This is a federal construction solicitation (RFP) for fire alarm system replacement and security system upgrades at the McClellan VA Medical Clinic in California.

The Department of Veterans Affairs, VA Sierra Pacific Network (VISN 21), Network Contracting Office 21, is soliciting firm-fixed-price construction services to replace existing fire alarm systems in Buildings 911 and 98 with new VA-approved Mircom addressable fire alarm control panels and upgrade security camera and intrusion detection systems with Avigilon and Bosch equipment compatible with the central station system. The scope includes demolition, installation, programming, testing, commissioning, training, and turnover documentation. Building 911 (approximately 63,000 square feet) currently serves as a printing center, while Building 98 (approximately 71,000 square feet) operates as an outpatient clinic. The project location is 5443 Dudley Boulevard, McClellan Park, California 95652. The contract period is 365 calendar days from Notice to Proceed, with work hours from 7:30 AM to 4:00 PM Monday through Friday. The project value is between $2,000,000 and $5,000,000. This is a total Service-Disabled Veteran-Owned Business (SDVOSB) set-aside; offerors must be verified in the SBA DSBS database at time of offer submission and prior to award. Offers are due June 22, 2026, by 12:00 PM PDT. A mandatory site visit is scheduled for June 3, 2026, at 9:00 AM PT. Requests for Information are due June 9, 2026, by 9:00 AM PT. Performance and Payment Bonds are required, with bonds due within 10 calendar days of award. Davis-Bacon Act Wage Determination CA20250018 applies. The NAICS code is 236220 (Commercial and Institutional Building Construction) with a $45 million small business size standard.

View the file

Other files

File Type Posted
36C26126C0072_1 - Award Notice Replace B911 and B98 Fire Alarms.pdf PDF
36C26126R0052 _RFI Questions- 00008.pdf PDF
36C26126R0052 0008.pdf PDF
36C26126R0052 _RFI Questions- 00007.pdf PDF
36C26126R0052 0007.pdf PDF
36C26126R0052 _RFI Questions- 00006.pdf PDF
36C26126R0052 0006.pdf PDF
Instruction to Offerors -Revised .pdf PDF
Fire Protection DM-2026-05.pdf PDF
36C26126R0052 0005.pdf PDF
07.07.2026 Solicitation Amendment -Clauses.pdf PDF
RFI Questions- 36C26126R0052 Answers_ 7.7.2026.pdf PDF
Pricing Breakdown Solicitation MCC B911 and B98 Fire Alarm Replacement -Corrected.docx DOCX document
MCC B911 and B98 Fire Alarm Replacement and Security Upgrades - Specifications V3 6-17.pdf PDF
P03 - Partial Brand Name Justification MCC B911 and B98 Fire Security Alarm 4-28-26_Redacted.pdf PDF
36C26126R0052 0004.pdf PDF
36C26126R0052 0003.pdf PDF
36C26126R0052 0002 -Amendment Replace Bldg. 911 and 98.pdf PDF
Attachment REQUEST FOR INFORMATION Form.docx DOCX document
36C26126R0052 0001 -Amendment Replace Bldg. 911 and 98.pdf PDF
Attachment Request for Information RFI Form - Fillable.pdf PDF
612A4-26-051 MCC Fire Alarm Site Visit Log 6-3-2026 -Signed.pdf PDF
SAFETY - ENVIRONMENTAL RECORD AND EXPERIENCE MODIFICATION RATE -Attachment 3.pdf PDF
MCC B911 and B98 Fire Alarm Replacement and Security Upgrades - Spec V2 4-24.pdf PDF
MCC B911 and B98 Fire Alarm Replacement and Security Upgrades - Drawings Exhibit A.pdf PDF
852.219-75 VA NOTICE OF LIMITATIONS SUBCONTRACTING- DEVIATION.pdf PDF
Davis-Bacon Act WD CA20260018 - Contra Costa - VAMC Martinez.pdf PDF
Pricing Breakdown Solicitation MCC B911 and B98 Fire Alarm Replacement.docx DOCX document
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26126R0052

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________

(hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

1 64

X

05-22-2026

612-26-3-6056-0066

36C261-26-AP-3410

612A4-26-051

36C261

Department of Veterans Affairs

VA Sierra Pacific Network (VISN 21)

Network Contracting Office (NCO) 21

Offerors have been authorized and are to be sent by email to Jessica Newman at jessica.newman2@va.gov and to

Jose Hernandez at jose.hernandez1@va.gov

Jessica Newman 808-539-1310

A. Project Number: 612A4-46-051, Project Title: Replace Bldg. 911 and 98 and Security Alarms VA Medical Clinic McClellan

NAICS Code: 236220, Commercial and Institutional Building Construction; Small Business Size Standard: $45M.

In accordance with VAAR 36.204(f)(2) -- Disclosure of the magnitude of construction projects:

Between $2,000,000 and $5,000,000.

B. This is a firm-fixed price construction requirement. Offeror shall furnish all labor, material, transportation and overhead accordance with SOW, Specifications, and drawings.

C. Place of Performance: McClellan VA Medical Clinic – 5443 Dudley Blvd, McClellan Park, CA 95652

D. Period of Performance: 365 calendar days after Notice to Proceed (NTP).

E. This procurement is a total Service-Disable Veteran Owned Business (SDVOSB) set-aside. Offerors must be verified in

SBA DSBS the time submission of the offer and prior to award. SBA DSBS Link: https://search.certifications.sba.gov/.

SBA DSBS will be used as the official source for the SDVOSB verifications for this solicitation until further notice from the SBA.

F. Site Visit - McClellan VA Medical Clinic on Wednesday, June 3rd, 2026, at 9:00 AM PT.

Address: 5443 Dudley Blvd, McClellan Park, CA 95652

Meeting Location: Outside the front of building 911.

POC: Randy Ruiz-Meneses email: Randy.Ruiz-Meneses@va.gov

G. RFIs are due on : Tuesday, June 9th, 2026, by 9:00 AM PT.

H. Wage Determinations - CA20250018 applies to this requirement.

I. Bid Bonds, Payment Bonds and Performance Bonds are required.

K. All documentation must be submitted electronically to Jessica.newman2@va.gov and Jose.Hernandez1@va.gov.

10 365

X X

- 1 - 12:00 PM PDT

06-22-2026

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your

Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

36C261

Department of Veterans Affairs

Network Contracting Office 21 (NCO 21)

VA Pacific Islands Health Care System

711 Kapiolani Blvd Suite 200

Honolulu HI 96813

Department of Veterans Affairs

FMS VA-9(101) Financial Services Center

PO Box 149971

Austin TX 78714-9971

866-372-1141 vafscenterprisesupport@va

Jose Hernandez

Contracting Officer

Table of Contents

INSTRUCTIONS, CONDITIONS, AND OTHER STATEMENTS TO BIDDERS/OFFERORS

BASIS FOR AWARD

STATEMENT OF WORK

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

A.4 DELIVERY SCHEDULE

A.5 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—

CERTIFICATION (NOV 2021)

A.6 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)

A.7 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE

OF THE WORK (NOV 2025) (DEVIATION)

A.8 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION

MATERIALS (MAY 2014)

A.9 52.233-2 SERVICE OF PROTEST (SEP 2006)

A.10 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS

REPRESENTATIONS AND CERTIFICATIONS (NOV 2025) (DEVIATION)

A.11 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE

(FEB 1998)

A.12 52.228-1 BID GUARANTEE (SEP 1996)

A.13 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE)

(FEB 2021)

A.14 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS

(DEVIATION NOV 2025)

A.15 52.237-1 SITE VISIT (APR 1984)

A.16 SUPPLEMENTAL INSURANCE REQUIREMENTS

A.17 52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2025) (DEVIATION) ...30

A.18 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION

(NOV 2025) (DEVIATION)

A.19 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (NOV

2025) (DEVIATION)

(End of Clause)

A.20 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS

(APR 2026)

A.21 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (DEVIATION) (NOV

2025)

A.22 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025)

(DEVIATION)

A.23 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

A.24 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

A.25 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION

(APR 2019)

A.26 VAAR 852.204-72 PERSONNEL VETTING AND CREDENTIALING (DEVIATION)

(MAR 2026)

A.27 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2018)

A.28 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)

A.29 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)

A.30 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT

(SEP 2019)

A.31 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED

SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023)

(DEVIATION)

INSTRUCTIONS, CONDITIONS, AND OTHER STATEMENTS TO

BIDDERS/OFFERORS

OFFER SUBMISSION:

The following documents are to be included in the solicitation submission:

1. One fully completed and signed SF 1442 Offer page, completed offer amount entered in block 17, acknowledgment of all amendments either via entering data in block 19 of the

SF1442 or completing blocks 15a, b, and c of the Amendment and attaching to the SF

1442 Offer page.

2. One fully completed Supplemental Price Breakdown by Division Sheet

3. One Documentation of Safety & Environmental Record and Documentation of

Experience Modification Rate (EMR) (See below instructions).

4. Bid Bond

5. Completed Certificate 852.219-75

Offerors are responsible for ensuring and verifying their price and all required documents are received at the email address designated in block 8 of the SF 1442 Solicitation and by the date and time specified in block 13A of the SF 1442 Solicitation (subject to amendment). Any exception to the terms and conditions of this request for proposal will result in a nonresponsive proposal.

PROPOSALS ARE TO BE SENT TO:

One electronic copy via email of the price offer is to be sent to arrive on or before the due date/time at the following email address: jessica.newman2@va.gov and jose.hernandez1@va.gov with solicitation number and title in the subject. Faxed proposals are not permitted under any circumstances.

PLANS/SPECIFICATIONS/DRAWINGS:

Drawings and specifications are attached in electronic format to this solicitation. Contractors are responsible for downloading and printing their own plan sets. The VA will not provide hard copies of the drawings and specifications to any Contractor. Contractors are responsible for ensuring that any construction document package used for their proposal or construction is complete and up to date.

QUESTIONS AND ANSWERS:

Submit a question via the Questions Form (included in this Solicitation), via email to jessica.newman2@va.gov and jose.hernandez1@va.gov.

RFI/Questions for this solicitation are due Tuesday, June 9th, 2026, at 9:00 AM PT. No questions will be answered after this date/time unless determined to be in the best interest of the

Government as determined by the Contracting Officer.

OFFER DUE DATE SCHEDULE:

Offers received after date and time in Block 13 of SF 1442 may be rejected.

mailto:jessica.newman2@va.gov mailto:jose.hernandez1@va.gov mailto:jessica.newman2@va.gov mailto:jose.hernandez1@va.gov

Proposal(s) are due by the date and time shown in Block 13 of the SF 1442. Offers received after this date and time may be rejected unless considered beneficial to the government.

INSTRUCTIONS TO OFFERORS:

The apparent successful offeror must be determined as “responsible” by the Contracting Officer in accordance with FAR Part 9, Contractor Qualifications.

SITE VISIT:

Potential Offerors are strongly urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of performing construction services. Failure to inspect the site shall not constitute grounds for a claim after contract award.

BASIS FOR AWARD

1. INTRODUCTION:

This is a price-only selection conducted in accordance with Federal Acquisition Regulation

(FAR) Overhaul at RFO FAR Part 15.These regulations are available electronically at https://www.acquisition.gov/far-overhaul/far-part-deviation-guide/far-overhaul-part-15 .

2. EVALUATION:

Price Only -- The Government will evaluate the lowest price offer to determine if the price is fair and reasonable for the work to be performed. To be considered fair and reasonable for the work performed, the evaluators will also check for appearance of unbalanced line-item prices. If deemed necessary, the supplemental price breakdown information will be used to assist the Government in performing the price evaluation described above. Offers that are materially unbalanced as to prices for the basic requirement and the option quantities are not fair and reasonable. An Offer is unbalanced when it is based on prices significantly less than the cost for some work and prices that are significantly overstated for other work.

NOTICE TO PROCEED (NTP):

A notice to proceed shall be issued after the award of a fully executed contract. The NTP date and time are “to be determined” after the award to a successful contractor. The primary factor in the determination to issue NTP shall be the Prime Contractor submission of, and the Government review and approval of both Payment and Performance Bonds, both of which are enforceable legal documents.

PERFORMANCE & PAYMENT BONDS:

In accordance with FAR 28.102-1 and Contract Clause 52.228-15, offerors are reminded that any award amount over $35,000 shall require a Payment Bond (or other acceptable protection – see clause FAR 52.228-13), and awards exceeding $150,000 shall require both Payment and

Performance Bonds. All bonds are due no later than 10 calendar days after award.

LIQUIDATED DAMAGES: N/A

WAGE DETERMINATION APPLICABLE TO THIS PROJECT:

General Decision Number: Davis-Bacon Act WD CA20250018

SYSTEM FOR AWARD MANAGEMENT (SAM):

Federal Acquisition Regulations require that federal contractors shall register in the System for

Award Management (SAM) database at http://www.sam.gov and enter all mandatory information into the system.

PER VHA DIRECTIVE 7715 (06 April 2017) SAFETY & ENVIRONMENTAL RECORD

AND EXPERIENCE MODIFICATION RATE (EMR):

To be eligible for consideration and award, the contractor shall have no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 3 years and have an EMR of equal to or less than 1.0.

All contractors shall submit the following information pertaining to their past Safety &

Environmental Record and EMR with their VASFHCS Station.

1. SAFETY & ENVIRONMENTAL RECORD: A self-certification on company letterhead that the contractor has no more than three (3) serious, or one (1) repeat or one (1) willful

OSHA or any EPA violation(s) in the past three years.

2. EMR: All contractors shall submit information regarding their current EMR. This information shall be obtained from the contractor’s insurance carrier and be furnished on the insurance carrier’s letterhead. Must have an EMR of equal to or less than 1.0.

PRIVACY TRAINING:

All workers regardless of project length must take VA Privacy Training which will be coordinated after project award with the Contracting Officer’s Representative (COR).

TRAINING:

All employees of the general contractor and subcontractors shall have the 10-hour OSHA certified construction safety course and/or other relevant competency training, as determined by the COR with input from the ICRA (Infection Control Risk Assessment) team. The General

Contractor’s Competent Person/Superintendent shall have completed the 30-hour OSHA certified construction safety course. Documentation of training shall be submitted to the

Contracting Officer for review and approval prior to any work being performed. No ID badge will be issued to an employee who does not provide this documentation. There shall be no exceptions to this requirement.

PRIVACY AND CONFIDENTIALITY:

Contractors to the Department of Veteran Affairs may be unintentionally exposed to sensitive information. Information may be overheard, seen on documents or electronic devices, or observed that could potentially violate the privacy and confidentiality of our veterans, employees, volunteers, and their families. Regulations such as, but not limited to the Health

Insurance Portability and Accountability Act of 1996 (HIPAA), Freedom of Information Act

(FOIA) and Privacy Act of 1974 have been enacted to protect sensitive information from being improperly disclosed. Information should not be divulged or released to anyone unless specifically authorized by this contract or its’ attached documents in accordance with the contracted services. Failure to comply with applicable statutes and regulation can result in the termination of this contract and civil and criminal penalties, including fines and imprisonment.

http://www.sam.gov/

All suspected or actual breeches of privacy and confidentiality should be reported immediately to the Contracting Officer, Contracting Officer’s Representative (COR) or the Facility Privacy

Officer.

The C&A requirements do not apply, and a Security Accreditation Package is not required. If the contractor opts to use a computer or computer system for processing contract documents, the requirements of FIPS 140-2 for encryption of contract documents must be met.

ADDITIONAL SBA DSBS INFORMATION:

1. Eligibility of SDVOSBs continues to be governed by the Small Business Administration regulations, 13 CFR subparts 125.8 through 125.13, as well as the FAR, except where expressly directed otherwise by the VAAR, and 38 CFR verification regulations for

SDVOSBs.

2. At the time of submission of offer, the offeror must represent to the contracting officer that it is an:

a. SDVOSB concern

b. Small business concern under the North American Industry Classification System

(NAICS) code assigned to the acquisition; and

c. Verified for eligibility in the SBA DSBS database.

3. A joint venture may be considered an SDVOSB or VOSB concern if:

a. At least one member of the joint venture is an SDVOSB or VOSB concern, and makes the representations in paragraph (b) of this section

b. Each other concern is small under the size standard corresponding to the NAICS code assigned to the procurement.

c. The joint venture meets the requirements of paragraph 7 of the size standard explanation of affiliates in RFO FAR 19.106-1; and

d. The joint venture meets the requirements of 13 CFR 125.15(b), modified to include Veteran-owned small businesses where this CFR section refers to

SDVOSB concerns.

4. Any SDVOSB or VOSB concern (nonmanufacturer) must meet the requirements in RFO

FAR 19.103 to receive a benefit under this program.

RESPONSIBILITY REQUIREMENTS:

A responsibility check will be accomplished for the apparent awardee prior to award. Checks of the SBA DSBS database (to insure apparently successful offeror is a verified Service-Disabled

Veteran Owned Small Business), System for Award Management (SAM) database (Central

Contractor Registration, Online Representations and Certifications, and Excluded Parties List

System to ensure registrations are current, valid, and no debarment records exist). Any information retrieved or received by the Government that would be cause for negative or unsatisfactory responsibility rating may result in the offeror being determined ineligible for award.

CONFORMANCE WITH ENVIRONMENTAL MANAGEMENT SYSTEMS:

The Contractor shall perform work under this contract consistent with the relevant policy and objectives identified in the agency, organizational, or facility Green Environmental Management

System (GEMS) applicable for your contract. The Contractor shall perform work in a manner that conforms to all appropriate Environmental Management Programs and Operational Controls identified by the agency, organizational, or facility GEMS, and provide monitoring and measurement information as necessary for the organization to address environmental performance relative to the environmental, energy, and transportation management goals. In the event an environmental nonconformance or noncompliance associated with the contracted services is identified, the contractor shall take corrective and/or preventative actions. In the case of a noncompliance, the Contractor shall respond and take corrective action immediately. In the case of a nonconformance, the Contractor shall respond and take corrective action based on the time schedule established by the facility GEMS Coordinator. In addition, the Contractor shall ensure that their employees are aware of the roles and responsibilities identified by the environmental management system and how these requirements affect their work performed under this contract.

All on-site contractor personnel shall complete yearly EPA sponsored environmental training specified for the type of work conducted on-site. Upon inclusion in the contract, the Contracting

Officer’s Representative will verify that all contractor personnel have acquired EMS Awareness

Training at their appropriate site or location.

SMOKE AND CARBON MONOXIDE MONITORING REQUIREMENTS:

Contractor, his employees, his subcontractors, and their employees shall adhere to VA, VHA, and VANCHCS Policies for smoke and carbon monoxide monitoring requirements. They are available upon request from COR.

STATEMENT OF WORK

Replace Building 911 and 98 Fire and Security Alarms

PROJECT: 612A4-26-051

VA NORTHERN CALIFORNIA HEALTH CARE SYSTEM

MCCLELLAN PARK, CALIFORNIA

PROJECT PURPOSE AND INTENT

1.1. The purpose of this project is to replace the existing fire alarm system serving Building 911 and 98 with a new VA compliant, fully addressable fire alarm system. The security camera system and intrusion detection systems in building 911 and 98 are to be upgraded to a system compatible with the central station system.

1.2. The scope of this project includes demolition, installation, programming, testing, commissioning, training, and turnover documentation for the complete fire alarm system replacement and security system upgrades.

1.3. The contractor shall provide and furnish all labor, materials, tools, equipment, testing, analysis, supervision, and administration for the construction phase of this contract.

1.4. Building 911 is approximately 63,000 square feet and is currently used as a printing center (former shopping center). Building 98 is approximately 71,000 square feet and is currently used as an outpatient clinic.

1.5. The project is located at the McClellan VA Campus, located at 5342 and

5443 Dudley Blvd, McClellan Park, CA 95652.

PROJECT OBJECTIVES

1.6. Replace the existing Notifier fire alarm systems with a new VA-approved

Mircom addressable fire alarm control panel (FACP) and associated devices, notification appliances, and interfaces.

1.7. Provide a code-compliant, reliable, and maintainable fire alarm system with improved troubleshooting capability, future expandability, and required integration with existing building systems.

1.8. Replace and install additional cameras with a VA approved Avigilon system that is compatible with the central station system.

1.9. Replace and install additional motion sensors and door contact alarms with

VA-approved Bosch Intrusion Detection System that is compatible with the central station system.

PROJECT SCOPE

1.10. Site Utilities: Monitor existing fire service post indicating valves and outside stem and yoke valves with new addressable tamper switches.

1.11. The Contractor shall remove and dispose of the existing Notifier fire alarm control panels and associated obsolete equipment in accordance with federal, state, and local regulations. The existing DACT and Central Station Service shall be reused.

1.12. The Contractor shall provide and install a new VA-approved Mircom addressable Fire Alarm Control Panel (FACP) located in building 911, Mechanical Room 85 with addressable architecture supporting individual device monitoring and troubleshooting, a minimum 100 addresses per SLC circuit, with no less than two Class A SLC circuits or four Class B SLC

Circuits (expandable for future growth), graphical user interface for system management, and remote monitoring capability where required by the VA.

1.13. The Contractor shall provide and install a new VA-approved Mircom addressable Fire Alarm Control Panel (FACP) located in building 98, vestibule 1A00 with addressable architecture supporting individual device monitoring and troubleshooting, a minimum 100 addresses per SLC circuit, with no less than two Class A SLC circuits or four Class B SLC Circuits

(expandable for future growth), graphical user interface for system management, and remote monitoring capability where required by the VA.

1.14. The Contractor shall provide a minimum of two (2) Supervisory Loop

Circuits (SLC) for addressable initiating devices and modules. SLC wiring shall be installed in new metallic conduit painted red and designed such that voltage drop does not exceed 10% for 16 AWG TwPr (or as required by manufacturer/VA).

1.15. The Contractor shall provide a minimum of two (2) Notification

Appliance Circuits (NAC) for notification appliances, including voice/strobe devices as required. NAC wiring shall be installed in new metallic conduit painted red and designed such that voltage drop does not exceed 5% for 14

AWG copper fire alarm riser wiring (or as required by manufacturer/VA).

1.16. The Contractor shall provide voice evacuation capabilities as required by the VA and NFPA 72, including tone alert and intelligible voice messaging.

Voice messages shall repeat three (3) rounds per alarm event and identify the specific smoke zone/compartment. Provide manual override capability at both the FACP and the Fire Alarm Remote Annunciator (FARA) such that manual operation overrides all automatic messages.

1.17. The Contractor shall provide and install a new Fire Alarm Remote

Annunciator (FARA) in building 911, Vestibule 38 with audible/visual annunciation and voice feed/manual override controls as required.

1.18. The Contractor shall connect the FACP to the existing Digital Alarm

Communicator/Transmitter (DACT) for central station monitoring (or provide an approved replacement interface), including any required redundant pathways, routed in new metallic conduit painted red per VA and manufacturer requirements.

1.19. The Contractor shall provide primary and secondary power supplies for the fire alarm system. Primary AC power shall be provided from an existing circuit breaker located upstream of the main electrical service disconnect

(where available/required). Provide batteries and calculations sized for the complete system loads (including door holders/magnets and voice/strobe activation) with a minimum 25% additional reserve capacity.

1.20. The Contractor shall replace existing manual pull stations with listed double-action pull stations with reset keys, and provide protective covers where required by VA.

1.21. The Contractor shall provide and install new addressable initiating devices and associated modules (smoke detectors, heat detectors, monitor/control modules) as required to meet VA design criteria and NFPA

72, and label all devices with addressable identifiers.

1.22. The Contractor shall provide and install ADA and NFPA 72 compliant notification appliances (voice/strobes) mounted at

80 inches AFF or 6 inches below ceiling (whichever is lower), and verify audibility/intelligibility as required.

1.23. The Contractor shall integrate the new fire alarm system with existing building systems as required (e.g., HVAC shutdown, door holders), including all necessary interface modules, wiring, and testing. HVAC

Shutdown needs to be coordinated with the existing Building Johnson

Controls Inc. Metasys systems spread throughout the building supporting the existing rooftop HVAC units noted on the existing fire alarm plans.

1.24. The Contractor shall remove all fire alarm conduit and wiring and replace with new conduit and wiring.

1.25. The Contractor shall provide and install sixty-two (62) high-definition cameras and associated accessories (wall-mounts, ceiling-mounts, pendant-mounts) as required by manufacturer. Building 911 shall have twenty-six (26) cameras and building 98 shall have thirty-six (36) cameras

1.26. The Contactor shall provide and install two (2) new Avigilon Unity

Network Video Recorders (NVR), to be located in building 911, room 49, and in building 98 room 2T09A. The NVR shall be monitored by Mather VAMC

VA police.

1.27. The Contractor shall provide Power over Ethernet wiring to all cameras from Avigilon Unity NVR.

1.28. The Contractor shall provide and install fourteen (14) motion sensors and associated accessories (wall-mount, ceiling-mount) as required by manufacturer. Building 911 shall have five (5) motion sensors and building 98 shall have nine (9) motion sensors.

1.29. The Contractor shall provide and install thirty-four (34) door contact alarm sensors to exterior access points. Building 911 shall have twenty-three

(23) door contact alarm sensors, and building 98 shall have eleven (11) door contact alarm sensors.

1.30. The Contractor shall provide and install two (2) Bosch Intrusion Alarm

System control panels. To be located in building 98 room 49, and in building

98 room 1A20B. The control panels shall communicate to Mather VAMC

VA police via cellular network.

1.31. The Contractor shall provide and install communication and power supply wiring from security control panels to motion sensors and door contact alarm sensors.

1.32. The Contractor shall restore affected areas to match existing finishes.

1.33. The Contractor shall label all conduits and terminations with polarity, circuit identification, line voltage where applicable, and zone/device identification.

1.34. The Contractor shall perform complete system programming, pre-acceptance testing, and final acceptance testing with the VA, including testing each smoke zone/compartment, verifying annunciation at the FACP and

FARA, and verifying voice messages and manual override functions.

1.35. The Contractor shall provide required closeout documentation including

NFPA 72 Record of Completion, battery calculations, as-built drawings

(including riser diagrams and circuit routing), O&M manuals, and owner training.

1.36. The Contractor shall install a 24-hour emergency response phone number sign adjacent to the new FACP.

1.37. The Contractor shall coordinate all shutdowns and testing activities with the COR.

RISK CONTROL

1.38. VANCHCS is an active hospital and therefore will require consideration to those areas with patients and staff.

1.39. The Contractor shall be responsible for the

administration and management of all aspects of this SOW. This includes responsibility for all Contractor employees, subcontractors, agents, and anyone acting for or on behalf of Contractor.

1.40. The Government is authorized to restrict the employment under the contract of any Contractor employee or prospective Contractor employee, who is identified as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population.

1.41.The parties agree that the Contractor’s personnel working as a result of this contract shall not be considered VA employees for any purpose and shall be considered employees of the Contractor.

SECURITY

1.42. Contractors do not need and shall not be allowed access to any VA personnel or VA patients Personal Health Information (PHI) or Personally Identifiable

Information (PII) in the performance of the requirements of this SOW.

Additionally, the contractor does not need and shall not be allowed access to VA sensitive information in the performance of the requirements of this SOW.

1.43.The contractor shall not connect contractor-owned IT devices (laptop computer or remote connection from a contractor system) to a VA internal trusted (i.e., nonpublic) network. Computer certification and accreditation requirements do not apply, and a security accreditation package is not required.

1.44. Contractors, contractor personnel, subcontractors, and subcontractor personnel shall be subject to the same Federal laws, regulations, standards, and

VA Directives and Handbooks as VA and VA personnel regarding information and information system security.

Records Management Language for Contracts Required

1.45.Applicability

This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists.

1.46.Definitions

“Federal record” as defined in 44 U.S.C. § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them.

The term Federal record:

1. Includes VHA records.

2. Does not include personal materials.

3. Applies to records created, received, or maintained by

Contractors pursuant to their VHA contract.

4. May include deliverables and documentation associated with deliverables.

1.47.Requirements

1. Contractor shall comply with all applicable records management laws and regulations, as well as National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44

U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII

Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.

2. In accordance with 36 CFR 1222.32, all data created for

Government use and delivered to, or falling under the legal control of, the

Government are Federal records subject to the provisions of 44 U.S.C.

chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5

U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.

3. In accordance with 36 CFR 1222.32, the Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the

Government and must be managed in accordance with Federal law.

Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.

4. VHA and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of VHA or destroyed except in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting

Activity. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, the Contractor must report to VHA. The agency must report promptly to NARA in accordance with

36 CFR 1230.

5. The Contractor shall immediately notify the appropriate

Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records, or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle]. The

Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records, and/or equipment is properly protected. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records, and/or equipment is no longer required, it shall be returned to VHA control, or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand-carried, mailed, emailed, or securely electronically transmitted to the Contracting

Officer or address prescribed in the [contract vehicle]. Destruction of records is

EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).

6. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material, and/or records generated under, or relating to, contracts. The

Contractor (and any subcontractor) is required to abide by Government and

VHA guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.

7. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VHA policy.

8. The Contractor shall not create or maintain any records containing any non-public VHA information that is not specifically tied to or authorized by the contract.

9. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of

1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.

10. The VHA owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which VHA shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.

11. Training. All Contractor employees assigned to this contract who create, work with or otherwise handle records are required to take VHA-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.

1.48. Flow down of requirements to subcontractors

1. The Contractor shall incorporate the substance of this clause, its terms, and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same.

2. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.

Period of Performance, Station Work, Holidays

1.49. This project is to take no longer than 365 calendar days from notice to proceed (NTP).

1.50. Schedule of work; all work to be performed during normal working hours from 7:30 AM to 4:00PM Monday through Friday, except holidays.

1.51.Federal Holidays

New Year’s Day January 1st

Martin Luther King’s Birthday January 19th

President’s Day February 16th

Memorial Day May 25th

Juneteenth National Independence Day June 19th

Independence Day July 4th

Labor Day September 7th

Columbus Day October 12th

Veterans Day November 11th

Thanksgiving Day November 26th

Christmas Day December 25th

ATTACHMENTS

1.52. Replace Bldgs. 911 & 98 Fire and Security Alarms - Drawings

1.53. Replace Bldgs. 911 & 98 Fire and

Security Alarms – Specifications

End of SOW

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMBER

DESCRIPTION OF

SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

1.00 JB __________________ __________________

The purpose of this project is to replace the existing fire alarm system serving Bldg. 911 & 98 with a new VA compliant, fully addressable fire alarm system. The security camera system and instrusion detection systems in bldgs. 911 & 98 are to be upgraded to a system compatible with the central station system. See Statement of Work (SOW) loaded to FORCE AP for complete details.

Contract Period: Base POP Begin: 07-06-2026 POP End: 07-26-2027 PRINCIPAL NAICS CODE: 236220 - Commercial and Institutional Building Construction PRODUCT/SERVICE CODE: Z1DA - Maintenance of Hospitals and Infirmaries

MANUFACTURER PART NUMBER (MPN): N/A

GRAND TOTAL __________________

A.4 DELIVERY SCHEDULE

ITEM

NUMBER SHIPPING INFORMATION QUANTITY DELIVERY DATE

0001 SHIP TO: McClellan VA Campus 5342 and 5443 Dudley Blvd McClellan Park, CA 95652

1.00 ARO 365 Days

FOB: DESTINATION

A.5 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR

AGREEMENTS—CERTIFICATION (NOV 2021)

(a) This provision does not apply to acquisitions at or below the simplified acquisition threshold or to acquisitions of commercial products and commercial services as defined in Federal

Acquisition Regulation 2.101.

(b) Certification. [Offeror shall check either (1) or (2).]

_____ (1) The Offeror certifies that—

(i) It does not engage and has not engaged in any activity that contributed to or was a significant factor in the President’s or Secretary of State’s determination that a foreign country is in violation of its obligations undertaken in any arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. The determinations are described in the most recent unclassified annual report provided to Congress pursuant to section 403 of the Arms Control and Disarmament Act (22 U.S.C.

2593a). The report is available at https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international-security-affairs/bureau-of-arms-control-verification-and-compliance/; and

(ii) No entity owned or controlled by the Offeror has engaged in any activity that contributed to or was a significant factor in the President’s or Secretary of State’s determination that a foreign country is in violation of its obligations undertaken in any arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. The determinations are described in the most recent unclassified annual report provided to Congress pursuant to section 403 of the Arms Control and Disarmament Act

(22 U.S.C. 2593a). The report is available at https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international-security-affairs/bureau-of-arms-control-verification-and-compliance/; or

(2) The Offeror is providing separate information with its offer in accordance with paragraph (d)(2) of this provision.

(c) Procedures for reviewing the annual unclassified report (see paragraph (b)(1) of this provision). For clarity, references to the report in this section refer to the entirety of the annual unclassified report, including any separate reports that are incorporated by reference into the annual unclassified report.

(1) Check the table of contents of the annual unclassified report and the country section headings of the reports incorporated by reference to identify the foreign countries listed there.

Determine whether the Offeror or any person owned or controlled by the Offeror may have engaged in any activity related to one or more of such foreign countries.

(2) If there may have been such activity, review all findings in the report associated with those foreign countries to determine whether or not each such foreign country was determined to be in violation of its obligations undertaken in an arms control, nonproliferation, or disarmament agreement to which the United States is a party, or to be not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. For clarity, in the annual report an explicit certification of noncompliance is equivalent to a determination of violation. However, the following statements in the annual report are not equivalent to a determination of violation:

(i) An inability to certify compliance.

(ii) An inability to conclude compliance.

(iii) A statement about compliance concerns.

https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international-security-affairs/bureau-of-arms-control-verification-and-compliance/ https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international-security-affairs/bureau-of-arms-control-verification-and-compliance/ https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international-security-affairs/bureau-of-arms-control-verification-and-compliance/ https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international-security-affairs/bureau-of-arms-control-verification-and-compliance/ https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international-security-affairs/bureau-of-arms-control-verification-and-compliance/ https://www.state.gov/bureaus-offices/under-secretary-for-arms-control-and-international-security-affairs/bureau-of-arms-control-verification-and-compliance/

(3) If so, determine whether the Offeror or any person owned or controlled by the Offeror has engaged in any activity that contributed to or is a significant factor in the determination in the report that one or more of these foreign countries is in violation of its obligations undertaken in an arms control, nonproliferation, or disarmament agreement to which the United States is a party, or is not adhering to its arms control, nonproliferation, or disarmament commitments in which the United States is a participating state. Review the narrative for any such findings reflecting a determination of violation or non-adherence related to those foreign countries in the report, including the finding itself, and to the extent necessary, the conduct giving rise to the compliance or adherence concerns, the analysis of compliance or adherence concerns, and efforts to resolve compliance or adherence concerns.

(4) The Offeror may submit any questions with regard to this report by email to

NDAA1290Cert@state.gov. To the extent feasible, the Department of State will respond to such email inquiries within 3 business days.

(d) Do not submit an offer unless—

(1) A certification is provided in paragraph (b)(1) of this provision and submitted with the offer;

or

(2) In accordance with paragraph (b)(2) of this provision, the Offeror provides with its offer information that the President of the United States has—

(i) Waived application under U.S.C. 2593e(d) or (e); or

(ii) Determined under 22 U.S.C. 2593e(g)(2) that the entity has ceased all activities for which measures were imposed under 22 U.S.C.2593e(b).

(e) Remedies. The certification in paragraph (b)(1) of this provision is a material representation of fact upon which reliance was placed when making award. If it is later determined that the

Offeror knowingly submitted a false certification, in addition to other remedies available to the

Government, such as suspension or debarment, the Contracting Officer may terminate any contract resulting from the false certification.

(End of Provision)

A.6 52.216-1 TYPE OF CONTRACT (NOV 2025) (DEVIATION)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

A.7 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—

SECONDARY SITE OF THE WORK (NOV 2025) (DEVIATION)

(a)(1) The offeror must notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror must request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror must request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

A.8 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—

CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material,"

"domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials"

(Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the

Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the

Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .