This is a Performance Work Statement (PWS) for Boiler Plant Inspection Services at the VA Southern Oregon Rehabilitation Center and Clinics (VA SORCC). The contract is structured as a one base year plus four option year engagement, with the base year running from November 1, 2026 through October 31, 2027, followed by four consecutive option years through October 31, 2031. The facility operates three heating boilers, each rated at 250 horsepower and operating at low pressure, which form the primary focus of the required inspection services.
The scope of work centers on providing comprehensive boiler plant inspection services to maintain operational safety and compliance at the VA facility in White City, Oregon. The contract is being solicited by the Department of Veterans Affairs Veterans Health Administration under Solicitation Number 36C26026Q0977 through Veterans Integrated Service Network 20. While the provided excerpt does not include complete details regarding specific inspection frequencies, performance standards, staffing requirements, or pricing terms, these elements would be detailed in the full PWS document. Contractors should expect to review the complete statement of work for specific requirements related to inspection protocols, reporting procedures, qualifications of inspection personnel, and service level expectations.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PWS
(Performance Work Statement)
VA SORCC Boiler Plant Inspections
A. GENERAL
A.1 GOAL:
The objective of this contract is to provide VA Southern Oregon Rehabilitation Center and Clinics (VA SORCC) with Boiler Plant Inspection Services. This contract should be for one base year and four options years as follows:
Base Year: 11/1/2026 to 10/31/2027.
Option Year 1: 11/1/2027 to 10/31/2028 Option Year 2: 11/1/2028 to 10/31/2029 Option Year 3: 11/1/2029 to 10/31/2030
Option Year 4: 11/1/2030 to 10/31/2031
A.2 BACKGROUND:
The VA SORCC has three heating boilers, each rated at 250HP operating at low pressure (<15 psi), gas and oiled fired. Yearly state inspections are required on all three boilers, one deaerator/ feed water tank, one heat recovery tank, one condensate tank, and one bottom blow tank.
******Option year three will require the yearly state inspections on all three boilers, one deaerator/ feed water tank, one heat recovery tank, one condensate tank, and one bottom blow tank and have an NDT test performed******.
A.3 LOCATION OF SERVICES:
VA SORCC
8495 Crater Lake Hwy
White City, OR 97503
A.4 DVA – FURNISHED PROPERTY OR SERVICES:
Contractor to furnish labor, personnel, materials and equipment to perform inspections on three heating boilers, each rated at 250HP, gas and oil fired.
A.5 DEFINITIONS:
Qualified Professional Inspector: The inspections shall be supervised on-site by a "Qualified Professional Inspector", defined as anyone or combination of:
1. A boiler inspector who has a valid commission from the National Board of Boiler and Pressure Vessel Inspectors.
2. A boiler inspector who has qualified by passing a written examination under the laws, rules and regulations of a jurisdiction of a state.
3. A boiler inspector who is regularly employed as a boiler inspector by a jurisdiction that has adopted and administers one or more sections of the ASME Boiler and Pressure Vessel Code as a legal requirement and has a representative serving as a member of the ASME (American Society of Mechanical Engineers) Conference Committee.
4. A boiler inspector who is regularly employed by an insurance company that has been licensed or registered by the appropriate authority of a state of the United States to write boiler and pressure vessel insurance.
A.6 DOCUMENTATION:
Service record documents shall be provided at the conclusion of each inspection to the White City VA SORCC Boiler Plant Operator (Derrick Schawo) or the FMS Deputy Chief (Stephen Stimson) and shall include but is not necessarily limited to: Name of company, name of technician rendering the service, date with which the services are rendered and any follow-up required. See B.4 for other specific requirements.
B. TECHNICAL APPROACH/TASK
B.1 HOURS OF OPERATION:
1. Contractor to work at the VA SORCC between the hours of 7:30am and 4:30pm, Monday through Friday, excluding federal holidays.
B.2 DELIVERY/PICK-UP POINT:
VA SORCC
8495 Crater Lake Hwy
White City, OR 97503
B.3 METHODS TO BE USED:
1. The vendor shall use standard methods and procedures for the items required to be collected/delivered to the VA SORCC.
2. All work shall be in conformance with State, local and/or Federal laws.
B.4 SPECIFIC REQUIREMENTS:
1. Contractor to furnish Boiler Authorized Inspector (AI) to perform inspections on the following for each year of the contract.
a. (3) Three heating boilers, each rated at 250HP (operating pressure <15psi), gas and oil fired.
i. To perform Internal Inspections
ii. Witness the Safety Device Testing and perform External Inspections
b. (1) One deaerator/feed water tank (Internal Inspections)
c. (1) One heat recovery tank (Internal Inspections)
d. (1) One bottom blow tank (Internal Inspections)
2. Contractor to furnish labor, personnel, materials and equipment to perform NDT inspections on the following. During Year 3.
a. (1) One deaerator/feed water tank (Option Year 3 only)
i. Perform a non-destructive test (Option Year 3 only) A certified inspector must be present during the NDT Test in order for the NDT test to be valid.
ii. NDT must be performed by
iii. Certified American Society for Non-Destructive Testing (ASNT) Level II technicians who are experienced in evaluating boilers and Visually inspect all visible pressure vessel and tanks surfaces for corrosion, material thinning, deposits, and weld cracking
iv. Shall perform non-destructive tests (NDT) using the wet fluorescent magnetic particle (WFMT), ultrasonic testing (UT), and any other necessary non-destructive tests
v. Inspect DA spray nozzles and trays.
vi. Completely examine all accessible welds utilizing the WFMT test method. Properly prepare the surfaces before testing.
vii. Determine pressure vessel material thickness by UT. Thickness measurement locations shall be selected by dividing the storage tank heads into quadrants and taking measurements at each quadrant on two imaginary rings in each head (eight measurements total) . Measurement locations on the shell shall be on each of the quadrants, on four to six locations along the length of the shell (16 to 24 measurements total). The technician may recommend fewer or more tests to the owner, providing justification.
viii. Typically, the pressure vessel section containing the deaerator trays and sprays is not accessible for non-destructive testing. The experience is that this section, which is mainly exposed to steam, is less vulnerable to weld failures and material thinning than the storage section which contains condensate and make-up water.
b. A Written report shall be submitted under the Seal of a professional Engineer that details the result of the NDT Testing and gives the life expectancy of the DA / Feedwater tank
i. This Report must be Written and Certified by a National Board Certified Boiler Inspector Employed by the State of Oregon.
3. Qualification Requirements for Consultant and Inspection Personnel:
a. A professional engineering firm (Professional License (PE)) that specializes in life expectancy evaluations must be part of the team and provide an analysis and recommendations under their seal based on the evaluation of the boiler and associated equipment by means of visual inspection and non-destructive testing conducted by experienced boiler inspectors and non-destructive testing experts on the team.
b. A National Board Certified Boiler Inspector Employed by the State of Oregon
c. Non-destructive testing personnel shall be certified to American Society for Non-destructive Testing (ASNT) Level II, who are experienced in evaluating boilers and associated equipment.
4. Inspections to include a TYPE “A” Internal inspection and a TYPE “C” External inspection under steam pressure for each boiler.
5. The Boiler Inspector shall witness and sign a checklist of boiler safety devises as per VA-SORCC testing procedures during the external operational inspection and shall provide a written inspection report upon completion of each inspection to Facilities Management Service. The checklist of required safety devises to be tested will be available to the contractor
6. The inspections are to be scheduled anytime throughout the term of the contract at the discretion of the Boiler Plant Lead.
7. Why an Inspector Must Be Present
a. Legal Compliance: Without an inspector’s presence and approval, the NDT cannot be considered valid for regulatory purposes.
b. Safety Verification: The inspector confirms that the test is conducted according to recognized standards (e.g., ASME, NBIC) and that any defects are properly documented.
c. Certification: The inspector’s signature or approval is required on the Certificate of Inspection or NDT report, which is necessary for the boiler to remain in service.
B.5 DELIVERABLES:
NA
B.6 ID Badge:
NA
B.7 PERSONNEL:
The contract manager shall be responsible for management and coordination of the contract and shall be the point of contact with all government representatives. The contractor shall notify the contracting officer in writing prior to contract start date the names of the Contract Manager and an alternate contract manager.
The Contract Manager shall be available for the Government to reach. During normal business hours, the contract manager shall respond within one business day from the time of notification. During non-business hours, the Contract Manager shall respond within one business day.
B. 8 SERVICES Delivery Summary:
The contractor service requirements are summarized into performance objectives that relate directly to mission essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each requirement. These thresholds are critical to mission success.
C. SPECIAL CONTRACT REQUIREMENTS
C.1 QUALITY Control:
The contractor is responsible for developing and maintaining a quality program to ensure that the services are performed in accordance with commonly accepted commercial practices. The contractor is responsible for developing and implementing procedures to identify, prevent, and ensure non-recurrence of defective services. At a minimum, the contractor is responsible for developing quality control procedures addressing each specific bid item of the contract to include a service delivery summary. The contractor is responsible for submitting the quality control program to the Contracting Officer with their proposal.
C.2 QUALITY Assurance:
1. The government will periodically evaluate the contractor’s performance by way of Environment of Care Specialist to monitor the performance to ensure services are received.
2. Contractor shall be physically present on the appointed times and days, unless necessary to come more often as requested by the VA SORCC.
3. The completed services shall be performed in an efficient and reliable manner. The VA SORCC has the right to reject work if the work is not performed in an efficient and reliable manner with the timelines and frequencies outlined above.
C.3 GOVERNMENT Remedies:
The Contracting Officer is responsible for following Contract Terms and Conditions.
C.4 RECOGNIZED Holidays:
The contractor is not responsible to provide services on the following days but must provide frequent enough service prior to and after these holidays:
New Years Day, Martin Luther Kings Day, President’s Day, Memorial Day, Juneteenth, Fourth of July, Labor Day, Columbus Day, Veteran’s Day, Thanksgiving Day, and Christmas.
C.5 PERSONNEL Identification:
NA.
C.6 PERSONNEL Policy:
The Contractor shall be responsible for protecting the personnel furnishing services under this contract. To carry out this responsibility, the contractor shall provide the following for their personnel:
1. Worker’s compensation, Professional Liability Insurance, Income tax withholding, and Social Security payments.
2. The parties agree that such personnel shall not be considered VA employees for any purpose and shall be considered employees of the Contractor.
C.7 LAWS & Ordinances:
The Contractor shall comply with all applicable laws, ordinances and regulations (Federal, state, city or otherwise) covering his operations under the contract.
C.8 TWO WAY RADIOS:
The use of two-way radios is prohibited in all VA SORCC buildings. The equipment shall be turned off upon entering either of those buildings.
C.9 INVOICES:
All payments shall be made in arrears upon receipt of a proper invoice. Invoices will provide the following minimum information:
· Contract Number
· Date of Service
· Itemized Charges
· Weight of all waste and recycle
· Authorizing Official
D. TECHNICAL EXHIBITS
NA
File details come from the government source that posted it. Updated .