09 65 16-06R2 SRE Transitions.pdf
PDF 15 MB Posted
- Solicitation number
- 36C25922R0040
About this file
This solicitation is for renovation services at the Rocky Mountain Regional Veterans Affairs Medical Center in Denver, Colorado. The scope of work involves converting an existing residential apartment into a storage and repair area for powered wheelchairs along with computer workstations. An existing nursing office will be renovated into two flexible private treatment spaces. The contractor must comply with all applicable codes and regulations including NFPA, OSHA, and VA standards. The period of performance is ninety calendar days from notice to proceed. The selected contractor will be responsible for project management documentation, site safety plans, permits, schedules, and quality control to ensure all work meets specifications and acceptance standards of the VA.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
na ç ir. - nn - p9
RETURN OF SUBMITTAL
title Ur Description Date: Spec. Section:
| lBS - IBN - Floorz Resilient Floorina Submittal Plans SD's | 0965 16 |
| Contractor's Name and Address | Station Location: |
Chris Bantner 13611 East Colfax Ave.
Aurora, CO 80045
Kiewit-Turner. a Joint Venture Contract No: Project No:
| 13611 East Colfax Avenue | VAI01F-15-C-0005 554-501 | |
| Aurora, CO 80045 | Transmittal Date: | VA File No: |
8/28/2015 0965 16- 006- R2
Submittal Scone 09 65 16 - IBS-IBN - Floorz Resilient Flooring WSF 01-10
Submittal Items Acted Upon
Submittal Item Status
001 - IBS - IBN - Floorz Resilient Flooring Submittal APP- Approved Plans SD's WSF 01-10
Supplier or Manufacturer Submittal Type
Floorz Shop Drawings Notes/Comments
APPROVED. Questions or comments can be directed to John Calzada 720-857-5188
Signature of Authorizing Official
I
Date
Fax: 303.930.9001
303.930.9000Tel:
Kiewit - Turner a Joint Venture
Suite A-300 7200 S. Alton Way
Englewood, CO 80112
Job: 15387 - Replacement Medical Center Facility
Product Data
Sample
Other
Shop Drawing
Resubmittal
First Submittal X
VA Proj #:
To: H+L Architecture 1755 Blake Street
Suite 400
Denver, CO 80202
DESCRIPTIONSpecificationSUBMITTAL
ItemQuantity Section Sub./SupplierNo. Mfgr.
ACTION
DCBA E
Kiewit Submittal No. 22 13 00-01 Architect's Submittal No. 00008
Review Cycle: 001
Attn: Chuck Adkisson
1 SWPPP - CBS & RFP #3 OnlyKiewit - Turner a
Joint Venture
01 573
ACTION TAKEN
CONTRACTOR'S SIGNATURE:
CONTRACTOR'S NOTES:
DATE: 7/12/2011
Reviewed Only for Revisions to
Reviewed: Incorporate Changes
Reviewed=
A
B
C
Previous Submittal
Revise and Resubmit=D
Rejected =E
ARCHITECT/ENGINEER RESPONSE:
REMARKS:
BY: DATE:
Expedition f_sb_pks_01a
VA101CFM-C-0100
Cc: Tim Pogany, U.S. Dept. of Veterans Affairs
Received By ___________________
Date _______________
09 65 16
X
IBS IBN Floorz Resilient Flooring Submittal Plans SD's
X
Floorz, LLLP
09 65 1606R2
08/28/2015
09/11/2015
Kiewit-Turner Submittal No.
VA 1
JVT 2
REQUESTED RETURN DATE:
Kevin Lindsey, U.S. Dept. of Veterans Affairs
VA101F-15-C-0005
13611 E. Colfax Avenue 2nd Floor Aurora, CO 80045
VHAECHBoltoT Received
These shop drawings/submittals have been reviewed in accordance with the provisions of the Contract Documents. Kiewit-Turner's review shall not serve to relieve Subcontractors or Suppliers of contractual responsibilities for any error or deviation from contract and subcontract requirements.
KIEWIT-TURNER
a Joint Venture
REVIEWED - NO COMMENTS MADE
REVIEWED WITH COMMENTS
RESUBMITTAL REQUIRED
DATE SIGNED
SUBMITTAL #:
Brett Dickerson
8/28/15
09 65 16-06R2 x
Kiewit-Turner a Joint Venture
7200 S. Alton Way, Suite A-300, Englewood, CO 80112
Phone: 303-930-9000 FAX: 303-930-9001
Project Name:
Subcontractor Name: Submittal Date: 07/29/2015 Contact Name: E-mail: Return By Date:
Contact Phone(s): Review Days: 21
Number: Name:
1.4.C.3 n/a Y N N YX
M e e ts
A ll
S p e c
R e q u ir e m e n ts
E x c e p ti o n s o r
V a ri a n c e s f ro m S p e c
A p p ro v e r
In fo rm a ti o n
N e e d e d
I n
T h is P a c k a g e
Submittal Type
Submittal Item Description Manufacturer
(303) 574-0777
Specification Section: 09 65 16 IBN & IBS - Resilient Sheet Flooring
S p e c
S u b m it ta l
P a ra g ra p h
S p e c
P ro d u c t
P a ra g ra p h
S p e c if ie d o r L is te d
M a n u fa c tu re r?
SUBMITTAL INDEX & COVER SHEET
Department of Veteran's Affairs
Replacement Medical Center
FloorZ, LLLP07/
Nicole Kammerer nkammerer@osfloorz.com 08/14/2015
Reviewed By Date 8/13/2014
Submittal is in Compliance
Submittal is in Compliance with Variances from Specifications
Signature Brett Dickerson
Floorz, LLLPShop Drawing - WSF 01 - 10
SubmittalIndexForm_041009 Page 1 of 1
X Brett Dickerson
8/28/15 9/10/15
Y
-05R2 mailto:nkammerer@osfloorz.com
6" FC outside corner
Transition resilient flooring to conc Johnsonite EG-49-J Beige
Transition carpet to resilent Johnsonite CTA-49-D Beige
WSF02 Armstrong
WSF07 Lonseal Lonwood Natural Heiko Gentle Wind 7462
WSF01 Armstrong Medintone Powder Chocolate H8316
0 (99% of Scale); Bldg 04 IBS Inpatient Building South; Projects 10 v1.0; 7/27/2015 03:42 PM
04.AI.100
Transition - Resilient to Resinous Flooring (Transition Strip Provided by Resinous Contractor)
Transition - Resilient to Ceramic Tile Flooring (Transition Strip Provided by Ceramic Contractor)
Transition - Resilient to Resilient Flooring (Transition Strip not needed per Detail 8/XX.AI.771)
Transition carpet to resilent Johnsonite CTA-49-D Beige
WSF07 Lonseal Lonwood Natural Heiko Gentle Wind 7462
WSF02 Armstrong
WSF08 Lonseal Lonwood Natural Heiko Thunderstorm 7463
2 Transition - WSF to SVT
Transition - WSF Heat Weld
1 Transition - WSF to Epoxy
4 Transition - WSF to VCT
04.AI.101
- APP in Submittal # 09 67 23.20/60)
- APP in Submittal # 09 30 00-05)
- (Attachment D)
- (Attachment A)
- (Attachment B)
- (Attachment C)
- (Attachment E)
8-9/
* Note - On some drawings, please disregard material overlap; does not affect quantities.
Transition carpet to resilent Johnsonite CTA-49-D Beige
WSF07 Lonseal Lonwood Natural Heiko Gentle Wind 7462
WSF02 Armstrong
WSF08 Lonseal Lonwood Natural Heiko Thunderstorm 7463
04.AI.102
WSF02 Armstrong Medintech Sand Light H8319
Transition carpet to resilent Johnsonite CTA-49-D Beige
Transition resilient flooring to conc Johnsonite EG-49-J Beige
WSF07 Lonseal Lonwood Natural Heiko Gentle Wind 7462
04.AI.103
WSF07 Lonseal Lonwood Natural Heiko Gentle Wind 7462
Transitions
WSF01 Armstrong Medintone Powder Chocolate H8316
05.AI.100
8' 3"
WSF07 Lonseal Lonwood Natural Heiko Gentle Wind 7462
WSF08 Lonseal Lonwood Natural Heiko Thunderstorm 7463
WSF08 Lonseal Lonwood Natural Heiko Thunderstorm 7463
WSF08 Lonseal Lonwood Natural Heiko Thunderstorm 7463
WSF02 Armstrong Medintech Sand Light H8319
Transitions
Transition carpet to resilent Johnsonite CTA-49-D Beige
Transition resilient flooring to conc Johnsonite EG-49-J Beige
05.AI.101_JSI058.pdf (99% of Scale); Bldg 05 IBN Inpatient Building North; Projects 10 v1.0; 7/29/2015 11:12 AM
2 Transition - WSF to SVT
Transition - WSF01 Heat Weld
1 Transition - WSF to Epoxy
4 Transition - WSF to VCT
05.AI.101
WSF02 Armstrong Medintech Sand Light H8319
WSF08 Lonseal Lonwood Natural Heiko Thunderstorm 7463
WSF08 Lonseal Lonwood Natural Heiko Thunderstorm 7463
Transition carpet to resilent Johnsonite CTA-49-D Beige
Transition resilient flooring to conc Johnsonite EG-49-J Beige
05.AI.102_JSI058.pdf (99% of Scale); Bldg 05 IBN Inpatient Building North; Projects 10 v1.0; 7/29/2015 11:09 AM
05.AI.102
WSF02 Armstrong Medintech Sand Light H8319
WSF08 Lonseal Lonwood Natural Heiko Thunderstorm 7463
WSF08 Lonseal Lonwood Natural Heiko Thunderstorm 7463
Transitions
WSF06 Armstrong Medintone Tea Green Mid H8332
Transition carpet to resilent Johnsonite CTA-49-D Beige
Transition resilient flooring to conc Johnsonite EG-49-J Beige
05.AI.103_JSI058.pdf (99% of Scale); Bldg 05 IBN Inpatient Building North; Projects 10 v1.0; 7/29/2015 11:06 AM
05.AI.103
Johnsonite carpet to resilient transition, color #49 Beige
ATTACHMENT A
Carpet
Resilient
Johnsonite resilient to concrete, color #49 Beige
ATTACHMENT B
Resilient
DOOR (CLOSED) AND TRANSITION
DOOR FRAME BEYOND
CERAMIC TILE AS
SCHEDULED W/ CRACK-
SUPPRESSION
MEMBRANE
DOOR WHERE OCCURS.
FLOAT CONCRETE FLOOR SLAB
FOR GRADUAL SLOPE TO ALIGN
FLOOR FINISH MATERIALS
TOP OF CARPET PILE
TOP OF TILE
STAINLESS STEEL EDGE TRIM
CARPET AS SCHEDULED
SLOPE
1:20
1/
SANITARY STOP BEYOND
SEE DOOR SCHEDULE FOR DOOR
TYPE (WHERE DOOR OCCURS)
CARPET
CONCRETE AS SCHEDULED
RESILIENT TRANSITION STRIP
DOOR (CLOSED) AND TRANSITION
FLOAT CONCRETE FLOOR SLAB FOR
GRADUAL SLOPE TO ALIGN FINISH
FLOORING MATERIALS
SILICONE SEALANT AT JOINT
(1/8" MAXIMUM)
TOP OF CARPET PILE
TOP OF FINISHED FLOOR
DOOR WHERE OCCURS
RESILIENT TRANSITION STRIP
CARPET OR ENTRANCE
FLOOR MAT AS SCHEDULED
RESILIENT FLOORING AS SCHEDULED
SLOPE 1:20 MAX.
1/
FLOOR FINISH
SEE SCHEDULE THINSET OVER
CRACK SUPPRESSION MEMBRANE
TILE
SOLID SURFACE
THRESHOLD
1/ 4"
M A
X
SILICONE SEALANT TO MATCH GROUT
1/ 2"
M A
X
DOOR (CLOSED) AND TRANSITION
DOOR FRAME BEYOND
DOOR WHERE OCCURS.
4"
FLOOR FINISH
SEE SCHEDULE
WALL BEYOND WHERE OCCURS
THINSET OVER
CRACK SUPPRESSION MEMBRANE
TILE
SOLID SURFACE
THRESHOLD
1/ 4"
M A
X
SILICONE SEALANT TO MATCH GROUT
1/ 2"
M A
X
4"
RESILIENT TRANSITION STRIPCONCRETE AS
SCHEDULED
SEE DOOR SCHEDULE
FOR DOOR TYPE
WHERE DOOR OCCURS
RESILIENT FLOORING AS SCHEDULED
DOOR (CLOSED) AND TRANSITION STRIP
RESILIENT FLOORING AS
SCHEDULED
RESILIENT FLOORING
AS SCHEDULED
SEE DOOR SCHEDULE
FOR DOOR TYPE
WHERE DOOR OCCURS
HEAT WELD MATERIALS
AS SPECIFIED
DOOR (CLOSED) AND TRANSITION STRIP
THICKER RESILIENT
FLOORING AS SCHEDULED
THINNER RESILIENT FLOORING
AS SCHEDULED
SEE DOOR SCHEDULE
FOR DOOR TYPE
WHERE DOOR OCCURS
HEAT WELD MATERIALS
AS SPECIFIED
DOOR (CLOSED) AND TRANSITION
FLOAT CONCRETE FLOOR SLAB FOR
GRADUAL SLOPE TO ALIGN FINISH
FLOORING MATERIALS, SLOPE 1:20 MAX
STAINLESS STEEL EDGE
PROTECTION,CONTINUOUS
DOOR AS SCHEDULED
RESILIENT FLOORING AS
SCHEDULED - SEALED
CONC AT SIM LOCATION
DOOR (CLOSED) AND TRANSITION STRIP
EPOXY FLOORING AS
SCHEDULED
SILICONE SEALANT
@ JOIN 1/8" MAX
CONC TOPPING
SLAB AT WHERE
RECESSED CONC
SLAB OCCURS
FILLET STRIP
SHEET VINYL AS SCHEDULED
ZERO EDGE COVE CAP
CONTINUOUS SEALANT
BETWEEN COVE CAP
AND FINISHED WALL
PARTITION AS SCHEDULED
SCHEDULED
PARTITION
SETTING MATERIALS,
AS SPECIFIED
FLOOR TILE, AS SCHEDULED
SEALANT TO MATCH GROUT
SEALANT
WALL TILE, AS
SCHEDULED
NOTE:
ALIGN VERTICAL JOINTS ON WALL W/ JOINTS ON FLOOR
PROVIDE MANUFACTURER'S FINISHED TRIM UNITS AS REQUIRED
CONCRETE SLAB
CRACK-SUPPRESSION
MEMBRANE OVER CONCRETE
GROUT
1/ 4"
M
IN
FLEXIBLE EPOXY BASE
COAT AT WET LOCATIONS
ROUGHEN CONC. SURFACE
6"-12" IN DIAMETER AROUND
DRAIN TO INCREASE
BONDING DRAIN WITHOUT
SECONDARY WEEPS
RESINOUS EPOXY
TOP COAT
ADJUSTABLE
HEIGHT STRAINER
BACKER ROD
AND SEALANT
1/4"/FT SLOPE
MAX
1/4"/FT SLOPE
MAX
FLOOR DRAIN
CERAMIC TILE. THIN SET
ON WATERPROOF
MEMBRANE ON SLOPED
MORTAR BED OVER
SLAB DEPRESSION
CLAMP WATER PROOF
MEMBRANE INSIDE
DRAIN BODY
SLOPED MORTAR BED
BOUNDED WATER
PROOF MEMBRANE
1/4"/FT SLOPE
MAX
1/4"/FT SLOPE
MAX
STANDARD METAL
COVE STRIP
TOP COAT
MORTAR
3/16" PLASTIC FLOOR STRIP
CONTINUOUS SEALANT
BETWEEN COVE CAP AND
FINISHED WALL
R E
: R O
O M
F
IN
IS
H
S C
H E
D
4" U
.N .O
FLOORING AS SCHEDULED
SCHEDULED PARTITION
CONTINUOUS CLEAR SEALANT
AT TOP AND BOTTOM OF
BASE WHERE OCCURS
COVE BASE AS
SCHEDULED
SEALANT
GROUT COAT
MORTAR
3/16" PLASTIC FLOOR STRIP
GLAZED CMU
UN-GLAZED CMU
INTEGRAL COVED
EPOXY BASE
UNTOOLED, FLAT
MORTAR JOINT
U N
G
LA
Z E
D C
M U
G
LA
Z E
D C
M U
GROUT COAT
MORTAR
3/16" PLASTIC FLOOR STRIP
CONTINUOUS SEALANT
BETWEEN COVE CAP AND
FINISHED WALL
R E
: R O
O M
F
IN
IS
H
S C
H E
D
4" U
.N .O
EPOXY WALL PANEL ON
SUBSTRATE W/ BEVELED
EDGE AT BASE
EPOXY FLOORING;
RE: FINISH SCHEDULE
SSTL PIT LINER
SSTL GRATING
TREAD AND
SUPPORT RODS
SELF-LEVELING
CEMENTITIOUS
UNDERLAYMENT - FILL AS
NECESSARY TO OBTAIN
MANUFACTURERS
RECOMMENDED PIT
DEPTH AND TO ALIGN TOP
OF GRATING W/
ADJACENT FINISH FLOOR
3/4"x3/4"x1/8"
SSTL ANGLE
5/ 8"
ALIGN
RESILIENT FLOORING
AS SCHEDULED
M A
X 1/
2"
SLOPING TILE @
SHOWER FLOOR
SEALANT TO
MATCH GROUT
FLOOR TILE @ ROOM
BULLNOSE GROUND EDGE
WATERPROOFING
MEMBRANE
REINFORCING
SLOPED MOTAR BED
SCHEDULED
PARTITION
FLOOR TILE -
RE: FINISH SCHED
SEALANT TO
MATCH GROUT
WALL TILE, AS
SCHEDULED
NOTE: ALIGN VERTICAL JOINTS ON WALL W/ JOINTS ON FLOOR
PROVIDE MANUFACTURER'S FINISHED TRIM UNITS AS REQUIRED
SLOPED CONC BACKFILL
CRACK-SUPPRESSION
MEMBRANE OVER
CONCRETE
GROUT
TRENCH DRAIN
ASSEMBLY
WATERPROOF MEMBRANE
DRAIN PIPE
BEYOND
CONC FLR SLAB -
RE: STRUCT DWGS
8" M
IN
1/4"/FT SLOPE
MAX
TILE EDGING (BOTH SIDES)
FLOOR TILE -
RE: FINISH SCHEDULE
SLOPED CONC
BACKFILL
CRACK-SUPPRESSION
MEMBRANE OVER
CONCRETE
GROUT
TRENCH DRAIN
ASSEMBLY
WATERPROOF
MEMBRANE
DRAIN PIPE BEYOND
CONC FLR SLAB -
RE: STRUCT DWGS
1/4"/FT SLOPE
MAX
1/4"/FT SLOPE
MAX
TILE EDGING
(BOTH SIDES)
FIREPROOFING AS
REQUIRED AT
FLOOR - RE: FLS
PLANS FOR RATING
FLOOR SINK W/
GRATE - RE: PLUMB
EPOXY FLOORING -
RE: ROOM FIN SCHED
8"
ALIGN
GROUT TO FINE
ADJUST HEIGHT
AS REQUIRED
CONT ALUM
TRANSISTION STRIP
SET IN SEALANT
SEALED CONCRETE
AS SCHEDULED
SEE DOOR SCHEDULE
FOR DOOR TYPE
WHERE DOOR OCCURS
EPOXY FLOORING -
RE: FINISH SCHEDULE
DOOR (CLOSED) AND TRANSITION STRIP
11 12 08 09 13
03040506
Drawing Number
Building Number
Project NumberProject Title
Location
Date Checked Drawn
Drawing Title
Approved: Project Director
Key Plan
CONSULTANTS:
DateRevisions
1 2 3 4 5 6 7 8 9 10 11 12
D
C
B
A
554-501REPLACEMENT MEDICAL CENTER
FACILITY, EASTERN COLORADO
HEALTH CARE SYSTEM
AURORA, COLORADO
N
C O
N
R
E S
D A
T
IB
S
IB
N
E
N C
C
LC
C B
N
C
B C
C B
S
P
S N
P V
N
P
V S
13 14
1 2 3 4 5 6 7 8 9 10 11 12 13 14
E
OFFICE OF
CONSTRUCTION
AND FACILITIES
MANAGEMENT
ARCHITECT/ENGINEERS:
H+L Architecture 1755 Blake Street, Suite 400 Denver, CO 80202
Skidmore, Owings & Merrill LLP 224 South Michigan Avenue Suite 1000 Chicago, IL 60604
Cator, Ruma & Associates 896 Tabor Street Lakewood, CO 80401
S. A. Miro, Inc.
4582 South Ulster Street Pkwy.
Suite 300 Denver, CO 80237
Professional Seal
8/
/2
9:
:2
A
M C
:\U se rs \b br ab ec \D es kt op \A
I- T
Y P
IC
A
L D
E T
A
IL
S .r vt
XX.AI.771
FINISH DETAILS
08/31/2012
3" = 1'-0"1
TYP. TRANSITION CARPET
TO CERAMIC TILE
3" = 1'-0"2
TYP. TRANSITION CARPET
TO CONCRETE
3" = 1'-0"3
TYP TRANSITION CARPET
TO RESILIENT FLOORING
3" = 1'-0"5
TYP. TRANSITION FROM
CERAMIC TILE
3" = 1'-0"6
TYP. TRANSITION TO
CERAMIC TILE W/O DOOR
3" = 1'-0"7
TYP. TRANSITION CONC. TO
RESILIENT FLOORING
3" = 1'-0"8
TYP. TRANSITION @ SAME
THICKNESS RESILIENT
3" = 1'-0"9
TYP. TRANSITION @
DIFFERENT THICKNESS
RESILIENT
3" = 1'-0"10
TYP. TRANSITION
RESILIENT TO EPOXY
3" = 1'-0"11
TYP INTEGRAL COVED
WELDED SHEET FLOORING
3" = 1'-0"14 TYP. BASE @ CERAMIC TILE
3" = 1'-0"16
TYPICAL SHOWER DRAIN @
RESINOUS FLOORING
3" = 1'-0"17
TYPICAL FLOOR DRAIN @
CERAMIC TILE
6" = 1'-0"12
TYP. COVE @ EPOXY
FLOORING
3" = 1'-0"13 TYP. RUBBER BASE - COVE
3" = 1'-0"19
TYP. COVE DETAIL @ EPOXY
FLOORING & GLAZED CMU
6" = 1'-0"20
COVE @ EPOXY FLOORING -
PROJECTING WALL FINISH
6" = 1'-0"21
TYPICAL FLOOR GRATING
TRANISTION DETAIL
6" = 1'-0"18
TYPICAL SHOWER
THRESHOLD
3" = 1'-0"22
TYPICAL SHOWER TRENCH
DRAIN @ CERAMIC TILE
3" = 1'-0"23
TYPICAL SHOWER TRENCH
DRAIN @ SHOWER CENTER
3" = 1'-0"24 TYPICAL FLOOR SINK
3" = 1'-0"4
TYP. TRANSITION CONC. TO
EPOXY FLOORING
CDI No.12 08/31/2012
See RFI 1511
KT RFI 2364 (VA RFI
2068) Provide a manufacturer standard, silicone sealant joint transition detail similar to base detail 20/XX.AI771, between the epoxy wall panel (RESWC-1) and scheduled ceiling.
KT RFI #5954/VA #5223:
Acceptable to float the subfloor to the solid surface thresholds, up to 2% per ADA requirement.
The top of finished floor needs to maintain the 1/2" MAX dim from top of finish floor to top of threshold.
KT RFI #3165 / VA RFI #2939
The "waterproof membrane" shown is not a "vapor barrier".
The waterproof membranes are required as shown.
ATTACHMENT C & D
ATTACHMENT E
ATTACHMENT C
ATTACHMENT D
Float included w/sub
& E
File details come from the government source that posted it. Updated .