This document contains a request for information related to a federal contract opportunity to repurpose the fifth floor of a Veterans Affairs medical center for a substance abuse recovery treatment program.
The solicitation seeks construction services with a magnitude between $500,000 and $1,000,000 to complete the project of repurposing the fifth floor at the Grand Junction VA Medical Center in Grand Junction, Colorado. The work is 100% set aside for service-disabled veteran-owned small businesses. The point of contact is Robyn Young, who can be reached by phone or email. Responses to the RFI were due by March 8, 2021. The contract will have a 10-day notice to proceed stipulated after award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25921R0031 0005.docx | DOCX document | |
| 36C25921R0031 0004.docx | DOCX document | |
| 03c Combined Specifications-3-17-2021.pdf | ||
| 36C25921R0031 0003.docx | DOCX document | |
| Past Performance Questionnaire.docx | DOCX document | |
| G2 SARRTP EXISTING _ ICRA.pdf | ||
| G5 SARRTP EQUIPMENT.pdf | ||
| 010000 General Conditions.pdf | ||
| 36C25921R0031 0002.docx | DOCX document | |
| Instructions to Offerors - PPT-updated.pdf | ||
| G3 SARRTP DEMO.pdf | ||
| G6 SARRTP FIRE SYSTEM.pdf | ||
| G8 SARRTP DETAIL.pdf | ||
| G4 SARRTP CONSTRUCTION.pdf | ||
| G7 SARRTP VIDEO SYSTEM.pdf | ||
| RFI 2.pdf | ||
| G1 SARRTP FUNCTIONAL PLAN.pdf | ||
| RFI 3 factor 1.pdf | ||
| 20210224_575-20-114 SARRTP PreBid GC Site Walk.pdf | ||
| 2016-09-07 S04 -Site Visit Meeting Doc.pdf | ||
| 36C25921R0031 0001.docx | DOCX document | |
| 36C25921R0031_1.docx | DOCX document | |
| 03c Combined Specifications.pdf | ||
| 03b Background.pdf | ||
| 03a Combined Drawings.pdf | ||
| 01b Bid Sheet.xlsx | XLSX spreadsheet |
Show all 26
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C25921R0031 SARRTP
RFI Sheet 1
Specification Section
Paragraph Section Drawing Detail Description
COR RESPONSE
Will the video surveillance system be a "stand alone" system monitored only at the equipment in room 5401?
Yes, “Stand alone”.
Will the video surveillance system be a "stand alone" system monitored only at the equipment in room 5401?
Yes, “Stand alone”.
Is there any recording equipment requirement (DVR) for the video surveillance system?
Yes, see specification 28230.
Will the video surveillance system be on emergency power only or is there a requirement for UPS/battery backup?
Yes, a double conversion UPS with 100% back-up power for 10 minutes.
G4 Rooms5424, It appears that there may be some areas that will affect the fire sprinkler coverage. Will fire sprinkler addition scope be provided for bid purposes?
No, any fire sprinkler work will be part of a separate contract.
Specification Section
Paragraph Section Drawing Detail Description RFI RESPONSE
When does the Owner anticipate issuing notice to proceed to Contractor?
Contract will stipulate contract should start NLT 10 days after Award. NTP will be issued at or after preconstruction conference, which will be scheduled after contract award.
Is the cutoff for submitting RFIs Sunday 03/07/21 at
1400 MST?
Questions will be accepted until COB on 3/8/2021.
013526 1.12 G1 52 Is the Owner or Contractor obtaining the GJVA IRCA Permit? If Contractor then what does this entail?
The Infection Control requirements are found on plan sheet G2 and in specification 013526, paragraph 1.12.
Can Contractor use bathroom(s) on 5th floor and does not need an outdoor temp toilet?
YES
Confirm Contractor can use water on 5th floor for construction water?
YES
Confirm Contractor can use electric on 5th floor and does not need separate temp meter?
YES
255000 Is there a sole source company GJ VA uses for integrated controls whom the Contractor must use?
All GJ VA controls are by JCI controls.
013526 Solicitation Document
Specification 013526 is mentioned in the solicitation document but appears to not be in the combined specs document. Please provide GJ VA safety requirements if more stringent than OSHA.
Combined Specifications document attached
Where will short term laydown area be allocated for Contractor in order to get materials up to the 5th floor?
Plan on the short-term laydown area being near the south west corner of building 1 in the landscape sod area to the north east of the water tower.
Can a scale for the construction drawings be provided? An ACAD file can be provided.
Does Owner have material for all patch back work for existing conditions? If not, please provide specs on existing materials.
Reference Specification Section 01 33 23 paragraph 1.2.D. Contractor is to provide physical samples for approval of the closest match available of existing materials/colors. Manufacturer’s information on specific installed materials can be provided.
G3 13 Could not locate 2'x2' hole during job walk. Can Owner provide pictures and exact location of hole?
Bid Item #13, in Electric Closet room #5423, was completed by another construction project and will be removed from the bid list.