This document contains a request for information related to a federal contract opportunity to repurpose the fifth floor of a Veterans Affairs medical center for a substance abuse recovery treatment program.

The solicitation seeks construction services with a magnitude between $500,000 and $1,000,000 to complete the project of repurposing the fifth floor at the Grand Junction VA Medical Center in Grand Junction, Colorado. The work is 100% set aside for service-disabled veteran-owned small businesses. The point of contact is Robyn Young, who can be reached by phone or email. Responses to the RFI were due by March 8, 2021. The contract will have a 10-day notice to proceed stipulated after award.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Repurpose 5th Floor for SARRTP, newest first.
File Type Posted
36C25921R0031 0005.docx DOCX document
36C25921R0031 0004.docx DOCX document
03c Combined Specifications-3-17-2021.pdf PDF
36C25921R0031 0003.docx DOCX document
Past Performance Questionnaire.docx DOCX document
G2 SARRTP EXISTING _ ICRA.pdf PDF
G5 SARRTP EQUIPMENT.pdf PDF
010000 General Conditions.pdf PDF
36C25921R0031 0002.docx DOCX document
Instructions to Offerors - PPT-updated.pdf PDF
G3 SARRTP DEMO.pdf PDF
G6 SARRTP FIRE SYSTEM.pdf PDF
G8 SARRTP DETAIL.pdf PDF
G4 SARRTP CONSTRUCTION.pdf PDF
G7 SARRTP VIDEO SYSTEM.pdf PDF
RFI 2.pdf PDF
G1 SARRTP FUNCTIONAL PLAN.pdf PDF
RFI 3 factor 1.pdf PDF
20210224_575-20-114 SARRTP PreBid GC Site Walk.pdf PDF
2016-09-07 S04 -Site Visit Meeting Doc.pdf PDF
36C25921R0031 0001.docx DOCX document
36C25921R0031_1.docx DOCX document
03c Combined Specifications.pdf PDF
03b Background.pdf PDF
03a Combined Drawings.pdf PDF
01b Bid Sheet.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25921R0031 SARRTP

RFI Sheet 1

Specification Section

Paragraph Section Drawing Detail Description

COR RESPONSE

Will the video surveillance system be a "stand alone" system monitored only at the equipment in room 5401?

Yes, “Stand alone”.

Will the video surveillance system be a "stand alone" system monitored only at the equipment in room 5401?

Yes, “Stand alone”.

Is there any recording equipment requirement (DVR) for the video surveillance system?

Yes, see specification 28230.

Will the video surveillance system be on emergency power only or is there a requirement for UPS/battery backup?

Yes, a double conversion UPS with 100% back-up power for 10 minutes.

G4 Rooms5424, It appears that there may be some areas that will affect the fire sprinkler coverage. Will fire sprinkler addition scope be provided for bid purposes?

No, any fire sprinkler work will be part of a separate contract.

Specification Section

Paragraph Section Drawing Detail Description RFI RESPONSE

When does the Owner anticipate issuing notice to proceed to Contractor?

Contract will stipulate contract should start NLT 10 days after Award. NTP will be issued at or after preconstruction conference, which will be scheduled after contract award.

Is the cutoff for submitting RFIs Sunday 03/07/21 at

1400 MST?

Questions will be accepted until COB on 3/8/2021.

013526 1.12 G1 52 Is the Owner or Contractor obtaining the GJVA IRCA Permit? If Contractor then what does this entail?

The Infection Control requirements are found on plan sheet G2 and in specification 013526, paragraph 1.12.

Can Contractor use bathroom(s) on 5th floor and does not need an outdoor temp toilet?

YES

Confirm Contractor can use water on 5th floor for construction water?

YES

Confirm Contractor can use electric on 5th floor and does not need separate temp meter?

YES

255000 Is there a sole source company GJ VA uses for integrated controls whom the Contractor must use?

All GJ VA controls are by JCI controls.

013526 Solicitation Document

Specification 013526 is mentioned in the solicitation document but appears to not be in the combined specs document. Please provide GJ VA safety requirements if more stringent than OSHA.

Combined Specifications document attached

Where will short term laydown area be allocated for Contractor in order to get materials up to the 5th floor?

Plan on the short-term laydown area being near the south west corner of building 1 in the landscape sod area to the north east of the water tower.

Can a scale for the construction drawings be provided? An ACAD file can be provided.

Does Owner have material for all patch back work for existing conditions? If not, please provide specs on existing materials.

Reference Specification Section 01 33 23 paragraph 1.2.D. Contractor is to provide physical samples for approval of the closest match available of existing materials/colors. Manufacturer’s information on specific installed materials can be provided.

G3 13 Could not locate 2'x2' hole during job walk. Can Owner provide pictures and exact location of hole?

Bid Item #13, in Electric Closet room #5423, was completed by another construction project and will be removed from the bid list.