This is a Request for Information (RFI) Questions and Answers document for federal contract opportunity 36C26126R0052 regarding the replacement of fire and security alarm systems in Buildings 911 and 98, dated July 30, 2026.

The document addresses two key inquiries from potential contractors. The first question concerns the scope and specifications for an access control system with card readers that was confirmed as required work in Amendment 005, Question 63. The contractor noted that the provided security drawing sheets (ES-100, ES-101, ES-200, ES-201, and ES-202) do not contain access control system details, only intrusion alarm and CCTV components, and requested updated drawings, system layout, and brand specifications to accurately cost the access control work. The Government's response clarified that no additional drawing set is currently available; the awarded contractor will be required to provide redlined drawings with access control updates upon project completion for inclusion in the as-built dataset. The second question addressed whether subcontractor past performance can be used to satisfy specialized experience requirements. The Government confirmed that key subcontractors' past performance may be utilized to demonstrate specialized experience.

View the file

Other files

File Type Posted
36C26126C0072_1 - Award Notice Replace B911 and B98 Fire Alarms.pdf PDF
36C26126R0052 0008.pdf PDF
36C26126R0052 0007.pdf PDF
36C26126R0052 _RFI Questions- 00007.pdf PDF
36C26126R0052 _RFI Questions- 00006.pdf PDF
36C26126R0052 0006.pdf PDF
Instruction to Offerors -Revised .pdf PDF
07.07.2026 Solicitation Amendment -Clauses.pdf PDF
Pricing Breakdown Solicitation MCC B911 and B98 Fire Alarm Replacement -Corrected.docx DOCX document
P03 - Partial Brand Name Justification MCC B911 and B98 Fire Security Alarm 4-28-26_Redacted.pdf PDF
36C26126R0052 0005.pdf PDF
MCC B911 and B98 Fire Alarm Replacement and Security Upgrades - Specifications V3 6-17.pdf PDF
RFI Questions- 36C26126R0052 Answers_ 7.7.2026.pdf PDF
Fire Protection DM-2026-05.pdf PDF
36C26126R0052 0004.pdf PDF
36C26126R0052 0003.pdf PDF
36C26126R0052 0002 -Amendment Replace Bldg. 911 and 98.pdf PDF
Attachment REQUEST FOR INFORMATION Form.docx DOCX document
36C26126R0052 0001 -Amendment Replace Bldg. 911 and 98.pdf PDF
612A4-26-051 MCC Fire Alarm Site Visit Log 6-3-2026 -Signed.pdf PDF
Attachment Request for Information RFI Form - Fillable.pdf PDF
Pricing Breakdown Solicitation MCC B911 and B98 Fire Alarm Replacement.docx DOCX document
MCC B911 and B98 Fire Alarm Replacement and Security Upgrades - Drawings Exhibit A.pdf PDF
MCC B911 and B98 Fire Alarm Replacement and Security Upgrades - Spec V2 4-24.pdf PDF
852.219-75 VA NOTICE OF LIMITATIONS SUBCONTRACTING- DEVIATION.pdf PDF
Davis-Bacon Act WD CA20260018 - Contra Costa - VAMC Martinez.pdf PDF
36C26126R0052 Replace Bldg 911 and 98 Fire and Security Alarms.pdf PDF
SAFETY - ENVIRONMENTAL RECORD AND EXPERIENCE MODIFICATION RATE -Attachment 3.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Questions – 36C26126R0052 - Replace Bldg. 911 and 98 Fire and Security Alarms 7/30/2026

1. Per Amendment 005, question 63: "Reference: 28 13 00 - Access Control - Is Access Control required for this work scope? If so, please provide the updated plans that detail the associated work scopes. VA Response: Access control is required with card readers. See plans that were provided.

The security drawing sheets provided for new work: ES-100, ES-101, ES200, ES-201 &ES202 (attached) do not contain access control system. They do have an intrusion alarm and CCTV but no access control system. The solicitation does not provide new drawings with any of the amendments showing any access control scope. Will the scope required to add access control per response to question 63, please provide drawings and system layout, brand, etc. for the contractor to provide accurate cost for access control system. Please advise.

VA Response: The Government does not have the requested drawing set to provide at this time. At the completion of the project, the awarded Contactor will be requested to provide a drawing set with the updated redlines to be added into the as-built dataset.

2. Regarding the specialized experience, will the Government utilize key subcontractors’ past performance?

VA Response: Yes, subcontractor’s past performance can utilized for specialized experience.