING RAILINGS
ANTENNA POST SECURED TO SUBSTRATE 2 EACH
EXISTING GRAVIT MOUNTED ANTENNAS TO BE INSTALLED PERMINATE TYPE MOUNT
PRIOR TO REROOF
VERTICAL CONTROL JOINTS IN STUCCO PARAPET WALLS 220 EACH 3' HIGH REMOVE AND INSTALL NEW SEALANT
HORIZONTAL SEALANT AT TOP OF FLASHING AT CONCRETE PARAPET
WALL 560 LF
REMOVE SEALANT AT TOP OF FLASHING JOINT COMPLETELY AND INSTALL NEW SEALANT
JOINT.
HORIZONTAL SEALANT AT TOP OF FLASHING IN STUCCO PARAPET
WALL AND PENTHOUSE ROOFS 2800 LF
REMOVE SEALANT AT TOP OF FLASHING JOINT COMPLETELY AND INSTALL NEW SEALANT
JOINT.
ROOF/OVERFLOW DRAINS 28 EACH 4" DIAMETER DRAINS TYPICAL
ITEM/DESCRIPTION QUANTITY UNIT REMARKS/NOTES
MAIN HOSPITAL BUILDING
REPAIR ITEMS AND QUANTITIES
NOTE:
DocuSign Envelope ID: 6043734F-C02F-4C86-A533-C1342BFCF722
12/22/2023
A
C
G
F
H
I
LL
J
K
4 87 9 10 13 14 322
ANNEX
MM
N
Q
O
9 9
9 9
4 4 44
CLC
N.I.C. N.I.C.
N.I.C.
323334
3 35 28
36 37
41 41
PH 1
PH 2
PH 3
PH 4
PH 5
PH 6
PH 7
22'-0" 13'-6" 52'-6" 111'-0" 47'-6" 111'-0" 50'-0" 10'-0" 26'-0"
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2 /2
:2
:1
A M
C U s e rs
\o m a n ts c h \D o c u m e n ts
\R e v it L o c a l\ A
G I_
-3
-V
A L o m a L in d a R e p la c e
R o o f_ o m a n ts c h
.r v t
AD101
ROOF DEMOLITION PLAN - MAIN
BUILDING
2 10OKM
ROOF REPLACEMENT AND
LIGHTNING PROTECTION
VA LOMA LINDA HEALTHCARE SYSTEM
11201 BENTON ST, LOMA LINDA,
CA 92357 DECEMBER 20, 2023
100% BID DOCUMENTS
605-20-41121-330-Q31
TM
N
KEY PLAN
SCALE: NO SCALE
Scale: 1" = 20'-0"
ROOF DEMOLITION PLAN - MAIN BUILDING
NORTH
0 2010 40
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED AT
ALL ENTRY/EXIT POINTS FROM BUILDING WHERE
WORK IS BEING PERFORMED ABOVE.
B. CONTRACTOR TO SET UP AND MAINTAIN
TEMPORARY GUARDS AT EDGE OF ROOF
WHERE WORK IS BEING PERFORMED AND ALL
PERSONNEL WEAR PROPER SAFE DEVICES/FALL
PROTECTION.
C. CONTRACTOR TO REMOVE ALL ROOF DRAIN
COVERS AND PROVIDE BLOW DOWN OF DRAIN
PIPES TO ENSURE NO BLOCKAGE.
D. ALL LIGHTNING PROTECTION IS CONNECTED
CONTINUOUSLY IN A LOOP RUNNING ON TAG
PARAPET OF THE ROOF PERIMETER, IDENTIFY +
PROTECT EXISTING CONNECTIONS TO
LIGHTNING PROTECTION SYSTEM DOWN
CONDUCTOR FOR CONNECTION TO NEW
SYSTEM COMPONENTS. NEW LIGHTNING
PROTECTION TO BE INSTALLED, SEE
ELECTRICAL DOCUMENTS FOR VA
REQUIREMENTS.
E. CONTRACTOR SHALL ENSURE ROOF SLOPE TO
DRAINS, MINIMUM SLOPE IS 1/4" PER 1'-0".
F. CONTRACTOR SHALL PROVIDE FLASHING,
WATER PROOFING, AND FIRE STOPPING AS
REQUIRED FOR ALL PIPING, SUPPORTS,
CONDUIT, OR ANY ITEM ON THE NEW ROOF.
G. CONTRACTOR SHALL BE REQUIRED TO SET UP
PROJECT PHASING FOR REMOVAL AND
REPLACEMENT OF ROOFING. SHALL NOT
REMOVE MORE ROOFING THAN WHAT CAN BE
REPLACED IN ONE DAY.
H. RECYCLE ALL SOLAR PANELS/EQUIPMENT, SEE
NOTE 18 (DEMOLITION NOTES) SHEET AG001.
1 REMOVE EXISTING SINGLE PLY ROOF SYSTEM,
INSULATION, PROTECTION BOARD, WALK PADS, ETC.
TO SUBSTRATE.
2 EXISTING EXHAUST FAN TO REMAIN.
3 EXISTING ROOF TOP EQUIPMENT TO REMAIN.
4 EXISTING ROOF DRAINS AND OVERLOW DRAINS TO BE
REMOVED AND REPLACED, SEE PLUMBING
DRAWINGS/SPECIFICATIONS.
5 EXISTING ROOF HATCH TO BE REMOVED AND
REPLACED.
6 EXISTING EQUIPMENT STANDS NO LONGER IN USES,
REMOVE FROM ROOF.
7 EXISTING DUCTWORK ON RAISED SUPPORTS TO
REMAIN.
8 EXISTING PIPE ON ROOF TO REMAIN.
9 EXISTING SOLAR EQUIPMENT TO BE REMOVED
COMPLETELY BY VA. ALL SOLAR EQUIPMENT IS
GRAVITY MOUNTED ONTO ROOF, REMOVE ALL SOLAR
PANELS, SUPPORTS, BRACKETS, DISCONNNECTS,
JUNCTION BOXES, OTHER ASSOCIATED EQUIPMENT,
ALL CONDUIT BACK TO ELECTRICAL PANEL (DO NOT
REMOVE ELECTRICAL PANELS).
10 EXISTING ANTENNA TO BE REMOVED. PATCH/PLUG ALL
HOLES FOR CONDUIT OR WIRES THROUGH SLAB PRIOR
TO REROOFING.
11 EXISTING VENTS THROUGH ROOF TO REMAIN.
12 CONCRETE PARAPET, NO FINISH OR COPING ON
PARAPET.
13 EXISTING METAL COPING CAP ON PARAPET WITH
STUCCO FINISH, REMOVE SEALANT AND REPLACE AT
CONNECTION WITH OTHER MATERIAL AT WALL AND
CONCRETE PARAPET.
14 EXISTING PIPING MOUNTED ON EXISTING EQUIPMENT
STANDS TO REMAIN.
15 EXISTING OPENING TO BE ENCLOSED AND REROOFED
AS PART OF THE PROJECT.
16 EXISTING DUCT WORK TO REMAIN.
17 REMOVE AND REPLACE SEALANT AT TOP OF FLASHING
AROUND ALL PENTHOUSES (ALL SITUATIONS TYPICAL).
18 MOUNTED SURVEILLANCE CAMERA ASSEMBLY TO
REMAIN.
19 REPAIR EXISTING COPING CONNECTION AND RESEAL.
20 APPROXIMATE OUTLINE OF SOLAR ARRAY - FIELD
VERIFY.
21 MECHANICAL PENTHOUSE TO BE REROOFED AS PART
OF PROJECT.
22 OPEN AREAS OF ROOF TO COURTYARD BELOW.
23 REMOVE AND REPLACE SEALANT AT VERTICAL
CONNECT OF STUCCO FACED PARAPETS AND
CONCRETE PARAPETS (ALL SITUATIONS TYPICAL).
24 EXISTING ANTENNA/SATILLITE DISH MOUNTED ON POLE
SECURED TO SUBSTRATE. REMOVE DISH AND POLE
FROM SLAB. PATCH SLAB AND SEAL ALL CONDUIT/WIRE
PENETRATIONS THROUGH SLAB PRIOR TO REROOFING.
25 REMOVE AND REPLACE SEALANT AT TOP OF FLASHING
ON CONCRETE PARAPET WALLS (ALL SITUATIONS
TYPICAL).
26 EXISTING STEAM PIPE THROUGH ROOF, TO REMAIN.
REFLASH BASE OF PIPE AT NEW ROOF.
27 EXISTING CONDUIT ON GRAVITY MOUNTED SUPPORTS
FOR ANTENNAS TO REMAIN.
28 EXISTING HOLLOW METAL DOOR AND FRAME. REMOVE
AND REPLACE SEALANT AROUND ENTIRE FRAME.
29 EXISTING ROOF COUNTER FLASH AT STUCCO FINISHED
WALLS.
30 EXISTING SPOT LIGHT SYSTEM MOUNTED ON PAD TO
REMAIN, INCLUDING CABLES AND BOX.
31 EXISTING HOSE BIBB TO REMAIN, REMOVE AND
REPLACE FLASHING AT ROOF.
32 FLAT STEEL HANDRAILS AROUND OPENING TO
COURTYARD BELOW TO REMAIN.
33 EXISTING METAL COPING CAP OVER LOW ROOF AT
EDGE TO BE REMOVED AND SALVAGED FOR
REPLACEMENT AFTER INSTALLATION OF NEW ROOF.
34 REMOVE AND REPLACE EXISTING FLASHING AT
PENTHOUSE WALL WITH SPLIT FACE CONCRETE AND
OTHER WALLS PANEL WALL TYPE.
35 EXISTING SPLIT SYSTEM AC UNITS TO REMAIN.
36 EXISTING METAL CANOPY ROOF. REMOVE AND
REPLACE SEALANT ALONG EDGE CONNECTING TO
PENTHOUSE.
37 EXISTING ELECTRICAL EQUIPMENT ON METAL PAD,
CONTRACTOR TO COORDINATE WORK ON THIS AREA
WITH C.O.R. REGARDING ANY INTERRUPTION OF
POWER. EQUIPMENT MOUNTED ON THE ROOF CAN BE
REMOVED AND REINSTALLED TO ROOF AND FLASH
AROUND EQUIPMENT.
38 EXISTING ANTENNA TOWER SECURED TO WALL OF
PENTHOUSE, REMOVE ROOFING + INSULATION
WITHOUT MOVING ANTENNA.
39 REPLACE EXISTING FLASHING MISSING AT CONCRETE
PARAPET. 10 LF
40 REMOVE AND REPLACE DAMAGED COPING CAP ALONG
ENTIRE LENGTH OF RUN, APPROXIMATELY 40 LF,
MATCH EXISTING COPING MATERIAL, FINISH, AND
COLOR OR EXISTING COPING ON THIS ROOF.
41 REMOVE AND REPLACE DAMAGED STUCCO AT
PARAPET WALL, 5 SF PER REPAIR.
42 EXISTING METAL COPING ON PARAPET TO REMAIN.
43 REMOVE EXISTING MECHANICAL UNIT CURB FROM
ROOF. PATCH SLAB AND SEAL ALL CONDUIT/WIRE
PENETRATIONS THROUGH SLAB BEFORE REROOFING.
EQUIPMENT TO BE DISCONNECTED PRIOR BY VA.
44 REMOVE EXISTING CAPPED CURB AND 4 CONDUIT STUB
UPS AND PATCH (PHOTO #1A-401).
L
M
16 20
MAIN
BUILDING
Q
28 29 30
9 9
9 9
4 4 4
2727 4
34 34
55'-5 3/4" 37'-0" 54'-0" 113'-0"
56'-0"
G
MM
4 4
MAIN
BUILDING
12 24
24 12
12 24 12 24
12 24
45'-0" 115'-0"
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2 /2
:2
:1
A M
C U s e rs
\o m a n ts c h \D o c u m e n ts
\R e v it L o c a l\ A
G I_
-3
-V
A L o m a L in d a R e p la c e
R o o f_ o m a n ts c h
.r v t
AD102
ROOF DEMOLITION PLAN - CLC &
ANNEX
3 10OKM
ROOF REPLACEMENT AND
LIGHTNING PROTECTION
VA LOMA LINDA HEALTHCARE SYSTEM
11201 BENTON ST, LOMA LINDA,
CA 92357 DECEMBER 20, 2023
100% BID DOCUMENTS
605-20-41121-330-Q31
TM
NORTH
0 2010 40
Scale: 1" = 20'-0"
ROOF DEMOLITION PLAN - CLC
N
KEY PLAN
SCALE: NO SCALE
NORTH
0 2010 40
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED AT
ALL ENTRY/EXIT POINTS FROM BUILDING WHERE
WORK IS BEING PERFORMED ABOVE.
B. CONTRACTOR TO SET UP AND MAINTAIN
TEMPORARY GUARDS AT EDGE OF ROOF
WHERE WORK IS BEING PERFORMED AND ALL
PERSONNEL WEAR PROPER SAFE DEVICES/FALL
PROTECTION.
C. CONTRACTOR TO REMOVE ALL ROOF DRAIN
COVERS AND PROVIDE BLOW DOWN OF DRAIN
PIPES TO ENSURE NO BLOCKAGE.
D. ALL LIGHTNING PROTECTION IS CONNECTED
CONTINUOUSLY IN A LOOP RUNNING ON TAG
PARAPET OF THE ROOF PERIMETER, IDENTIFY +
PROTECT EXISTING CONNECTIONS TO
LIGHTNING PROTECTION SYSTEM DOWN
CONDUCTOR FOR CONNECTION TO NEW
SYSTEM COMPONENTS. NEW LIGHTNING
PROTECTION TO BE INSTALLED, SEE
ELECTRICAL DOCUMENTS FOR VA
REQUIREMENTS.
E. CONTRACTOR SHALL ENSURE ROOF SLOPE TO
DRAINS, MINIMUM SLOPE IS 1/4" PER 1'-0".
F. CONTRACTOR SHALL PROVIDE FLASHING,
WATER PROOFING, AND FIRE STOPPING AS
REQUIRED FOR ALL PIPING, SUPPORTS,
CONDUIT, OR ANY ITEM ON THE NEW ROOF.
G. CONTRACTOR SHALL BE REQUIRED TO SET UP
PROJECT PHASING FOR REMOVAL AND
REPLACEMENT OF ROOFING. SHALL NOT
REMOVE MORE ROOFING THAN WHAT CAN BE
REPLACED IN ONE DAY.
H. RECYCLE ALL SOLAR PANELS/EQUIPMENT, SEE
NOTE 18 (DEMOLITION NOTES) SHEET AG001.
1 REMOVE EXISTING SINGLE PLY ROOF SYSTEM,
INSTALLATION, PROTECTION BOARD. ETC. TO
SUBSTRATE.
2 EXISTING EXHAUST FAN TO REMAIN.
3 EXISTING ROOF TOP EQUIPMENT TO REMAIN.
4 EXISTING ROOF DRAIN AND OVERFLOW DRAINS TO
BE REMOVED AND REPLACED, SEE PLUMBING
DRAWINGS/SPECIFICATIONS.
5 EXISTING SKYLIGHT ON TRACKS TO OPEN
ALLOWING FURNISHING TO BE BROUGHT IN THE
ROOF TO REMAIN. HANDRAILS AROUND SKYLIGHT
UNIT TO REMAIN. REMOVE AND REPLACE FLASHING
BOOTS AT HANDRAIL POST. REPLACE FLASHING
OVER RAIL SUPPORTS.
6 EXISTING LADDER FROM ANNEX LOWER ROOF TO
UPPER ROOF TO REMAIN.
7 EXISTING DUCTWORK ON RAISED SUPPORTS TO
REMAIN.
8 EXISTING PIPE ON ROOF TO REMAIN.
9 EXISTING SOLAR EQUIPMENT TO BE REMOVED
COMPLETELY BY VA. ALL SOLAR EQUIPMENT IS
GRAVITY MOUNTED ONTO ROOF, REMOVE ALL
SOLAR PANELS, SUPPORTS, BRACKETS,
DISCONNNECTS, JUNCTION BOXES, OTHER
ASSOCIATED EQUIPMENT, ALL CONDUIT BACK TO
ELECTRICAL PANEL (DO NOT REMOVE ELECTRICAL
PANELS).
10 EXISTING ANTENNA TO REMAIN, ANTENNA IS
MOVABLE NOT SECURED TO ROOF DECK.
11 EXISTING VENTS THROUGH ROOF TO REMAIN.
12 REMOVE SEALANT AND DEBRIS FROM HORIZONTAL
JOINT IN STUCCO ABOVE WALL FLASHING AND
REPLACE WITH SEALANT. ENTIRE PARAPET WALL
OF ANNEX BUILDING UPPER LEVEL ROOF.
13 EXISTING RAISE WALK AND RAMP FROM SECOND
FLOOR OF ANNEX BUILDING INTO MAIN HOSPITAL
BUILDING. REMOVE AND SALVAGE FOR
REINSTALLATION.
14 EXISTING PIPING MOUNTED ON EXISTING
EQUIPMENT STANDS TO REMAIN, GRAVITY
MOUNTED.
15 EXISTING AIR INTAKE TO REMAIN. REMOVE AND
REINSTALL AS NECESSARY.
16 RAISE AREA OF LOWER ROOF, APPROXIMATELY
4'-0" HIGHER.
17 EXISTING PARAPET AND ROOF BRIDGE HOLDING
EXISTING LOUVERS AT FIRST FLOOR ROOF AREA
LEVEL.
18 ANNEX BUILDING SECOND FLOOR ROOF AREA.
19 ANNEX BUILDING FIRST FLOOR ROOF AREA.
20 APPROXIMATE OUTLINE OF SOLAR ARRAY - FIELD
VERIFY.
21 REMOVED FROM SCOPE OF WORK.
22 OPEN AREAS OF ROOF TO COURTYARD BELOW.
23 EXISTING VENT STACK THROUGH ROOF TO
REMAIN.
24 REMOVE DAMAGED CONTROL JOINTS IN PARAPET
WALL AND REPLACE AS INDICATED. JOINTS 3'-0"
TALL VERTICAL. 30 JOINTS TO BE REPLACED 90 LF.
25 EXISTING WALL LOUVERS, 2 SETS,
APPROXIMATELY 30' LONG EACH, TO EQUIPMENT
SPACE, TO REMAIN.
26 REMOVE AND SALVAGE EXISTING COPING CAP ON
LOWER PARAPET OF RAISED AREA.
27 EXISTING HANDRAIL AT RAISED AREA OF ROOF TO
REMAIN. REMOVE FLASHING BOOTS.
28 REMOVED FROM SCOPE OF WORK.
29 EXISTING ROOF HATCH AND HANDRAIL TO BE
REMOVED AND REPLACED.
30 EXISTING ANTENNA MOUNTED ON PIPE SECURED
TO THE ROOF SUBSTRATE TO REMAIN.
31 EXISTING BUILDING EXPANSION JOINT AT ROOF
LEVEL, REMOVE ROOF MEMBRANE FROM
EXPANSION JOINT.
32 REMOVE ANY EXISTING FLASHING/COPING
AGAINST WALL AT ENTRY DOOR TO CLC BUILDING
ROOF. SALVAGE FLASHING/COPING, AND
HARDWARE FOR REINSTALLATION AFTER ROOF
REPLACEMENT.
33 REMOVE EXISTING BUILT UP ROOFING SYSTEM,
INCLUDING INSULATION, MEMBRANE, COVER
BOARD, ETC, TO EXISTING SUBSTRATE. LOW ROOF
BELOW CLC ROOF.
34 REMOVE AND SALVAGE METAL COPING AT EDGE
OF ROOF FOR REINSTALLATION AFTER ROOF
REPLACEMENT.
35 EXISTING METAL CURB AROUND RTU AND ROOF
DRAIN, REMOVE AND SALVAGE FOR
REINSTALLATION AFTER ROOF REPLACEMENT.
36 EXISTING ELECTRICAL PANEL AND EQUIPMENT TO
REMAIN. EQUIPMENT MOUNTED ON THE ROOF CAN
BE REMOVED AND REINSTALLED TO ROOF AND
FLASH AROUND EQUIPMENT.
37 EXISTING ANTENNA AND ALL WIRE & CONDUIT TO
BE REMOVED. PATCH SLAB SUBSTRATE PRIOR TO
REROOFING.
Scale: 1" = 20'-0"
ROOF DEMOLITION PLAN - ANNEX
A
B
C
D
G
F
H
I
LL
J
K
4 5 6 87 9 10 11 12 13 14 3221
MM
N
Q
P
O
CLC
ANNEX
2 2
1 1 1 1
3 3
3 3
N.I.C. N.I.C.
N.I.C.
PH 1
PH 2
PH 3
PH 4
PH 5
PH 6
PH 7
7 9
7 9
9 7
9 7
9 7
9 7
9 7
7 9
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2 /2
:2
:1
A M
C U s e rs
\o m a n ts c h \D o c u m e n ts
\R e v it L o c a l\ A
G I_
-3
-V
A L o m a L in d a R e p la c e
R o o f_ o m a n ts c h
.r v t
AE101
ROOF PLAN - MAIN BUILDING
4 10OKM
ROOF REPLACEMENT AND
LIGHTNING PROTECTION
VA LOMA LINDA HEALTHCARE SYSTEM
11201 BENTON ST, LOMA LINDA,
CA 92357 DECEMBER 20, 2023
100% BID DOCUMENTS
605-20-41121-330-Q31
TM
NORTH
0 2010 40
N
KEY PLAN
SCALE: NO SCALE
Scale: 1" = 20'-0"
ROOF PLAN - MAIN BUILDING
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED AT
ALL ENTRY/EXIT POINTS FROM BUILDING WHERE
WORK IS BEING PERFORMED ABOVE.
B. CONTRACTOR TO SET UP AND MAINTAIN
TEMPORARY GUARDS AT EDGE OF ROOF
WHERE WORK IS BEING PERFORMED AND ALL
PERSONNEL WEAR PROPER SAFE DEVICES/FALL
PROTECTION.
C. CONTRACTOR TO REMOVE ALL ROOF DRAIN
COVERS AND PROVIDE BLOW DOWN OF DRAIN
PIPES TO ENSURE NO BLOCKAGE.
D. ALL LIGHTNING PROTECTION IS CONNECTED
CONTINUOUSLY IN A LOOP RUNNING ON TAG
PARAPET OF THE ROOF PERIMETER, IDENTIFY +
PROTECT EXISTING CONNECTIONS TO
LIGHTNING PROTECTION SYSTEM DOWN
CONDUCTOR FOR CONNECTION TO NEW
SYSTEM COMPONENTS. NEW LIGHTNING
PROTECTION TO BE INSTALLED, SEE
ELECTRICAL DOCUMENTS FOR VA
REQUIREMENTS.
E. CONTRACTOR SHALL ENSURE ROOF SLOPE TO
DRAINS, MINIMUM SLOPE IS 1/4" PER 1'-0".
F. CONTRACTOR SHALL PROVIDE FLASHING,
WATER PROOFING, AND FIRE STOPPING AS
REQUIRED FOR ALL PIPING, SUPPORTS,
CONDUIT, OR ANY ITEM ON THE NEW ROOF.
G. CONTRACTOR SHALL BE REQUIRED TO SET UP
PROJECT PHASING FOR REMOVAL AND
REPLACEMENT OF ROOFING. SHALL NOT
REMOVE MORE ROOFING THAN WHAT CAN BE
REPLACED IN ONE DAY.
1 INSTALL NEW SINGLE PLY TPO ROOF SYSTE OVER
RIGID INSULATION, MIN R-25.
2 NEW ROOF DRAINS AND OVERFLOW DRAINS TO BE
INSTALLED IN SAME LOCATION AS THOSE REMOVED
DURING DEMOLITION.
3 PATCH CONCRETE DECK WHERE EQUIPMENT WAS
REMOVED AND NO LONGER REQUIRED.
4 PROVIDE NEW WALK PADS AS INDICATED. WALK
PADS TO BE PROVIDED BY ROOF SYSTEM SUPPLIER.
5 INSTALL NEW OSHA COMPLIANT ROOF HATCH WITH
EXTENTION BAR AND RAILING AROUND HATCH.
RAILING TO BE 42" HIGH AND WITHSTAND 200 LBS
DOWNWARD FORCE.
6 INSTALL SEALANT IN VERTICAL CONTROL JOINTS IN
STUCCO FINISHED PARAPET WALLS. 3'-0" HIGH
VERTICAL JOINTS SPACED 10'-0" APART ON ROOF.
7 INSTALL SEALANT AT ALL CONNECTION POINTS
BETWEEN STUCCO FINISHED PARAPETS AND
CONCRETE PARAPETS, TYPICAL OF ALL 3'-0" HIGH
JOINTS.
8 REFINISH EXISTING HANDRAILS AS INDICATED,
MATCH EXISTING METAL COLOR AND FINISH, SEE
SPECIFICATION SECTION 09 91 00.
9 INSTALL NEW SEALANT AT COPING CAP
CONNECTION TO WALLS, CONCRETE, OR ANY
DIFFERENT MATERIAL CONNECTION.
10 CURBING AND CONDUIT/PIPE STUB UPS REMOVED,
PATCH CONCRETE SLAB PRIOR TO INSTALLATION OF
NEW ROOF.
11 INSTALL STEEL PIPE SUPPORT FOR ANTENNA TO BE
SECURED TO SUBSTRATE PRIOR TO REROOFING.
CONTRACTOR TO PROVIDE PIPE OF SUFFICIENT SIZE
TO SUPPORT ANTENNA. SEE DETAIL 3/AE501.
12 EXISTING EQUIPMENT TO REMAIN. SHALL BE
RELOCATED IN ORDER TO REROOF AND FLASH
AROUND EQUIPMENT.
13 REPLACE DAMAGED COPING CAP IN AREA INDICATED
WITH NEW COPING CAP MATCHING EXISTING
MATERIAL, SIZE/THICKNESS AND FINISH/COLOR.
L
16 20
MAIN
BUILDING
Q
28 29 30
2 2 2
3 3
3 3
2 2 2
2 2
2 2
G
MM
MAIN
BUILDING
2 2
9 9
9 9
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2 /2
:2
:1
A M
C U s e rs
\o m a n ts c h \D o c u m e n ts
\R e v it L o c a l\ A
G I_
-3
-V
A L o m a L in d a R e p la c e
R o o f_ o m a n ts c h
.r v t
AE102
ROOF PLAN - CLC & ANNEX
5 10OKM
ROOF REPLACEMENT AND
LIGHTNING PROTECTION
VA LOMA LINDA HEALTHCARE SYSTEM
11201 BENTON ST, LOMA LINDA,
CA 92357 DECEMBER 20, 2023
100% BID DOCUMENTS
605-20-41121-330-Q31
TM
NORTH
0 2010 40
N
KEY PLAN
SCALE: NO SCALE
Scale: 1" = 20'-0"
ROOF PLAN - CLC
NORTH
0 2010 40
A. CONTRACTOR TO ENSURE PROPER SAFETY
BARRIERS AND ENCLOSURES ARE PROVIDED AT
ALL ENTRY/EXIT POINTS FROM BUILDING WHERE
WORK IS BEING PERFORMED ABOVE.
B. CONTRACTOR TO SET UP AND MAINTAIN
TEMPORARY GUARDS AT EDGE OF ROOF
WHERE WORK IS BEING PERFORMED AND ALL
PERSONNEL WEAR PROPER SAFE DEVICES/FALL
PROTECTION.
C. CONTRACTOR TO REMOVE ALL ROOF DRAIN
COVERS AND PROVIDE BLOW DOWN OF DRAIN
PIPES TO ENSURE NO BLOCKAGE.
D. ALL LIGHTNING PROTECTION IS CONNECTED
CONTINUOUSLY IN A LOOP RUNNING ON TAG
PARAPET OF THE ROOF PERIMETER, IDENTIFY +
PROTECT EXISTING CONNECTIONS TO
LIGHTNING PROTECTION SYSTEM DOWN
CONDUCTOR FOR CONNECTION TO NEW
SYSTEM COMPONENTS. NEW LIGHTNING
PROTECTION TO BE INSTALLED, SEE
ELECTRICAL DOCUMENTS FOR VA
REQUIREMENTS.
E. CONTRACTOR SHALL ENSURE ROOF SLOPE TO
DRAINS, MINIMUM SLOPE IS 1/4" PER 1'-0".
F. CONTRACTOR SHALL PROVIDE FLASHING,
WATER PROOFING, AND FIRE STOPPING AS
REQUIRED FOR ALL PIPING, SUPPORTS,
CONDUIT, OR ANY ITEM ON THE NEW ROOF.
G. CONTRACTOR SHALL BE REQUIRED TO SET UP
PROJECT PHASING FOR REMOVAL AND
REPLACEMENT OF ROOFING. SHALL NOT
REMOVE MORE ROOFING THAN WHAT CAN BE
REPLACED IN ONE DAY.
Scale: 1" = 20'-0"
ROOF PLAN - ANNEX
1 INSTALL NEW SINGLE PLY TPO ROOF SYSTEM OVER
RIGID INSULATION, MIN R-25.
2 NEW ROOF DRAINS AND OVERFLOW DRAINS TO BE
INSTALLED IN SAME LOCATION AS THOSE REMOVED
DURING DEMOLITION.
3 PATCH CONCRETE DECK WHERE EQUIPMENT WAS
REMOVED AND NO LONGER REQUIRED.
4 PROVIDE NEW WALK PADS AS INDICATED. WALK
PADS TO BE PROVIDED BY ROOF SYSTEM
SUPPLIER.
5 INSTALL NEW OSHA COMPLIANT ROOF HATCH WITH
EXTENTION BAR AND RAILING AROUND HATCH.
RAILING TO BE 42" HIGH AND WITHSTAND 200 LBS
DOWNWARD FORCE.
6 INSTALL SEALANT IN VERTICAL CONTROL JOINTS IN
STUCCO FINISHED PARAPET WALLS. 3'-0" HIGH
VERTICAL JOINTS SPACED 10'-0" APART ON ROOF.
7 INSTALL SEALANT AT ALL CONNECTION POINTS
BETWEEN STUCCO FINISHED PARAPETS AND
CONCRETE PARAPETS, TYPICAL OF ALL 3'-0" HIGH
JOINTS.
8 REFINISH EXISTING HANDRAILS AS INDICATED,
MATCH EXISTING METAL COLOR AND FINISH, SEE
SPECIFICATION SECTION 09 91 00.
9 INSTALL NEW SEALANT AT COPING CAP
CONNECTION TO WALLS, CONCRETE, OR ANY
DIFFERENT MATERIAL CONNECTION.
10 EXISTING EQUIPMENT TO REMAIN. SHALL BE
RELOCATED IN ORDER TO REROOF AND FLASH
AROUND EQUIPMENT.
11 INSTALL SEALANT AT ALL HORIZONTAL AND
VERTICAL CRACKS IN PARAPET (TYPICAL). PROVIDE
STUCCO REFINISHING FOR AREAS WITH SEVERE
CRACKING AND MISSING STUCCO.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2 /2
:2
:2
A M
C U s e rs
\o m a n ts c h \D o c u m e n ts
\R e v it L o c a l\ A
G I_
-3
-V
A L o m a L in d a R e p la c e
R o o f_ o m a n ts c h
.r v t
AE401
PHOTOS MAIN HOSPITAL BUILDING
6 10OKM
ROOF REPLACEMENT AND
LIGHTNING PROTECTION
VA LOMA LINDA HEALTHCARE SYSTEM
11201 BENTON ST, LOMA LINDA,
CA 92357 DECEMBER 20, 2023
100% BID DOCUMENTS
605-20-41121-330-Q31
TM
Scale: No Scale
CONCRETE STUCCO PARAPET
Scale: No Scale
FLASHING JOINT ON STUCCO PARAPET
Scale: No Scale
CONCRETE-STUCCO PARAPET JOINT
Scale: No Scale
FLASHING AT PENTHOUSE #5
Scale: No Scale
SATILLITE DISH FLASHING
Scale: No Scale
STEAM PIPE THROUGH MAIN ROOF
Scale: No Scale
SEALANT AT EDGE OF HM DOOR
Scale: No Scale
STEEL RAIL ON MAIN ROOF
Scale: No Scale
COPING CAP AT EDGE OF MAIN ROOF
Scale: No Scale
LIGHT PANEL ON MAIN ROOF
Scale: No Scale
COPING AT SE CORNER OF MAIN ROOF
Scale: No Scale
FLASHING AT PENTHOUSE #2 & 6 SPLIT-FACED
Scale: No Scale
MAIN ROOF SOLAR PANEL ARRAY
Scale: No Scale
MAIN ROOF SOLAR ARRAY CONDUIT
Scale: No Scale
ANTENNA ON PENTHOUSE #3
Scale: No Scale
PENTHOUSE #4
Scale: No Scale
PENTHOUSE #4 SOLAR EQUIPMENT (1)
Scale: No Scale
PENTHOUSE #4 SOLAR EQUIPMENT (2)
Scale: No Scale
ANTENNA ATTACHED TO PENTHOUSE #5
Scale: No Scale
CONTROL JOINT ON STUCCO
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2 /2
:2
:2
A M
C U s e rs
\o m a n ts c h \D o c u m e n ts
\R e v it L o c a l\ A
G I_
-3
-V
A L o m a L in d a R e p la c e
R o o f_ o m a n ts c h
.r v t
AE402
PHOTOS ANNEX BUILDING
7 10OKM
ROOF REPLACEMENT AND
LIGHTNING PROTECTION
VA LOMA LINDA HEALTHCARE SYSTEM
11201 BENTON ST, LOMA LINDA,
CA 92357 DECEMBER 20, 2023
100% BID DOCUMENTS
605-20-41121-330-Q31
TM
Scale: No Scale
OPENABLE SKYLIGHT UNIT
Scale: No Scale
UPPER ANNEX PARAPET FLASHING
Scale: No Scale
UPPER ANNEX ROOF HATCH
Scale: No Scale
LOWER ANNEX ROOF EQUIPMENT REMOVAL
Scale: No Scale
UPPER ANNEX ROOF EQUIPMENT (1)
Scale: No Scale
UPPER ANNEX ROOF EQUIPMENT (2)
Scale: No Scale
UPPER ANNEX ROOF EQUIPMENT (3)
Scale: No Scale
UPPER ANNEX PARAPET
Scale: No Scale
UPPER ANNEX ROOF EQUIPMENT (4)
Scale: No Scale
UPPER ANNEX ROOF EQUIPMENT (5)
Scale: No Scale
UPPER ANNEX PARAPET STUCCO
Scale: No Scale
TYPICAL ROOF DRAINS
Scale: No Scale
LOWER ANNEX PARAPET FLASHING
Scale: No Scale
TANK SUPPORTS
Scale: No Scale
LOWER ANNEX WALKING PLATFORM
Scale: No Scale
LOWER ANNEX HAND RAIL
Scale: No Scale
CONTROL JOINT ON STUCCO REPAIR
Scale: No Scale
ROOF EQUIPMENT
Scale: No Scale
PENTHOUSE (2) #4
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2 /2
:2
:3
A M
C U s e rs
\o m a n ts c h \D o c u m e n ts
\R e v it L o c a l\ A
G I_
-3
-V
A L o m a L in d a R e p la c e
R o o f_ o m a n ts c h
.r v t
AE403
PHOTOS CLC BUILDING
8 10OKM
ROOF REPLACEMENT AND
LIGHTNING PROTECTION
VA LOMA LINDA HEALTHCARE SYSTEM
11201 BENTON ST, LOMA LINDA,
CA 92357 DECEMBER 20, 2023
100% BID DOCUMENTS
605-20-41121-330-Q31
TM
Scale: No Scale
CLC ROOF FLASHING AT DOOR
Scale: No Scale
CLC ROOF SOLAR PANEL CONDUIT
Scale: No Scale
CLC ROOF VENTS
Scale: No Scale
CLC ROOF COPING CAP
Scale: No Scale
CLC EXPANSION JOINT CAP
Scale: No Scale
CLC EXPANSION JOINT
Scale: No Scale
CLC SOLAR PANEL ARRAY
Scale: No Scale
CLC ROOF EQUIPMENT FLASHING
Scale: No Scale
CLC COPING CAPS & HAND RAIL
Scale: No Scale
CLC SOLAR EQUIPMENT
Scale: No Scale
CLC BENEATH ROOF
INSTALL NEW DRAIN
STRAINER
NEW TPO ROOF
SYSTEM
FLASHING CLAMP
DEVICE
EXISTING STRUCTURE
ROOF DRAIN BODY
TO REMAIN
SEALANT
METAL RAIN COLLAR
NEW TPO ROOF PER
SPECIFICATION
SECTION 07 54 23.
MINIMUM R30 RIGID
INSULATION
EXISTING STRUCTURE
CONTINUOUS
SEALANT AT BASE
EXISTING STEEL
EQUIPMENT STAND
STAINLESS STEEL
DRAW BAND WITH
RUBBER GASKET
2 PIECE METAL
FLANGE IN BED OF
MASTIC
LEAD FLASHING
ROLLED MIN 1"
DOWN PIPE
EXISTING VENT PIPE
THROUGH ROOF
NEW TPO ROOF PER
SPECIFICATION
SECTION 07 54 23.
MINIMUM R30
RIGID INSULATION
EXISTING CONCRETE
STRUCTURE
SET LEAD FLASHING
FLANGE IN BED OF
MASTIC
PRESSURE AND
FIRE TREATED
WOOD BLOCKING
CONTINUOUS CANT
STRIP
NEW TPO ROOF PER
SPECIFICATION
SECTION 07 54 23.
MINIMUM R30 RIGID
INSULATION
EXISTING STRUCTURE
EXISTING EQUIPMENT
TO BE REINSTALLED
EXISTING EQUIPMENT
SHAFT
WOOD BLOCKING
EXISTING EQUIPMENT CURB.
CARRY BASE FLASHING AND
CAP FLASHING UP AND
UNDER COUNTER FLASHING
BASE FLASHING
CAP FLASHING
COVER BOARD
PRE-FABRICATED ROOF
HATCH INTEGRAL
COUNTER FLASHING
(DOUBLE-WALLED CURB)
ROOF HATCH FRAME WORK
SUPPORT BEAM, SEE
STRUCTURAL
DRAWINGS
ROOF DECK
ROOF
INSULATION
SLOPE: 1/4"
P.T F.T WOOD BLOCKING
SINGLE PLY MEMBRANE
SLOPE: 1/4" SLOPE: 1/4"
2 1/2" X 3/8" BAR
2 1/2" X 3/8" STRAP
ANCHORS @ 4'-0"
VERT. MAX.
4'-0"
NOTE:
PROVIDE LADDER
BRACING AND
ADDITIONAL
SUPPORT PER MFR
RECOMMENDATIONS
INSTALL
MEMBRANE
FLASHING
AROUND
POSTS
P.T F.T
WOOD
BLOCKING
ROOF HATCH
(48"X36" CLEAR
OPENING)
SAFETY POST
NEW TAPERED RIGID
INSULATION
INSTALL NEW DRAIN
STRAINER
NEW TPO ROOF
SYSTEM
FLASHING CLAMP
DEVICE
EXISTING STRUCTURE
ROOF DRAIN BODY
TO REMAIN
EXISTING ROOF
STRUCTURE
EXISTING RIGID
INSULATION
NEW TAPERED RIGID
INSULATION
NEW P.T. 2X6
BLOCKING
NEW TPO ROOF
MEMBRANE.
INCORPORATED INTO
NEW EXPANSION
JOINT AND COVER
ROOF JOINT FLAPS
ROOFING MEMBRANE
LOOPED UNDER
EXPANSION JOINT
MINERAL WOOL ROOF JOINT
INSULATION
NEW TERMINATION
BAR AND FASTENERS
NEW ROOF JOINT
EXPANSION JOINT COVER AND
FLASHING INCORPORATED
INTO NEW TPO ROOFING
MEMBRANE
MATCH EXIST.
EXISTING ROOF
STRUCTURE
EXISTING RIGID
INSULATION
NEW TAPERED RIGID
INSULATION
RIGID INSULATION / CANT
NEW TPO ROOF MEMBRANE.
INCORPORATED INTO NEW
EXPANSION JOINT AND COVER
WELDED PVC FLANGES
EXPANSION JOINT
COVER
EXPANSION JOINT COVER AND
FLASHING INCORPORATED
INTO NEW TPO ROOFING
MEMBRANE
MINERAL WOOL ROOF JOINT
INSULATION AS REQUIRED
FOAM INSULATION
M
IN
CONTINUOUS BEAD OF
SEALANT
8" METAL COUNTER FLASHING
TERMINATION BAR
FASTENER
CANT
NEW TAPERED RIGID
INSULATION
EXISTING STUCCO - PATCH
AND REPAIR
AS REQUIRED. MATCH
EXISTING
EXISTING
PENTHOUSE WALL
NEW 1/2" DENSGLASS
SHEATHING
NEW WEATHER
RESISTIVE BARRIER
EXISTING CONCRETE
STRUCTURE
EXISTING RIGID
INSULATION NEW TPO ROOFING
MEMBRANE
NEW 1" RIGID
INSULATION
CONTINUOUS BEAD OF WATER
BLOCK
BONDING ADHESIVE AS REQUIRED
NEW REGLET
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2 /2
:2
:3
A M
C U s e rs
\o m a n ts c h \D o c u m e n ts
\R e v it L o c a l\ A
G I_
-3
-V
A L o m a L in d a R e p la c e
R o o f_ o m a n ts c h
.r v t
AE501
TYPICAL ROOF DETAILS
9 10OKM
ROOF REPLACEMENT AND
LIGHTNING PROTECTION
VA LOMA LINDA HEALTHCARE SYSTEM
11201 BENTON ST, LOMA LINDA,
CA 92357 DECEMBER 20, 2023
100% BID DOCUMENTS
605-20-41121-330-Q31
TM
Scale: 3" = 1'-0"
TYPICAL OVERFLOW ROOF DRAIN DETAIL
Scale: 3" = 1'-0"
EQUIPMENT STAND FLASHING DETAIL
Scale: 3" = 1'-0"
VENT THROUGH ROOF DETAIL
Scale: 3" = 1'-0"
EQUIPMENT CURB DETAIL
Scale: 1 1/2" = 1'-0"
ROOF HATCH CURB DETAIL
Scale: 3/4" = 1'-0"
ROOF HATCH LADDER - ELEVATION
A. ALL ROOF AND FLASHING DETAILS ARE GENERIC
AND FOR REFERENCE ONLY. THE FINAL DETAILS
SHALL BE SUBMITTED AS PART OF THE SUBMITTAL
PROCESS WITH THE ROOFING MANUFACTURER'S
RECOMMENDED DETAILS FOR THEIR ROOFING
SYSTEM TO BE INSTALLED.
B. CONTRACTOR TO REMOVE ALL ROOF DRAIN
COVERS AND PROVIDE BLOW DOWN OF DRAIN
PIPES TO ENSURE NO BLOCKAGE.
C. THE ROOFING SYSTEM FOR THIS PROJECT
VARIES. SEE SPECIFICATIONS FOR
REQUIREMENTS OF EACH ROOF SYSTEM. ROOF
SYSTEM MANUFACTURER WILL PROVIDE ALL
FINAL DETAILS AND REQUIREMENTS FOR
INSTALLATION OF THEIR SYSTEM.
D. CONTRACTOR TO INSTALL INSULATION PER
SPECIFICATION SECTION 07 22 00, AND ROOF
MANUFACTURER APPROVED SUBMITTALS. R-30
RIGID INSULATION SHOWN ON DETAILS IS THE
MINIMUM INSULATION REQUIRED.
E. ALL METAL COPING CAPS, SCUPPERS, DRIP EDGE,
FLASHING TO BE REPLACED WILL BE PAINTED TO
MATCH THE ORIGINAL METAL UNLESS NOTED
OTHERWISE.
Scale: 3" = 1'-0"
TYPICAL ROOF DRAIN DETAIL
Scale: 3" = 1'-0"
EXPANSION JOINT AT CLC1 & CLC2
Scale: 3" = 1'-0"
EXPANSION JOINT AT CLC1
Scale: 3" = 1'-0"
FLASHING AT PENTHOUSE WALL
IN
CONTINUOUS BEAD OF
SEALANT
8" METAL COUNTER FLASHING
TERMINATION BAR
FASTENER
CANT
NEW TAPERED RIGID
INSULATION
EXISTING STUCCO - PATCH AND REPAIR
AS REQUIRED. MATCH EXISTING
NEW REGLET AT
COUNTER
FLASHING
NEW 1/2" DENSGLASS
SHEATHING
WEATHER RESISTIVE
BARRIER
EXISTING CONCRETE
STRUCTURE
EXISTING ANGLE
EXISTING RIGID
INSULATION
NEW TPO ROOFING
MEMBRANE
NEW 1" RIGID
INSULATION
CONTINUOUS BEAD OF WATER
BLOCK
BONDING ADHESIVE AS REQUIRED
EXISTING METAL COPING TO REMAIN
EXISTING PARAPET
WALL
EXISTING BLOCKING TO REMAIN
NEW SEALANT PER SPECIFICATION
EXISTING SEALANT
CONTINUOUS BEAD OF
SEALANT
8" METAL COUNTER FLASHING
TERMINATION BAR
FASTENER
CANT
NEW TAPERED RIGID
INSULATION
EXISTING PAINTED CONCRETE
EXISTING PARAPET
WALL
EXISTING CONCRETE
STRUCTURE
EXISTING RIGID
INSULATION
NEW TPO ROOFING
MEMBRANE
CONTINUOUS BEAD OF WATER
BLOCK
BONDING ADHESIVE AS REQUIRED
EXISTING METAL COPING TO REMAIN
EXISTING PARAPET
WALL
EXISTING BLOCKING TO REMAIN
NEW SEALANT PER SPECIFICATION
M
IN
NEW REGLET
NEW WEATHER
RESISTIVE BARRIER
EXISTING PARAPET
WALL
EXISTING CONCRETE
STRUCTURE
EXISTING ANGLE
EXISTING RIGID
INSULATION
NEW 1/2" DENSGLASS
SHEATHING
NEW TAPERED RIGID
INSULATION
NEW TPO ANCHOR
SHEET
REINSTALL EXISTING
COPING
NEW P.T. BLOCKING
REPLACE FLASHING
AS REQURED
NEW WEATHER
RESISTIVE BARRIER
OVER EXISTING
SHEATHING
EXISTING METAL
PANEL
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/2 /2
:2
:3
A M
C U s e rs
\o m a n ts c h \D o c u m e n ts
\R e v it L o c a l\ A
G I_
-3
-V
A L o m a L in d a R e p la c e
R o o f_ o m a n ts c h
.r v t
AE502
TYPICAL ROOF DETAILS
10 10OKM
ROOF REPLACEMENT AND
LIGHTNING PROTECTION
VA LOMA LINDA HEALTHCARE SYSTEM
11201 BENTON ST, LOMA LINDA,
CA 92357 DECEMBER 20, 2023
100% BID DOCUMENTS
605-20-41121-330-Q31
TM
Scale: 3" = 1'-0"
PARAPET WITH STUCCO FINISH
Scale: 3" = 1'-0"
PARAPET AT CONCRETE WALL
Scale: 3" = 1'-0"
LOW PARAPET AND COPING
A. ALL ROOF AND FLASHING DETAILS ARE GENERIC
AND FOR REFERENCE ONLY. THE FINAL DETAILS
SHALL BE SUBMITTED AS PART OF THE SUBMITTAL
PROCESS WITH THE ROOFING MANUFACTURER'S
RECOMMENDED DETAILS FOR THEIR ROOFING
SYSTEM TO BE INSTALLED.
B. CONTRACTOR TO REMOVE ALL ROOF DRAIN
COVERS AND PROVIDE BLOW DOWN OF DRAIN
PIPES TO ENSURE NO BLOCKAGE.
C. THE ROOFING SYSTEM FOR THIS PROJECT
VARIES. SEE SPECIFICATIONS FOR
REQUIREMENTS OF EACH ROOF SYSTEM. ROOF
SYSTEM MANUFACTURER WILL PROVIDE ALL
FINAL DETAILS AND REQUIREMENTS FOR
INSTALLATION OF THEIR SYSTEM.
D. CONTRACTOR TO INSTALL INSULATION PER
SPECIFICATION SECTION 07 22 00, AND ROOF
MANUFACTURER APPROVED SUBMITTALS. R-30
RIGID INSULATION SHOWN ON DETAILS IS THE
MINIMUM INSULATION REQUIRED.
E. ALL METAL COPING CAPS, SCUPPERS, DRIP EDGE,
FLASHING TO BE REPLACED WILL BE PAINTED TO
MATCH THE ORIGINAL METAL UNLESS NOTED
OTHERWISE.
| Sheets |
| AG001 - ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES |
| AD101 - ROOF DEMOLITION PLAN - MAIN BUILDING |
| AD102 - ROOF DEMOLITION PLAN - CLC & ANNEX |
| AE101 - ROOF PLAN - MAIN BUILDING |
| AE102 - ROOF PLAN - CLC & ANNEX |
| AE401 - PHOTOS MAIN HOSPITAL BUILDING |
| AE402 - PHOTOS ANNEX BUILDING |
| AE403 - PHOTOS CLC BUILDING |
| AE501 - TYPICAL ROOF DETAILS |
| AE502 - TYPICAL ROOF DETAILS |
| 2023-12-22T11:04:25-0800 | |