This document outlines requirements for a federal contract solicitation to renovate residential and treatment spaces at the Rocky Mountain Regional VA Medical Center. The solicitation seeks a contractor to convert an existing residential apartment into a storage area for powered wheelchairs, a wheelchair charging closet, and six computer workstations. An existing nursing office will be converted into two private treatment spaces or semi-private physical therapy spaces. The work must be completed within 90 calendar days of notice to proceed for a price between $250,000 and $500,000. Contractors must hold current OSHA certifications and comply with various building codes and regulations. The submission deadline is June 15, 2022.

View the file

Other files

File Type Posted
Pre-Bid Site Visit Attendance Renovate K1 SCI Residential Apt.docx DOCX document
36C25922R0040 0010.docx DOCX document
36C25922R0040 0009.docx DOCX document
36C25922R0040 0008.docx DOCX document
08 71 00-07R1 - IBN Interior Door Hardware Resubmittal.pdf PDF
08 14 00-03R1 - IBN - Wood Door Resubmittal.pdf PDF
08 14 00-03 - IBN - Wood Door Submittal.pdf PDF
36C25922R0040 0007.docx DOCX document
08 71 00-07 - IBN Hardware.pdf PDF
Questions Amend 7.docx DOCX document
36C25922R0040 0006.docx DOCX document
36C25922R0040 0005.docx DOCX document
36C25922R0040 0004.docx DOCX document
K1 Apartment Door Product Literature.pdf PDF
K1 Apartment Level 1 Arch Plan.pdf PDF
K1 Apartment Door Hardware Schedule.pdf PDF
K1 Apartment Door Hardware Data.pdf PDF
K1 Apartment Level 1S Arch Plan.pdf PDF
K1 Apartment Door Submittals.pdf PDF
36C25922R0040 0003.docx DOCX document
36C25922R0040 0002.docx DOCX document
S04 -Site Visit Meeting Doc.docx DOCX document
Pre-Bid Sign In Sheet.pdf PDF
36C25922R0040 0001.docx DOCX document
Past Performance Questionnaire.docx DOCX document
Combined Spec.pdf PDF
Pages from 09 68 00-02 Carpet.pdf PDF
36C25922R0040_1.docx DOCX document
Pages from 09 65 16-06R1 Sheet Flooring.pdf PDF
Combined Drawings.pdf PDF
09 65 16-06R2 SRE Transitions.pdf PDF
ICRA MASTER-RMR.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Bid Meeting

FOR

The contractor is to provide all labor, tools, materials, equipment and supervision required to Renovate K1 SCI Residential Apartment at the Rocky Mountain Regional VA Medical Center.

Location: Rocky Mountain Regional VA Medical Center

AGENDA:

· Introduction of Joseph Wingfield CO, Steve Manciagli backup COR, and Sylwia Zak CS

· The pre-bid meeting/site walk is not mandatory

· QUESTIONS During site visit MUST BE WRITTEN DOWN

· Address where to send RFP:

· Electronic submissions to sylwia.zak@va.gov

· Pertinent Dates:

· Questions due June 10, 2022 at 1pm, any questions submitted after this time will not be reviewed or answered! submit to sylwia.zak@va.gov

· We’ll get the answers back to you timely

· Proposals due on 6/15/2022 at 11 AM MT via email

· Prospective bidders are prohibited from attempting to gain information by inquiring with VA employees about project other than through written questions submitted to Contracting Officer.

· Prospective bidders are prohibited from visiting site other than through formal invitation by Contracting Officer.

· Attendees of walk-through are to stay as a group while walking to various locations and are to leave the future project site once the walk-through is concluded

· Masks are required at all times while on VA property. Entrance screenings will be conducted each day.

· Confirmation of construction range is between $250,000.00 and $500,000.00

· Bid Guarantee & Payment/Performance Bonds: Are required at 20% of bid price of $3,000,000.00 whichever is less.

· Contractor shall begin performance within 10 days after Notice To Proceed (NTP) and complete within 90 calendar days.

· Post Award Compliance:

· Compliance with Davis Bacon Wages and Application wage determination shall be expected of the contractor. The contractor can submit their weekly certified payrolls with their monthly invoice.