Pricing Breakdown Solicitation MCC B911 and B98 Fire Alarm Replacement -Corrected.docx
DOCX document 34 KB Posted
- Attached to
- Z1DA--36C26126R0052 Replace Buildings 911 and 98 - Fire and Security Alarms Project # 612A4-26-051
- Solicitation number
- 36C26126R0052
About this file
This is a pricing breakdown template for RFP No. 36C26126R0052 related to the replacement of fire and security alarm systems in Buildings 911 and 98 at the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 21 (VANCHCS). The template requires contractors to provide itemized cost estimates separated into material and labor components across multiple construction divisions, with a final total offer that includes general conditions, overhead, profit, and bonds and insurance.
The pricing structure encompasses ten primary divisions: General Requirements, Existing Conditions (demolition), Wood and Composite materials, Thermal and Moisture Protection (firestopping and joint sealants), Openings (hollow metal doors and hardware), Finishes (framing, gypsum board, acoustical ceilings, and painting), Electrical installations, Communications structured cabling, Electronic Safety and Security systems (including fire detection and alarm, physical access control, intrusion detection, and video surveillance), and Exterior Improvements. The solicitation has undergone multiple amendments extending the receipt of offers deadline to July 24, 2026 at 12:00 PM PT, with Amendment 0005 providing revised specifications, a Fire Protection Design Guide, and additional documentation. Contractors must complete this pricing breakdown as part of their proposal submission, with all costs itemized and any additional costs identified separately.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFP No. 36C26126R0052
PRICE BREAKDOWN
MCC B911 and B98 Fire Alarm Replacement
| DESCRIPTION |
| MATERIAL |
| LABOR |
| TOTAL |
01. DIVISION 01 - General Requirements
| A. General Requirements |
| $ |
| $ |
| $ |
| B. Shop Drawings, Product Data, and Samples |
| $ |
| $ |
| $ |
| C. Safety Requirements |
| $ |
| $ |
| $ |
| D. Reference Standards |
| $ |
| $ |
| $ |
| E. Quality Control |
| $ |
| $ |
| $ |
| F. Temporary Environmental Controls |
| $ |
| $ |
| $ |
| G. Construction Waste Management |
| $ |
| $ |
| $ |
| H. General Commission Requirements |
| $ |
| $ |
| $ |
| 01. General Requirements Subtotal |
| $ |
| $ |
| $ |
02. DIVISION 02 - Existing Conditions
| A. Demolition |
| $ |
| $ |
| $ |
| 02. Existing Conditions Subtotal |
| $ |
| $ |
| $ |
03. DIVISION 06 – Wood + Plastic and Composite
| A. Rough Carpentry |
| $ |
| $ |
| $ |
| 03. Wood + Plastic and Composite Subtotal |
| $ |
| $ |
| $ |
04. DIVISION 07 - Thermal and Moisture Protection
| A. Firestopping |
| $ |
| $ |
| $ |
| B. Joint Sealants |
| $ |
| $ |
| $ |
| 04. Thermal and Moisture Protection subtotal |
| $ |
| $ |
| $ |
05. DIVISION 08 - Openings
| A. Hollow Metal Doors and Frames |
| $ |
| $ |
| $ |
| B. Door Hardware |
| $ |
| $ |
| $ |
| 05. Openings subtotal |
| $ |
| $ |
| $ |
06. DIVISION 09 - Finishes
A. Non-Structural Metal Framing
B. Gypsum Board
C. Acoustical Ceilings
| D. Painting |
| $ |
| $ |
| $ |
| 06. Special Construction subtotal |
| $ |
| $ |
| $ |
08. DIVISION 26 - Electrical
| A. Requirements for Electrical Installations |
| $ |
| $ |
| $ |
| B. Grounding and Bonding for Electrical Systems |
| $ |
| $ |
| $ |
| C. Raceway and Boxes for Electrical Systems |
| $ |
| $ |
| $ |
| D. Wiring Devices |
| $ |
| $ |
| $ |
| E. Facility Lighting Protection |
| $ |
| $ |
| $ |
| 08. Electrical subtotal |
| $ |
| $ |
| $ |
09. DIVISION 27 – Communications
| A. Requirements for Communications Installations |
| $ |
| $ |
| $ |
| B. Communications Structured Cabling |
| $ |
| $ |
| $ |
09. Communications Subtotal
10. DIVISION 28- Electronic Safety and Security
| A. Common Work results for Electric Safety and Security |
| $ |
| $ |
| $ |
| B. Conductors and Cables for Electronic Safety and Security |
| $ |
| $ |
| $ |
| C. Grounding and Bonding for Electronic Safety and Security |
| $ |
| $ |
| $ |
| D. Conduits and Backboxes for Electronic safety and Security |
| $ |
| $ |
| $ |
| E. Commissioning of Electronic Safety and Security Systems |
| $ |
| $ |
| $ |
F. Physical Access Control System
G. Intrusion Detection System
H. Video Surveillance
I. Fire Detection and Alarm
| 10. Communications Subtotal |
| $ |
| $ |
| $ |
11. DIVISION 32 - Exterior Improvements
A. Cement and Concrete for Exterior Improvements
| B. Asphalt Paving |
| $ |
| $ |
| $ |
| 11. Exterior Improvements subtotal |
| $ |
| $ |
| $ |
| SUB TOTAL (Items 1 -12) |
| $ |
| $ |
| $ |
| Total |
| $ |
| $ |
| $ |
| General Conditions |
| $ |
| $ |
| $ |
| Overhead |
| $ |
| $ |
| $ |
| Profit |
| $ |
| $ |
| $ |
| Bonds and Insurance |
| $ |
| $ |
| $ |
| TOTAL OFFER |
| $ |
| $ |
| $ |
Note: All other costs maybe included as a separate item and shall be specified in this breakdown.