08 14 00-03 - IBN - Wood Door Submittal.pdf

PDF 2 MB Posted

Attached to
Z2DA--554-22-137 Renovate K1 SCI Residential Apartment (VA-22-00041954)
Solicitation number
36C25922R0040
Issued by

About this file

This document outlines a solicitation for renovation work at a Department of Veterans Affairs medical center. The solicitation includes three line items for converting existing residential apartments and offices into storage, repair, and workspaces to support power wheelchair maintenance and computer workstations. Renovations are to include demolition, new construction, finishes, mechanical and electrical work. The solicitation provides general requirements for schedule and quality control documentation, safety plans, personnel qualifications, performance periods, and standards for code compliance. Submissions including schedules, safety plans, qualifications and quality control documentation are due within 10 days of award. The work must be completed within 90 calendar days of notice to proceed.

View the file

Other files

File Type Posted
Pre-Bid Site Visit Attendance Renovate K1 SCI Residential Apt.docx DOCX document
36C25922R0040 0010.docx DOCX document
S04 -Site Visit Meeting Doc 6.9.22.docx DOCX document
36C25922R0040 0009.docx DOCX document
36C25922R0040 0008.docx DOCX document
08 71 00-07R1 - IBN Interior Door Hardware Resubmittal.pdf PDF
08 14 00-03R1 - IBN - Wood Door Resubmittal.pdf PDF
36C25922R0040 0007.docx DOCX document
08 71 00-07 - IBN Hardware.pdf PDF
Questions Amend 7.docx DOCX document
36C25922R0040 0006.docx DOCX document
36C25922R0040 0005.docx DOCX document
36C25922R0040 0004.docx DOCX document
K1 Apartment Door Product Literature.pdf PDF
K1 Apartment Level 1 Arch Plan.pdf PDF
K1 Apartment Door Hardware Schedule.pdf PDF
K1 Apartment Door Hardware Data.pdf PDF
K1 Apartment Level 1S Arch Plan.pdf PDF
K1 Apartment Door Submittals.pdf PDF
36C25922R0040 0003.docx DOCX document
36C25922R0040 0002.docx DOCX document
S04 -Site Visit Meeting Doc.docx DOCX document
Pre-Bid Sign In Sheet.pdf PDF
36C25922R0040 0001.docx DOCX document
Past Performance Questionnaire.docx DOCX document
Combined Spec.pdf PDF
Pages from 09 68 00-02 Carpet.pdf PDF
36C25922R0040_1.docx DOCX document
Pages from 09 65 16-06R1 Sheet Flooring.pdf PDF
Combined Drawings.pdf PDF
09 65 16-06R2 SRE Transitions.pdf PDF
ICRA MASTER-RMR.docx DOCX document
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RETURN OF SUBMITTAL VA File No: 08 14 00-03

Title or Description Date Spec. Section

IBN-Wood Door i 081400

Contractor's Name and Address Station Location

VA Medical Center Kiewit-Turner, a Joint Venture Denver, CO

7200 S. Alton Way, Suite A-300 Contract Nb. Project No.

Englewood, CO 80112 VA101CFMC0100 554-501 Transmittal Date VA File No.

10/22/2013 081400-03 Form of Submittal

Letter of Affidavit fl Shop Drawings DU Data Sheets fl Brochure Physical Sample of Compliance Manufacturers Literature F- ] Test Reports DOther or Catalog Cuts

Submittal Scope

IBN - Wood Door

Package was prepared by KT and the Haligren Co. and agreed by VA and Denver MC. JVT performed code compliance review.

Department of Veterans Affairs Actions Authority for Approval/Disapproval (Check appropriate box - Approvals subject to compliance with all contract requirements and to notations/corrections noted)

Approved L Approved, as Noted Approved, as Noted, Resubmit Disapproved, Resubmit No Action No Action, Resubmit

Submittal Items Acted Upon Submittal Item Status

.001 IBN - Wood Door ANR

Supplier or Manufacturer

Notes/Comments Incorporate comments into resubmittal.

-Door 05-01-RARI-01-A - Add 425 glass.
-Door 05-01-RARI-01-B - Add 425 glass.
-Door 05-01-RDRI-01-A - The ceiling lift does need to pass through this door. CFM/JVT to verify this will work as it

appears the contract documents have an incorrect detail.

-Door 05-02-A2-02-A - Add 425 glass.
-Door 05-02-C2-01-A - Add 4x25 glass.
-Door 05-02-E3-08-A - Delete 4x25 glass.
-Door 05-02-H1-01-A - This door needs to be lead lined.
-Door -05-02-RHRI-02-A - Delete 425 glass.
-Door 05-03-C2-01-A - Delete 425 glass.
-Door 05-03-E3-04-A - Delete 4x25 glass.
-Door 05-03-H3-01-A - The ceiling lift does need to pass through this door. CFM/JVT to verify this will work as it appears

the contract documents have an incorrect detail.

-Door 05-03-RHR 1-02-A - Delete 425 glass.
-Change the following Level I hollow metal doors to wood doors (flush - no glass): B3-06-A, C2-01-A, C2-02-B, C2-02-A,

C2-02-B, C2-02-C, C3-03-A, G2-04-A, H2-02-A, RBR 1-01-B, RBR1-02-A.

- Change the following Level 2 hollow metal doors to wood doors (flush - no glass): B2-01-A, B2-02-A, B2-03-A, B2-04-A, 92-05-A, B2-06-A, B2-07-A, B2-08-A, B3-01-A, B3-02-A, B3-03-A, B3-04-A, B3-05-A, B3-06-A, B3-07-A, B3-07-B, C2-04-A, C2-04-B, C3-01-A, C3-02-A, D2-02-A, D2-03-A, D2-04-A, D2-05-A, E2-01-A, E2-05B-A, E3-05-A, G2-03-A, G2-04-A.

- Change the following Level 3 hollow metal doors to wood doors (flush - no glass): A3-05-A, B2-01-A, B2-01-B, B3-03-A, B3-07-A, B3-08-A, C2-04-A, C2-04-B, C3-01-A, C3-02-A, D2-01-A, D2-02-A, D2-05-A, D2-08-A, E2-02-A, E2-05-A, E3-05-A.

Any question, contact James Chang rMrc/M,UIN riojeci ivianagernent oysi n Va Form 05-1522b Page 1 SUBMOO-23-VA Return ofSubmittal

Received 12/23/2013

PARAGON Project Management System Va Form 08-6225 Page 2 SUBMOO-23-VA Return of Submittal

Fax: 303.930.9001

303.930.9000Tel:

Kiewit - Turner a Joint Venture

Suite A-300 7200 S. Alton Way

Englewood, CO 80112

Job: 15387 - Replacement Medical Center Facility

Product Data

Sample

Other

Shop Drawing

Resubmittal

First Submittal X

VA Proj #:

To: H+L Architecture 1755 Blake Street

Suite 400

Denver, CO 80202

DESCRIPTIONSpecificationSUBMITTAL

ItemQuantity Section Sub./SupplierNo. Mfgr.

ACTION

DCBA E

Kiewit Submittal No. 22 13 00-01 Architect's Submittal No. 00008

Review Cycle: 001

Attn: Chuck Adkisson

1 SWPPP - CBS & RFP #3 OnlyKiewit - Turner a

Joint Venture

01 573

ACTION TAKEN

CONTRACTOR'S SIGNATURE:

CONTRACTOR'S NOTES:

DATE: 7/12/2011

Reviewed Only for Revisions to

Reviewed: Incorporate Changes

Reviewed=

A

B

C

Previous Submittal

Revise and Resubmit=D

Rejected =E

ARCHITECT/ENGINEER RESPONSE:

REMARKS:

BY: DATE:

Expedition f_sb_pks_01a

VA101CFM-C-0100

Cc: Tim Pogany, U.S. Dept. of Veterans Affairs

Received By ___________________

Date _______________

REQUESTED RETURN DATE:

08 14 00VA 1

JVT 1

X

IBN Wood Door Submittal

X

The Hallgren Company

08 14 0003

10/22/2013

11/05/2013

Kiewit-Turner Submittal No.

By VACO BoltonT at 4:14 pm, Oct 22, 2013

These shop drawings/submittals have been reviewed in accordance with the provisions of the Contract Documents. Kiewit-Turner's review shall not serve to relieve Subcontractors or Suppliers of contractual responsibilities for any error or deviation from contract and subcontract requirements.

KIEWIT-TURNER

a Joint Venture

REVIEWED - NO COMMENTS MADE

REVIEWED WITH COMMENTS

RESUBMITTAL REQUIRED

DATE SIGNED

SUBMITTAL #: XX XX XXXX

X/XX/XX10/22/13

08 14 00-03

Kiewit-Turner a Joint Venture

7200 S. Alton Way, Suite A-300, Englewood, CO 80112

Phone: 303-930-9000 FAX: 303-930-9001

Project Name:

Subcontractor Name: Submittal Date:

Contact Name: E-mail: Return By Date:

Contact Phone(s): Review Days:

Number: Name:

1.3.A NA Y N N N - Submittal #1623

1.4.C

1.3.C.1-3 NA Y N N Y

1.3.D

1.3.D.1-3 NA Y N N N - Submittal #1623

1.3.E

1.3.E.1 NA Y N N N - Submittal #1623

1.3.E.2 NA Y N N N - Submittal #1623

1.3.E.3 NA Y N N N - Submittal #1623

1.3.F NA Y N N X

NA Y N N N - Submittal #1623

X

Hinge Loading Test Report Eggers Industries

MANUFACTURERS LITERATURE & DATA

Screw Holding Capacity Test Report

Sustainable Design Submittals - Manufacturers Data

SUSTAINABLE DESIGN REQUIREMENTS

Date 10/21/2013

Submittal is in Compliance

Submittal is in Compliance with Variances from Specifications

Signature

Reviewed By

SUBMITTAL INDEX & COVER SHEET

Department of Veteran's Affairs Replacement

Medical Center

The Hallgren Company 10/21/13

Mike Hallgren mike@hallgrenco.com

702.523.7525

Specification Section: 08 14 00 IBN Interior Wood Doors

S p e c

S u b m it ta l

P a ra g ra p h

S p e c

P ro d u c t

P a ra g ra p h

S p e c if ie d o r L is te d

M a n u fa c tu re r?

M e e ts

A ll

S p e c

R e q u ir e m e n ts

E x c e p ti o n s o r

V a ri a n c e s f ro m

S p e c

A p p ro v e r In fo rm a ti o n

N e e d e d

I n

T h is P a c k a g e

Submittal Type

Submittal Item Description Manufacturer

Chris Sprecker

Wood Door Data - SCLC, Fire Rated, STC & Lead Lined Eggers Industries

Eggers Industries

Eggers Industries

Eggers Industries

WOOD DOOR SAMPLES - SUBMITTED WITH DAT INTERIORS Eggers Industries

Shop Drawings

Wood Door Shop Drawings w/Schedule & Elevations Eggers Industries

LABORATORY TEST REPORTS

Cycle/Slam Test Report

SubmittalIndexForm_041009 Page 1 of 1

1.3.B SAMPLES

Section 01 33 23

1. WOOD DOOR SAMPLES

Page 000002

1.3.C SHOP DRAWINGS

Section 01 33 23

1-3

1. WOOD DOOR SHOP DRAWINGS

Page 000006

Construction F6 Bonded Fire Core 45/60 Min.

F9 Bonded Fire Core 90 Min.

SLC Structural Composite Lumber

Edge

Face

F FLUSH DOOR

N1 N1 G2 G2 N2 N2

Label 90min PP w/Int. Seal 90 min [Cat. A] 45min PP w/Int. Seal 45 min [Cat. A]

Prefinish CST Custom Color

Series

EG EGGERS A GRADE

Set

Specie

BDF CW BACON DOUGLAS FIR 63811

Stile

MATCH MATCHING STILES

LEGEND

Wood Doors

10/3/2013 7:26:13 AM

Page 000007

Wood Door Schedule Project ID: C13-061-05-I VA MEDICAL CENTER - IBN INTERIOR Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

01-A1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B1-04/EXAM 01-A1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-A1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0291 EG 3/3

01-A1-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B1-04/EXAM 01-A1-02

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-A1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0301 EG 3/3

01-A1-03-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B1-04/EXAM 01-A1-03

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-A1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0311 EG 3/3

01-A2-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

WAIT 01-A2-01/CORRIDOR 01-B1-04

1 SGL LHR SGLLHR 4'0" x 7'0" x 1 3/4"01-A2-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0321 EG 3/3

01-A2-01-B 4'0" x 7'10" x 1 3/4" WD/HMF 90

CONCOURSE 01/WAIT 01-A2-01

1 SGL LH SGLLH 4'0" x 7'10" x 1 3/401-A2-01-B F9BDFG2 MATCH 90min G2

CST GB16 5-0331 EG 3/3

01-A3-01-A 3'0" x 7'0" x 1 3/4" WD/HMF

WAIT 01-A2-01/TOILET 01-A3-01

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"01-A3-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0341 EG 3/3

01-A3-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

WAIT 01-A2-01/TOILET 01-A3-02

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"01-A3-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0351 EG 3/3

01-A3-05-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B3-01/OFFICE 01-A3-05

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-A3-05-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0361 EG 3/3

01-B1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B1-04/EXAM 01-B1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-B1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0381 EG 3/3

Page 3 of 32 10/3/2013 7:26:14 AM

Page 000008

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

01-B1-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B1-04/EXAM 01-B1-02

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-B1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0391 EG 3/3

01-B1-03-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B1-04/EXAM 01-B1-03

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-B1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0401 EG 3/3

01-B2-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B3-01/RECOVERY 01-B2-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-B2-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0411 EG 3/3

01-B2-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B3-01/CYSTOSCOPY 01-B2-02

1 SGL LH

LEAD LINED

SGLLH 4'0" x 7'0" x 1 3/4"01-B2-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0421 EG 3/3

01-B2-02-B 3'0" x 7'0" x 1 3/4" WD/HMF

INSTRUMENT 01-C2-01/CYSTOSCOPY

01-B2-02

1 SGL RH

LEAD LINED

SGLRH 3'0" x 7'0" x 1 3/4"01-B2-02-B SLCBDFF MATCH

FLUSH DOOR

CST 5-0431 EG 3/3

01-B3-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B3-01/EXAM 01-B3-02

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-B3-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0461 EG 3/3

01-B3-03-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B3-01/DRESSING 01-B3-03

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-B3-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0471 EG 3/3

01-B3-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B3-01/SHOWER 01-B3-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-B3-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0481 EG 3/3

01-B3-05-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B3-01/TOILET 01-B3-05

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-B3-05-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0491 EG 3/3

Page 4 of 32 10/3/2013 7:26:14 AM

Page 000009

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

01-B3-07-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-01/TOILET 01-B3-07

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-B3-07-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0511 EG 3/3

01-B3-08-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-01/TOILET 01-B3-08

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-B3-08-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0521 EG 3/3

01-C1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B1-04/OFFICE 01-C1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-C1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0531 EG 3/3

01-C1-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B1-04/OFFICE 01-C1-02

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-C1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0541 EG 3/3

01-C1-03-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B1-04/OFFICE 01-C1-03

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-C1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0551 EG 3/3

01-C3-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-B3-01/UROLOGY 01-C3-01

1 SGL LH

LEAD LINED

SGLLH 4'0" x 7'0" x 1 3/4"01-C3-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0611 EG 3/3

01-C3-01-B 3'0" x 7'0" x 1 3/4" WD/HMF

INSTRUMENT 01-C2-01/UROLOGY 01-C3-01

1 SGL LH

LEAD LINED

SGLLH 3'0" x 7'0" x 1 3/4"01-C3-01-B SLCBDFF MATCH

FLUSH DOOR

CST 5-0621 EG 3/3

01-D3-01-A 3'0" x 7'0" x 1 3/4" WD/HMF

PHYS THER 01-D1-01/OFFICE 01-D3-01

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"01-D3-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0671 EG 3/3

01-E1-01-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/POOL 01-E1-01

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"01-E1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0681 EG 3/3

10/3/2013 7:26:14 AM

Page 000010

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

01-E3-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

POOL 01-E1-01/TOILET 01-E3-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-E3-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0701 EG 3/3

01-E3-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

POOL 01-E1-01/DRESSING 01-E3-02

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-E3-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0711 EG 3/3

01-F1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

POOL 01-E1-01/DRESSING 01-F1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-F1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0721 EG 3/3

01-F1-03-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/OFFICE 01-F1-03

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-F1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0731 EG 3/3

01-F2-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/OFFICE 01-F2-02

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-F2-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0751 EG 3/3

01-F2-03-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/OFFICE 01-F2-03

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-F2-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0761 EG 3/3

01-F3-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/INTERVIEW 01-F3-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-F3-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0771 EG 3/3

01-F3-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDRO 01-FR1-03/OFFICE 01-F3-02

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-F3-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0781 EG 3/3

01-G1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/OFFICE 01-G1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-G1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0801 EG 3/3

10/3/2013 7:26:15 AM

Page 000011

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

01-G1-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/SECRETARY 01-G1-02

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-G1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0811 EG 3/3

01-G1-03-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/OFFICE 01-G1-03

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-G1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0821 EG 3/3

01-G2-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/OFFICE 01-G2-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-G2-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0831 EG 3/3

01-G2-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/COORDINATOR

01-G2-02

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-G2-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0841 EG 3/3

01-G2-03-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/COORDINATOR

01-G2-03

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-G2-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0851 EG 3/3

01-G2-05-A 3'0" x 7'0" x 1 3/4" WD/HMF 45

CORRIDOR 01-FR1-03/STORAGE 01-G2-05

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"01-G2-05-A F6BDFF MATCH 45min

FLUSH DOOR

CST GB16 5-0871 EG 3/3

01-G2-06-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/OFFICE 01-G2-06

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-G2-06-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0881 EG 3/3

01-G3-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/OFFICE 01-G3-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-G3-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0891 EG 3/3

01-H1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-F1-04/OFFICE 01-H1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-H1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0911 EG 3/3

Page 000012

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

01-H1-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/OFFICE 01-H1-02

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-H1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0921 EG 3/3

01-H2-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/OFFICE 01-H2-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-H2-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-0931 EG 3/3

01-RAR101A

2-3'8" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-01/CORRIDOR 01-B1-04

1 PR RHR/LHR PRRHR 3'8" x 7'0" x 1 3/4"01-RAR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-0951 EG 3/3

PRLHR 3'8" x 7'0" x 1 3/4" SLCBDFF MATCH

FLUSH DOOR

CST1 EG 3/3

01-RAR101B

2-3'8" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-01/CORRIDOR 01-B1-04

1 PR RHR/LHR PRRHR 3'8" x 7'0" x 1 3/4"01-RAR101B SLCBDFF MATCH

FLUSH DOOR

CST 5-0961 EG 3/3

PRLHR 3'8" x 7'0" x 1 3/4" SLCBDFF MATCH

FLUSH DOOR

CST1 EG 3/3

01-RAR103A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-07/CONF. 01-RAR1-03

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RAR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-0981 EG 3/3

01-RAR104A

2-3'8" x 7'0" x 1 3/4" WD/HMF 45

MULTI-PURP 01-RAR1-05/STOR. 01-RAR1-04

1 PR RHRA/LHR PRARHR 3'8" x 7'0" x 1 3/4"01-RAR104A F6BDFF MATCH 45min

FLUSH DOOR

CST GB16 5-0991 EG 3/3

PRILHR 3'8" x 7'0" x 1 3/4" F6BDFF MATCH 45min

FLUSH DOOR

CST GB161 EG 3/3

Page 000013

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

01-RAR104B

2-3'8" x 7'0" x 1 3/4" WD/HMF 45

MULTI-PURP 01-RAR1-05/STOR. 01-RAR1-04

1 PR RHRA/LHR PRARHR 3'8" x 7'0" x 1 3/4"01-RAR104B F6BDFF MATCH 45min

FLUSH DOOR

CST GB16 5-1001 EG 3/3

PRILHR 3'8" x 7'0" x 1 3/4" F6BDFF MATCH 45min

FLUSH DOOR

CST GB161 EG 3/3

01-RAR105A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-07/MULT-PURP

01-RAR1-05

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RAR105A SLCBDFF MATCH

FLUSH DOOR

CST 5-1011 EG 3/3

01-RAR106A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-07/DINING 01-RAR1-06

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-RAR106A SLCBDFF MATCH

FLUSH DOOR

CST 5-1021 EG 3/3

01-RAR106B

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-07/DINING 01-RAR1-06

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RAR106B SLCBDFF MATCH

FLUSH DOOR

CST 5-1031 EG 3/3

01-RAR108A

4'0" x 7'0" x 1 3/4" WD/HMF 45

CORRIDOR 01-RAR1-07/STORAGE

01-RAR1-08

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RAR108A F6BDFF MATCH 45min

FLUSH DOOR

CST GB16 5-1041 EG 3/3

01-RAR109A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-01/INT CAFE

01-RAR1-09

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RAR109A SLCBDFF MATCH

FLUSH DOOR

CST 5-1051 EG 3/3

01-RAR110A

3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-07/SERVERY

01-RAR1-10

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"01-RAR110A SLCBDFF MATCH

FLUSH DOOR

CST 5-1061 EG 3/3

01-RAR110B

3'0" x 7'0" x 1 3/4" WD/HMF

DINING 01-RAR1-06/SERVERY 01-RAR1-10

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"01-RAR110B SLCBDFF MATCH

FLUSH DOOR

CST 5-1071 EG 3/3

10/3/2013 7:26:16 AM

Page 000014

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

01-RAR110C

3'0" x 7'0" x 1 3/4" WD/HMF

SERVERY 01-RAR1-10/STORAGE

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"01-RAR110C SLCBDFF MATCH

FLUSH DOOR

CST 5-1081 EG 3/3

01-RBR101A

4'0" x 7'0" x 1 3/4" WD/HMF 45

CORRIDOR 01-RAR1-01/PHARMACY

01-RBR1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-RBR101A F6BDFF MATCH 45min

FLUSH DOOR

CST GB16 5-1111 EG 3/3

01-RCR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-01/LEARNING

01-RCR1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RCR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-1141 EG 3/3

01-RCR102A

3'0" x 7'0" x 1 3/4" WD/HMF

LEARNING 01-RCR1/TOILET 01-RCR1-02

1 SGL RH

VERIFY DOOR ELEVATION

SGLRH 3'0" x 7'0" x 1 3/4"01-RCR102A SLCBDFN1 MATCH N1

CST 5-1151 EG 3/3

01-RCR103A

3'0" x 7'0" x 1 3/4" WD/HMF

BEDROOM 01-RDR1-02/CLOSET 01-RCR1-03

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"01-RCR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-1161 EG 3/3

01-RDR101A

4'0" x 7'0" x 1 3/4" WD/HMF

BEDROOM 01-RDR1-02/TOILET 01-RDR1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RDR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-1171 EG 3/3

01-RDR102A

4'0" x 7'0" x 1 3/4" WD/HMF

LEARNING 01-RCR1-01/BEDROOM

01-RDR1-02

1 SGL RHR SGLRHR 4'0" x 7'0" x 1 3/4"01-RDR102A SLCBDFF MATCH

FLUSH DOOR

CST 5-1181 EG 3/3

01-RDR103A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-RAR1-01/CONF. 01-RDR1-03

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-RDR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-1191 EG 3/3

01-RFR103A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/SHOWER 01-RFR1-03

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-RFR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-1221 EG 3/3

Page 000015

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

01-RGR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/PATIENT ED

01-RGR1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-RGR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-1231 EG 3/3

01-RGR102A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/OFFICE 01-RGR1-02

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RGR102A SLCBDFF MATCH

FLUSH DOOR

CST 5-1241 EG 3/3

01-RGR103A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/OFFICE 01-RGR1-03

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-RGR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-1251 EG 3/3

01-RHR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/HORTICULT.

01-RHR1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RHR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-1261 EG 3/3

01-RHR103A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/LOUNGE 01-RHR1-03

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RHR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-1271 EG 3/3

01-RJR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 01-FR1-03/MEDITATION

01-RJR1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-RJR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-1281 EG 3/3

02-A1-01-A (4'0")(1'6") x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D1-05/PATIENT ROOM

02-A1-01

1 PR RHA/LH PRARH 4'0" x 7'0" x 1 3/4"02-A1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1291 EG 3/3

PRILH 1'6" x 7'0" x 1 3/4" SLCBDFF MATCH

FLUSH DOOR

CST1 EG 3/3

02-A1-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-A1-01/TOILET 02-A1-02

1 SGL LHR SGLLHR 4'0" x 7'0" x 1 3/4"02-A1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1301 EG 3/3

Page 000016

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-A1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-A1-04/TOILET 02-A1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-A1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1311 EG 3/3

02-A1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D1-05/PATIENT ROOM

02-A1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-A1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1321 EG 3/3

02-A2-01-B 4'0" x 7'10" x 1 3/4" WD/HMF 90

CONCOURSE 01/WAIT 02-A2-01

1 SGL LH SGLLH 4'0" x 7'10" x 1 3/402-A2-01-B F9BDFG2 MATCH 90min G2

CST GB16 5-1331 EG 3/3

02-A2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D1-05/CLASSROOM 02-A2-02

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-A2-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1341 EG 3/3

02-A2-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-A2-03/CORRIDOR 02-B3-08

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-A2-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1351 EG 3/3

02-A3-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-A2-03/TOILET 02-A3-02

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-A3-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1361 EG 3/3

02-A3-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-A2-03/TOILET 02-A3-03

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-A3-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1371 EG 3/3

02-B1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D1-05/PATIENT ROOM

02-B1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-B1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1411 EG 3/3

02-B1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-B1-01/TOILET 02-B1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-B1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1421 EG 3/3

Page 000017

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-B1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-B1-04/TOILET 02-B1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-B1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1431 EG 3/3

02-B1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D1-05/PATIENT ROOM

02-B1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-B1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1441 EG 3/3

02-C1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D1-05/PATIENT ROOM

02-C1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-C1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1611 EG 3/3

02-C1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-C1-01/TOILET 02-C1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-C1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1621 EG 3/3

02-C1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-C1-04/TOILET 02-C1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-C1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1631 EG 3/3

02-C1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D1-05/PATIENT ROOM

02-C1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-C1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1641 EG 3/3

02-C2-01-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D1-05/CONFERENCE 02-C2-01

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-C2-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1651 EG 3/3

02-C2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D2-08/OFFICE 02-C2-02

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-C2-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1661 EG 3/3

02-C2-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-C2-04/LINEN 02-C2-03

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-C2-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1671 EG 3/3

10/3/2013 7:26:17 AM

Page 000018

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-D1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-D1-05/PATIENT ROOM

02-D1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-D1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1721 EG 3/3

02-D1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-D1-01/TOILET 02-D1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-D1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1731 EG 3/3

02-D1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-D1-04/TOILET 02-D1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-D1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1741 EG 3/3

02-D1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT ROOM

02-D1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-D1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1751 EG 3/3

02-D3-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/OFFICE 02-D3-03

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-D3-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1821 EG 3/3

02-D3-04-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/OFFICE 02-D3-04

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-D3-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1831 EG 3/3

02-E1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT ROOM

02-E1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-E1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1841 EG 3/3

02-E1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-E1-01/TOILET 02-E1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-E1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1851 EG 3/3

02-E1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-E1-04/TOILET 02-E1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-E1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1861 EG 3/3

Page 000019

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-E1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT ROOM

02-E1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-E1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1871 EG 3/3

02-E2-05-A 3'6" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-F3-04/MEDS 02-E2-05

1 SGL LH SGLLH 3'6" x 7'0" x 1 3/4"02-E2-05-A SLCBDFN2 MATCH N2

CST 5-1921 EG 3/3

02-E2-06-A 3'6" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/CONSULT 02-E2-06

1 SGL LH SGLLH 3'6" x 7'0" x 1 3/4"02-E2-06-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1941 EG 3/3

02-E2-06CA

3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/LACTATION

02-E2-06C

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-E2-06CA SLCBDFF MATCH

FLUSH DOOR

CST 5-1951 EG 3/3

02-E3-07-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/EDUCATOR 02-E3-07

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-E3-07-A SLCBDFF MATCH

FLUSH DOOR

CST 5-1981 EG 3/3

02-E3-08-A 3'0" x 7'0" x 1 3/4" WD/HMF 45

CORRIDOR 02-F3-04/CLEAN LINEN 02-E3-08

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-E3-08-A F6BDFN1 MATCH 45min N1

CST GB16 5-1991 EG 3/3

02-F1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT ROOM

02-F1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-F1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2001 EG 3/3

02-F1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-F1-01/TOILET 02-F1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-F1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2011 EG 3/3

02-F1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-F1-04/TOILET 02-F1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-F1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2021 EG 3/3

Page 000020

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-F1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT ROOM

02-F1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-F1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2031 EG 3/3

02-F2-01BA

3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/OFFICE 02-F2-01B

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-F2-01BA SLCBDFF MATCH

FLUSH DOOR

CST 5-2041 EG 3/3

02-F2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF 45

CORRIDOR 02-E1-05/EQUIP STOR 02-F2-02

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-F2-02-A F6BDFF MATCH 45min

FLUSH DOOR

CST GB16 5-2051 EG 3/3

02-F3-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/OFFICE 02-F3-02

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-F3-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2071 EG 3/3

02-G1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT ROOM

02-G1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-G1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2081 EG 3/3

02-G1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-G1-01/TOILET 02-G1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-G1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2091 EG 3/3

02-G1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-G1-04/TOILET 02-G1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-G1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2101 EG 3/3

02-G1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT ROOM

02-G1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-G1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2111 EG 3/3

02-G2-05-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-G2-06/OFFICE 02-G2-05

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-G2-05-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2141 EG 3/3

10/3/2013 7:26:18 AM

Page 000021

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-G3-01-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/OFFICE 02-G3-01

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-G3-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2151 EG 3/3

02-G3-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-G2-06/STORAGE 02-G3-03

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-G3-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2161 EG 3/3

02-G3-03BA

3'0" x 7'0" x 1 3/4" WD/HMF

WORK 02-G2-04/INTERVIEW 02-G3-03B

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-G3-03BA SLCBDFF MATCH

FLUSH DOOR

CST 5-2171 EG 3/3

02-H1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT ROOM

02-H1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-H1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2181 EG 3/3

02-H1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 02-H1-01/TOILET 02-H1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-H1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2191 EG 3/3

02-RAR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/PAT ROOM

02-RAR1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-RAR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-2201 EG 3/3

02-RAR102A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RAR1-04/TOILET 02-RAR1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-RAR102A SLCBDFF MATCH

FLUSH DOOR

CST 5-2211 EG 3/3

02-RAR103A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RAR1-01/TOILET 02-RAR1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-RAR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-2221 EG 3/3

02-RAR104A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/PAT ROOM

02-RAR1-04

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-RAR104A SLCBDFF MATCH

FLUSH DOOR

CST 5-2231 EG 3/3

10/3/2013 7:26:18 AM

Page 000022

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-RBR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/PAT ROOM

02-RBR1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-RBR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-2251 EG 3/3

02-RBR102A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RBR1-04/TOILET 02-RBR1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-RBR102A SLCBDFF MATCH

FLUSH DOOR

CST 5-2261 EG 3/3

02-RBR103A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RBR1-01/TOILET 02-RBR1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-RBR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-2271 EG 3/3

02-RBR104A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/PAT ROOM

02-RBR1-04

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-RBR104A SLCBDFF MATCH

FLUSH DOOR

CST 5-2281 EG 3/3

02-RCR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/PAT ROOM

02-RCR1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-RCR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-2291 EG 3/3

02-RCR102A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RCR1-04/TOILET 02-RCR1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-RCR102A SLCBDFF MATCH

FLUSH DOOR

CST 5-2301 EG 3/3

02-RCR103A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RCR1-01/TOILET 02-RCR1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-RCR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-2311 EG 3/3

02-RCR104A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/PAT ROOM

02-RCR1-04

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-RCR104A SLCBDFF MATCH

FLUSH DOOR

CST 5-2321 EG 3/3

10/3/2013 7:26:18 AM

Page 000023

AE Please confirm. Matches other Patient Toilets.

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-RDR101A

(4'0")(1'6") x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/PAT ROOM

02-RDR1-01

1 PR LHA/RH PRALH 4'0" x 7'0" x 1 3/4"02-RDR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-2331 EG 3/3

PRIRH 1'6" x 7'0" x 1 3/4" SLCBDFF MATCH

FLUSH DOOR

CST1 EG 3/3

02-RDR102A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RDR1-04/TOILET 02-RDR1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-RDR102A SLCBDFF MATCH

FLUSH DOOR

CST 5-2341 EG 3/3

02-RDR103A

4'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RDR1-01/TOILET 02-RDR1-03

1 SGL RHR SGLRHR 4'0" x 7'0" x 1 3/4"02-RDR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-2351 EG 3/3

02-RDR104A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-RAR1-05/PAT ROOM

02-RDR1-04

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-RDR104A SLCBDFF MATCH

FLUSH DOOR

CST 5-2361 EG 3/3

02-RER101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT RM

02-RER1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-RER101A SLCBDFF MATCH

FLUSH DOOR

CST 5-2371 EG 3/3

02-RER102A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RER1-04/TOILET 02-RER1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-RER102A SLCBDFF MATCH

FLUSH DOOR

CST 5-2381 EG 3/3

02-RER103A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RER1-01/TOILET 02-RER1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-RER103A SLCBDFF MATCH

FLUSH DOOR

CST 5-2391 EG 3/3

02-RER104A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT RM

02-RER1-04

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-RER104A SLCBDFF MATCH

FLUSH DOOR

CST 5-2401 EG 3/3

10/3/2013 7:26:19 AM

Page 000024

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-RFR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT RM

02-RFR1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-RFR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-2411 EG 3/3

02-RFR102A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RFR1-04/TOILET 02-RFR1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-RFR102A SLCBDFF MATCH

FLUSH DOOR

CST 5-2421 EG 3/3

02-RFR103A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RFR1-01/TOILET 02-RFR1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-RFR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-2431 EG 3/3

02-RFR104A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT RM

02-RFR1-04

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-RFR104A SLCBDFF MATCH

FLUSH DOOR

CST 5-2441 EG 3/3

02-RGR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT RM

02-RGR1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-RGR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-2451 EG 3/3

02-RGR102A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RGR1-04/TOILET 02-RGR1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-RGR102A SLCBDFF MATCH

FLUSH DOOR

CST 5-2461 EG 3/3

02-RGR103A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RGR1-01/TOILET 02-RGR1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-RGR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-2471 EG 3/3

02-RGR104A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT RM

02-RGR1-04

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-RGR104A SLCBDFF MATCH

FLUSH DOOR

CST 5-2481 EG 3/3

02-RHR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/PATIENT RM

02-RHR1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-RHR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-2491 EG 3/3

Page 000025

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

02-RHR101B

3'0" x 7'0" x 1 3/4" WD/HMF

ANTEROOM 02-RHR1-02/PAT. ROOM

02-RHRA-01

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-RHR101B SLCBDFN1 MATCH N1

CST 5-2501 EG 3/3

02-RHR102A

3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/ANTEROOM 02-RHR1-02

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-RHR102A SLCBDFN1 MATCH N1

CST 5-2511 EG 3/3

02-RHR103A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 02-RHR1-01/TOILET 02-RHR1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-RHR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-2521 EG 3/3

02-RHR104A

3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 02-E1-05/OFFICE 02-RHR1-04

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-RHR104A SLCBDFF MATCH

FLUSH DOOR

CST 5-2531 EG 3/3

03-A1-01-A (4'0")(1'6") x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B2-02/PATIENT ROOM

03-A1-01

1 PR RHA/LH PRARH 4'0" x 7'0" x 1 3/4"03-A1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2541 EG 3/3

PRILH 1'6" x 7'0" x 1 3/4" SLCBDFF MATCH

FLUSH DOOR

CST1 EG 3/3

03-A1-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 03-A1-01/TOILET 03-A1-02

1 SGL LHR SGLLHR 4'0" x 7'0" x 1 3/4"03-A1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2551 EG 3/3

03-A1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 03-A1-04/TOILET 03-A1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"03-A1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2561 EG 3/3

03-A1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B2-02/PATIENT ROOM

03-A1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"03-A1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2571 EG 3/3

Page 000026

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

03-A2-01-B 3'0" x 7'0" x 1 3/4" WD/HMF

WAIT 03-A2-01/CORRIDOR 03-A3-01

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"03-A2-01-B SLCBDFF MATCH

FLUSH DOOR

CST 5-2581 EG 3/3

03-A2-01-H 4'0" x 7'10" x 1 3/4" WD/HMF 90

CONCOURSE 01/WAIT 03-A2-01

1 SGL LH SGLLH 4'0" x 7'10" x 1 3/403-A2-01-H F9BDFG2 MATCH 90min G2

CST GB16 5-2591 EG 3/3

03-A2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B2-02/CONFERENCE 03-A2-02

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"03-A2-02-A SLCBDFN1 MATCH N1

CST 5-2601 EG 3/3

03-A3-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

WAIT 03-A2-01/TOILET 03-A3-02

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"03-A3-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2611 EG 3/3

03-A3-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

WAIT 03-A2-01/TOILET 03-A3-03

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"03-A3-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2621 EG 3/3

03-A3-07-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B3-09/LACTATION 03-A3-07

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"03-A3-07-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2671 EG 3/3

03-B1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B2-02/PATIENT ROOM

03-B1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"03-B1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2681 EG 3/3

03-B1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 03-B1-01/TOILET 03-B1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"03-B1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2691 EG 3/3

03-B1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 03-B1-04/TOILET 03-B1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"03-B1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2701 EG 3/3

Page 000027

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

03-B1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B2-02/PATIENT ROOM

03-B1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"03-B1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2711 EG 3/3

03-B3-04-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-A3-01/SPEECH 03-B3-04

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"03-B3-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2761 EG 3/3

03-B3-06-A 3'0" x 7'0" x 1 3/4" WD/HMF 45

CORRIDOR 03-B3-09/EQUIP STOR 03-B3-06

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"03-B3-06-A F6BDFF MATCH 45min

FLUSH DOOR

CST GB16 5-2771 EG 3/3

03-C1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B2-02/PATIENT ROOM

03-C1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"03-C1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2811 EG 3/3

03-C1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 03-C1-01/TOILET 03-C1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"03-C1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2821 EG 3/3

03-C1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 03-C1-04/TOILET 03-C1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"03-C1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2831 EG 3/3

03-C1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B2-02/PATIENT ROOM

03-C1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"03-C1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2841 EG 3/3

03-C2-01-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B2-02/STAFF 03-C2-01

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"03-C2-01-A SLCBDFN1 MATCH N1

CST 5-2851 EG 3/3

03-C3-05-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B3-09/COORDINATOR

03-C3-05

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"03-C3-05-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2921 EG 3/3

10/3/2013 7:26:20 AM

Page 000028

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

03-D1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B2-02/PATIENT ROOM

03-D1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"03-D1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2931 EG 3/3

03-D1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 03-D1-01/TOILET 03-D1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"03-D1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2941 EG 3/3

03-D1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 03-D1-04/TOILET 03-D1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"03-D1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2951 EG 3/3

03-D1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-C2-03/PATIENT ROOM

03-D1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"03-D1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-2961 EG 3/3

03-D3-01BA

3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B3-09/OFFICE 03-D3-01B

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"03-D3-01BA SLCBDFF MATCH

FLUSH DOOR

CST 5-3001 EG 3/3

03-D3-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B3-09/DISCHARGE 03-D3-03

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"03-D3-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3011 EG 3/3

03-E1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-C2-03/PATIENT ROOM

03-E1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"03-E1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3041 EG 3/3

03-E1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 03-E1-01/TOILET 03-E1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"03-E1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3051 EG 3/3

03-E1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 03-E1-04/TOILET 03-E1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"03-E1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3061 EG 3/3

10/3/2013 7:26:20 AM

Page 000029

AE: Please confirm fire rating not needed

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

03-E1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-C2-03/PATIENT ROOM

03-E1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"03-E1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3071 EG 3/3

03-E2-01-A 3'6" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-C2-03/CONSULT 03-E2-01

1 SGL LH SGLLH 3'6" x 7'0" x 1 3/4"03-E2-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3081 EG 3/3

03-E2-03-A 3'6" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-F3-01/MEDS 03-E2-03

1 SGL LH SGLLH 3'6" x 7'0" x 1 3/4"03-E2-03-A SLCBDFN2 MATCH N2

CST 5-3101 EG 3/3

03-E3-04-A 3'0" x 7'0" x 1 3/4" WD/HMF 45

CORRIDOR 03-F3-01/CLEAN LINEN 03-E3-04

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"03-E3-04-A F6BDFN1 MATCH 45min N1

CST GB16 5-3141 EG 3/3

03-E3-06-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-C2-03/OFFICE 03-E3-06

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"03-E3-06-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3161 EG 3/3

03-F1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-C2-03/PATIENT ROOM

03-F1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"03-F1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3171 EG 3/3

03-F1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 03-F1-01/TOILET 03-F1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"03-F1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3181 EG 3/3

03-F1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 03-F1-04/TOILET 03-F1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"03-F1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3191 EG 3/3

03-F1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-C2-03/PATIENT ROOM

03-F1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"03-F1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3201 EG 3/3

10/3/2013 7:26:20 AM

Page 000030

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

03-F2-01-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B3-09/OFFICE 03-F2-01

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"03-F2-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3211 EG 3/3

03-F2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF 45

CORRIDOR 03-F3-01/EQUIP STOR 03-F2-02

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"03-F2-02-A F6BDFF MATCH 45min

FLUSH DOOR

CST GB16 5-3221 EG 3/3

03-F2-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-C2-03/LAUNDRY 03-F2-03

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"03-F2-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3231 EG 3/3

03-F3-03-A 3'6" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-C2-03/X-RAY ALCOVE 03-F3-03

1 SGL RHR SGLRHR 3'6" x 7'0" x 1 3/4"03-F3-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3251 EG 3/3

03-G1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-C2-03/PATIENT ROOM

03-G1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"03-G1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3261 EG 3/3

03-G1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 03-G1-01/TOILET 03-G1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"03-G1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3271 EG 3/3

03-G1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 03-G1-04/TOILET 03-G1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"03-G1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3281 EG 3/3

03-G1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-C2-03/PATIENT ROOM

03-G1-04

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"03-G1-04-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3291 EG 3/3

03-G2-01-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-C2-03/APARTMENT 03-G2-01

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"03-G2-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3301 EG 3/3

10/3/2013 7:26:21 AM

Page 000031

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

03-G2-01-B 3'0" x 7'0" x 1 3/4" WD/HMF

APARTMENT 03-G2-01/STORAGE 03-G2-01C

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"03-G2-01-B SLCBDFF MATCH

FLUSH DOOR

CST 5-3311 EG 3/3

03-G2-02-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-C2-03/MULTI-PURPOSE

03-G2-02

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"03-G2-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3321 EG 3/3

03-G2-03-B 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-C2-03/DINING 03-G2-03

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"03-G2-03-B SLCBDFF MATCH

FLUSH DOOR

CST 5-3331 EG 3/3

03-H1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-C2-03/PATIENT ROOM

03-H1-01

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"03-H1-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3341 EG 3/3

03-H1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT ROOM 03-H1-01/TOILET 03-H1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"03-H1-02-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3351 EG 3/3

03-H1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-C2-03/STAFF TOILET 01-H1-03

1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"03-H1-03-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3361 EG 3/3

03-H1-04-A 3'0" x 7'0" x 1 3/4" WD/HMF 45

CORRIDOR 03-C2-03/CART STORAGE

03-H1-04

1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"03-H1-04-A F6BDFF MATCH 45min

FLUSH DOOR

CST GB16 5-3371 EG 3/3

03-H3-01-A 3'0" x 8'0" x 1 3/4" WD/HMF

APARTMENT 03-G2-01/TOILET 03-H3-01

1 SGL RHR SGLRHR 3'0" x 8'0" x 1 3/4"03-H3-01-A SLCBDFF MATCH

FLUSH DOOR

CST 5-3381 EG 3/3

03-RAR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B3-09/PATIENT RM

03-RAR1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"03-RAR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-3391 EG 3/3

Page 000032

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

Status

Series EdgeSpecie Stile LabelBlocking HDS #Prefinish

C on st ru ct io n

BevelFace Type

03-RAR102A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 03-RAR1-04/TOILET 03-RAR1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"03-RAR102A SLCBDFF MATCH

FLUSH DOOR

CST 5-3401 EG 3/3

03-RAR103A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 03-RAR1-01/TOILET 03-RAR1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"03-RAR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-3411 EG 3/3

03-RAR104A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B3-09/PATIENT RM

03-RAR1-04

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"03-RAR104A SLCBDFF MATCH

FLUSH DOOR

CST 5-3421 EG 3/3

03-RBR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B3-09/PATIENT RM

03-RBR1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"03-RBR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-3431 EG 3/3

03-RBR102A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 03-RBR1-04/TOILET 03-RBR1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"03-RBR102A SLCBDFF MATCH

FLUSH DOOR

CST 5-3441 EG 3/3

03-RBR103A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 03-RBR1-01/TOILET 03-RBR1-03

1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"03-RBR103A SLCBDFF MATCH

FLUSH DOOR

CST 5-3451 EG 3/3

03-RBR104A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B3-09/PATIENT RM

03-RBR1-04

1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"03-RBR104A SLCBDFF MATCH

FLUSH DOOR

CST 5-3461 EG 3/3

03-RCR101A

4'0" x 7'0" x 1 3/4" WD/HMF

CORRIDOR 03-B3-09/PATIENT RM

03-RCR1-01

1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"03-RCR101A SLCBDFF MATCH

FLUSH DOOR

CST 5-3471 EG 3/3

03-RCR102A

3'0" x 7'0" x 1 3/4" WD/HMF

PATIENT RM 03-RCR1-04/TOILET 03-RCR1-02

1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"03-RCR102A SLCBDFF MATCH

FLUSH DOOR

CST 5-3481 EG 3/3

Page 000033

Job Number: C13-061-05-I

O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location

Qty Hand Size UOM

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .