S05 RFI 11 Answered 36C26125Q0029 Amendment 0003.pdf

PDF 204 KB Posted

Attached to
Z1DA--36C261-24-AP-5056 | 36C26125Q0029 | VA Palo Alto Boiler Plant Retrofit
Solicitation number
36C26125Q0029
Issued by

About this file

This document is a Request for Information (RFI) related to Solicitation Number 36C26125Q0029 for the VA Palo Alto Boiler Plant Retrofit project. The RFI provides clarification that a third-party inspector is required to verify completion of the boiler plant deficiency corrections and provide test results, per Section 3.2 of the Statement of Work. The key objectives of the solicitation are to retrofit three boilers at the VA Palo Alto Health Care System facility to meet safety standards and address deficiencies identified in a prior Boiler Efficiency Institute report. The contractor must provide all personnel, expertise, equipment, tools, materials, supervision, and other items/services necessary to complete the project within a 120-calendar day or 90-calendar day performance period, and provide as-built drawings for the three boilers. Quotes are due by 9:00 AM PST on November 8, 2024.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26125Q0029 36C261-24-AP-5056 | 36C26125Q0029 | NRM 640-25-900 VA Palo Alto Boiler Plant Retrofit

RFI FORM

Send to Contract Specialist: nicole.renfrew@va.gov

RFI

(REQUEST FOR INFORMATION)

RFQ #:

36C26125Q0029 CONTRACTOR RFI #: 11

PROJECT NAME:

VA Palo Alto Boiler Plant Retrofit

DATE REQUESTED: 10/29/2024

ACQUISITION NO.:

N/A REFERENCE: Documents:

36C26125Q0029_1

DRAWING: n/a SPECIFICATION SECTION:

n/a

DESCRIPTION OF PROBLEM OR INFORMATION BEING REQUESTED

Please be specific as possible:

11. Q: Please clarify if we are required to have a “Third Party” to provide verifiable documented proof that all of the corrections to the deficiencies have been completed, and also provide verification in the form of test results and/or inspection by a Third Party” inspector who is qualified to perform boiler plant inspections?

A:

VA PROJECT MANAGER’S RESPONSE

VA TRACKING # FOR ALL RFIs: AMENDMENT #: 0003

VA PROJECT ENGINEER/MANAGER: DATE:

Verification by third party inspector required. See section 3.2 of SOW.

10/30/2024Naveed Subhan

2024-10-31T18:51:51-0700
NAVEED SUBHAN

File details come from the government source that posted it. Updated .