This document is a Request for Information (RFI) related to Solicitation Number 36C26125Q0029 for the VA Palo Alto Boiler Plant Retrofit project. The RFI addresses a request to relocate three switches on two panel covers outside of the panel boxes, as a potential solution to a temporary situation. The VA Project Engineer/Manager has provided a response indicating the contractor should propose a location for the switches for review and approval by the Contracting Officer's Representative (COR) and Boiler Plant Supervisor.
The related federal contract opportunity is for a Request for Quotes (RFQ) to retrofit three boilers at the VA Palo Alto Health Care System facility boiler plant. The objective is to address deficiencies and meet safety standards per the Statement of Work. Contractors must provide all necessary personnel, expertise, equipment, materials, and services. Two quote options are requested - one with as-built drawings and a 120-calendar day performance period, and one without as-built drawings and a 90-calendar day performance period. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration, Veterans Integrated Service Network 21.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C26125Q0029 36C261-24-AP-5056 | 36C26125Q0029 | NRM 640-25-900 VA Palo Alto Boiler Plant Retrofit
RFI FORM
Send to Contract Specialist: nicole.renfrew@va.gov
RFI
(REQUEST FOR INFORMATION)
RFQ #:
36C26125Q0029 CONTRACTOR RFI #: 10
PROJECT NAME:
VA Palo Alto Boiler Plant Retrofit
DATE REQUESTED: 10/29/2024
ACQUISITION NO.:
N/A REFERENCE: Documents: Job Walk Photos- see attached
DRAWING: n/a SPECIFICATION SECTION:
n/a
DESCRIPTION OF PROBLEM OR INFORMATION BEING REQUESTED
Please be specific as possible:
10. Q: It was brought to our attention at the job walk on Oct. 24th by some of the workers in the Boiler Plant that would like the (three) switches shown (Photo #1 & #2) on these two panel covers (FD Fan 2 & FD Fan 3) redone with relocated outside of the panel boxes, possibly to the right of the main panel, just below the single elect panel door (Photo #3), final solution unknown. We were told that these switches were a temporary solution as well.
A:
VA PROJECT MANAGER’S RESPONSE
VA TRACKING # FOR ALL RFIs: AMENDMENT #: 0003
VA PROJECT ENGINEER/MANAGER: DATE:
See SOW, task item #14. Contractor to propose location for review and approval by COR and Boiler plant supervisor.