This federal solicitation seeks renovation services at the Rocky Mountain Regional Veterans Affairs Medical Center. The scope of work involves converting an existing residential apartment into office and computer workstation spaces for wheelchair repairs and storage. An additional task is converting a nursing office into two private physical therapy treatment rooms. The contractor must demolish and remove existing fixtures, install new finishes, partitions and doors, upgrade HVAC and electrical systems, and patch and paint all work areas. The period of performance is 90 calendar days from notice to proceed. The solicitation provides requirements for safety plans, personnel qualifications, quality control, acceptance standards, working hours, badging and parking procedures, hazardous materials handling, and infection control risk assessment implementation.

View the file

Other files

File Type Posted
Pre-Bid Site Visit Attendance Renovate K1 SCI Residential Apt.docx DOCX document
36C25922R0040 0010.docx DOCX document
S04 -Site Visit Meeting Doc 6.9.22.docx DOCX document
36C25922R0040 0009.docx DOCX document
36C25922R0040 0008.docx DOCX document
08 71 00-07R1 - IBN Interior Door Hardware Resubmittal.pdf PDF
08 14 00-03 - IBN - Wood Door Submittal.pdf PDF
36C25922R0040 0007.docx DOCX document
08 71 00-07 - IBN Hardware.pdf PDF
Questions Amend 7.docx DOCX document
36C25922R0040 0006.docx DOCX document
36C25922R0040 0005.docx DOCX document
36C25922R0040 0004.docx DOCX document
K1 Apartment Door Product Literature.pdf PDF
K1 Apartment Level 1 Arch Plan.pdf PDF
K1 Apartment Door Hardware Schedule.pdf PDF
K1 Apartment Door Hardware Data.pdf PDF
K1 Apartment Level 1S Arch Plan.pdf PDF
K1 Apartment Door Submittals.pdf PDF
36C25922R0040 0003.docx DOCX document
36C25922R0040 0002.docx DOCX document
S04 -Site Visit Meeting Doc.docx DOCX document
Pre-Bid Sign In Sheet.pdf PDF
36C25922R0040 0001.docx DOCX document
Past Performance Questionnaire.docx DOCX document
Combined Spec.pdf PDF
Pages from 09 68 00-02 Carpet.pdf PDF
36C25922R0040_1.docx DOCX document
Pages from 09 65 16-06R1 Sheet Flooring.pdf PDF
Combined Drawings.pdf PDF
09 65 16-06R2 SRE Transitions.pdf PDF
ICRA MASTER-RMR.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Veterans Affairs

RETURN OF SUBMITTAL VA File No: 0814 00-03R1 Title or Description

IBN - Wood Door

I Date hf...-001

Spec. Section

081400

Contractors Name and Address Station Location VA Medical Center

Kiewit-Turner, a Joint Venture Denver, CO

7200 S. Alton Way, Suite A-300 Contract No. Project No.

Englewood, CO 80112 VA101CFM-C-0100 554-501 Transmittal Date VA File No.

03/06/2014 081400-03R1 Form of Submittal

Letter of Affidavit Shop Drawings X Data Sheets Brochure Physical Sample of Compliance

Manufacturers Literature Test Reports Other or Catalog Cuts

Submittal Scope

08 14 00-03R1 - IBN - Wood Door Resubmittal

Department of Veterans Affairs Actions Authority for Approval/Disapproval (Check appropriate box - Approvals subject to compliance with all contract requirements and to notations/corrections noted)

Approved X Approved, as Noted Approved, as Noted, Resubmit fl Disapproved, Resubmit No Action No Action, Resubmit

Submittal Items Acted Upon

Submittal Item Status

001 IBN - Wood Door AN

Supplier or Manufacturer

Notes/Comments

See comments on submittal.

Note: Refer to RFP 0-181 and CM 1046 for the change of door finish from Doug/as Fir to White Maple.

-- -- Any question, see James Chang

Signature of Authorizg Official

/ Date

PARAGON Project Management System Va Form 08-6225 Paae 1

Received 04/02/2014

Fax: 303.930.9001

303.930.9000Tel:

Kiewit - Turner a Joint Venture

Suite A-300 7200 S. Alton Way

Englewood, CO 80112

Job: 15387 - Replacement Medical Center Facility

Product Data

Sample

Other

Shop Drawing

Resubmittal

First Submittal X

VA Proj #:

To: H+L Architecture 1755 Blake Street

Suite 400

Denver, CO 80202

DESCRIPTIONSpecificationSUBMITTAL

ItemQuantity Section Sub./SupplierNo. Mfgr.

ACTION

DCBA E

Kiewit Submittal No. 22 13 00-01 Architect's Submittal No. 00008

Review Cycle: 001

Attn: Chuck Adkisson

1 SWPPP - CBS & RFP #3 OnlyKiewit - Turner a

Joint Venture

01 573

ACTION TAKEN

CONTRACTOR'S SIGNATURE:

CONTRACTOR'S NOTES:

DATE: 7/12/2011

Reviewed Only for Revisions to

Reviewed: Incorporate Changes

Reviewed=

A

B

C

Previous Submittal

Revise and Resubmit=D

Rejected =E

ARCHITECT/ENGINEER RESPONSE:

REMARKS:

BY: DATE:

Expedition f_sb_pks_01a

VA101CFM-C-0100

Cc: Tim Pogany, U.S. Dept. of Veterans Affairs

Received By ___________________

Date _______________

REQUESTED RETURN DATE:

08 14 00

X

IBN Wood Door Resubmittal

X

The Hallgren Company

08 14 0003R1

03/06/2014

03/20/2014

Kiewit-Turner Submittal No.

VA 1

JVT 1

By VACO BoltonT at 12:26 pm, Mar 24, 2014

These shop drawings/submittals have been reviewed in accordance with the provisions of the Contract Documents. Kiewit-Turner's review shall not serve to relieve Subcontractors or Suppliers of contractual responsibilities for any error or deviation from contract and subcontract requirements.

KIEWIT-TURNER

a Joint Venture

REVIEWED - NO COMMENTS MADE

REVIEWED WITH COMMENTS

RESUBMITTAL REQUIRED

DATE SIGNED

SUBMITTAL #: 08 14 0003R1

03/06/14

03/06/2014

081400-03R1

SOM/TF, H+L/RL

03/21/2014

Kiewit-Turner a Joint Venture

7200 S. Alton Way, Suite A-300, Englewood, CO 80112

Phone: 303-930-9000 FAX: 303-930-9001

Project Name:

Subcontractor Name: Submittal Date:

Contact Name: E-mail: Return By Date:

Contact Phone(s): Review Days:

Number: Name:

1.3.A NA Y N N N - See 08 14 0-02

1.3.C

1.3.C.1-3 NA Y N N Y - 08 14 00-03R1

1.3.D

1.3.D.1-3 NA Y N N N - See 08 14 0-02

1.3.E

1.3.E.1 NA Y N N N - See 08 14 0-02

1.3.E.2 NA Y N N N - See 08 14 0-02

1.3.E.3 NA Y N N N - See 08 14 0-02

1.3.F NA Y N N N

NA Y N N N - See 08 14 0-02

X

Eggers Industries

Sustainable Design Submittals - Manufacturers Data

SUSTAINABLE DESIGN REQUIREMENTS

Date 3/4/2014

Eggers Industries

Eggers Industries

Eggers Industries

Hinge Loading Test Report

Submittal is in Compliance

Submittal is in Compliance with Variances from Specifications

Signature

Reviewed By

SUBMITTAL INDEX & COVER SHEET

Department of Veteran's Affairs Replacement

Medical Center

The Hallgren Company 03/04/14

Mike Hallgren mike@hallgrenco.com

702.523.7525

Specification Section: 08 14 00-03R1 IBN Interior Wood Doors Resubmittal

S p e c

S u b m it ta l

P a ra g ra p h

S p e c

P ro d u c t

P a ra g ra p h

S p e c if ie d o r L is te d

M a n u fa c tu re r?

M e e ts

A ll

S p e c

R e q u ir e m e n ts

E x c e p ti o n s o r

V a ri a n c e s f ro m

S p e c

A p p ro v e r

In fo rm a ti o n N e e d e d

I n

T h is P a c k a g e

Submittal Type

Submittal Item Description Manufacturer

Emily Mays

Wood Door Data - SCLC, Fire Rated, STC & Lead Lined Eggers Industries

WOOD DOOR SAMPLES - SUBMITTED WITH DAT INTERIORS Eggers Industries

Shop Drawings

Wood Door Shop Drawings w/Schedule & Elevations Eggers Industries

MANUFACTURERS LITERATURE & DATA

Cycle/Slam Test Report

Screw Holding Capacity Test Report

LABORATORY TEST REPORTS

SubmittalIndexForm_041009 Page 1 of 1 mailto:mike@hallgrenco.com

1/21/2014 3:21:00 PM

W O O D D O O R S Distributed By:

The Hallgren Company Colorado 2340 Executive Circle Colorado Springs, CO

DOOR HANDING CHART

RECORD OF SUBMITTALS

JOB NO.

PROJECT

LOCATION

ARCHITECT

CONTRACTOR

FINISH HARDWARE BY

SHEET NO. OF

SUBMITTED RETURNED

1ST

2ND

3RD

4TH

RECEIVED APPROVED DRAWINGS

RECEIVED APPROVED HARDWARE

DRAWN BY:

Double EgressDouble Acting

RH - Right HandLH - Left Hand

= KEY SIDEK

K K

K K

LHR - Left Hand Reverse RHR - Right Hand Reverse

C13-061-05-I

VA MEDICAL CENTER - IBN INTERIOR

THE HALLGREN CO. OF NEVADA

Phone: (719) 590-9962 Fax: (719) 590-9969

Construction F6 Bonded Fire Core 45/60 Min.

F9 Bonded Fire Core 90 Min.

SLC Structural Composite Lumber

Edge

Face

F FLUSH DOOR

N1 4 X 25 VISION LITE

N2 4 X 25 VISION LITE

N3 N3

FT1 FT1

FT2 FT2

Label 45min PP w/Int. Seal 45 min [Cat. A]

Prefinish CST Custom Color

Series

EG EGGERS A GRADE

Set

Specie

BDF CW BACON DOUGLAS FIR 63811

Stile

MATCH MATCHING STILES

LEGEND

Wood Doors

Page 2 of 40 1/21/2014 3:21:01 PM

Wood Door Schedule Project ID: C13-061-05-I VA MEDICAL CENTER - IBN INTERIOR Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

01-A1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B1-04/EXAM 01-A1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-A1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0291 EG 3/3

01-A1-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B1-04/EXAM 01-A1-02

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-A1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0301 EG 3/3

01-A1-03-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B1-04/EXAM 01-A1-03

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-A1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0311 EG 3/3

01-A2-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

WAIT 01-A2-01/CORRIDOR 01-B1-04

1 SGL LHR SGLLHR 4'0" x 7'0" x 1 3/4"01-A2-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0321 EG 3/3

01-A3-01-A 3'0" x 7'0" x 1 3/4" WD/HMF

WAIT 01-A2-01/TOILET 01-A3-01

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"01-A3-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0341 EG 3/3

01-A3-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

WAIT 01-A2-01/TOILET 01-A3-02

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"01-A3-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0351 EG 3/3

01-A3-05-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B3-01/OFFICE 01-A3-05

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-A3-05-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0361 EG 3/3

01-B1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B1-04/EXAM 01-B1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-B1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0381 EG 3/3

01-B1-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B1-04/EXAM 01-B1-02

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-B1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0391 EG 3/3

Page 3 of 40 1/21/2014 3:21:01 PM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

01-B1-03-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B1-04/EXAM 01-B1-03

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-B1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0401 EG 3/3

01-B2-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B3-01/RECOVERY 01-B2-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-B2-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0411 EG 3/3

01-B2-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B3-01/CYSTOSCOPY 01-B2-02

1 SGL LH

1/16" LEAD-LINED

SGLLH 4'0" x 7'0" x 1 3/4"01-B2-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0421 EG 3/3

01-B2-02-B 3'0" x 7'0" x 1 3/4" WD/HMF

INSTRUMENT 01-C2-01/CYSTOSCOPY

01-B2-02

1 SGL RH

1/16" LEAD-LINED

SGLRH 3'0" x 7'0" x 1 3/4"01-B2-02-B SLCBDFF MATCH

FLUSH DOOR

CST 5-0431 EG 3/3

01-B3-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B3-01/EXAM 01-B3-02

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-B3-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0461 EG 3/3

01-B3-03-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B3-01/DRESSING 01-B3-03

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-B3-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0471 EG 3/3

01-B3-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B3-01/SHOWER 01-B3-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-B3-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0481 EG 3/3

01-B3-05-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B3-01/TOILET 01-B3-05

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-B3-05-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0491 EG 3/3

01-B3-06-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-01/CLEAN LINEN

01-B3-06

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"01-B3-06-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0501 EG 3/3

Page 4 of 40 1/21/2014 3:21:01 PM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

01-B3-07-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-01/TOILET 01-B3-07

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-B3-07-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0511 EG 3/3

01-B3-08-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-01/TOILET 01-B3-08

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-B3-08-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0521 EG 3/3

01-C1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B1-04/OFFICE 01-C1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-C1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0531 EG 3/3

01-C1-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B1-04/OFFICE 01-C1-02

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-C1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0541 EG 3/3

01-C1-03-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B1-04/OFFICE 01-C1-03

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-C1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0551 EG 3/3

01-C2-01-A 3'0" x 7'0" x 1 3/4" WD/HMF

INSTRUMENT 01-C2-01/STORAGE 01-C2-02

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"01-C2-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0561 EG 3/3

01-C2-01-B 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B1-04/INSTRUMENT 01-C2-01

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"01-C2-01-B SLCBDFF MATCH

FLUSH DOOR

CST 5-0571 EG 3/3

01-C2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B3-01/STORAGE 01-C2-02

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"01-C2-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0581 EG 3/3

01-C2-02-B 3'0" x 7'0" x 1 3/4" WD/HMF

CYSTOSCOPY 01-B2-02/STORAGE 01-C2-02

1 SGL LH

1/16" LEAD-LINED

SGLLH 3'0" x 7'0" x 1 3/4"01-C2-02-B SLCBDFF MATCH

FLUSH DOOR

CST 5-0591 EG 3/3

Page 5 of 40 1/21/2014 3:21:01 PM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

01-C2-02-C 3'0" x 7'0" x 1 3/4" WD/HMF

UROLOGY 01-C3-01/STORAGE 01-C2-02

1 SGL LH

1/16" LEAD-LINED

SGLLH 3'0" x 7'0" x 1 3/4"01-C2-02-C SLCBDFF MATCH

FLUSH DOOR

CST 5-0601 EG 3/3

01-C3-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B3-01/UROLOGY 01-C3-01

1 SGL LH

1/16" LEAD-LINED

SGLLH 4'0" x 7'0" x 1 3/4"01-C3-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0611 EG 3/3

01-C3-01-B 3'0" x 7'0" x 1 3/4" WD/HMF

INSTRUMENT 01-C2-01/UROLOGY 01-C3-01

1 SGL LH

1/16" LEAD-LINED

SGLLH 3'0" x 7'0" x 1 3/4"01-C3-01-B SLCBDFF MATCH

FLUSH DOOR

CST 5-0621 EG 3/3

01-C3-03-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-01/CLEAN UTIL 01-C3-03

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-C3-03-A SLCBDFF MATCH 45min

FLUSH DOOR

CST 5-0641 EG 3/3

01-D3-01-A 3'0" x 7'0" x 1 3/4" WD/HMF

PHYS THER 01-D1-01/OFFICE 01-D3-01

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"01-D3-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0671 EG 3/3

01-E1-01-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/POOL 01-E1-01

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"01-E1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0681 EG 3/3

01-E3-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

POOL 01-E1-01/TOILET 01-E3-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-E3-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0701 EG 3/3

01-E3-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

POOL 01-E1-01/DRESSING 01-E3-02

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-E3-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0711 EG 3/3

01-F1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

POOL 01-E1-01/DRESSING 01-F1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-F1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0721 EG 3/3

Page 6 of 40 1/21/2014 3:21:01 PM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

01-F1-03-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/OFFICE 01-F1-03

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-F1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0731 EG 3/3

01-F2-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/OFFICE 01-F2-02

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-F2-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0751 EG 3/3

01-F2-03-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/OFFICE 01-F2-03

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-F2-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0761 EG 3/3

01-F3-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/INTERVIEW 01-F3-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-F3-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0771 EG 3/3

01-F3-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDRO 01-FR1-03/OFFICE 01-F3-02

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-F3-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0781 EG 3/3

01-G1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/OFFICE 01-G1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-G1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0801 EG 3/3

01-G1-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/SECRETARY 01-G1-02

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-G1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0811 EG 3/3

01-G1-03-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/OFFICE 01-G1-03

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-G1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0821 EG 3/3

01-G2-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/OFFICE 01-G2-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-G2-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0831 EG 3/3

Page 7 of 40 1/21/2014 3:21:01 PM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

01-G2-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/COORDINATOR

01-G2-02

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-G2-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0841 EG 3/3

01-G2-03-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/COORDINATOR

01-G2-03

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-G2-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0851 EG 3/3

01-G2-04-A 2-3'8" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/STORAGE 01-G2-04

1 PR RHRA/LHR PRARHR 3'8" x 7'0" x 1 3/4"01-G2-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0861 EG 3/3

PRILHR 3'8" x 7'0" x 1 3/4" SLCBDFF MATCH

FLUSH DOOR

CST1 EG 3/3

01-G2-05-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/STORAGE 01-G2-05

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"01-G2-05-A F6BDFF MATCH 45min

FLUSH DOOR

CST GB16 5-0871 EG 3/3

01-G2-06-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/OFFICE 01-G2-06

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-G2-06-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0881 EG 3/3

01-G3-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/OFFICE 01-G3-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-G3-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0891 EG 3/3

01-H1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/OFFICE 01-H1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-H1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0911 EG 3/3

01-H1-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/OFFICE 01-H1-02

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-H1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0921 EG 3/3

Page 8 of 40 1/21/2014 3:21:01 PM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

01-H2-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/OFFICE 01-H2-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-H2-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0931 EG 3/3

01-H2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/TOILET 01-H2-02

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"01-H2-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0941 EG 3/3

01-RAR101A

2-3'8" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-01/CORRIDOR 01-B1-04

1 PR RHR/LHR PRRHR 3'8" x 7'0" x 1 3/4"01-RAR101A SLCBDFN3 MATCH N3

CST 5-0951 EG 3/3

PRLHR 3'8" x 7'0" x 1 3/4" SLCBDFN3 MATCH N3

CST1 EG 3/3

01-RAR101B

2-3'8" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-01/CORRIDOR 01-B1-04

1 PR RHR/LHR PRRHR 3'8" x 7'0" x 1 3/4"01-RAR101B SLCBDFN3 MATCH N3

CST 5-0961 EG 3/3

PRLHR 3'8" x 7'0" x 1 3/4" SLCBDFN3 MATCH N3

CST1 EG 3/3

01-RAR103A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-07/CONF. 01-RAR1-03

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RAR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-0981 EG 3/3

01-RAR104A

2-3'8" x 7'0" x 1 3/4" WD/HMF

MULTI-PURP 01-RAR1-05/STOR. 01-RAR1-04

1 PR RHRA/LHR PRARHR 3'8" x 7'0" x 1 3/4"01-RAR104A F6BDFF MATCH 45min

FLUSH DOOR

CST GB16 5-0991 EG 3/3

PRILHR 3'8" x 7'0" x 1 3/4" F6BDFF MATCH 45min

FLUSH DOOR

CST GB161 EG 3/3

Page 9 of 40 1/21/2014 3:21:01 PM

4" X 25" Glass

4" X 25" Glass

4" X 25" Glass

4" X 25" Glass

HM

Flush Door

HM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

01-RAR104B

2-3'8" x 7'0" x 1 3/4" WD/HMF

MULTI-PURP 01-RAR1-05/STOR. 01-RAR1-04

1 PR RHRA/LHR PRARHR 3'8" x 7'0" x 1 3/4"01-RAR104B F6BDFF MATCH 45min

FLUSH DOOR

CST GB16 5-1001 EG 3/3

PRILHR 3'8" x 7'0" x 1 3/4" F6BDFF MATCH 45min

FLUSH DOOR

CST GB161 EG 3/3

01-RAR105A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-07/MULT-PURP

01-RAR1-05

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RAR105A SLCBDFF MATCH

FLUSH DOOR

CST 5-1011 EG 3/3

01-RAR106A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-07/DINING 01-RAR1-06

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-RAR106A SLCBDFF MATCH

FLUSH DOOR

CST 5-1021 EG 3/3

01-RAR106B

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-07/DINING 01-RAR1-06

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RAR106B SLCBDFF MATCH

FLUSH DOOR

CST 5-1031 EG 3/3

01-RAR108A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-07/STORAGE

01-RAR1-08

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RAR108A F6BDFF MATCH 45min

FLUSH DOOR

CST GB16 5-1041 EG 3/3

01-RAR109A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-01/INT CAFE

01-RAR1-09

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RAR109A SLCBDFF MATCH

FLUSH DOOR

CST 5-1051 EG 3/3

01-RAR110A

3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-07/SERVERY

01-RAR1-10

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"01-RAR110A SLCBDFF MATCH

FLUSH DOOR

CST 5-1061 EG 3/3

01-RAR110B

3'0" x 7'0" x 1 3/4" WD/HMF

DINING 01-RAR1-06/SERVERY 01-RAR1-10

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"01-RAR110B SLCBDFF MATCH

FLUSH DOOR

CST 5-1071 EG 3/3

Page 10 of 40 1/21/2014 3:21:01 PM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

01-RAR110C

3'0" x 7'0" x 1 3/4" WD/HMF

SERVERY 01-RAR1-10/STORAGE

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"01-RAR110C SLCBDFF MATCH

FLUSH DOOR

CST 5-1081 EG 3/3

01-RBR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-01/PHARMACY

01-RBR1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-RBR101A F6BDFF MATCH 45min

FLUSH DOOR

CST GB16 5-1111 EG 3/3

01-RBR101B

3'0" x 7'0" x 1 3/4" WD/HMF

PHARMACY 01-RBR1-02/PHARMACY

01-RBR1-01

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"01-RBR101B F6BDFF MATCH 45min

FLUSH DOOR

CST GB16 5-1121 EG 3/3

01-RBR102A

3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-01/PHARMACY

01-RBR1-02

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"01-RBR102A SLCBDFF MATCH

FLUSH DOOR

CST 5-1131 EG 3/3

01-RCR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-01/LEARNING

01-RCR1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RCR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-1141 EG 3/3

01-RCR102A

3'0" x 7'0" x 1 3/4" WD/HMF

LEARNING 01-RCR1/TOILET 01-RCR1-02

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"01-RCR102A SLCBDFN1 MATCH

4 X 25 VISION LITE

CST 5-1151 EG 3/3

01-RCR103A

3'0" x 7'0" x 1 3/4" WD/HMF

BEDROOM 01-RDR1-02/CLOSET 01-RCR1-03

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"01-RCR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-1161 EG 3/3

01-RDR101A

4'0" x 9'2-1/2" x 1 3/4" WD/HMF

BEDROOM 01-RDR1-02/TOILET 01-RDR1-01

1 SGL LH SGLLH 4'0" x 9'2-1/2" x 101-RDR101A SLCBDFFT2 MATCH

FT2

CST 5-1171 EG 3/3

01-RDR102A

4'0" x 7'0" x 1 3/4" WD/HMF

LEARNING 01-RCR1-01/BEDROOM

01-RDR1-02

1 SGL RHR SGLRHR 4'0" x 7'0" x 1 3/4"01-RDR102A SLCBDFF MATCH

FLUSH DOOR

CST 5-1181 EG 3/3

Page 11 of 40 1/21/2014 3:21:01 PM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

01-RDR103A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-01/CONF. 01-RDR1-03

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-RDR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-1191 EG 3/3

01-RFR103A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/SHOWER 01-RFR1-03

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-RFR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-1221 EG 3/3

01-RGR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/PATIENT ED

01-RGR1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-RGR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-1231 EG 3/3

01-RGR102A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/OFFICE 01-RGR1-02

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RGR102A SLCBDFF MATCH

FLUSH DOOR

CST 5-1241 EG 3/3

01-RGR103A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/OFFICE 01-RGR1-03

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-RGR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-1251 EG 3/3

01-RHR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/HORTICULT.

01-RHR1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RHR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-1261 EG 3/3

01-RHR103A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/LOUNGE 01-RHR1-03

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RHR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-1271 EG 3/3

01-RJR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/MEDITATION

01-RJR1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-RJR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-1281 EG 3/3

Page 12 of 40 1/21/2014 3:21:02 PM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-A1-01-A (4'0")(1'6") x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D1-05/PATIENT ROOM

02-A1-01

1 PR RHA/LH PRARH 4'0" x 7'0" x 1 3/4"02-A1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1291 EG 3/3

PRILH 1'6" x 7'0" x 1 3/4" SLCBDFF MATCH

FLUSH DOOR

CST1 EG 3/3

02-A1-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-A1-01/TOILET 02-A1-02

1 SGL LHR SGLLHR 4'0" x 7'0" x 1 3/4"02-A1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1301 EG 3/3

02-A1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-A1-04/TOILET 02-A1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-A1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1311 EG 3/3

02-A1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D1-05/PATIENT ROOM

02-A1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-A1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1321 EG 3/3

02-A2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D1-05/CLASSROOM 02-A2-02

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-A2-02-A SLCBDFN1 MATCH

4 X 25 VISION LITE

CST 5-1341 EG 3/3

02-A2-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-A2-03/CORRIDOR 02-B3-08

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-A2-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1351 EG 3/3

02-A3-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-A2-03/TOILET 02-A3-02

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-A3-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1361 EG 3/3

02-A3-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-A2-03/TOILET 02-A3-03

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-A3-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1371 EG 3/3

Page 13 of 40 1/21/2014 3:21:02 PM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-B1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D1-05/PATIENT ROOM

02-B1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-B1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1411 EG 3/3

02-B1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-B1-01/TOILET 02-B1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-B1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1421 EG 3/3

02-B1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-B1-04/TOILET 02-B1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-B1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1431 EG 3/3

02-B1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D1-05/PATIENT ROOM

02-B1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-B1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1441 EG 3/3

02-B2-01-A 3'0" x 7'0" x 1 3/4" WD/HMF

BED 02-B2-06/TOILET 02-B2-01

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-B2-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1451 EG 3/3

02-B2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

BED 02-B2-05/TOILET 02-B2-02

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-B2-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1461 EG 3/3

02-B2-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

BED 02-B2-07/TOILET 02-B2-03

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-B2-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1471 EG 3/3

02-B2-04-A 3'0" x 7'0" x 1 3/4" WD/HMF

BED 02-B2-08/TOILET 02-B2-04

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-B2-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1481 EG 3/3

02-B2-05-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-C2-04/BED 02-B2-05

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-B2-05-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1491 EG 3/3

Page 14 of 40 1/21/2014 3:21:02 PM

HM

HM

HM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-B2-06-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-C2-04/BED 02-B2-06

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-B2-06-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1501 EG 3/3

02-B2-07-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-C2-04/BED 02-B2-07

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-B2-07-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1511 EG 3/3

02-B2-08-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-C2-04/BED 02-B2-08

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-B2-08-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1521 EG 3/3

02-B3-01-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-C2-04/BED 02-B3-01

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-B3-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1531 EG 3/3

02-B3-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-C2-04/BED 02-B3-02

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-B3-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1541 EG 3/3

02-B3-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-C2-04/BED 02-B3-03

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-B3-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1551 EG 3/3

02-B3-04-A 3'0" x 7'0" x 1 3/4" WD/HMF

BED 02-B3-01/TOILET 02-B3-04

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-B3-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1561 EG 3/3

02-B3-05-A 3'0" x 7'0" x 1 3/4" WD/HMF

BED 02-B3-02/TOILET 02-B3-05

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-B3-05-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1571 EG 3/3

02-B3-06-A 3'0" x 7'0" x 1 3/4" WD/HMF

BED 02-B3-03/TOILET 02-B3-06

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-B3-06-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1581 EG 3/3

Page 15 of 40 1/21/2014 3:21:02 PM

HM

HM

HM

HM

HM

HM

HM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-B3-07-A 2-3'8" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/EQUIP STOR

02-B3-07

1 PR RHRA/LHR PRARHR 3'8" x 7'0" x 1 3/4"02-B3-07-A SLCBDFF MATCH 45min

FLUSH DOOR

CST 5-1591 EG 3/3

PRILHR 3'8" x 7'0" x 1 3/4" SLCBDFF MATCH 45min

FLUSH DOOR

CST1 EG 3/3

02-B3-07-B 2-3'8" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/EQUIP STOR

02-B3-07

1 PR RHRA/LHR PRARHR 3'8" x 7'0" x 1 3/4"02-B3-07-B SLCBDFF MATCH 45min

FLUSH DOOR

CST 5-1601 EG 3/3

PRILHR 3'8" x 7'0" x 1 3/4" SLCBDFF MATCH 45min

FLUSH DOOR

CST1 EG 3/3

02-C1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D1-05/PATIENT ROOM

02-C1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-C1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1611 EG 3/3

02-C1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-C1-01/TOILET 02-C1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-C1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1621 EG 3/3

02-C1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-C1-04/TOILET 02-C1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-C1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1631 EG 3/3

02-C1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D1-05/PATIENT ROOM

02-C1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-C1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1641 EG 3/3

02-C2-01-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D1-05/CONFERENCE 02-C2-01

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-C2-01-A SLCBDFN1 MATCH

4 X 25 VISION LITE

CST 5-1651 EG 3/3

Page 16 of 40 1/21/2014 3:21:02 PM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-C2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D2-08/OFFICE 02-C2-02

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-C2-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1661 EG 3/3

02-C2-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-C2-04/LINEN 02-C2-03

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-C2-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1671 EG 3/3

02-C2-04-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-B3-08/CORRIDOR 02-C2-04

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-C2-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1681 EG 3/3

02-C2-04-B 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D2-08/CORRIDOR 02-C2-04

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-C2-04-B SLCBDFF MATCH

FLUSH DOOR

CST 5-1691 EG 3/3

02-C3-01-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-C2-04/STAFF LOUNGE

02-C3-01

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-C3-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1701 EG 3/3

02-C3-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/OFFICE 02-C3-02

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-C3-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1711 EG 3/3

02-D1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D1-05/PATIENT ROOM

02-D1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-D1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1721 EG 3/3

02-D1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-D1-01/TOILET 02-D1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-D1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1731 EG 3/3

02-D1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-D1-04/TOILET 02-D1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-D1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1741 EG 3/3

Page 17 of 40 1/21/2014 3:21:02 PM

HM

HM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-D1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT ROOM

02-D1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-D1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1751 EG 3/3

02-D2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

LOUNGE 02-D2-03/LOCKERS 02-D2-02

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-D2-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1771 EG 3/3

02-D2-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D2-08/STAFF LOUNGE

02-D2-03

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-D2-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1781 EG 3/3

02-D2-04-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D2-08/TOILET 02-D2-04

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-D2-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1791 EG 3/3

02-D2-05-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D2-08/TOILET 02-D2-05

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-D2-05-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1801 EG 3/3

02-D3-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/OFFICE 02-D3-03

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-D3-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1821 EG 3/3

02-D3-04-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/OFFICE 02-D3-04

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-D3-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1831 EG 3/3

02-E1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT ROOM

02-E1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-E1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1841 EG 3/3

02-E1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-E1-01/TOILET 02-E1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-E1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1851 EG 3/3

Page 18 of 40 1/21/2014 3:21:02 PM

HM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-E1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-E1-04/TOILET 02-E1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-E1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1861 EG 3/3

02-E1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT ROOM

02-E1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-E1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1871 EG 3/3

02-E2-01-A 2-2'6" x 7'0" x 1 3/4" WD/HMF

NURSE STATION 02-E2-01/STORAGE

02-E2-01A

1 PR RHRA/LHR PRARHR 2'6" x 7'0" x 1 3/4"02-E2-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1901 EG 3/3

PRILHR 2'6" x 7'0" x 1 3/4" SLCBDFF MATCH

FLUSH DOOR

CST1 EG 3/3

02-E2-05-A 3'6" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-F3-04/MEDS 02-E2-05

1 SGL LH SGLLH 3'6" x 7'0" x 1 3/4"02-E2-05-A SLCBDFN2 MATCH

4 X 25 VISION LITE

CST 5-1921 EG 3/3

02-E2-05BA

3'6" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-F3-04/CLEAN UTIL 02-E2-05B

1 SGL RH SGLRH 3'6" x 7'0" x 1 3/4"02-E2-05BA SLCBDFF MATCH 45min

FLUSH DOOR

CST 5-1931 EG 3/3

02-E2-06-A 3'6" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/CONSULT 02-E2-06

1 SGL LH SGLLH 3'6" x 7'0" x 1 3/4"02-E2-06-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1941 EG 3/3

02-E2-06CA

3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/LACTATION

02-E2-06C

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-E2-06CA SLCBDFF MATCH

FLUSH DOOR

CST 5-1951 EG 3/3

Page 19 of 40 1/21/2014 3:21:02 PM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-E3-05-A 2-2'6" x 7'0" x 1 3/4" WD/HMF

NURSE STATION 02-E3-05/STORAGE

02-E3-05A

1 PR RHRA/LHR PRARHR 2'6" x 7'0" x 1 3/4"02-E3-05-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1971 EG 3/3

PRILHR 2'6" x 7'0" x 1 3/4" SLCBDFF MATCH

FLUSH DOOR

CST1 EG 3/3

02-E3-07-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/EDUCATOR 02-E3-07

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-E3-07-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1981 EG 3/3

02-E3-08-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-F3-04/CLEAN LINEN 02-E3-08

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-E3-08-A F6BDFF MATCH 45min

FLUSH DOOR

CST GB16 5-1991 EG 3/3

02-F1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT ROOM

02-F1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-F1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2001 EG 3/3

02-F1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-F1-01/TOILET 02-F1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-F1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2011 EG 3/3

02-F1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-F1-04/TOILET 02-F1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-F1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2021 EG 3/3

02-F1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT ROOM

02-F1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-F1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2031 EG 3/3

02-F2-01BA

3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/OFFICE 02-F2-01B

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-F2-01BA SLCBDFF MATCH

FLUSH DOOR

CST 5-2041 EG 3/3

Page 20 of 40 1/21/2014 3:21:03 PM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-F2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/EQUIP STOR 02-F2-02

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-F2-02-A F6BDFF MATCH 45min

FLUSH DOOR

CST GB16 5-2051 EG 3/3

02-F3-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/OFFICE 02-F3-02

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-F3-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2071 EG 3/3

02-G1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT ROOM

02-G1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-G1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2081 EG 3/3

02-G1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-G1-01/TOILET 02-G1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-G1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2091 EG 3/3

02-G1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-G1-04/TOILET 02-G1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-G1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2101 EG 3/3

02-G1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT ROOM

02-G1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-G1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2111 EG 3/3

02-G2-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/STAFF TOILET 02-G2-03

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-G2-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2121 EG 3/3

02-G2-04-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/WORK 02-G2-04

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-G2-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2131 EG 3/3

02-G2-05-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-G2-06/OFFICE 02-G2-05

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-G2-05-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2141 EG 3/3

Page 21 of 40 1/21/2014 3:21:03 PM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-G3-01-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/OFFICE 02-G3-01

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-G3-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2151 EG 3/3

02-G3-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-G2-06/STORAGE 02-G3-03

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-G3-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2161 EG 3/3

02-G3-03BA

3'0" x 7'0" x 1 3/4" WD/HMF

WORK 02-G2-04/INTERVIEW 02-G3-03B

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-G3-03BA SLCBDFF MATCH

FLUSH DOOR

CST 5-2171 EG 3/3

02-H1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT ROOM

02-H1-01

1 SGL RH

1/4" LEAD LINED

SGLRH 4'0" x 7'0" x 1 3/4"02-H1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2181 EG 3/3

02-H1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-H1-01/TOILET 02-H1-02

1 SGL LHR

1/4" LEAD LINED

SGLLHR 3'0" x 7'0" x 1 3/4"02-H1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2191 EG 3/3

02-RAR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/PAT ROOM

02-RAR1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-RAR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-2201 EG 3/3

02-RAR102A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RAR1-04/TOILET 02-RAR1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-RAR102A SLCBDFF MATCH

FLUSH DOOR

CST 5-2211 EG 3/3

02-RAR103A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RAR1-01/TOILET 02-RAR1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-RAR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-2221 EG 3/3

02-RAR104A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/PAT ROOM

02-RAR1-04

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-RAR104A SLCBDFF MATCH

FLUSH DOOR

CST 5-2231 EG 3/3

Page 22 of 40 1/21/2014 3:21:03 PM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-RBR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/PAT ROOM

02-RBR1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-RBR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-2251 EG 3/3

02-RBR102A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RBR1-04/TOILET 02-RBR1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-RBR102A SLCBDFF MATCH

FLUSH DOOR

CST 5-2261 EG 3/3

02-RBR103A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RBR1-01/TOILET 02-RBR1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-RBR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-2271 EG 3/3

02-RBR104A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/PAT ROOM

02-RBR1-04

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-RBR104A SLCBDFF MATCH

FLUSH DOOR

CST 5-2281 EG 3/3

02-RCR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/PAT ROOM

02-RCR1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-RCR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-2291 EG 3/3

02-RCR102A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RCR1-04/TOILET 02-RCR1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-RCR102A SLCBDFF MATCH

FLUSH DOOR

CST 5-2301 EG 3/3

02-RCR103A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RCR1-01/TOILET 02-RCR1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-RCR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-2311 EG 3/3

02-RCR104A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/PAT ROOM

02-RCR1-04

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-RCR104A SLCBDFF MATCH

FLUSH DOOR

CST 5-2321 EG 3/3

Page 23 of 40 1/21/2014 3:21:03 PM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-RDR101A

(4'0")(1'6") x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/PAT ROOM

02-RDR1-01

1 PR LHA/RH PRALH 4'0" x 7'0" x 1 3/4"02-RDR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-2331 EG 3/3

PRIRH 1'6" x 7'0" x 1 3/4" SLCBDFF MATCH

FLUSH DOOR

CST1 EG 3/3

02-RDR102A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RDR1-04/TOILET 02-RDR1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-RDR102A SLCBDFF MATCH

FLUSH DOOR

CST 5-2341 EG 3/3

02-RDR103A

4'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RDR1-01/TOILET 02-RDR1-03

1 SGL RHR SGLRHR 4'0" x 7'0" x 1 3/4"02-RDR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-2351 EG 3/3

02-RDR104A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/PAT ROOM

02-RDR1-04

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-RDR104A SLCBDFF MATCH

FLUSH DOOR

CST 5-2361 EG 3/3

02-RER101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT RM

02-RER1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-RER101A SLCBDFF MATCH

FLUSH DOOR

CST 5-2371 EG 3/3

02-RER102A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RER1-04/TOILET 02-RER1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-RER102A SLCBDFF MATCH

FLUSH DOOR

CST 5-2381 EG 3/3

02-RER103A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RER1-01/TOILET 02-RER1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-RER103A SLCBDFF MATCH

FLUSH DOOR

CST 5-2391 EG 3/3

02-RER104A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT RM

02-RER1-04

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-RER104A SLCBDFF MATCH

FLUSH DOOR

CST 5-2401 EG 3/3

Page 24 of 40 1/21/2014 3:21:03 PM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-RFR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT RM

02-RFR1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-RFR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-2411 EG 3/3

02-RFR102A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RFR1-04/TOILET 02-RFR1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-RFR102A SLCBDFF MATCH

FLUSH DOOR

CST 5-2421 EG 3/3

02-RFR103A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RFR1-01/TOILET 02-RFR1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-RFR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-2431 EG 3/3

02-RFR104A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT RM

02-RFR1-04

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-RFR104A SLCBDFF MATCH

FLUSH DOOR

CST 5-2441 EG 3/3

02-RGR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT RM

02-RGR1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-RGR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-2451 EG 3/3

02-RGR102A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RGR1-04/TOILET 02-RGR1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-RGR102A SLCBDFF MATCH

FLUSH DOOR

CST 5-2461 EG 3/3

02-RGR103A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RGR1-01/TOILET 02-RGR1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-RGR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-2471 EG 3/3

02-RGR104A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT RM

02-RGR1-04

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-RGR104A SLCBDFF MATCH

FLUSH DOOR

CST 5-2481 EG 3/3

02-RHR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT RM

02-RHR1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-RHR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-2491 EG 3/3

Page 25 of 40 1/21/2014 3:21:03 PM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-RHR101B

3'0" x 7'0" x 1 3/4" WD/HMF

ANTEROOM 02-RHR1-02/PAT. ROOM

02-RHRA-01

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-RHR101B SLCBDFN1 MATCH

4 X 25 VISION LITE

CST 5-2501 EG 3/3

02-RHR102A

3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/ANTEROOM 02-RHR1-02

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-RHR102A SLCBDFF MATCH

FLUSH DOOR

CST 5-2511 EG 3/3

02-RHR103A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RHR1-01/TOILET 02-RHR1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-RHR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-2521 EG 3/3

02-RHR104A

3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/OFFICE 02-RHR1-04

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-RHR104A SLCBDFF MATCH

FLUSH DOOR

CST 5-2531 EG 3/3

03-A1-01-A (4'0")(1'6") x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B2-02/PATIENT ROOM

03-A1-01

1 PR RHA/LH PRARH 4'0" x 7'0" x 1 3/4"03-A1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2541 EG 3/3

PRILH 1'6" x 7'0" x 1 3/4" SLCBDFF MATCH

FLUSH DOOR

CST1 EG 3/3

03-A1-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 03-A1-01/TOILET 03-A1-02

1 SGL LHR SGLLHR 4'0" x 7'0" x 1 3/4"03-A1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2551 EG 3/3

03-A1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 03-A1-04/TOILET 03-A1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"03-A1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2561 EG 3/3

03-A1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B2-02/PATIENT ROOM

03-A1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"03-A1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2571 EG 3/3

Page 26 of 40 1/21/2014 3:21:03 PM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

03-A2-01-B 3'0" x 7'0" x 1 3/4" WD/HMF

WAIT 03-A2-01/CORRIDOR 03-A3-01

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"03-A2-01-B SLCBDFF MATCH

FLUSH DOOR

CST 5-2581 EG 3/3

03-A2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B2-02/CONFERENCE 03-A2-02

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"03-A2-02-A SLCBDFN1 MATCH

4 X 25 VISION LITE

CST 5-2601 EG 3/3

03-A3-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

WAIT 03-A2-01/TOILET 03-A3-02

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"03-A3-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2611 EG 3/3

03-A3-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

WAIT 03-A2-01/TOILET 03-A3-03

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"03-A3-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2621 EG 3/3

03-A3-05-A 3'6" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-A3-01/STORAGE 03-A3-05

1 SGL RHR SGLRHR 3'6" x 7'0" x 1 3/4"03-A3-05-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2651 EG 3/3

03-A3-07-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B3-09/LACTATION 03-A3-07

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"03-A3-07-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2671 EG 3/3

03-B1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B2-02/PATIENT ROOM

03-B1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"03-B1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2681 EG 3/3

03-B1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 03-B1-01/TOILET 03-B1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"03-B1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2691 EG 3/3

03-B1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 03-B1-04/TOILET 03-B1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"03-B1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2701 EG 3/3

Page 27 of 40 1/21/2014 3:21:03 PM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

03-B1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B2-02/PATIENT ROOM

03-B1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"03-B1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2711 EG 3/3

03-B2-01-A 3'6" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B2-02/GYM 03-B2-01

1 SGL LHR SGLLHR 3'6" x 7'0" x 1 3/4"03-B2-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2721 EG 3/3

03-B2-01-B 3'6" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-A3-01/GYM 03-B2-01

1 SGL LHR SGLLHR 3'6" x 7'0" x 1 3/4"03-B2-01-B SLCBDFF MATCH

FLUSH DOOR

CST 5-2731 EG 3/3

03-B3-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-C2-04/STORAGE 03-B3-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"03-B3-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2751 EG 3/3

03-B3-04-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-A3-01/SPEECH 03-B3-04

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"03-B3-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2761 EG 3/3

03-B3-06-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B3-09/EQUIP STOR 03-B3-06

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"03-B3-06-A F6BDFF MATCH 45min

FLUSH DOOR

CST GB16 5-2771 EG 3/3

03-B3-07-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-C2-04/SAFETY COORD

03-B3-07

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"03-B3-07-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2781 EG 3/3

03-B3-08-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-C2-04/OFFICE 03-B3-08

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"03-B3-08-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2791 EG 3/3

03-C1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B2-02/PATIENT ROOM

03-C1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"03-C1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2811 EG 3/3

Page 28 of 40 1/21/2014 3:21:03 PM

HM

HM

HM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

03-C1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 03-C1-01/TOILET 03-C1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"03-C1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2821 EG 3/3

03-C1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 03-C1-04/TOILET 03-C1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"03-C1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2831 EG 3/3

03-C1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B2-02/PATIENT ROOM

03-C1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"03-C1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2841 EG 3/3

03-C2-01-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B2-02/STAFF 03-C2-01

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"03-C2-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2851 EG 3/3

03-C2-04-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-A3-01/CORRIDOR 03-C2-04

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"03-C2-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2881 EG 3/3

03-C2-04-B 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-D3-06/CORRIDOR 03-C2-04

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"03-C2-04-B SLCBDFF MATCH

FLUSH DOOR

CST 5-2891 EG 3/3

03-C3-01-A 2-3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-C2-04/CLOSET 03-C3-01

1 PR RHRA/LHR PRARHR 3'0" x 7'0" x 1 3/4"03-C3-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2901 EG 3/3

PRILHR 3'0" x 7'0" x 1 3/4" SLCBDFF MATCH

FLUSH DOOR

CST1 EG 3/3

Page 29 of 40 1/21/2014 3:21:03 PM

HM

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

03-C3-02-A 2-3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .