AMENDMENT 5 TO SOLICITATION 36C26026R0076

This is Standard Form 30, an Amendment to Solicitation issued by the NCO 20 Network Contracting Office on June 4, 2026, with an effective date of June 16, 2026. The amendment clarifies requirements for Blast Resistant Door Assemblies under specification section 08 11 13. The contracting officer clarifies that while door assemblies must be constructed to specification, a fully blast-resistant door is not required. Door panels shall be a minimum of 14 gauge and are not required to be explicitly designed for blast. However, door panels must bear against a continuous stop and frame designed and anchored for blast, as specified in subsection 2.1.A.2. Contractors may alternatively provide a fully blast-resistant door that exceeds the specification requirements if they choose to do so.

The proposal submission deadline remains unchanged, with proposals due no later than 1200 PM Pacific Time on June 17, 2026. Offerors/bidders must acknowledge receipt of this amendment prior to the deadline by completing and returning the amendment, acknowledging receipt on each copy of the offer submitted, or by separate letter or electronic communication referencing the solicitation and amendment numbers. Failure to provide timely acknowledgment may result in rejection of the offer. The requisition/purchase requisition number is 653-23-100, and the contract ID code is 36C26026R0076. Stephen Slaby is the Contracting Officer administering this amendment.

View the file

Other files for this federal contract opportunity

Other files attached to Y1NA--CON | NRM 653-23-100 | Remove Replace Underground Fuel Tanks, newest first.
File Type Posted
Amendment 4 Attachment 2 - PSRDM WITH MIST CHANGES JUNE 2025.pdf PDF
36C26026R0076 0004.docx DOCX document
Amendment 4 Attachment 1 - RFIs Answers.docx DOCX document
Amendment 3 Attachment 1 - Incorporated Provisions.docx DOCX document
36C26026R0076 0003.docx DOCX document
Amendment 3 Attachment 2 - RFI Answer Clarification.docx DOCX document
36C26026R0076 0002.docx DOCX document
Amendment 2 Attachment 1a - 653-23-100 - VA OR Roseburg UST - Architectural - AE301 update.pdf PDF
36C26026R0076 P0002 SF-30 draft.docx DOCX document
Amendment 2 Attachment 1 - RFI Questions and Answers.pdf PDF
Amendment 2 Attachment 1b - C-104-GP_BID RFI SET.pdf PDF
Amendment 2 Attachment 2 - SF-1442 pages 6 through 14.docx DOCX document
ATTACHMENT 1 - 653-23-100 Remove Replace UFT Bidwalk Sign In Sheet 051326.pdf PDF
36C26026R0076 0001.docx DOCX document
ATTACHMENT 2 - RFO CLAUSE 52.222-90.docx DOCX document
36C26026R0076 SF-1442.docx DOCX document
ATTACHMENT 3 - 100 Percent Submittal Drawings 653-23-100.pdf PDF
36C26026R0076.docx DOCX document
ATTACHMENT 4 - DOL Wage Determination OR20260066 Mod 1 - 23 Jan 2026.pdf PDF
ATTACHMENT 2 - 100 Percent Submittal Specs 653-23-100.pdf PDF
ATTACHMENT 1 - Remove Replace UST SOW 1 653-23-100.docx DOCX document
ATTACHMENT 5 - Past Performance Reference Form.docx DOCX document
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 1

0005 06-16-2026

653-23-100

NCO 20 Network Contracting Office

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661

NCO 20 Network Contracting Office

ATTN: V4CONT

1601 E. Fourth Plain Blvd Bldg.17, Suite B428 Vancouver WA 98661

To all Offerors/Bidders

36C26026R0076

04-29-2026

X

X X

The purpose of Amendment 5 is to further clarify the requirements for the Blast Resistant Door Assemblies as follows:

The door must be constructed to the specification, but we do not require a fully blast resistent door. As stated in specification section 08 11 13, subparagraph 2.1.A.2.c door panels shall be a minimum of 14 gauge and “are not required to be explicitly designed for blast.” However, as stated in 2.1.A.2.a door panels shall bear against a continuous stop and frame designed and anchored for blast. Please refer to subsection 2.1.A.2 in its totality for all door blast requirements. The contractor may alternatively provide a fully blast resistant door that exceeds spec section 08 11 13 requirements, if they so choose.

The proposal due date and time remains unchanged. Proposals are due no later than 1200 PM Pacific Time on 17 June 2026.

Stephen Slaby Contracting Officer