This is an Amendment 3 Attachment containing clarifications to Requests for Information (RFI) responses for Solicitation 36C26026R0076, a Department of Veterans Affairs project to remove and replace underground fuel tanks.

The document addresses three specific RFI clarifications: (1) regarding fuel storage capacity, the VA confirms that contractors must store up to 25,000 gallons of fuel to support operations during underground storage tank (UST) and dispensing unit downtime, with approximately 13,000 gallons representing excess fuel storage during construction phases; (2) regarding secondary containment pipe materials, the VA accepts fiberglass reinforced plastic (FRP) as an alternative to steel pipe as specified in Section 23 10 00, paragraph 2.4.D, pending submittal review after award for specification compliance; and (3) regarding slab thickness for the fuel tank foundation, the VA clarifies that the entire slab-on-grade (SOG) for the fuel farm will be a uniform 24 inches thick, designed in accordance with PSRDM blast requirements to support tank walls, with no thickened perimeter edge as previously questioned. The clarifications confirm design specifications and material flexibility while maintaining compliance with structural and safety requirements for this fuel storage infrastructure project.

View the file

Other files for this federal contract opportunity

Other files attached to Y1NA--CON | NRM 653-23-100 | Remove Replace Underground Fuel Tanks, newest first.
File Type Posted
36C26026R0076 0005.pdf PDF
36C26026R0076 0004.docx DOCX document
Amendment 4 Attachment 1 - RFIs Answers.docx DOCX document
Amendment 4 Attachment 2 - PSRDM WITH MIST CHANGES JUNE 2025.pdf PDF
Amendment 3 Attachment 1 - Incorporated Provisions.docx DOCX document
36C26026R0076 0003.docx DOCX document
36C26026R0076 0002.docx DOCX document
Amendment 2 Attachment 1a - 653-23-100 - VA OR Roseburg UST - Architectural - AE301 update.pdf PDF
Amendment 2 Attachment 1b - C-104-GP_BID RFI SET.pdf PDF
Amendment 2 Attachment 2 - SF-1442 pages 6 through 14.docx DOCX document
36C26026R0076 P0002 SF-30 draft.docx DOCX document
Amendment 2 Attachment 1 - RFI Questions and Answers.pdf PDF
ATTACHMENT 2 - RFO CLAUSE 52.222-90.docx DOCX document
ATTACHMENT 1 - 653-23-100 Remove Replace UFT Bidwalk Sign In Sheet 051326.pdf PDF
36C26026R0076 0001.docx DOCX document
36C26026R0076 SF-1442.docx DOCX document
ATTACHMENT 3 - 100 Percent Submittal Drawings 653-23-100.pdf PDF
ATTACHMENT 5 - Past Performance Reference Form.docx DOCX document
36C26026R0076.docx DOCX document
ATTACHMENT 4 - DOL Wage Determination OR20260066 Mod 1 - 23 Jan 2026.pdf PDF
ATTACHMENT 2 - 100 Percent Submittal Specs 653-23-100.pdf PDF
ATTACHMENT 1 - Remove Replace UST SOW 1 653-23-100.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C26026R0076 Amendment 3 Attachment 2 RFIs and Answers

1. Question #13.b. Response - Indicates the Contractor is required to store up to 25,000 gallons of fuel.

On Sheet M-601, the storage requirements are shown on a table and indicates that the most temporary storage required is in TAST-02 in the amount of 2,742 gallons.

ANSWER: The tanks on the fuel oil schedule are the tanks required to hold the fuel oil, gasoline and E85 for use while the USTs/ dispensing units are down. AST 04 (see Attachment 3 – 100 Percent Submittal Drawings 653-23-100, page 35 of 63) is the tank being used for temporary fuel oil for the boilers and is not new. Additionally, these units are for use during construction. There will be excess fuel to be stored by the contractor during construction. This amount will be the delta between the temporary storage and the current fuel in the tanks. This delta is estimated at approximately 13k gallons.

2. Question #22 Response - Indicates that the secondary pipe should be steel as listed in 2.4.

Spec Section 23 10 00, Para. 2.4.D. Indicates that fiberglass reinforced plastic (FRP) is allowed for use as secondary containment pipe. We priced for that because it is substantially cheaper than welded steel joints.

ANSWER: The VA does not take exception to this approach, pending submittal review after award for compliance with specifications.

3. Question #31 Response - Indicates the slab thickness is 24" per detail 1/S-101.

I do not think 24" is adequate for a 20,000 gallon tank. The plans show 24" for the building perimeter's thickened edge but there is no detail or dimension for the highlighted below (see picture) which is what the question was asking. This is the same question asked in Question #23 but it appears the reviewer misinterpreted it. In that response, there was notion that it would need to be designed and submitted for review from a Structural Engineer.

ANSWER:

0. RFI 23 references the tank Saddle not the slab. The Slab at the tanks will be the uniform 24” thickness as noted.

0. The 24” slab is designed to PSRDM requirements for the blast consideration and to support the walls. The detail indicates the entire slab on grade is 24” thick. There is no thickened edge, the entire slab will be 24” SOG for the fuel farm.