580-25-101 Project Drawings.pdf

PDF 42 MB Posted

Attached to
Y1DA--580-25-101 Replace/Upgrade Campus Overhead Paging System Solicitation
Solicitation number
36C25626R0067
Issued by

About this file

This file is a comprehensive set of 100% bid-level project drawings for a campus-wide public address system replacement and upgrade project at the Michael E. DeBakey VA Medical Center in Houston, Texas. The project, identified as VA Project Number 580-25-101 and H2B Contract Number 23-133, consists of 231 total sheets covering architectural, telecommunications, environmental, and fire protection design documentation. The drawings are dated July 21, 2025, and prepared by SPUR Design as the architect/engineer of record, with H2B, Inc. serving as the project manager.

The scope encompasses the replacement and upgrade of the campus overhead paging system across the 12-building medical center complex. The project is organized into three phases: Phase 1 addresses Building 100 head-end equipment installation and Fisher Houses 2 and 3; Phase 2 covers Buildings 103, 104/105, 108, 108A, 109, 110, 123, and Fisher House 1; and Phase 3 involves Building 100 basement and levels 1 through 7 speaker installation. Key deliverables include new IP-based public address speakers, user-interface modules, network equipment cabinet redistribution, and integration with existing campus structured cabling infrastructure. The drawings contain detailed environmental hazard documentation, infection prevention and control (ICRA) requirements with specified precaution levels, architectural reference plans for all buildings and levels, extensive telecommunications demolition and installation plans with multiple building zones, fire alarm system coordination, and physical security design considerations. Construction must comply with VA-adopted codes including the 2021 International Building Code, 2021 NFPA 101 Life Safety Code, 2023 National Electrical Code, and multiple ASHRAE standards for the Houston, Texas climate zone.

View the file

Other files

File Type Posted
36C25626R0067 0005.docx DOCX document
9-H1091.pdf PDF
36C25626R0067 0004.docx DOCX document
36C25626R0067 0003.docx DOCX document
36C25626R0067 0002.docx DOCX document
DOL Wage Determinations dated 5-18-26.pdf PDF
36C25626R0067 0001.docx DOCX document
Sign in Sheet 580-25-101.jpg JPG image
SF24 Bid Bond.pdf PDF
580-25-101 Project Specifications.pdf PDF
36C25626R0067_1.docx DOCX document
DOL Wage Determinations TX20260253 dated 1-2-26.pdf PDF
580-25-101 Statement of Work.docx DOCX document
36C25626R0067.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

U.S. DEPARTMENT OF VETERANS AFFAIRS

VA Health Care System Approval:

H2B, INC.

1225 NORTH LOOP WEST, # 800

HOUSTON, TEXAS 77008

(713) 864-2900

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Drawing Number

Building Number

ARCHITECT MECH / ELEC / PLUMB / TELECOM

SPUR DESIGN

2519 MADISON AVE., STE 100

KANSAS CITY, MO 64108

(913) 369-7200

SPUR DESIGN

312 SW 25TH STREET

OKLAHOMA CITY, OK 73109

(405) 842-6100

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

CONSULTANTS: ENGINEER: STAMP:

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD

HOUSTON, TX 77030

FIRE PROTECTION ENGINEER

RATED ENGINEERING

609 S. KELLY AVENUE, STE H2

EDMOND, OK 73003

(405) 210-5814

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

11140 S TOWNE SQUARE, STE 100

ST. LOUIS, MO 63123

(314) 917-0148

TEXAS FIRM REGISTRATION #: 8856

FULLY SPRINKLERED

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

/1

/2

:2 :2

P

M

COVER SHEET

CABAJS

100% BID DOCUMENTS

REPLACE/UPGRADE CAMPUS

OVERHEAD PAGING SYSTEM

VA PROJECT NUMBER: 580-25-101

REPLACE/UPGRADE CAMPUS

OVERHEAD PAGING SYSTEM

07/21/2025

580-25-101

MICHAEL E. DEBAKEY VA MEDICAL CENTER

2002 HOLCOMBE BLVD.

HOUSTON, TX 77030

100% BID DOCUMENTS

GI000

H2B #: 23-133

Drawing # 1 OF 231

SHEET INDEX

SEQUENCE NUMBER SHEET NAME

[01] GENERAL

1 GI000 COVER SHEET

2 GI001 GENERAL INFORMATION

3 GI002 ICRA CONSTRUCTION DETAILS

4 GI003 PHASING PLAN

[02] ENVIRONMENTAL

5 H1000 BUILDING 100 - ENVIRONMENTAL HAZARDS AND ABATEMENT - 1

6 H1001 BUILDING 100 - ENVIRONMENTAL HAZARDS AND ABATEMENT - 2

7 H1002 BUILDING 100 - ENVIRONMENTAL HAZARDS AND ABATEMENT - 3

8 H1003 BUILDING 100 - ENVIRONMENTAL HAZARDS AND ABATEMENT - 4

9 H1031 BUILDING 103 - LEVEL 1 - ENVIRONMENTAL HAZARDS AND ABATEMENT

10 H1041 BUILDINGS 104 & 105 - LEVEL 1 - ENVIRONMENTAL HAZARDS AND ABATEMENT

11 H1081 BUILDING 108 - LEVEL 1 - ENVIRONMENTAL HAZARDS AND ABATEMENT

12 H108A BUILDING 108A - LEVELS 1 & 2 - ENVIRONMENTAL HAZARDS AND ABATEMENT

13 H1091 BUILDING 109 - LEVEL 1 - ENVIRONMENTAL HAZARDS AND ABATEMENT

14 H1101 BUILDING 110 - LEVEL 1 - ENVIRONMENTAL HAZARDS AND ABATEMENT

15 H1201 BUILDING 120 - LEVEL 1 - ENVIRONMENTAL HAZARDS AND ABATEMENT

16 H1231 BUILDING 123 - LEVEL 1 - ENVIRONMENTAL HAZARDS AND ABATEMENT

17 H1251 BUILDING 125 - LEVEL 1 - ENVIRONMENTAL HAZARDS AND ABATEMENT

18 H1F11 FISHER HOUSES 1, 2, & 3 - ENVIRONMENTAL HAZARDS AND ABATEMENT

[03] ARCHITECTURAL

19 AS001 ARCHITECTURAL SITE PLAN

20 A-101 REFERENCE PLAN - BUILDING 100- BASEMENT LEVEL

21 A-102 REFERENCE PLAN - BUILDING 100 - LEVEL 1

22 A-103 REFERENCE PLAN - BUILDING 100 - LEVEL 2

23 A-104 REFERENCE PLAN - BUILDING 100 - LEVEL 3

24 A-105 REFERENCE PLAN - BUILDING 100 - LEVEL 4

25 A-106 REFERENCE PLAN - BUILDING 100 - LEVEL 5

26 A-107 REFERENCE PLAN - BUILDING 100- LEVEL 6

27 A-108 REFERENCE PLAN - BUILDING 100 - LEVEL 7

28 A-109 REFERENCE PLANS - BUILDINGS 103, 104 & 105

29 A-110 REFERENCE PLANS - BUILDINGS 108 & 108A - LEVEL 1 & 2

30 A-111 REFERENCE PLANS - BUILDING 109 - BASEMENT LEVEL, LEVELS 1 & 2

31 A-112 REFERENCE PLANS - BUILDING 110 - BASEMENT & LEVEL 1

32 A-113 REFERENCE PLANS - BUILDING 110 - LEVELS 2 & 3

33 A-114 REFERENCE PLAN - BUILDINGS 120, 123, & 125 - LEVELS 1 & 2

34 A-115 REFERENCE PLANS - FISHER HOUSE #1, #2, & #3 - LEVELS 1 & 2

[04] FIRE PROTECTION

35 FA001 FIRE ALARM NOTES MATRIX AND RISER DIAGRAM

[06] TELECOMM

36 T-001 TELECOMMUNICATIONS COVER SHEET

37 T-010 TELECOMMUNICATIONS SITE PLAN

38 TN101 TELECOMMUNICATIONS REFERENCE PLAN - BUILDING 100- BASEMENT LEVEL

39 TN102 TELECOMMUNICATIONS REFERENCE PLAN - BUILDING 100 - LEVEL 1

40 TN103 TELECOMMUNICATIONS REFERENCE PLAN - BUILDING 100 - LEVEL 2

41 TN104 TELECOMMUNICATIONS REFERENCE PLAN - BUILDING 100 - LEVEL 3

42 TN105 TELECOMMUNICATIONS REFERENCE PLAN - BUILDING 100 - LEVEL 4

43 TN106 TELECOMMUNICATIONS REFERENCE PLAN - BUILDING 100 - LEVEL 5

44 TN107 TELECOMMUNICATIONS REFERENCE PLAN - BUILDING 100- LEVEL 6

45 TND201 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -

AREA A

46 TND202 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -

AREA B

47 TND203 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -

AREA C

48 TND204 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -

AREA D

49 TND205 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -

AREA E

50 TND208 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -

AREA H

51 TND206 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -

AREA F

52 TND207 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -

AREA G

LOCATION

PLAN

AREA

PLAN

N

N

PROJECT LOCATION

BLDG 100

OLD SPANISH TRAIL

AL

ME

DA

R

OA

D

MI

XO

N

AV

ECA

MB

RI

DG

E

ST

RE

ET

SHEET INDEX

SEQUENCE NUMBER SHEET NAME

53 TND209 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -

AREA J

54 TND210 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -

AREA K

55 TND211 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -

AREA L

56 TND212 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -

AREA N

57 TND213 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA A

58 TND214 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA B

59 TND215 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA C

60 TND216 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA D

61 TND217 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA E

62 TND218 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA F

63 TND219 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA G

64 TND220 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA H

65 TND221 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA J

66 TND222 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA K

67 TND223 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA L

68 TND224 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA M

69 TND225 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA N

70 TND226 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA P

71 TND227 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA A

72 TND228 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA B

73 TND229 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA C

74 TND230 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA D

75 TND231 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA E

76 TND232 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA F

77 TND233 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA G

78 TND234 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA H

79 TND235 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA J

80 TND236 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA K

81 TND237 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA L

82 TND238 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA N

83 TND239 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA A

84 TND240 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA B

85 TND241 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA C

86 TND242 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA D

87 TND243 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA E

88 TND244 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA F

89 TND245 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA G

90 TND246 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA H

91 TND247 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA J

92 TND248 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA K

93 TND249 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA L

94 TND250 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 4 - AREA A

95 TND251 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 4 - AREA B

96 TND252 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 4 - AREA C

97 TND253 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 4 - AREA D

98 TND254 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 4 - AREA E

99 TND255 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 4 - AREA F

100 TND256 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 4 - AREA G

101 TND257 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 4 - AREA H

102 TND258 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 4 - AREA K

103 TND259 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 4 - AREA L

104 TND260 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 5 - AREA A

105 TND261 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 5 - AREA B

106 TND262 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 5 - AREA C

107 TND263 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 5 - AREA D

108 TND264 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 5 - AREA E

109 TND265 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 5 - AREA F

110 TND266 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 5 - AREA G

111 TND267 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 5 - AREA H

112 TND268 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 5 - AREA K

113 TND269 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 6 - AREA A

114 TND270 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 6 - AREA B

115 TND271 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 6 - AREA C

116 TND272 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 6 - AREA D

SHEET INDEX

SEQUENCE NUMBER SHEET NAME

117 TND273 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 6 - AREA E

118 TND274 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 6 - AREA F

119 TND275 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 6 - AREA G

120 TND276 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 6 - AREA H

121 TND277 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 6 - AREA K

122 TN108 TELECOMMUNICATIONS PLANS - BUILDINGS 103, 104 & 105

123 TN109 TELECOMMUNICATIONS PLANS - BUILDINGS 108 & 108A - LEVEL 1 & 2

124 TN110 TELECOMMUNICATIONS PLANS - BUILDING 109 - BASEMENT LEVEL, LEVELS 1 & 2

125 TN111 TELECOMMUNICATIONS PLANS - BUILDING 110 - BASEMENT & LEVEL 1

126 TN112 TELECOMMUNICATIONS PLANS - BUILDING 110 - LEVELS 2 & 3

127 TN113 TELECOMMUNICATIONS PLAN - BUILDINGS 120 & 125 - LEVELS 1 & 2

128 TN114 TELECOMMUNICATIONS PLANS - FISHER HOUSE #1, #2, & #3 - LEVELS 1 & 2

129 TN201 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA A

130 TN202 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA B

131 TN203 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA C

132 TN204 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA D

133 TN205 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA E

134 TN206 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA F

135 TN207 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA G

136 TN208 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA H

137 TN209 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA J

138 TN210 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA K

139 TN211 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA L

140 TN212 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA N

141 TN213 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA A

142 TN214 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA B

143 TN215 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA C

144 TN216 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA D

145 TN217 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA E

146 TN218 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA F

147 TN219 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA G

148 TN220 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA H

149 TN221 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA J

150 TN222 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA K

151 TN223 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA L

152 TN224 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA M

153 TN225 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA N

155 TN227 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA A

154 TN226 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA P

156 TN228 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA B

157 TN229 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA C

158 TN230 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA D

159 TN231 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA E

160 TN232 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA F

161 TN233 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA G

162 TN234 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA H

163 TN235 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA J

164 TN236 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA K

165 TN237 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA L

166 TN238 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA N

167 TN239 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA A

168 TN240 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA B

169 TN241 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA C

170 TN242 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA D

171 TN243 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA E

172 TN244 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA F

173 TN245 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA G

174 TN246 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA H

175 TN247 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA J

176 TN248 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA K

177 TN249 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA L

178 TN250 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 4 - AREA A

179 TN251 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 4 - AREA B

180 TN252 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 4 - AREA C

181 TN253 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 4 - AREA D

182 TN254 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 4 - AREA E

183 TN255 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 4 - AREA F

SHEET INDEX

SEQUENCE NUMBER SHEET NAME

184 TN256 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 4 - AREA G

185 TN257 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 4 - AREA H

186 TN259 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 4 - AREA L

187 TN258 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 4 - AREA K

188 TN260 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 5 - AREA A

189 TN261 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 5 - AREA B

190 TN262 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 5 - AREA C

191 TN263 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 5 - AREA D

192 TN264 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 5 - AREA E

193 TN265 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 5 - AREA F

194 TN266 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 5 - AREA G

195 TN267 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 5 - AREA H

196 TN268 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 5 - AREA K

197 TN269 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 6 - AREA A

198 TN270 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 6 - AREA B

199 TN271 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 6 - AREA C

200 TN272 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 6 - AREA D

201 TN273 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 6 - AREA E

202 TN274 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 6 - AREA F

203 TN275 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 6 - AREA G

204 TN276 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 6 - AREA H

205 TN277 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 6 - AREA K

206 TN401 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - BASEMENT LEVEL

207 TN402 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - BASEMENT LEVEL

208 TN403 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - BASEMENT LEVEL

209 TN404 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 1

210 TN405 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 1

211 TN406 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 1

212 TN407 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 2

213 TN408 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 2

214 TN409 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 2

215 TN410 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 3

216 TN411 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 3

217 TN412 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 3

218 TN413 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 4

219 TN414 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 4

220 TN415 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 4

221 TN416 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 5

222 TN417 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 5

223 TN418 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 5

224 TN419 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 6

225 TN420 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 6

226 TN501 TELECOMMUNICATIONS DETAILS

227 TN502 TELECOMMUNICATIONS DETAILS

228 TN601 CAMPUS BACKBONE RISER DIAGRAMS

229 TN602 BUILDING 100 PUBLIC ADDRESS RISER - MECH BAYS #1 - #6

230 TN603 BUJILDING 100 PUBLIC ADDRESS RISER - MECH BAYS #7 - #12

231 TN604 BUILDINGS 103, 104 & 105, 108, 108A, 109, 110, 120, 125 AND FISHER HOUSE 1, 2, & 3

PUBLIC ADDRESS RISERS

TOTAL SHEETS: 231

HOLCOMBE BLVD

WYNDALE STREET

OLD SPANISH TRAIL

AL

ME

DA

R

OA

D

HOLCOMBE BLVD

N M

AC

GR

EG

OR

W

AY

SOUTH FW

Y

FANNIS STREET

HOLCOMBE BLVD

FA

NN

IS

ST

RE

ET

No. REVISION DESCRIPTION DATE

ABBREVIATIONS CODES STANDARDS AND EXECUTIVE ORDERS

18" MIN

" M

IN

FRONT APPROACH,

PULL SIDE

36" MIN

" M

IN

HINGE APPROACH,

PULL SIDE

HINGE APPROACH,

PULL SIDE

*12" MIN48

" M

IN

FRONT APPROACH,

PUSH SIDE

**4 2"

M

IN

HINGE APPROACH,

PUSH SIDE

22" MIN 24" MIN*4

8"

M

IN

LATCH APPROACH,

PULL SIDE

24" MIN*4

2"

M

IN

LATCH APPROACH,

PUSH SIDE

*IF BOTH CLOSER

AND LATCH ARE

PROVIDED

*54" MIN IF CLOSER

IS PROVIDED

*48" IF CLOSER IS

PROVIDED

FRONT APPROACH,

PUSH SIDE

" M

IN

42" MIN

DOOR AND FIXTURE CLEARANCES

MATERIALS LEGEND

PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN

VOLUNTARY STANDARD BODIES.

GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS. REFERENCE RELEVANT ADDNEDA FOR EACH OF THE ADOPTED CODES AND STANDARDS:

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL

INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

• 2021 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)

• 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)

• 2021 NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)

• 2022 NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE

• 2021 NATIONAL FIRE CODES (NFPA)

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

• 2023 VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• 2021 INTERNATIONAL MECHANICAL CODE

• 2023 NATIONAL ELECTRICAL CODE (NEC), NFPA 70

• 2021 INTERNATIONAL PLUMBING CODE (IPC)

• 2019 SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.

• 2022 ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)

• 2022 ANSI ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES

• 2022 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318-19)

• 2017 STEEL CONSTRUCTION MANUAL (15TH EDITION), AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• 2007 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND

NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.

• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS

• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 010000 OF THE VA MASTER CONSTRUCTION

SPECIFICATION.

• 2022 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1

• 2022 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15

• 2023 PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.

NOTES:

1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT

NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN.

DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES

EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

ASHRAE 90.1 - 2019 EDITION

BUILDING LOCATION: HOUSTON, TX

CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 2A

INTERIOR DESIGN CONDITIONS:

THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM

AND MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.

BUILDING ENVELOPE REQUIREMENTS (5.5 )

BUILDING ENVELOPE REQUIREMENTS FOR CLIMATE ZONE 4 (A,B,C)

ROOFS REQUIRED DESIGNED

INSULATION: R-30 c.i. EXISTING METAL BUILDINGS: R-19 + R-11 Ls or R-25 + R-8 Ls EXISTING

ATTIC AND OTHER: R-49 EXISTING

WALLS, ABOVE GRADE

MASS: R-9.5 c.i. EXISTING METAL BUILDING: R-0 + R-15.8 c.i. EXISTING STEEL-FRAMED: R-13 + R-7.5 c.i. EXISTING WOOD-FRAMED AND OTHER: R-13 + R-3.8 c.i. or R-20 EXISTING

WALL, BELOW GRADE

BELOW-GRADE WALL: R-7.5 c.i. EXISTING

FLOORS

MASS: R-14.6 c.i. EXISTING

STEEL-FRAMED: R-30 EXISTING

WOOD-FRAMED AND OTHER: R-30 EXISTING

SLAB-ON-GRADE FLOORS

UNHEATED SLABS: R-15 for 24 in. EXISTING HEATED SLABS: R-20 for 24 in. EXISTING

OPAQUE DOORS

SWINGING: U-0.370 EXISTING

NONSWINGING: U-0.310 EXISTING

FENESTRATION (TABLE 5.5-4):

VERTICAL FENESTRATION, U-FACTOR

FIXED: U-0.36 EXISTING

OPERABLE: U-0.45 EXISTING

ENTRANCE DOOR: U-0.63 EXISTING

DEFINITIONS

c.i = CONTINUOUS INSULATION Ls = LINEAR SYSTEM

NR = NO (INSULATION) REQUIREMENT

ENERGY REQUIREMENTS

N

1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL CONFIRM

ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE ENTIRE

DOCUMENT SET.

2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY WORK,

TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY DISCREPANCIES TO

THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS AND

EXISTING STRUCTURAL CONDITIONS.

3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT

CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.

4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE

CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK

AREAS FROM THE EXISTING FACILITIES.

5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.

6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN

PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND REPAIR

ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.

7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED OR

REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.

8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT

PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING SPACES.

9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE

ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.

10. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER

DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A

WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE AND

OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND

ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS, BUT

DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL DRAWINGS.

CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE OTHER SHEETS

AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION DOCUMENTS THAT REFLECT

WORK REQUIRED TO ACHIEVE A COMPLETE AND OPERATIONAL GOAL. LACK OF

COORDINATION AND REVIEW OF DRAWINGS AND SPECIFICATIONS AS AN ENTIRE

DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS, BEING OBVIOUS AND

TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE DRAWINGS AND SPECIFICATIONS, SHALL

NOT BE IN ANY WAY AN ADDITIONAL COST TO THE GOVERNMENT.

11. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH SERVICES

TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 48 HOURS IN ADVANCE OF

PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE, EXACT TIME OF, AND

APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR INTERRUPTIONS OF ANY

SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60 CALENDAR DAYS PRIOR TO THE

DESIRED TIME AND SHALL BE PERFORMED AS DIRECTED BY THE COR. MAJOR

INTERRUPTIONS SHALL BE COORDINATED WITH OTHER MAJOR INTERRUPTIONS AND MAY

NOT BE SCHEDULED FOR ONE DISCIPLINE MORE THAN TWICE THROUGHOUT THE OVERALL

CONSTRUCTION SCHEDULE UNLESS REQUESTED IN WRITING AND APPROVED BY THE COR.

CONTRACTOR WILL BE ADVISED, IN WRITING, OF APPROVAL OF REQUEST, OR OF WHICH

OTHER DATE AND/OR TIME SUCH INTERRUPTION WILL CAUSE THE LEAST INCONVENIENCE

TO OPERATIONS OF THE MEDICAL CENTER. INTERRUPTION TIME APPROVED BY THE

MEDICAL CENTER MAY OCCUR AT TIMES OTHER THAN CONTRACTOR'S NORMAL WORKING

HOURS. SCHEDULE INTERRUPTION MAY BE ON WEEKENDS OR LATE HOURS AND MAY NOT

BE AN ADDITIONAL COST TO THE GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT

MAY AFFECT THE NORMAL OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING

THE CONSTRUCTION SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.

12. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING BUILDING MATERIALS

(ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE DESIGNED/SPECIFIED AS BUILDING

MATERIAL IN ANY OF THE CONSTRUCTION DOCUMENTS.

13. REFER TO THE DESIGN BINDER FOR THE ICRA INFORMATION DOCUMENTATION.

GENERAL NOTES

AREA NAME

150 SF

A101

A101

1 SIM

A

00.0

A101

1 1

A101

LEVEL NAME

00'-00"

00'-00" 4B

3A

FIBERGLASS BATT

INSULATION

RIGID INSULATION

CONCRETE / PRECAST

CONCRETE

EARTH / SOIL

SAND, EIFS FINISH, OR

PLASTER FINISH

GYPSUM BOARD FINISH

BRICK

CONCRETE MASONRY

UNIT

STONE / CAST STONE

GYPSUM BOARD SECTION

EXTERIOR SHEATHING

BOARD SECTION

PLYWOOD SECTION

CLEAN UTILITY

000A

150 SF

/1 A101

X0000

ROOM TAG

AREA TAG

SPECIALTY EQUIPMENT TAG

DOOR TAG

KEYED NOTE TAG

WALL TAG

WINDOW TAG

A101

1 SIM 1

A101

SIM

A

ACB ACOUSTIC CEILING BAFFLE

ACP ACOUSTIC CEILING PANEL

ACST ACOUSTIC

ADA AMERICANS WITH DISABILITIES ACT

ACT ACOUSTICAL CEILING TILE

ADDL ADDITIONAL

ADDN ADDITION

ADJ ADJACENT, ADJOINING, OR

ADJUSTABLE

ADMIN ADMINISTRATION

AE ARCHITECT/ENGINEER

AF ACCESS FLOORING

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AHJ AUTHORITY HAVING JURISDICTION

AIA AMERICAN INSTITUTE OF

ARCHITECTS

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINIUM (TRIM)

AMT AMOUNT

APPROX APPROXIMATE

ARCH ARCHITECT

ASC ABOVE SUSPENDED CEILING

AT ACOUSTIC CEILING TILE

AVG AVERAGE

B

BD BOARD

BG BUMPER GUARD

BLDG BUILDING

BLKG BLOCKING

BLT IN BUILT-IN

BOS BOTTOM OF STEEL

BOT BOTTOM

BRKT BRACKET

BTWN BETWEEN

C

CAB CABINET

CAV CAVITY

CBB CONCRETE BACKER BOARD

CD CONSTRUCTION DOCUMENTS

CFM CUBIC FEET PER MINUTE

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CH BD CHALKBOARD

CIP CAST-IN-PLACE

CJ CONTROL JOINT

CL CENTERLINE

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

CMU CONCRETE MASONRY UNIT

CO CONTRACTING OFFICER

COL COLUMN

COMM COMMUNICATION

CONC CONCRETE

CONT CONTINUOUS

COORD COORDINATE

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CP CONTRACTOR PROVIDED

CC CONTRACTOR PROVIDED /

CONTRACTOR INSTALLED

CPT CARPET/CARPET TILE

CS CONCRETE SEALED

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTR CENTER

CU FT CUBIC FEET

D

DBL DOUBLE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DIA DIAMETER

DIR DIRECTION

DIST DISTANCE

DOC DOCUMENT

DR DOOR

DS DOWNSPOUT

DWG DRAWING

DWP DIMENSIONAL WALL PANEL

E

EA EACH

EJ EXPANSION JOINT

EL ELEVATION

ELEV ELEVATOR

ENTR ENTRANCE

EPY EPOXY FLOORING

EQ EQUAL

ETR EXISTING TO REMAIN

EX EXISTING

EXP EXPOSED

EXT EXTERIOR

F

FAB FABRIC

FED FEDERAL

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FIN FINISH

FIN BS FINISH BOTH SIDES

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIXT FIXTURE

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLMT FLUSH MOUNT

FLR FLOOR

FOC FACE OF CONCRETE

FOM FACE OF MASONRY

FP FIRE PROTECTION

FR FIRE RESISTANT

FT FEET

FTG FOOTING

FV FIELD VERIFY

FWC FABRIC WALL COVERING

G

GDR GUARDRAIL

GL GLASS/GLAZING

GRAN GRANITE

GR FL GROUND FLOOR

GT GROUT

GSM GALVANIZED SHEET METAL

GYP BD GYPSUM BOARD

H

HDW HARDWARE

HEPA HIGH EFFICIENCY

PARTICULATE AIR (FILTER)

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HANDRAIL

HT HEIGHT

I

IBC INTERNATIONAL BUILDING CODE

INSUL INSULATION

INT INTERIOR

ILO IN LIEU OF

J

J-BOX JUNCTION BOX

L

LAV LAVATORY

LBS POUND

LDG LANDING

LF LINEAR FEET (FOOT)

LIN LINEAR

LN LINOLEUM

LOC LOCATION

LT LIGHT

LVR LOUVER

LVT LUXURY VINYL TILE

M

MAT CARPET MAT / WALK-OFF MAT

MATL MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MEMB MEMBRANE

MFR MANUFACTURER

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM

MISC MISCELLANEOUS

MO MASONRY OPENING

MOD MODIFY

MTG MOUNTING

MTL METAL

MVBL MOVABLE

N

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NTS NOT TO SCALE

O

OA OVERALL

OC ON CENTER

OD OUTSIDE DIAMETER

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

ORD OVERFLOW ROOF DRAIN

ORIG ORIGINAL

P

P PAINT

PA PUBLIC ADDRESS

PBD PARTICLE BOARD

PCF POUNDS PER CUBIC FOOT

PCT PERCENT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PL PROPERTY LINE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

PNL PANEL

PR PAIR

PRB PROFILE BASE

PRKG PARKING

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PORCELAIN TILE

PWR POWER

Q

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QTY QUANTITY

REFERENCE SYMBOLS IDENTIFICATION TAGS

NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.

GRID HEAD AND

LINE

LEVEL INDICATOR

MATCH LINE AND

VIEW REFERENCE

NORTH ARROW W/

PROJECT NORTH

SPOT ELEVATION

DETAIL

SECTION

**48" MIN IF BOTH CLOSER

AND LATCH PROVIDED

WALL

SECTION

BUILDING

SECTION

DETAIL

ELEVATION

INTERIOR

ELEVATION

BUILDING

ELEVATION

1 1

" M

IN

R

RAF RESILIENT ATHLETIC FLOORING

RB RUBBER BASE/RESILIENT BASE

RCP REFLECTED CEILING PLAN

RD ROOF DRAIN

REC RECESSED

REF REFERENCE

REM REMOVABLE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RES RESINOUS FLOORING

RES-W RESINOUS / EPOXY WALL / CEILING

RF RUBBER FLOORING

RFG ROOFING

RM ROOM

RO ROUGH OPENING

RP RESIN PANEL

RSF RESILIENT SHEET FLOORING

RV ROOF VENT

RWC RIGID VINYL WALLCOVERING

S

SC SPECIALTY COATING

SD STATIC DISSIPATIVE FLOORING/TILE

SCHED SCHEDULE

SECT SECTION

SF SQUARE FOOT (FEET)

SGL SINGLE

SIM SIMILAR

SJ SCORED JOINT

SLNT SEALANT

SM SHEET METAL

SPEC SPECIFICATION

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SOLID SURFACE

ST STONE

STD STANDARD

STOR STORAGE

SV SHEET VINYL (ROLLED OR TILE)

T

TEL TELEPHONE

TEMP TEMPORARY

TER TERRAZZO

TOF TOP OF FOOTING/ FOUNDATION

TOM TOP OF MASONRY

TOS TOP OF SLAB/ STEEL

U

UNO UNLESS NOTED OTHERWISE

UTIL UTILITY

V

VAR VARIES

VC VA PROVIDED / CONTRACTOR

INSTALLED

VCT VINYL COMPOSITION TILE

VFAT VINYL-FACED ACOUSTICAL TILE

VP VENEERED PLASTER

VT VINYL TILE

VV VA PROVIDED / VA INSTALLED

VWC VINYL WALLCOVERING

VWF VINYL WALL FABRIC

W

W/ WITH

W/O WITHOUT

W/C WATER CLOSET

WC WHEELCHAIR

WD WOOD

WFAB WALL FABRIC

WPM WATERPROOF MEMBRANE

WSF WELDED SHEET FLOOR

X

X BRACE CROSS BRACE

TRUE

NORTH

th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t

A

B

C

D

E

F

Veterans Health

Administration

VA FORM 08-6231

Drawing Title Project Title

Location

Date Checked Drawn

Project Number

VA Health Care System Approval:

H2B, INC.

1225 NORTH LOOP WEST, # 800

HOUSTON, TEXAS 77008

(713) 864-2900

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

A

B

C

D

E

F

Drawing Number

Building Number

ARCHITECT MECH / ELEC / PLUMB / TELECOM

SPUR DESIGN

2519 MADISON AVE., STE 100

KANSAS CITY, MO 64108

(913) 369-7200

SPUR DESIGN

312 SW 25TH STREET

OKLAHOMA CITY, OK 73109

(405) 842-6100

The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.

CONSULTANTS: ENGINEER: STAMP:

MICHAEL E. DEBAKEY VAMC

2002 HOLCOMBE BLVD

HOUSTON, TX 77030

FIRE PROTECTION ENGINEER

RATED ENGINEERING

609 S. KELLY AVENUE, STE H2

EDMOND, OK 73003

(405) 210-5814

INDUSTRIAL HYGENIST

RIVERFRONT SAFETY & HEALTH

11140 S TOWNE SQUARE, STE 100

ST. LOUIS, MO 63123

(314) 917-0148

TEXAS FIRM REGISTRATION #: 8856

FULLY SPRINKLERED

PHYSICAL SECURITY

FORCE PROTECT

10901 FRONT BEACH RD, UNIT 1415

PANAMA CITY BEACH, FL 32407

(502) 836-4232

/1

/2

:2 :2

P

M

GENERAL INFORMATION

CABAJS

100% BID DOCUMENTS

REPLACE/UPGRADE CAMPUS

OVERHEAD PAGING SYSTEM

07/21/2025

580-25-101

GI001

H2B #: 23-133

Drawing # 2 OF 231

CONTROLS DEFINED BELOW FOR THE LEVEL OF PRECAUTIONS IDENTIFIED FOR THE ACTIVITY MUST BE IN PLACE BEFORE THE ACTIVITY BEGINS AND MAINTAINED UNTIL WORK IS COMPLETED AND THE AREA IS ACTIVATED. CONTROL MEASURES FOR EACH PRECAUTION LEVEL MUST ALSO INCLUDE THE CONTROL MEASURES IN THE PRECEDING LEVEL(S). AS THE ACTIVITY PROGRESSES, A FULL RE-

EVALUATION OF REMAINING ACTIVITY TYPE AND PATIENT RISK IS REQUIRED PRIOR TO

DOWNGRADING THE LEVEL OF PRECAUTIONS.

LEVEL I:

1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.

2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON COMPLETION

OF WORK.

3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE FREE OF

CONTAMINANTS AND LOOSE MATERIAL.

LEVEL II:

ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:

1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO OCCUPIED

AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G., MOBILE DUST CONTAINMENT

CART OR SOME OTHER SYSTEM).

2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE

WORK AREA.

3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE HVAC SYSTEM

FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM TO ADDRESS DIFFUSER

ISOLATION.

4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING

STAGNATION DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A WEEK OR

ISOLATED FROM THE MAIN SYSTEM.

5. SEAL DOORS TO PREVENT DUST MIGRATION.

6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY CLEANING AND

DISPOSAL OF TRASH (COVERED) FROM WORK AREA USING AN IDENTIFIED EXIT ROUTE.

7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA MUST BE IN

SEALED CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS PRIOR TO REMOVAL FROM THE

AREA.

8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST BE USED TO

TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION AREAS. THESE CONTAINERS

MUST BE DAMP-WIPED CLEANED AND FREE OF VISIBLE DUST/DEBRIS BEFORE LEAVING THE

CONTAINED WORK AREA.

9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK AREA

BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY

SOILED.

1. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP MOPPING OR

HEPA VACUUMING SURFACES AT LEAST DAILY.

LEVEL III:

ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:

1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.

2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241 REQUIREMENTS.

BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK

ABOVE.

3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE COMPLETED IN A

MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY

AFFIXED TO FLOOR AND CEILING (OR FLOOR/ROOF DECK ABOVE) AND SECURE FROM

MOVEMENT OR DAMAGE.

4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND CEILING,

USING APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE FOR BARRIER TYPE).

5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE ENTIRE

WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS, OR COMPLY

WITH THE ALTERNATIVE METHOD OUTLINED IN APPENDIX A OF THIS DOCUMENT. THESE

CONTROL MEASURES MUST BE MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE

PROJECT. HEPA FILTERED EXHAUST IF DISCHARGED DIRECTLY TO THE OUTDOORS MUST BE

AT A DISTANCE OF 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND OPERABLE

WINDOWS. EXHAUSTING DISCHARGED AIR INTO SHARED OR RECIRCULATING HVAC SYSTEMS,

OR OTHER SHARED EXHAUST SYSTEMS (E.G., BATHROOM EXHAUST) IS PROHIBITED.

6. INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC, MANOMETER, OR

DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO CONTINUALLY MONITOR

AND DOCUMENT NEGATIVE PRESSURIZATION. THE “BALL IN THE WALL” OR SIMILAR

APPARATUS ARE NOT ACCEPTABLE.

LEVEL IV:

ALL CONTROL MEASURES IN LEVELS I, II AND III AND THE FOLLOWING:

1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL BARRIER.

2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE CONTROL. ANTEROOM

MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING, CART CLEANING, WORKERS’ PPE AND

CLEANING.

3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF VISIBLE DUST

BEFORE LEAVING THE WORK AREA ANTEROOM. HEPA VACUUMING OF CLOTHING OR USE OF

COVER SUITS IS ACCEPTABLE.

4. WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN ANTEROOM.

SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM TO THE OCCUPIED

SPACE (NON-WORK AREA). DAMAGED SHOE COVERS MUST BE CHANGED IMMEDIATELY.

GENERAL ICRA NOTES - LEVEL OF PRECAUTIONS & CONTROL MEASURES

CONTROLS DEFINED BELOW SHALL BE COMPLETED UPON COMPLETION OF THE ACTIVITY AND

INSPECTED PRIOR TO TERMINATING MEASURES DEFINED IN TABLE 5.

LEVELS I -II:

CLEANING:

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL

SURFACES AND FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER

SURFACES AS WELL AS AIR DIFFUSER SURFACES.

HVAC SYSTEMS:

1. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.

VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

2. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN

SPECIFICATIONS.

WATER SYSTEMS:

1. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL

CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.

LEVELS III - IV:

CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND

ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR FINAL

ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION PREVENTION AND CONTROL

MEASURES.

WORK AREA CLEANING:

1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL

SURFACES AND FLOORING MATERIALS.

2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER

SURFACES AS WELL AS AIR DIFFUSER SURFACES.

REMOVAL OF CRITICAL BARRIERS:

1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL

REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE

BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN PERFORMED.

ADDITIONAL CLEANING MAY BE NEEDED AFTER REMOVAL OF BARRIER.

2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A MANNER

THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN REMOVING

HARD BARRIERS:

1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.

2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA

VACUUM.

3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.

4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD

BARRIER.

5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.

NEGATIVE AIR REQUIREMENTS:

1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE

WORK AREA.

2. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION EQUIPMENT)

MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD AFTER COMPLETION

OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM THE WORK AREA AND

BEFORE REMOVAL OF CRITICAL BARRIERS.

HVAC SYSTEMS:

1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN AREAS

WHERE WORK IS BEING PERFORMED.

2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.

3. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW

AND AIR EXCHANGE DESIGN SPECIFICATIONS.

WATER SYSTEMS:

UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT

LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.

MINIMUM INFECTION PREVENTION AND CONTROL MEASURES REQUIRED

UPON COMPLETION OF THE ACTIVITY

INSPECTION AND/OR FACILITY UPKEEP GENERALLY DEFINED AS FOLLOWS:

MATRIX OF PRECAUTIONS FOR CONSTRUCTION & RENOVATION

CATEGORY A

INCLUDES BUT NOT LIMITED TO:

• WORK CAN BE COMPLETED IN A SINGLE SHIFT, NOT TO EXCEED 10 HOURS.

• PATIENTS AND/OR EMPLOYEES MAY BE IN THE AREA DEPENDING ON THE ACTIVITY.

• WORK THAT DOES NOT CREATE DUST OR DEBRIS.

• REMOVAL OF CEILING TILE OR ACCESS TO MECHANICAL OR ELECTRICAL CHASE FOR VISUAL INSPECTION LIMITED TO 1 TILE

PER 50 SQUARE FEET WITH LIMITED EXPOSURE TIME (NOT TO EXCEED AN HOUR FOR EACH TILE) WITHIN THE SHIFT.

• MINOR INTERIOR UPDATES (E.G., REPLACING FLOOR OR CEILING TILES, CARPENTRY WORK TO INCLUDE HANGING SIGNAGE, AND PAINTING WITHOUT SANDING) THAT DO NOT CREATE DUST OR DEBRIS.

• LIMITED BUILDING SYSTEM MAINTENANCE SUCH AS BASIC PLUMBING ON POTABLE SYSTEMS (E.G., FAUCET REPLACEMENT)

OR BASIC ELECTRICAL WORK SUCH AS REPLACEMENT OF LIGHT BULBS, RECEPTACLES, OR SWITCHES.

GENERAL MAINTENANCE AND REPAIR WORK GENERALLY DEFINED AS FOLLOWS:CATEGORY B

INCLUDES BUT NOT LIMITED TO:

• PROLONGED INSPECTION AND WORK THAT MAY TAKE LONGER THAN A SINGLE SHIFT BUT NOT EXCEEDING A WEEK.

• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.

• WORK THAT CREATES MINIMAL DUST AND DEBRIS.

• INTERIOR FINISH OR SURFACE REPAIRS, UPDATES, OR MODIFICATIONS SUCH AS REPAIR OF FIREWALLS AND BARRIERS, AND

NEW FLOORING THAT PRODUCES MINIMAL DUST AND DEBRIS. CONTROLLED SANDING ACTIVITIES (E.G., WET OR DRY

SANDING) THAT PRODUCE MINIMAL DUST AND DEBRIS.

• PLUMBING WORK SUCH AS INSTALLATION OR REPLACEMENT OF A SINGLE FIXTURE OR PIPING FOR A SINGLE FIXTURE. ANY

WORK ON SANITARY PLUMBING INCLUDING SNAKING OF DRAINS.

• ELECTRICAL WORK SUCH AS INSTALLATION OF CABLING/WIRING/CONDUIT FOR A SINGLE DEVICE, INSTALLATION OF NEW

DEVICE SUCH AS A LIGHT FIXTURE THAT PRODUCES MINIMAL DUST AND DEBRIS.

• AIR HANDLER AND/OR FAN SHUTDOWN/STARTUP AND HVAC WORK SUCH AS REPLACEMENT OF A SINGLE DIFFUSER, SINGLE

TERMINAL UNIT OR A SINGLE DEVICE THAT PRODUCES MINIMAL DUST AND DEBRIS.

SMALL-SCALE CONSTRUCTION, RENOVATION, OR MAINTENANCE GENERALLY DEFINED AS FOLLOWS:

INCLUDES BUT NOT LIMITED TO:

• WORK REQUIRING LONGER THAN A SINGLE WEEK TO COMPLETE BUT NOT EXCEEDING 6 MONTHS.

• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.

• DEMOLITION/REMOVAL OF PREEXISTING FLOOR COVERING, CASEWORK, LAY-IN CEILING, OR OTHER ARCHITECTURAL

ELEMENTS.

• DEMOLITION/REMOVAL OF MORE THAN 32 FT2 OF DRYWALL/FRAMING, HARD CEILINGS, AND DOORS/FRAMING AND MINIMAL

INFRASTRUCTURE SUCH AS ELECTRICAL CIRCUITS AND BRANCH PIPING.

• INSTALLATION OF NEW WALLS, CEILINGS AND DOORS INCLUDING FRAMING, DRYWALL/PLASTER AND ASSOCIATED WORK.

• PLUMBING WORK SUCH AS THE INSTALLATION OF NEW SINKS, SHOWERS AND TOILETS AND ASSOCIATED PLUMBING.

• SHUT DOWN OF SECTIONS OF POTABLE WATER SYSTEMS.

• ELECTRICAL WORK SUCH AS INSTALLATION OF CONDUIT AND WIRE FOR LIGHTING, RECEPTACLES AND SWITCHES FOR AN

AREA, THE INSTALLATION OF CONDUIT AND WIRE FOR NEW DEVICES SUCH AS TERMINAL UNITS, FANS ETC.

• MODIFICATION OF EXISTING FIRE ALARM AND SUPPRESSION SYSTEMS.

• MECHANICAL WORK SUCH AS THE INSTALLATION OF DUCTWORK, DIFFUSERS, AND TERMINAL UNITS FOR AN AREA.

LARGE-SCALE CONSTRUCTION, RENOVATION, OR MAINTENANCE GENERALLY DEFINED AS FOLLOWS:

INCLUDES BUT NOT LIMITED TO:

• WORK EXCEEDING 6 MONTHS IN DURATION.

• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.

• LARGE-SCALE DEMOLITION OF BUILDING COMPONENTS AND INFRASTRUCTURE INCLUDING REMOVAL OF MULTIPLE DOORS, WALLS, FRAMING, CEILINGS, FLOORING, PIPING, ELECTRICAL AND HVAC.

• THE INSTALLATION BUILDING COMPONENTS SUCH AS NEW WALLS, CEILINGS AND DOORS INCLUDING FRAMING, DRYWALL AND

ASSOCIATED PLASTER WORK.

• PLUMBING WORK SUCH AS THE INSTALLATION OF:

• NEW MEDICAL GAS SYSTEMS,

• STEAM/HEATING HOT WATER, CONDENSATE SYSTEMS,

• MULTIPLE SINKS, SHOWERS AND TOILETS INCLUDING ASSOCIATED PLUMBING.

• SHUTDOWN OF POTABLE WATER, STEAM/HEATING HOT WATER, CONDENSATE, AND MEDICAL GAS SYSTEMS.

• ELECTRICAL WORK SUCH AS INSTALLATION OF ELECTRICAL FEEDERS, DISTRIBUTION PANELS, CONDUIT AND WIRE FOR

LIGHTING, RECEPTACLES AND SWITCHES FOR AN AREA, THE INSTALLATION OF CONDUIT AND WIRE FOR NEW DEVICES SUCH

AS TERMINAL UNITS, FANS ETC.

• INSTALLATION OF FIRE ALARM AND SUPPRESSION SYSTEMS.

• ELECTRICAL SHUTDOWN OF MULTIPLE PANELS.

• MECHANICAL WORK SUCH AS THE INSTALLATION OF AIR HANDLING EQUIPMENT, ASSOCIATED DUCTWORK, DIFFUSERS, HEAT

EXCHANGERS, TERMINAL UNITS AND CONTROLS.

CATEGORY C

CATEGORY D

LOW RISK

PATIENT RISK GROUPS

MEDIUM RISK HIGH RISK HIGHEST RISK

• PUBLIC HALLWAYS AND

GATHERING AREAS NOT

IN CLINICAL AREAS

• OFFICE AREAS NOT IN

CLINICAL AREAS

• BREAKROOMS NOT IN

CLINICAL AREAS

• BATHROOMS OR LOCKER

ROOMS NOT IN CLINICAL

AREAS

• MECHANICAL/ELECTRICAL

ROOMS NOT IN CLINICAL

AREAS

• WAITING AREAS

• CLINICAL ENGINEERING

(BIOMEDICAL)

• MATERIALS MANAGEMENT

• STERILE PROCESSING

DEPARTMENT – DIRTY

SIDE

• KITCHEN, CAFETERIA,

GIFT SHOP, COFFEE

SHOP, AND FOOD KIOSKS

• PATIENT CARE ROOMS AND

AREAS; INCLUDING SPINAL

CORD INJURY UNITS

• ALL ACUTE CARE UNITS,

INCLUDING MENTAL HEALTH

• ALL OUTPATIENT UNITS AND

CLINICS

• EMERGENCY DEPARTMENT

• COMMUNITY LIVING

CENTERS, DOMICILIARIES

AND TRANSITIONAL

RESIDENCES

• EMPLOYEE HEALTH

• PHARMACY – GENERAL

WORK ZONE

• MEDICATION ROOMS AND

CLEAN UTILITY ROOMS

• IMAGING SUITES –

DIAGNOSTIC IMAGING

• LABORATORY

• ALL TRANSPLANT UNITS

• ALL INTENSIVE CARE UNITS

• ALL ONCOLOGY UNITS AND

CHEMOTHERAPY/INFUSION

CENTERS

• OR THEATERS AND

RESTRICTED AREAS

• HEMODIALYSIS UNITS

• PROCEDURAL ROOMS*

• PHARMACY COMPOUNDING

AREA

• STERILE PROCESSING

DEPARTMENT – CLEAN SIDE

• TRANSFUSION SERVICES

• IMAGING SUITES –

INTERVENTIONAL IMAGING

• DEDICATED ISOLATION

WARDS/UNITS FOR

INFECTIOUS DISEASES

RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D

LOW RISK GROUP

MEDIUM RISK GROUP

HIGH RISK GROUP

HIGHEST RISK GROUP

I

I

I

II

II

II

II

III

II

III

IV

IV

III

IV

IV

IV

CONSTRUCTION PROJECT TYPE

NOTE: AN INFECTION PREVENTION AND CONTROL PERMIT IS REQUIRED FOR LEVEL III AND LEVEL IV. CONSULT WITH INFECTION

PREVENTION AND CONTROL FOR LEVEL I AND LEVEL II.

NON-PATIENT CARE

AREAS SUCH AS:

PATIENT CARE SUPPORT

AREAS SUCH AS:

PATIENT CARE

AREAS SUCH AS:

PROCEDURAL, INVASIVE,

STERILE SUPPORT AND HIGHLY

COMPROMISED PATIENT CARE

AREAS SUCH AS:

OUTSIDE OF BUILDING

WEEKLY CHANGED

HEPA FILTER

HEPA NEGATIVE

AIR UNIT

WEEKLY CHANGED

(OR MORE AS

NEEDED) PRE FILTER

FIRE RATED PLYWOOD

FL

EX

D

UC

T

SUPPLY DUCTS EITHER KEEP

RUNNING OR COVER WHEN

RUNNING TO KEEP DUST OUT.

TAPE ALL SERVICES

TO PROTECT AGAINST

CONTAMINATION A

O

V

FIRE EXTINGUISHER ON PORTABLE

FLOOR BRACKET (ILSM MAY REQUIRE

MORE THAN ONE)

SUSPENDED PLASTIC

ZIPPER WALL

CURTAIN BARRIER

6 MIL PLASTIC

TEMPORARY DIGITAL MANOMETER FOR NEGATIVE

PRESSURE MONITORING OUTSIDE OF ICRA BARRIER

FOR VA'S INSPECTION. INDICATOR SHALL BE AT -0.01

OR GREATER (VERIFY DAILY). IF NOT, VERIFY ALL

OPENINGS, SUCH AS DOOR CLOSED, AND/OR CHANGE

OUT NEGATIVE AIR PRE-FILTER.

PROVIDE STICKY MAT, DRY MAT, WET MAT

(CHANGED END OF SHIFT OR MORE IF

NECESSARYTO MAINTAIN CLEANLINESS)

PROVIDE WIPES AND SPRAY FOR WET MAT

POST ICRA ILSM FIRE

INSPECTION SHEETS

CONTAINER VISIBLE TO

PUBLIC

COVER ALL RETURNS AT THE

GRATE/DIFFUSERS

OPTIONAL EXHAUST DUCTS

(COVER THE GRATES AND THE DIFFUSERS)E

DOOR OPENING

VENT TO OUTSIDE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .