Attachment A - Statement of Work_Roof Replacement and Lightning Protection.pdf
PDF 456 KB Posted
- Solicitation number
- 36C26224B0001_1
About this file
This statement of work and solicitation describe a federal contract opportunity for construction services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22 is seeking to replace the existing PVC roofing system and install lightning protection at the Veterans Affairs Loma Linda Medical Center located in Loma Linda, California. The contractor will furnish all labor, equipment, materials, and supervision to remove the existing roof and install a new TPO roof system, along with a new lightning protection system. Work must be completed within 390 calendar days of receiving the notice to proceed. The contractor will be responsible for submittals, meetings, safety measures, and other services. All work must follow the specifications and documents prepared by the project designer.
View the file
Other files
Show all 35
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Roof Replacement and Lightning Protection Project 605-20-411
Construction Services Loma Lina California VA Health Care System (605)
B.1 INTRODUCTION:
This requirement is for Construction Services for Project 605-22-411 “Replace Roof” at Loma Linda VA Medical Center, Loma Linda, CA 92357 in accordance with items specified herein.
The contractor shall utilize the construction documents and specifications as prepared by Apogee Engineers/Architects. This requirement is classified under construction as it calls for the alteration of real property.
B.2 BACKGROUND / DESCRIPTION OF WORK:
The project will replace the existing PVC roofing system with a new TPO roofing system for the main building of the Loma Linda Healthcare System. The construction will be performed in 390 calendar days. This project was designed through awarded government contract 36C25819D0036 Order 36C26222N0396 to the AE firm Apogee Engineering/Architects.
B.3 CONSTRUCTION DOCUMENT:
Contractor shall furnish all labor, equipment, certification, supervision, and materials necessary to perform all operations in connection with this requirement. This requirement is classified under construction as it calls for the alteration of real property. Contractor shall perform work in strict accordance with the General Specifications, Statement of Work, Design, Schedule, and all other supporting documents for this contract to include, but not limited to, the following attachments:
1. Refer to Solicitation for attachments.
B.4 SPECIFICATIONS:
A. The VA Master Construction Specifications contain work procedures and material requirements designed to meet regulatory compliance requirements. Whenever possible, the Master Construction Specifications shall be used as the basis for project designs.
1. Refer to Solicitation for attachments.
B. A complete list of these specifications can be viewed at the following website:
http://www.cfm.va.gov. Specifications which address EOSH requirements include, but are not limited to:
1. Refer to Solicitation for attachments.
C. In the case of any differences, the specifications will govern over the drawings. Any discrepancies should be brought to the immediate attention of the Contracting Officer and COR for clarification. Any errors or omissions in the contract drawings or specifications must be provided promptly by the Contractor to the COR, but in no case later than the start of related work.
B.5 SPECIFIC REQUIREMENTS:
A. This project was designed through government contract. The contractor shall provide construction services in accordance with the attached specifications and construction documents as prepared by Apogee Engineering/Architect. Contract 36C25819D0036 Order 36C26222N0396.
B. This requirement will include, but will not be limited to preparation and/or performance for, submittals, change orders, field investigations, site visits, meetings and providing construction meeting minutes to the VA COR, staff interviews, phasing/scheduling, utility shut downs, infection control measures, and other related information and services.
C. The scope of this contract is as follows.
1. Remove and recycle all solar equipment from the roof including panels, supports, brackets, disconnects, junction boxes, conduit, and all associated equipment. Back to electrical panel.
2. Remove existing single ply roof system, insulation, protection board etc., to substrate.
3. Install new single ply roof system on main building, annex, CLC, and penthouses.
4. Install lighting protection system.
5. Include following bid-deducts:
a. Deductive Bid Alternate #1- Remove all work associated with repainting of steel handrails around the four courtyard areas on top of main hospital roof and the two courtyard areas of the CLC building roof.
b. Deductive Bid Alternate #2- Remove lighting protection system from scope.
D. This project will correct the aging roof of the facility and lack of lightning protection.
E. All contractors shall comply with VHA Face Covering Policy unless otherwise directed by Contracting or COR. Controls are also subject to change during this period of performance based off CDC, Federal and Local regulations.
B.6 CONFORMANCE STANDARDS:
All design and construction accomplished pursuant to this contract shall comply with the latest edition of the following documents unless the contractor is directed otherwise by the Contracting Officer. Any exceptions shall be approved in writing by the Contracting Officer prior to construction startup.
1. VA Master Construction Specifications – VA Technical Information Library link:
https://www.cfm.va.gov/til/spec.asp#01
2. VA Construction Standards
3. VA Seismic Design Handbook
4. VA Space Planning Criteria
5. VA Design Manuals
6. VA CADD Standards
7. NFPA 101, Life Safety Code
8. NFPA 70, National Electric Code
9. NFPA 99, Health Care Facilities
10. NFPA 12, Installation of Sprinkler Systems
11. Accessibility Standards (ADAAG, ABAAS, Barrier Free Design Guide)
12. AIA Guidelines for Construction and Equipment of Hospital and Medical Facilities
13. International Building Codes
14. State and Local codes and guidelines (as applicable)
B.7 HOURS OF COVERAGE:
A. Normal hours of operation are Monday through Friday from 7:00 am to 4:00 pm PST time. All work is expected to be performed generally inside of normal hours of coverage unless requested or approved by the COR or his/her designee.
B. Before commencement of work, the Contractor shall confer with the VHA COR and Contracting Office to agree on a sequence of procedures; means of access to premises and building. All work performed, to include delivery of materials and equipment, shall be made with minimal interference to Government operations and personnel.
C. Federal Holidays observed by Veterans Health Administration are:
1. Federal Holidays are as follows:
New Year’s Day Independence Day
Birthday of Martin Luther King, Jr. Labor Day
Inauguration Day Columbus Day
Washington’s Birthday Veterans Day
Memorial Day Thanksgiving Day
Juneteenth National Independence Day Christmas Day
For actual dates observed, see the following link:
https://www.opm.gov/policy-data-oversight/pay-leave/federal-holidays/
B.8 IDENTIFICATION, PARKING, NO SMOKING, & VA REGULATIONS:
The Contractor's FSEs shall wear visible badge identification issued by VAHCS Police Section at all times while on the premises of VAHCS. It is the responsibility of the Contractor to park in the appropriate designated parking areas. Information on parking is available from the VA Police Section. VAHCS shall not invalidate or make reimbursement for parking violations of the Contractor under any conditions. Smoking is strictly prohibited anywhere on the Veterans Affairs Health Care Facilities, to include main facility, and any other buildings at or on the premises. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the United States (Federal) District Court, not a local district, state, or municipal court.
B.9 INFORMATION SECURITY:
In accordance with Appendix A, Handbook 6500.6 Checklist blocks 7, the C&A requirements do not apply to this requirement, and Security Accreditation Package is not required. The nature of this requirement is technical; however, there is no information to be protected.
B.10 POINTS OF CONTACT AND PHYSICAL LOCATION:
Access to worksite shall be coordinated through: COR
COR will be appointed at time of award via COR Delegation Memo.
B.11 PERIOD OF PERFORMANCE:
Commencement of work shall begin within 10 days of receipt of written Notice to Proceed (NTP) and should last no longer than a duration of 390 calendar days after date NTP is issued.
B.12 SUBMITTALS:
A. Contractor shall submit all required material/shop drawing submittals to the Contracting Officer within 10 calendar days of award, or as agreed to by the Contracting Officer for approval. No materials shall be installed prior to approval via submittal exchange or other electronic transfer method.
B. All material submittals and shop drawings shall have the Project Title, Project Number, and Contract number clearly indicated.
C. Material submittals and shop drawings shall be checked and signed by the Contractor’s Quality Control Manager prior to submission to the Government.
D. Submittals shall be legible and shall include all technical data needed to verify that the item meets requirements of listed specifications, and applicable codes.
E. Contractors shall utilize Material Approval Submittal (or similar template) for use as cover sheet when submitting to Government for approval. Forms shall be provided to contractor at post-award, pre-construction conference.
B.13 COMMENCEMENT, COMPLETION, AND PAYMENT FOR WORK:
A. The Contractor shall be required to commence work required at the time specified on the Notice to Proceed (NTP), execute the work, and complete the entire work not later than the completion time specified on the NTP. The time stated for completion shall include final cleanup of the premises. At the government’s option, it may choose to specify a two-stage performance period. For example, separating material lead-time from construction days can considerably decrease the length of time occupied buildings are inconvenienced by construction.
B. Before commencement of work, the Contractor shall confer with the VA COR and Contracting Office to agree on a sequence of procedures; means of access to premises and building; space for storage of materials and equipment; delivery of materials and use of approaches; use of corridors, stairways, elevators, and similar means of communications; location of partitions, eating spaces, and restrooms for the Contractor employees; and the like. Delivery of materials and equipment shall be made with minimal interference to Government operations and personnel.
C. The Contractor shall be paid monthly upon submission of proper invoices for work completed. If the performance period exceeds 30 days and a progress schedule (approved by the Government) has been submitted, partial payment(s) may be authorized. Final payment shall be withheld until all discrepancies are corrected and as-built drawings are approved by the Government.
D. The contractor shall coordinate no less than bi-weekly progress meetings with the COR and/or Contracting Officer to discuss at a minimum; progression of work, projected progress versus actual progress, action items due from the contractor, submittals, invoicing, payroll submission and associated 1413’s, change order request, RFI’s, safety action items due from the government, and any other significant issues that require attention. The contractor also shall document the meeting minutes and forward a signed copy to the COR for concurrence of the documentation. Copies of all minutes shall be forwarded to the Contracting Officer and COR. In the event of any discrepancies, the Contracting Officer or COR shall be notified immediately for clarification. Contractor shall use the Meeting Minutes form (or similar template) provided for use at the post-award, pre-construction conference.
B.14 ESTIMATED COST RANGE
Magnitude estimated price ranges are in accordance with (IAW) VAAR 836.204
B.15 MODIFICATIONS:
Modifications for this project shall be submitted to the assigned COR who shall then submit a formal request to the Contracting Officer (CO). Work, time, cost or scope changes are not allowed to commence prior to Contracting Officer’s signed and/or written approval via fully executed Standard Form (SF) 30 modification.
B.16 ACRONYMS:
A. ABAAS - Architectural Barriers Act Accessibility Standard
B. ADAAG - Americans with Disabilities Act Accessibility Guidelines.
C. AIA - American Institute of Architects' AIA
D. CAC - Certified Asbestos Consultant
E. CADD - Computer Aided Design and Drawing
F. CO - Contracting Officer. The Federal employee who is warranted by the Government to enter into contracts on behalf of the Government and is the only person authorized to make changes to those contracts
G. COR - Contracting Officer's Representative. Individual designated by the CO to place orders, furnish technical guidance, advice, certify invoices, and provide general supervision of the work performed under the executed contract
H. EOSH - Environmental and Occupational Safety and Health
I. EPA - Environmental Protection Agency
J. FSE - Field Service Engineer
K. HIPAA - Health Insurance Portability and Accountability Act of 1996
L. ICRA - Infection Control Risk Assessment
M. IPRM - Information Protection Risk Management
N. ILSM - Interim Life Safety Measures
O. ISO - International Standards Organization
P. LBVAHCS - Long Beach VA Health Care System
Q. MOU - Memorandum of Understanding
R. NFPA - National Fire Protection Association
S. NTP - Notice to Proceed
T. OEM - Original Equipment Manufacturer
U. OSHA - Occupational Safety and Health Administration
V. SF - Standard Form
W. SME - Subject Matter Expert
X. SOW – Statement of Work
Y. TIL – Technical Information Library
Z. TWA - Time-Weighted Average
AA. VA – Veteran Affairs
BB. VAHCS – Veteran Affairs Health Care System
CC. VHA - Veterans Health Administration
(END OF SOW)