K1 Apartment Door Submittals.pdf
PDF 719 KB Posted
- Solicitation number
- 36C25922R0040
About this file
This is a solicitation for renovation work at a Department of Veterans Affairs medical center. The solicitation requires renovating an existing residential apartment to create a storage and repair area for powered wheelchairs, a wheelchair storage closet, and six computer workstations. An existing nursing office in a physical therapy gymnasium must also be renovated into two private treatment spaces. The work includes demolition, plumbing, HVAC, electrical, framing, drywall, finishes, and other construction tasks. The selected contractor must submit documentation including a construction schedule, site safety plan, inspection reports, and warranties. All work must comply with OSHA, NFPA, and other applicable codes and regulations. The period of performance is 90 calendar days from notice to proceed.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Fax: 303.930.9001
303.930.9000Tel:
Kiewit - Turner a Joint Venture
Suite A-300 7200 S. Alton Way
Englewood, CO 80112
Job: 15387 - Replacement Medical Center Facility
Product Data
Sample
Other
Shop Drawing
Resubmittal
First Submittal X
VA Proj #:
To: H+L Architecture 1755 Blake Street
Suite 400
Denver, CO 80202
DESCRIPTIONSpecificationSUBMITTAL
ItemQuantity Section Sub./SupplierNo. Mfgr.
ACTION
DCBA E
Kiewit Submittal No. 22 13 00-01 Architect's Submittal No. 00008
Review Cycle: 001
Attn: Chuck Adkisson
1 SWPPP - CBS & RFP #3 OnlyKiewit - Turner a
Joint Venture
01 573
ACTION TAKEN
CONTRACTOR'S SIGNATURE:
CONTRACTOR'S NOTES:
DATE: 7/12/2011
Reviewed Only for Revisions to
Reviewed: Incorporate Changes
Reviewed=
A
B
C
Previous Submittal
Revise and Resubmit=D
Rejected =E
ARCHITECT/ENGINEER RESPONSE:
REMARKS:
BY: DATE:
Expedition f_sb_pks_01a
VA101CFM-C-0100
Cc: Tim Pogany, U.S. Dept. of Veterans Affairs
Received By ___________________
Date _______________
REQUESTED RETURN DATE:
08 14 00
X
IBN Wood Door Resubmittal
X
The Hallgren Company
08 14 0003R1
03/06/2014
03/20/2014
Kiewit-Turner Submittal No.
VA 1
JVT 1
VHAECHBoltoT Received
These shop drawings/submittals have been reviewed in accordance with the provisions of the Contract Documents. Kiewit-Turner's review shall not serve to relieve Subcontractors or Suppliers of contractual responsibilities for any error or deviation from contract and subcontract requirements.
KIEWIT-TURNER
a Joint Venture
REVIEWED - NO COMMENTS MADE
REVIEWED WITH COMMENTS
RESUBMITTAL REQUIRED
DATE SIGNED
SUBMITTAL #: 08 14 0003R1
03/06/14
Kiewit-Turner a Joint Venture
7200 S. Alton Way, Suite A-300, Englewood, CO 80112
Phone: 303-930-9000 FAX: 303-930-9001
Project Name:
Subcontractor Name: Submittal Date:
Contact Name: E-mail: Return By Date:
Contact Phone(s): Review Days:
Number: Name:
1.3.A NA Y N N N - See 08 14 0-02
1.3.C
1.3.C.1-3 NA Y N N Y - 08 14 00-03R1
1.3.D
1.3.D.1-3 NA Y N N N - See 08 14 0-02
1.3.E
1.3.E.1 NA Y N N N - See 08 14 0-02
1.3.E.2 NA Y N N N - See 08 14 0-02
1.3.E.3 NA Y N N N - See 08 14 0-02
1.3.F NA Y N N N
NA Y N N N - See 08 14 0-02
X
Eggers Industries
Sustainable Design Submittals - Manufacturers Data
SUSTAINABLE DESIGN REQUIREMENTS
Date 3/4/2014
Eggers Industries
Eggers Industries
Eggers Industries
Hinge Loading Test Report
Submittal is in Compliance
Submittal is in Compliance with Variances from Specifications
Signature
Reviewed By
SUBMITTAL INDEX & COVER SHEET
Department of Veteran's Affairs Replacement
Medical Center
The Hallgren Company 03/04/14
Mike Hallgren mike@hallgrenco.com
702.523.7525
Specification Section: 08 14 00-03R1 IBN Interior Wood Doors Resubmittal
S p e c
S u b m it ta l
P a ra g ra p h
S p e c
P ro d u c t
P a ra g ra p h
S p e c if ie d o r L is te d
M a n u fa c tu re r?
M e e ts
A ll
S p e c
R e q u ir e m e n ts
E x c e p ti o n s o r
V a ri a n c e s f ro m
S p e c
A p p ro v e r
In fo rm a ti o n N e e d e d
I n
T h is P a c k a g e
Submittal Type
Submittal Item Description Manufacturer
Emily Mays
Wood Door Data - SCLC, Fire Rated, STC & Lead Lined Eggers Industries
WOOD DOOR SAMPLES - SUBMITTED WITH DAT INTERIORS Eggers Industries
Shop Drawings
Wood Door Shop Drawings w/Schedule & Elevations Eggers Industries
MANUFACTURERS LITERATURE & DATA
Cycle/Slam Test Report
Screw Holding Capacity Test Report
LABORATORY TEST REPORTS
SubmittalIndexForm_041009 Page 1 of 1 mailto:mike@hallgrenco.com
1/21/2014 3:21:00 PM
W O O D D O O R S Distributed By:
The Hallgren Company Colorado 2340 Executive Circle Colorado Springs, CO
DOOR HANDING CHART
RECORD OF SUBMITTALS
JOB NO.
PROJECT
LOCATION
ARCHITECT
CONTRACTOR
FINISH HARDWARE BY
SHEET NO. OF
SUBMITTED RETURNED
1ST
2ND
3RD
4TH
RECEIVED APPROVED DRAWINGS
RECEIVED APPROVED HARDWARE
DRAWN BY:
Double EgressDouble Acting
RH - Right HandLH - Left Hand
= KEY SIDEK
K K
K K
LHR - Left Hand Reverse RHR - Right Hand Reverse
C13-061-05-I
VA MEDICAL CENTER - IBN INTERIOR
THE HALLGREN CO. OF NEVADA
Phone: (719) 590-9962 Fax: (719) 590-9969
Construction F6 Bonded Fire Core 45/60 Min.
F9 Bonded Fire Core 90 Min.
SLC Structural Composite Lumber
Edge
Face
F FLUSH DOOR
N1 4 X 25 VISION LITE
N2 4 X 25 VISION LITE
N3 N3
FT1 FT1
FT2 FT2
Label 45min PP w/Int. Seal 45 min [Cat. A]
Prefinish CST Custom Color
Series
EG EGGERS A GRADE
Set
Specie
BDF CW BACON DOUGLAS FIR 63811
Stile
MATCH MATCHING STILES
LEGEND
Wood Doors
Page 2 of 40 1/21/2014 3:21:01 PM
Wood Door Schedule Project ID: C13-061-05-I VA MEDICAL CENTER - IBN INTERIOR Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
01-A1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-B1-04/EXAM 01-A1-01
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-A1-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0291 EG 3/3
01-A1-02-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-B1-04/EXAM 01-A1-02
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-A1-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0301 EG 3/3
01-A1-03-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-B1-04/EXAM 01-A1-03
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-A1-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0311 EG 3/3
01-A2-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
WAIT 01-A2-01/CORRIDOR 01-B1-04
1 SGL LHR SGLLHR 4'0" x 7'0" x 1 3/4"01-A2-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0321 EG 3/3
01-A3-01-A 3'0" x 7'0" x 1 3/4" WD/HMF
WAIT 01-A2-01/TOILET 01-A3-01
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"01-A3-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0341 EG 3/3
01-A3-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
WAIT 01-A2-01/TOILET 01-A3-02
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"01-A3-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0351 EG 3/3
01-A3-05-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-B3-01/OFFICE 01-A3-05
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-A3-05-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0361 EG 3/3
01-B1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-B1-04/EXAM 01-B1-01
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-B1-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0381 EG 3/3
01-B1-02-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-B1-04/EXAM 01-B1-02
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-B1-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0391 EG 3/3
Page 3 of 40 1/21/2014 3:21:01 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
01-B1-03-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-B1-04/EXAM 01-B1-03
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-B1-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0401 EG 3/3
01-B2-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-B3-01/RECOVERY 01-B2-01
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-B2-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0411 EG 3/3
01-B2-02-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-B3-01/CYSTOSCOPY 01-B2-02
1 SGL LH
1/16" LEAD-LINED
SGLLH 4'0" x 7'0" x 1 3/4"01-B2-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0421 EG 3/3
01-B2-02-B 3'0" x 7'0" x 1 3/4" WD/HMF
INSTRUMENT 01-C2-01/CYSTOSCOPY
01-B2-02
1 SGL RH
1/16" LEAD-LINED
SGLRH 3'0" x 7'0" x 1 3/4"01-B2-02-B SLCBDFF MATCH
FLUSH DOOR
CST 5-0431 EG 3/3
01-B3-02-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-B3-01/EXAM 01-B3-02
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-B3-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0461 EG 3/3
01-B3-03-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-B3-01/DRESSING 01-B3-03
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-B3-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0471 EG 3/3
01-B3-04-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-B3-01/SHOWER 01-B3-04
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-B3-04-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0481 EG 3/3
01-B3-05-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-B3-01/TOILET 01-B3-05
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-B3-05-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0491 EG 3/3
01-B3-06-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-RAR1-01/CLEAN LINEN
01-B3-06
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"01-B3-06-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0501 EG 3/3
Page 4 of 40 1/21/2014 3:21:01 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
01-B3-07-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-RAR1-01/TOILET 01-B3-07
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-B3-07-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0511 EG 3/3
01-B3-08-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-RAR1-01/TOILET 01-B3-08
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-B3-08-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0521 EG 3/3
01-C1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-B1-04/OFFICE 01-C1-01
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-C1-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0531 EG 3/3
01-C1-02-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-B1-04/OFFICE 01-C1-02
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-C1-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0541 EG 3/3
01-C1-03-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-B1-04/OFFICE 01-C1-03
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-C1-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0551 EG 3/3
01-C2-01-A 3'0" x 7'0" x 1 3/4" WD/HMF
INSTRUMENT 01-C2-01/STORAGE 01-C2-02
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"01-C2-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0561 EG 3/3
01-C2-01-B 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-B1-04/INSTRUMENT 01-C2-01
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"01-C2-01-B SLCBDFF MATCH
FLUSH DOOR
CST 5-0571 EG 3/3
01-C2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-B3-01/STORAGE 01-C2-02
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"01-C2-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0581 EG 3/3
01-C2-02-B 3'0" x 7'0" x 1 3/4" WD/HMF
CYSTOSCOPY 01-B2-02/STORAGE 01-C2-02
1 SGL LH
1/16" LEAD-LINED
SGLLH 3'0" x 7'0" x 1 3/4"01-C2-02-B SLCBDFF MATCH
FLUSH DOOR
CST 5-0591 EG 3/3
Page 5 of 40 1/21/2014 3:21:01 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
01-C2-02-C 3'0" x 7'0" x 1 3/4" WD/HMF
UROLOGY 01-C3-01/STORAGE 01-C2-02
1 SGL LH
1/16" LEAD-LINED
SGLLH 3'0" x 7'0" x 1 3/4"01-C2-02-C SLCBDFF MATCH
FLUSH DOOR
CST 5-0601 EG 3/3
01-C3-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-B3-01/UROLOGY 01-C3-01
1 SGL LH
1/16" LEAD-LINED
SGLLH 4'0" x 7'0" x 1 3/4"01-C3-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0611 EG 3/3
01-C3-01-B 3'0" x 7'0" x 1 3/4" WD/HMF
INSTRUMENT 01-C2-01/UROLOGY 01-C3-01
1 SGL LH
1/16" LEAD-LINED
SGLLH 3'0" x 7'0" x 1 3/4"01-C3-01-B SLCBDFF MATCH
FLUSH DOOR
CST 5-0621 EG 3/3
01-C3-03-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-RAR1-01/CLEAN UTIL 01-C3-03
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-C3-03-A SLCBDFF MATCH 45min
FLUSH DOOR
CST 5-0641 EG 3/3
01-D3-01-A 3'0" x 7'0" x 1 3/4" WD/HMF
PHYS THER 01-D1-01/OFFICE 01-D3-01
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"01-D3-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0671 EG 3/3
01-E1-01-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-F1-04/POOL 01-E1-01
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"01-E1-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0681 EG 3/3
01-E3-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
POOL 01-E1-01/TOILET 01-E3-01
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-E3-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0701 EG 3/3
01-E3-02-A 4'0" x 7'0" x 1 3/4" WD/HMF
POOL 01-E1-01/DRESSING 01-E3-02
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-E3-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0711 EG 3/3
01-F1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
POOL 01-E1-01/DRESSING 01-F1-01
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-F1-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0721 EG 3/3
Page 6 of 40 1/21/2014 3:21:01 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
01-F1-03-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-F1-04/OFFICE 01-F1-03
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-F1-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0731 EG 3/3
01-F2-02-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-F1-04/OFFICE 01-F2-02
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-F2-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0751 EG 3/3
01-F2-03-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-F1-04/OFFICE 01-F2-03
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-F2-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0761 EG 3/3
01-F3-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-F1-04/INTERVIEW 01-F3-01
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-F3-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0771 EG 3/3
01-F3-02-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDRO 01-FR1-03/OFFICE 01-F3-02
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-F3-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0781 EG 3/3
01-G1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-F1-04/OFFICE 01-G1-01
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-G1-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0801 EG 3/3
01-G1-02-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-F1-04/SECRETARY 01-G1-02
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-G1-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0811 EG 3/3
01-G1-03-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-F1-04/OFFICE 01-G1-03
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-G1-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0821 EG 3/3
01-G2-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-F1-04/OFFICE 01-G2-01
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-G2-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0831 EG 3/3
Page 7 of 40 1/21/2014 3:21:01 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
01-G2-02-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-F1-04/COORDINATOR
01-G2-02
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-G2-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0841 EG 3/3
01-G2-03-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-F1-04/COORDINATOR
01-G2-03
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-G2-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0851 EG 3/3
01-G2-04-A 2-3'8" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-F1-04/STORAGE 01-G2-04
1 PR RHRA/LHR PRARHR 3'8" x 7'0" x 1 3/4"01-G2-04-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0861 EG 3/3
PRILHR 3'8" x 7'0" x 1 3/4" SLCBDFF MATCH
FLUSH DOOR
CST1 EG 3/3
01-G2-05-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-FR1-03/STORAGE 01-G2-05
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"01-G2-05-A F6BDFF MATCH 45min
FLUSH DOOR
CST GB16 5-0871 EG 3/3
01-G2-06-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-FR1-03/OFFICE 01-G2-06
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-G2-06-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0881 EG 3/3
01-G3-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-FR1-03/OFFICE 01-G3-01
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-G3-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0891 EG 3/3
01-H1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-F1-04/OFFICE 01-H1-01
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-H1-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0911 EG 3/3
01-H1-02-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-FR1-03/OFFICE 01-H1-02
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-H1-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0921 EG 3/3
Page 8 of 40 1/21/2014 3:21:01 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
01-H2-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-FR1-03/OFFICE 01-H2-01
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-H2-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0931 EG 3/3
01-H2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-FR1-03/TOILET 01-H2-02
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"01-H2-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-0941 EG 3/3
01-RAR101A
2-3'8" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-RAR1-01/CORRIDOR 01-B1-04
1 PR RHR/LHR PRRHR 3'8" x 7'0" x 1 3/4"01-RAR101A SLCBDFN3 MATCH N3
CST 5-0951 EG 3/3
PRLHR 3'8" x 7'0" x 1 3/4" SLCBDFN3 MATCH N3
CST1 EG 3/3
01-RAR101B
2-3'8" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-RAR1-01/CORRIDOR 01-B1-04
1 PR RHR/LHR PRRHR 3'8" x 7'0" x 1 3/4"01-RAR101B SLCBDFN3 MATCH N3
CST 5-0961 EG 3/3
PRLHR 3'8" x 7'0" x 1 3/4" SLCBDFN3 MATCH N3
CST1 EG 3/3
01-RAR103A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-RAR1-07/CONF. 01-RAR1-03
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RAR103A SLCBDFF MATCH
FLUSH DOOR
CST 5-0981 EG 3/3
01-RAR104A
2-3'8" x 7'0" x 1 3/4" WD/HMF
MULTI-PURP 01-RAR1-05/STOR. 01-RAR1-04
1 PR RHRA/LHR PRARHR 3'8" x 7'0" x 1 3/4"01-RAR104A F6BDFF MATCH 45min
FLUSH DOOR
CST GB16 5-0991 EG 3/3
PRILHR 3'8" x 7'0" x 1 3/4" F6BDFF MATCH 45min
FLUSH DOOR
CST GB161 EG 3/3
Page 9 of 40 1/21/2014 3:21:01 PM
4" X 25" Glass
4" X 25" Glass
4" X 25" Glass
4" X 25" Glass
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
01-RAR104B
2-3'8" x 7'0" x 1 3/4" WD/HMF
MULTI-PURP 01-RAR1-05/STOR. 01-RAR1-04
1 PR RHRA/LHR PRARHR 3'8" x 7'0" x 1 3/4"01-RAR104B F6BDFF MATCH 45min
FLUSH DOOR
CST GB16 5-1001 EG 3/3
PRILHR 3'8" x 7'0" x 1 3/4" F6BDFF MATCH 45min
FLUSH DOOR
CST GB161 EG 3/3
01-RAR105A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-RAR1-07/MULT-PURP
01-RAR1-05
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RAR105A SLCBDFF MATCH
FLUSH DOOR
CST 5-1011 EG 3/3
01-RAR106A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-RAR1-07/DINING 01-RAR1-06
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-RAR106A SLCBDFF MATCH
FLUSH DOOR
CST 5-1021 EG 3/3
01-RAR106B
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-RAR1-07/DINING 01-RAR1-06
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RAR106B SLCBDFF MATCH
FLUSH DOOR
CST 5-1031 EG 3/3
01-RAR108A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-RAR1-07/STORAGE
01-RAR1-08
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RAR108A F6BDFF MATCH 45min
FLUSH DOOR
CST GB16 5-1041 EG 3/3
01-RAR109A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-RAR1-01/INT CAFE
01-RAR1-09
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RAR109A SLCBDFF MATCH
FLUSH DOOR
CST 5-1051 EG 3/3
01-RAR110A
3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-RAR1-07/SERVERY
01-RAR1-10
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"01-RAR110A SLCBDFF MATCH
FLUSH DOOR
CST 5-1061 EG 3/3
01-RAR110B
3'0" x 7'0" x 1 3/4" WD/HMF
DINING 01-RAR1-06/SERVERY 01-RAR1-10
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"01-RAR110B SLCBDFF MATCH
FLUSH DOOR
CST 5-1071 EG 3/3
Page 10 of 40 1/21/2014 3:21:01 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
01-RAR110C
3'0" x 7'0" x 1 3/4" WD/HMF
SERVERY 01-RAR1-10/STORAGE
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"01-RAR110C SLCBDFF MATCH
FLUSH DOOR
CST 5-1081 EG 3/3
01-RBR101A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-RAR1-01/PHARMACY
01-RBR1-01
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-RBR101A F6BDFF MATCH 45min
FLUSH DOOR
CST GB16 5-1111 EG 3/3
01-RBR101B
3'0" x 7'0" x 1 3/4" WD/HMF
PHARMACY 01-RBR1-02/PHARMACY
01-RBR1-01
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"01-RBR101B F6BDFF MATCH 45min
FLUSH DOOR
CST GB16 5-1121 EG 3/3
01-RBR102A
3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-RAR1-01/PHARMACY
01-RBR1-02
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"01-RBR102A SLCBDFF MATCH
FLUSH DOOR
CST 5-1131 EG 3/3
01-RCR101A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-RAR1-01/LEARNING
01-RCR1-01
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RCR101A SLCBDFF MATCH
FLUSH DOOR
CST 5-1141 EG 3/3
01-RCR102A
3'0" x 7'0" x 1 3/4" WD/HMF
LEARNING 01-RCR1/TOILET 01-RCR1-02
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"01-RCR102A SLCBDFN1 MATCH
4 X 25 VISION LITE
CST 5-1151 EG 3/3
01-RCR103A
3'0" x 7'0" x 1 3/4" WD/HMF
BEDROOM 01-RDR1-02/CLOSET 01-RCR1-03
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"01-RCR103A SLCBDFF MATCH
FLUSH DOOR
CST 5-1161 EG 3/3
01-RDR101A
4'0" x 9'2-1/2" x 1 3/4" WD/HMF
BEDROOM 01-RDR1-02/TOILET 01-RDR1-01
1 SGL LH SGLLH 4'0" x 9'2-1/2" x 101-RDR101A SLCBDFFT2 MATCH
FT2
CST 5-1171 EG 3/3
01-RDR102A
4'0" x 7'0" x 1 3/4" WD/HMF
LEARNING 01-RCR1-01/BEDROOM
01-RDR1-02
1 SGL RHR SGLRHR 4'0" x 7'0" x 1 3/4"01-RDR102A SLCBDFF MATCH
FLUSH DOOR
CST 5-1181 EG 3/3
Page 11 of 40 1/21/2014 3:21:01 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
01-RDR103A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-RAR1-01/CONF. 01-RDR1-03
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-RDR103A SLCBDFF MATCH
FLUSH DOOR
CST 5-1191 EG 3/3
01-RFR103A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-FR1-03/SHOWER 01-RFR1-03
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-RFR103A SLCBDFF MATCH
FLUSH DOOR
CST 5-1221 EG 3/3
01-RGR101A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-FR1-03/PATIENT ED
01-RGR1-01
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-RGR101A SLCBDFF MATCH
FLUSH DOOR
CST 5-1231 EG 3/3
01-RGR102A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-FR1-03/OFFICE 01-RGR1-02
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RGR102A SLCBDFF MATCH
FLUSH DOOR
CST 5-1241 EG 3/3
01-RGR103A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-FR1-03/OFFICE 01-RGR1-03
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-RGR103A SLCBDFF MATCH
FLUSH DOOR
CST 5-1251 EG 3/3
01-RHR101A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-FR1-03/HORTICULT.
01-RHR1-01
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RHR101A SLCBDFF MATCH
FLUSH DOOR
CST 5-1261 EG 3/3
01-RHR103A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-FR1-03/LOUNGE 01-RHR1-03
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"01-RHR103A SLCBDFF MATCH
FLUSH DOOR
CST 5-1271 EG 3/3
01-RJR101A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 01-FR1-03/MEDITATION
01-RJR1-01
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"01-RJR101A SLCBDFF MATCH
FLUSH DOOR
CST 5-1281 EG 3/3
Page 12 of 40 1/21/2014 3:21:02 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
02-A1-01-A (4'0")(1'6") x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-D1-05/PATIENT ROOM
02-A1-01
1 PR RHA/LH PRARH 4'0" x 7'0" x 1 3/4"02-A1-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1291 EG 3/3
PRILH 1'6" x 7'0" x 1 3/4" SLCBDFF MATCH
FLUSH DOOR
CST1 EG 3/3
02-A1-02-A 4'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 02-A1-01/TOILET 02-A1-02
1 SGL LHR SGLLHR 4'0" x 7'0" x 1 3/4"02-A1-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1301 EG 3/3
02-A1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 02-A1-04/TOILET 02-A1-03
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-A1-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1311 EG 3/3
02-A1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-D1-05/PATIENT ROOM
02-A1-04
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-A1-04-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1321 EG 3/3
02-A2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-D1-05/CLASSROOM 02-A2-02
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-A2-02-A SLCBDFN1 MATCH
4 X 25 VISION LITE
CST 5-1341 EG 3/3
02-A2-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-A2-03/CORRIDOR 02-B3-08
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-A2-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1351 EG 3/3
02-A3-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-A2-03/TOILET 02-A3-02
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-A3-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1361 EG 3/3
02-A3-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-A2-03/TOILET 02-A3-03
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-A3-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1371 EG 3/3
Page 13 of 40 1/21/2014 3:21:02 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
02-B1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-D1-05/PATIENT ROOM
02-B1-01
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-B1-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1411 EG 3/3
02-B1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 02-B1-01/TOILET 02-B1-02
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-B1-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1421 EG 3/3
02-B1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 02-B1-04/TOILET 02-B1-03
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-B1-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1431 EG 3/3
02-B1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-D1-05/PATIENT ROOM
02-B1-04
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-B1-04-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1441 EG 3/3
02-B2-01-A 3'0" x 7'0" x 1 3/4" WD/HMF
BED 02-B2-06/TOILET 02-B2-01
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-B2-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1451 EG 3/3
02-B2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
BED 02-B2-05/TOILET 02-B2-02
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-B2-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1461 EG 3/3
02-B2-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
BED 02-B2-07/TOILET 02-B2-03
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-B2-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1471 EG 3/3
02-B2-04-A 3'0" x 7'0" x 1 3/4" WD/HMF
BED 02-B2-08/TOILET 02-B2-04
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-B2-04-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1481 EG 3/3
02-B2-05-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-C2-04/BED 02-B2-05
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-B2-05-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1491 EG 3/3
Page 14 of 40 1/21/2014 3:21:02 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
02-B2-06-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-C2-04/BED 02-B2-06
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-B2-06-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1501 EG 3/3
02-B2-07-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-C2-04/BED 02-B2-07
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-B2-07-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1511 EG 3/3
02-B2-08-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-C2-04/BED 02-B2-08
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-B2-08-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1521 EG 3/3
02-B3-01-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-C2-04/BED 02-B3-01
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-B3-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1531 EG 3/3
02-B3-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-C2-04/BED 02-B3-02
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-B3-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1541 EG 3/3
02-B3-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-C2-04/BED 02-B3-03
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-B3-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1551 EG 3/3
02-B3-04-A 3'0" x 7'0" x 1 3/4" WD/HMF
BED 02-B3-01/TOILET 02-B3-04
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-B3-04-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1561 EG 3/3
02-B3-05-A 3'0" x 7'0" x 1 3/4" WD/HMF
BED 02-B3-02/TOILET 02-B3-05
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-B3-05-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1571 EG 3/3
02-B3-06-A 3'0" x 7'0" x 1 3/4" WD/HMF
BED 02-B3-03/TOILET 02-B3-06
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-B3-06-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1581 EG 3/3
Page 15 of 40 1/21/2014 3:21:02 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
02-B3-07-A 2-3'8" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-RAR1-05/EQUIP STOR
02-B3-07
1 PR RHRA/LHR PRARHR 3'8" x 7'0" x 1 3/4"02-B3-07-A SLCBDFF MATCH 45min
FLUSH DOOR
CST 5-1591 EG 3/3
PRILHR 3'8" x 7'0" x 1 3/4" SLCBDFF MATCH 45min
FLUSH DOOR
CST1 EG 3/3
02-B3-07-B 2-3'8" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-RAR1-05/EQUIP STOR
02-B3-07
1 PR RHRA/LHR PRARHR 3'8" x 7'0" x 1 3/4"02-B3-07-B SLCBDFF MATCH 45min
FLUSH DOOR
CST 5-1601 EG 3/3
PRILHR 3'8" x 7'0" x 1 3/4" SLCBDFF MATCH 45min
FLUSH DOOR
CST1 EG 3/3
02-C1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-D1-05/PATIENT ROOM
02-C1-01
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-C1-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1611 EG 3/3
02-C1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 02-C1-01/TOILET 02-C1-02
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-C1-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1621 EG 3/3
02-C1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 02-C1-04/TOILET 02-C1-03
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-C1-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1631 EG 3/3
02-C1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-D1-05/PATIENT ROOM
02-C1-04
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-C1-04-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1641 EG 3/3
02-C2-01-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-D1-05/CONFERENCE 02-C2-01
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-C2-01-A SLCBDFN1 MATCH
4 X 25 VISION LITE
CST 5-1651 EG 3/3
Page 16 of 40 1/21/2014 3:21:02 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
02-C2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-D2-08/OFFICE 02-C2-02
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-C2-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1661 EG 3/3
02-C2-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-C2-04/LINEN 02-C2-03
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-C2-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1671 EG 3/3
02-C2-04-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-B3-08/CORRIDOR 02-C2-04
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-C2-04-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1681 EG 3/3
02-C2-04-B 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-D2-08/CORRIDOR 02-C2-04
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-C2-04-B SLCBDFF MATCH
FLUSH DOOR
CST 5-1691 EG 3/3
02-C3-01-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-C2-04/STAFF LOUNGE
02-C3-01
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-C3-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1701 EG 3/3
02-C3-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-RAR1-05/OFFICE 02-C3-02
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-C3-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1711 EG 3/3
02-D1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-D1-05/PATIENT ROOM
02-D1-01
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-D1-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1721 EG 3/3
02-D1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 02-D1-01/TOILET 02-D1-02
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-D1-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1731 EG 3/3
02-D1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 02-D1-04/TOILET 02-D1-03
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-D1-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1741 EG 3/3
Page 17 of 40 1/21/2014 3:21:02 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
02-D1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/PATIENT ROOM
02-D1-04
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-D1-04-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1751 EG 3/3
02-D2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
LOUNGE 02-D2-03/LOCKERS 02-D2-02
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-D2-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1771 EG 3/3
02-D2-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-D2-08/STAFF LOUNGE
02-D2-03
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-D2-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1781 EG 3/3
02-D2-04-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-D2-08/TOILET 02-D2-04
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-D2-04-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1791 EG 3/3
02-D2-05-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-D2-08/TOILET 02-D2-05
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-D2-05-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1801 EG 3/3
02-D3-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-RAR1-05/OFFICE 02-D3-03
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-D3-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1821 EG 3/3
02-D3-04-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-RAR1-05/OFFICE 02-D3-04
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-D3-04-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1831 EG 3/3
02-E1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/PATIENT ROOM
02-E1-01
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-E1-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1841 EG 3/3
02-E1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 02-E1-01/TOILET 02-E1-02
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-E1-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1851 EG 3/3
Page 18 of 40 1/21/2014 3:21:02 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
02-E1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 02-E1-04/TOILET 02-E1-03
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-E1-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1861 EG 3/3
02-E1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/PATIENT ROOM
02-E1-04
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-E1-04-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1871 EG 3/3
02-E2-01-A 2-2'6" x 7'0" x 1 3/4" WD/HMF
NURSE STATION 02-E2-01/STORAGE
02-E2-01A
1 PR RHRA/LHR PRARHR 2'6" x 7'0" x 1 3/4"02-E2-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1901 EG 3/3
PRILHR 2'6" x 7'0" x 1 3/4" SLCBDFF MATCH
FLUSH DOOR
CST1 EG 3/3
02-E2-05-A 3'6" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-F3-04/MEDS 02-E2-05
1 SGL LH SGLLH 3'6" x 7'0" x 1 3/4"02-E2-05-A SLCBDFN2 MATCH
4 X 25 VISION LITE
CST 5-1921 EG 3/3
02-E2-05BA
3'6" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-F3-04/CLEAN UTIL 02-E2-05B
1 SGL RH SGLRH 3'6" x 7'0" x 1 3/4"02-E2-05BA SLCBDFF MATCH 45min
FLUSH DOOR
CST 5-1931 EG 3/3
02-E2-06-A 3'6" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/CONSULT 02-E2-06
1 SGL LH SGLLH 3'6" x 7'0" x 1 3/4"02-E2-06-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1941 EG 3/3
02-E2-06CA
3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-RAR1-05/LACTATION
02-E2-06C
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-E2-06CA SLCBDFF MATCH
FLUSH DOOR
CST 5-1951 EG 3/3
Page 19 of 40 1/21/2014 3:21:02 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
02-E3-05-A 2-2'6" x 7'0" x 1 3/4" WD/HMF
NURSE STATION 02-E3-05/STORAGE
02-E3-05A
1 PR RHRA/LHR PRARHR 2'6" x 7'0" x 1 3/4"02-E3-05-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1971 EG 3/3
PRILHR 2'6" x 7'0" x 1 3/4" SLCBDFF MATCH
FLUSH DOOR
CST1 EG 3/3
02-E3-07-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/EDUCATOR 02-E3-07
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-E3-07-A SLCBDFF MATCH
FLUSH DOOR
CST 5-1981 EG 3/3
02-E3-08-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-F3-04/CLEAN LINEN 02-E3-08
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-E3-08-A F6BDFF MATCH 45min
FLUSH DOOR
CST GB16 5-1991 EG 3/3
02-F1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/PATIENT ROOM
02-F1-01
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-F1-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2001 EG 3/3
02-F1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 02-F1-01/TOILET 02-F1-02
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-F1-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2011 EG 3/3
02-F1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 02-F1-04/TOILET 02-F1-03
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-F1-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2021 EG 3/3
02-F1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/PATIENT ROOM
02-F1-04
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-F1-04-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2031 EG 3/3
02-F2-01BA
3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/OFFICE 02-F2-01B
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-F2-01BA SLCBDFF MATCH
FLUSH DOOR
CST 5-2041 EG 3/3
Page 20 of 40 1/21/2014 3:21:03 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
02-F2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/EQUIP STOR 02-F2-02
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-F2-02-A F6BDFF MATCH 45min
FLUSH DOOR
CST GB16 5-2051 EG 3/3
02-F3-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/OFFICE 02-F3-02
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-F3-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2071 EG 3/3
02-G1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/PATIENT ROOM
02-G1-01
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-G1-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2081 EG 3/3
02-G1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 02-G1-01/TOILET 02-G1-02
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-G1-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2091 EG 3/3
02-G1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 02-G1-04/TOILET 02-G1-03
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-G1-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2101 EG 3/3
02-G1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/PATIENT ROOM
02-G1-04
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-G1-04-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2111 EG 3/3
02-G2-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/STAFF TOILET 02-G2-03
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-G2-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2121 EG 3/3
02-G2-04-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/WORK 02-G2-04
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-G2-04-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2131 EG 3/3
02-G2-05-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-G2-06/OFFICE 02-G2-05
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-G2-05-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2141 EG 3/3
Page 21 of 40 1/21/2014 3:21:03 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
02-G3-01-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/OFFICE 02-G3-01
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-G3-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2151 EG 3/3
02-G3-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-G2-06/STORAGE 02-G3-03
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-G3-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2161 EG 3/3
02-G3-03BA
3'0" x 7'0" x 1 3/4" WD/HMF
WORK 02-G2-04/INTERVIEW 02-G3-03B
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-G3-03BA SLCBDFF MATCH
FLUSH DOOR
CST 5-2171 EG 3/3
02-H1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/PATIENT ROOM
02-H1-01
1 SGL RH
1/4" LEAD LINED
SGLRH 4'0" x 7'0" x 1 3/4"02-H1-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2181 EG 3/3
02-H1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 02-H1-01/TOILET 02-H1-02
1 SGL LHR
1/4" LEAD LINED
SGLLHR 3'0" x 7'0" x 1 3/4"02-H1-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2191 EG 3/3
02-RAR101A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-RAR1-05/PAT ROOM
02-RAR1-01
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-RAR101A SLCBDFF MATCH
FLUSH DOOR
CST 5-2201 EG 3/3
02-RAR102A
3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT RM 02-RAR1-04/TOILET 02-RAR1-02
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-RAR102A SLCBDFF MATCH
FLUSH DOOR
CST 5-2211 EG 3/3
02-RAR103A
3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT RM 02-RAR1-01/TOILET 02-RAR1-03
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-RAR103A SLCBDFF MATCH
FLUSH DOOR
CST 5-2221 EG 3/3
02-RAR104A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-RAR1-05/PAT ROOM
02-RAR1-04
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-RAR104A SLCBDFF MATCH
FLUSH DOOR
CST 5-2231 EG 3/3
Page 22 of 40 1/21/2014 3:21:03 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
02-RBR101A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-RAR1-05/PAT ROOM
02-RBR1-01
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-RBR101A SLCBDFF MATCH
FLUSH DOOR
CST 5-2251 EG 3/3
02-RBR102A
3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT RM 02-RBR1-04/TOILET 02-RBR1-02
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-RBR102A SLCBDFF MATCH
FLUSH DOOR
CST 5-2261 EG 3/3
02-RBR103A
3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT RM 02-RBR1-01/TOILET 02-RBR1-03
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-RBR103A SLCBDFF MATCH
FLUSH DOOR
CST 5-2271 EG 3/3
02-RBR104A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-RAR1-05/PAT ROOM
02-RBR1-04
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-RBR104A SLCBDFF MATCH
FLUSH DOOR
CST 5-2281 EG 3/3
02-RCR101A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-RAR1-05/PAT ROOM
02-RCR1-01
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-RCR101A SLCBDFF MATCH
FLUSH DOOR
CST 5-2291 EG 3/3
02-RCR102A
3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT RM 02-RCR1-04/TOILET 02-RCR1-02
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-RCR102A SLCBDFF MATCH
FLUSH DOOR
CST 5-2301 EG 3/3
02-RCR103A
3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT RM 02-RCR1-01/TOILET 02-RCR1-03
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-RCR103A SLCBDFF MATCH
FLUSH DOOR
CST 5-2311 EG 3/3
02-RCR104A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-RAR1-05/PAT ROOM
02-RCR1-04
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-RCR104A SLCBDFF MATCH
FLUSH DOOR
CST 5-2321 EG 3/3
Page 23 of 40 1/21/2014 3:21:03 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
02-RDR101A
(4'0")(1'6") x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-RAR1-05/PAT ROOM
02-RDR1-01
1 PR LHA/RH PRALH 4'0" x 7'0" x 1 3/4"02-RDR101A SLCBDFF MATCH
FLUSH DOOR
CST 5-2331 EG 3/3
PRIRH 1'6" x 7'0" x 1 3/4" SLCBDFF MATCH
FLUSH DOOR
CST1 EG 3/3
02-RDR102A
3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT RM 02-RDR1-04/TOILET 02-RDR1-02
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-RDR102A SLCBDFF MATCH
FLUSH DOOR
CST 5-2341 EG 3/3
02-RDR103A
4'0" x 7'0" x 1 3/4" WD/HMF
PATIENT RM 02-RDR1-01/TOILET 02-RDR1-03
1 SGL RHR SGLRHR 4'0" x 7'0" x 1 3/4"02-RDR103A SLCBDFF MATCH
FLUSH DOOR
CST 5-2351 EG 3/3
02-RDR104A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-RAR1-05/PAT ROOM
02-RDR1-04
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-RDR104A SLCBDFF MATCH
FLUSH DOOR
CST 5-2361 EG 3/3
02-RER101A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/PATIENT RM
02-RER1-01
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-RER101A SLCBDFF MATCH
FLUSH DOOR
CST 5-2371 EG 3/3
02-RER102A
3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT RM 02-RER1-04/TOILET 02-RER1-02
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-RER102A SLCBDFF MATCH
FLUSH DOOR
CST 5-2381 EG 3/3
02-RER103A
3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT RM 02-RER1-01/TOILET 02-RER1-03
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-RER103A SLCBDFF MATCH
FLUSH DOOR
CST 5-2391 EG 3/3
02-RER104A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/PATIENT RM
02-RER1-04
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-RER104A SLCBDFF MATCH
FLUSH DOOR
CST 5-2401 EG 3/3
Page 24 of 40 1/21/2014 3:21:03 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
02-RFR101A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/PATIENT RM
02-RFR1-01
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-RFR101A SLCBDFF MATCH
FLUSH DOOR
CST 5-2411 EG 3/3
02-RFR102A
3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT RM 02-RFR1-04/TOILET 02-RFR1-02
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-RFR102A SLCBDFF MATCH
FLUSH DOOR
CST 5-2421 EG 3/3
02-RFR103A
3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT RM 02-RFR1-01/TOILET 02-RFR1-03
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-RFR103A SLCBDFF MATCH
FLUSH DOOR
CST 5-2431 EG 3/3
02-RFR104A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/PATIENT RM
02-RFR1-04
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-RFR104A SLCBDFF MATCH
FLUSH DOOR
CST 5-2441 EG 3/3
02-RGR101A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/PATIENT RM
02-RGR1-01
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-RGR101A SLCBDFF MATCH
FLUSH DOOR
CST 5-2451 EG 3/3
02-RGR102A
3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT RM 02-RGR1-04/TOILET 02-RGR1-02
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"02-RGR102A SLCBDFF MATCH
FLUSH DOOR
CST 5-2461 EG 3/3
02-RGR103A
3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT RM 02-RGR1-01/TOILET 02-RGR1-03
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-RGR103A SLCBDFF MATCH
FLUSH DOOR
CST 5-2471 EG 3/3
02-RGR104A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/PATIENT RM
02-RGR1-04
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"02-RGR104A SLCBDFF MATCH
FLUSH DOOR
CST 5-2481 EG 3/3
02-RHR101A
4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/PATIENT RM
02-RHR1-01
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"02-RHR101A SLCBDFF MATCH
FLUSH DOOR
CST 5-2491 EG 3/3
Page 25 of 40 1/21/2014 3:21:03 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
02-RHR101B
3'0" x 7'0" x 1 3/4" WD/HMF
ANTEROOM 02-RHR1-02/PAT. ROOM
02-RHRA-01
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-RHR101B SLCBDFN1 MATCH
4 X 25 VISION LITE
CST 5-2501 EG 3/3
02-RHR102A
3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/ANTEROOM 02-RHR1-02
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"02-RHR102A SLCBDFF MATCH
FLUSH DOOR
CST 5-2511 EG 3/3
02-RHR103A
3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT RM 02-RHR1-01/TOILET 02-RHR1-03
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"02-RHR103A SLCBDFF MATCH
FLUSH DOOR
CST 5-2521 EG 3/3
02-RHR104A
3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 02-E1-05/OFFICE 02-RHR1-04
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"02-RHR104A SLCBDFF MATCH
FLUSH DOOR
CST 5-2531 EG 3/3
03-A1-01-A (4'0")(1'6") x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-B2-02/PATIENT ROOM
03-A1-01
1 PR RHA/LH PRARH 4'0" x 7'0" x 1 3/4"03-A1-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2541 EG 3/3
PRILH 1'6" x 7'0" x 1 3/4" SLCBDFF MATCH
FLUSH DOOR
CST1 EG 3/3
03-A1-02-A 4'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 03-A1-01/TOILET 03-A1-02
1 SGL LHR SGLLHR 4'0" x 7'0" x 1 3/4"03-A1-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2551 EG 3/3
03-A1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 03-A1-04/TOILET 03-A1-03
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"03-A1-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2561 EG 3/3
03-A1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-B2-02/PATIENT ROOM
03-A1-04
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"03-A1-04-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2571 EG 3/3
Page 26 of 40 1/21/2014 3:21:03 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
03-A2-01-B 3'0" x 7'0" x 1 3/4" WD/HMF
WAIT 03-A2-01/CORRIDOR 03-A3-01
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"03-A2-01-B SLCBDFF MATCH
FLUSH DOOR
CST 5-2581 EG 3/3
03-A2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-B2-02/CONFERENCE 03-A2-02
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"03-A2-02-A SLCBDFN1 MATCH
4 X 25 VISION LITE
CST 5-2601 EG 3/3
03-A3-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
WAIT 03-A2-01/TOILET 03-A3-02
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"03-A3-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2611 EG 3/3
03-A3-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
WAIT 03-A2-01/TOILET 03-A3-03
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"03-A3-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2621 EG 3/3
03-A3-05-A 3'6" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-A3-01/STORAGE 03-A3-05
1 SGL RHR SGLRHR 3'6" x 7'0" x 1 3/4"03-A3-05-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2651 EG 3/3
03-A3-07-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-B3-09/LACTATION 03-A3-07
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"03-A3-07-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2671 EG 3/3
03-B1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-B2-02/PATIENT ROOM
03-B1-01
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"03-B1-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2681 EG 3/3
03-B1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 03-B1-01/TOILET 03-B1-02
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"03-B1-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2691 EG 3/3
03-B1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 03-B1-04/TOILET 03-B1-03
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"03-B1-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2701 EG 3/3
Page 27 of 40 1/21/2014 3:21:03 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
03-B1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-B2-02/PATIENT ROOM
03-B1-04
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"03-B1-04-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2711 EG 3/3
03-B2-01-A 3'6" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-B2-02/GYM 03-B2-01
1 SGL LHR SGLLHR 3'6" x 7'0" x 1 3/4"03-B2-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2721 EG 3/3
03-B2-01-B 3'6" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-A3-01/GYM 03-B2-01
1 SGL LHR SGLLHR 3'6" x 7'0" x 1 3/4"03-B2-01-B SLCBDFF MATCH
FLUSH DOOR
CST 5-2731 EG 3/3
03-B3-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-C2-04/STORAGE 03-B3-03
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"03-B3-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2751 EG 3/3
03-B3-04-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-A3-01/SPEECH 03-B3-04
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"03-B3-04-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2761 EG 3/3
03-B3-06-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-B3-09/EQUIP STOR 03-B3-06
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"03-B3-06-A F6BDFF MATCH 45min
FLUSH DOOR
CST GB16 5-2771 EG 3/3
03-B3-07-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-C2-04/SAFETY COORD
03-B3-07
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"03-B3-07-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2781 EG 3/3
03-B3-08-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-C2-04/OFFICE 03-B3-08
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"03-B3-08-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2791 EG 3/3
03-C1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-B2-02/PATIENT ROOM
03-C1-01
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"03-C1-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2811 EG 3/3
Page 28 of 40 1/21/2014 3:21:03 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
03-C1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 03-C1-01/TOILET 03-C1-02
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"03-C1-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2821 EG 3/3
03-C1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 03-C1-04/TOILET 03-C1-03
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"03-C1-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2831 EG 3/3
03-C1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-B2-02/PATIENT ROOM
03-C1-04
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"03-C1-04-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2841 EG 3/3
03-C2-01-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-B2-02/STAFF 03-C2-01
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"03-C2-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2851 EG 3/3
03-C2-04-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-A3-01/CORRIDOR 03-C2-04
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"03-C2-04-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2881 EG 3/3
03-C2-04-B 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-D3-06/CORRIDOR 03-C2-04
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"03-C2-04-B SLCBDFF MATCH
FLUSH DOOR
CST 5-2891 EG 3/3
03-C3-01-A 2-3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-C2-04/CLOSET 03-C3-01
1 PR RHRA/LHR PRARHR 3'0" x 7'0" x 1 3/4"03-C3-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2901 EG 3/3
PRILHR 3'0" x 7'0" x 1 3/4" SLCBDFF MATCH
FLUSH DOOR
CST1 EG 3/3
Page 29 of 40 1/21/2014 3:21:03 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand Description Rev Location
Qty Hand Size UOM
Status
Series EdgeSpecie Stile LabelBlocking HDS #Prefinish
C on st ru ct io n
BevelFace Type
03-C3-02-A 2-3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-C2-04/CLOSET 03-C3-02
1 PR RHRA/LHR PRARHR 3'0" x 7'0" x 1 3/4"03-C3-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2911 EG 3/3
PRILHR 3'0" x 7'0" x 1 3/4" SLCBDFF MATCH
FLUSH DOOR
CST1 EG 3/3
03-C3-05-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-B3-09/COORDINATOR
03-C3-05
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"03-C3-05-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2921 EG 3/3
03-D1-01-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-B2-02/PATIENT ROOM
03-D1-01
1 SGL RH SGLRH 4'0" x 7'0" x 1 3/4"03-D1-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2931 EG 3/3
03-D1-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 03-D1-01/TOILET 03-D1-02
1 SGL LHR SGLLHR 3'0" x 7'0" x 1 3/4"03-D1-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2941 EG 3/3
03-D1-03-A 3'0" x 7'0" x 1 3/4" WD/HMF
PATIENT ROOM 03-D1-04/TOILET 03-D1-03
1 SGL RHR SGLRHR 3'0" x 7'0" x 1 3/4"03-D1-03-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2951 EG 3/3
03-D1-04-A 4'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-C2-03/PATIENT ROOM
03-D1-04
1 SGL LH SGLLH 4'0" x 7'0" x 1 3/4"03-D1-04-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2961 EG 3/3
03-D2-01-A 3'0" x 7'0" x 1 3/4" WD/HMF
CORRIDOR 03-D3-06/STAFF TOILET 03-D2-01
1 SGL RH SGLRH 3'0" x 7'0" x 1 3/4"03-D2-01-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2971 EG 3/3
03-D2-02-A 3'0" x 7'0" x 1 3/4" WD/HMF
LOUNGE 03-D2-08/LOCKERS 03-D2-02
1 SGL LH SGLLH 3'0" x 7'0" x 1 3/4"03-D2-02-A SLCBDFF MATCH
FLUSH DOOR
CST 5-2981 EG 3/3
Page 30 of 40 1/21/2014 3:21:04 PM
Job Number: C13-061-05-I
O P E N I N G S D O O R S Opening # Arch Mark Qty UOM Hand…