2016-09-07 S04 -Site Visit Meeting Doc.pdf

PDF 131 KB Posted

Attached to
Z2DA--Repurpose 5th Floor for SARRTP Federal contract opportunity
Solicitation number
36C25921R0031
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19

About this file

This document outlines a federal contract solicitation for construction services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19 is seeking a contractor to provide all labor, materials, equipment and services required to remodel the west and south wings of the 5th floor in Building 1 at the VA Western Colorado Health Care System campus in Grand Junction, Colorado. The project budget is between $500,000 and $1,000,000. The solicitation number is 36C25921R0031 and is designated as a 100% set-aside for verified Service-Disabled Veteran-Owned Small Businesses. Offerors must be verified and listed in the Vendor Information Pages database prior to award. The contractor is expected to begin performance within 10 days of the Notice to Proceed and complete the project within 120 days, with an anticipated possession of the first phase after 30 days.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--Repurpose 5th Floor for SARRTP, newest first.
File Type Posted
36C25921R0031 0005.docx DOCX document
36C25921R0031 0004.docx DOCX document
03c Combined Specifications-3-17-2021.pdf PDF
36C25921R0031 0003.docx DOCX document
Instructions to Offerors - PPT-updated.pdf PDF
G3 SARRTP DEMO.pdf PDF
G6 SARRTP FIRE SYSTEM.pdf PDF
G8 SARRTP DETAIL.pdf PDF
G4 SARRTP CONSTRUCTION.pdf PDF
G7 SARRTP VIDEO SYSTEM.pdf PDF
G1 SARRTP FUNCTIONAL PLAN.pdf PDF
RFI 3 factor 1.pdf PDF
Past Performance Questionnaire.docx DOCX document
G2 SARRTP EXISTING _ ICRA.pdf PDF
G5 SARRTP EQUIPMENT.pdf PDF
010000 General Conditions.pdf PDF
RFI 1.pdf PDF
36C25921R0031 0002.docx DOCX document
RFI 2.pdf PDF
36C25921R0031 0001.docx DOCX document
20210224_575-20-114 SARRTP PreBid GC Site Walk.pdf PDF
36C25921R0031_1.docx DOCX document
03b Background.pdf PDF
03a Combined Drawings.pdf PDF
01b Bid Sheet.xlsx XLSX spreadsheet
03c Combined Specifications.pdf PDF
Show all 26

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Pre-Bid Meeting

FOR

Repurpose 5th Floor for SARRTP Project 575-20-114

The contractor is to provide all labor, tools, materials, equipment and supervision required to complete the construction of the Station Level Project 575-20-114 entitled Repurpose 5th Floor for SARRTP Provide labor, materials, equipment, and other services as necessary to remodel the West and South wings of the 5th floor in Building 1 at the Grand Junction VA campus, 2121 North Ave., Grand Junction, CO 81501.

Time: 2/24/2021, 10:00 AM MST

Location: VA Western Colorado Health Care System, 2121 North Avenue, Grand Junction, CO 81501.

AGENDA:

Introduction of Project Manager/COR

Discussing renovation of project The pre-bid meeting/site walk is not mandatory Review Instructions to offerors for information on preparing and submitting proposal.

QUESTIONS During site visit MUST BE WRITTEN DOWN Address where to send RFP:

o Electronic submissions to Robyn.young2@va.gov Pertinent Dates:

o Questions due by 3/8/2021, any questions submitted after this time will not be reviewed or answered. Submit to Robyn.young2@va.gov o We’ll get the answers back to you timely o Proposals due on 3/22/2021 at 2:00 PM MDT via email

Confirmation of construction range is between $500,000 and $1,000,000.00.

Bid Guarantee & Payment/Performance Bonds: Bid Guarantee & Payment/Performance Bonds:

IAW FAR 52.228-15, offerors are reminded that any award amount exceeding $150,000 shall require both Payment and Performance Bonds. Performance and Payment bonds are due no later than 10 calendar days after award. Original bid guarantee due at time of solicitation closing.

Address to send original bid bonds is in instructions to offerors. If original bid guarantee is not received by the solicitation closing date and time, proposal will be late and will not be considered.

Contractor shall begin performance within 10 days after Notice To Proceed (NTP) and complete within 120 days. This will be a two-phase project running concurrently. It is the Government’s expectation to take possession of phase I of the project when completed after 30 days.

Post Award Compliance:

o Compliance with Davis Bacon Wages and Application wage determination shall be expected of the contractor. The contractor can submit their weekly certified payrolls with their monthly invoice.