580-25-101 Project Drawings.pdf
PDF 42 MB Posted
- Solicitation number
- 36C25626R0067
About this file
This file is a comprehensive set of 100% bid-level project drawings for a campus-wide public address system replacement and upgrade project at the Michael E. DeBakey VA Medical Center in Houston, Texas. The project, identified as VA Project Number 580-25-101 and H2B Contract Number 23-133, consists of 231 total sheets covering architectural, telecommunications, environmental, and fire protection design documentation. The drawings are dated July 21, 2025, and prepared by SPUR Design as the architect/engineer of record, with H2B, Inc. serving as the project manager.
The scope encompasses the replacement and upgrade of the campus overhead paging system across the 12-building medical center complex. The project is organized into three phases: Phase 1 addresses Building 100 head-end equipment installation and Fisher Houses 2 and 3; Phase 2 covers Buildings 103, 104/105, 108, 108A, 109, 110, 123, and Fisher House 1; and Phase 3 involves Building 100 basement and levels 1 through 7 speaker installation. Key deliverables include new IP-based public address speakers, user-interface modules, network equipment cabinet redistribution, and integration with existing campus structured cabling infrastructure. The drawings contain detailed environmental hazard documentation, infection prevention and control (ICRA) requirements with specified precaution levels, architectural reference plans for all buildings and levels, extensive telecommunications demolition and installation plans with multiple building zones, fire alarm system coordination, and physical security design considerations. Construction must comply with VA-adopted codes including the 2021 International Building Code, 2021 NFPA 101 Life Safety Code, 2023 National Electrical Code, and multiple ASHRAE standards for the Houston, Texas climate zone.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25626R0067 0005.docx | DOCX document | |
| 9-H1091.pdf | ||
| 36C25626R0067 0004.docx | DOCX document | |
| 36C25626R0067 0003.docx | DOCX document | |
| 36C25626R0067 0002.docx | DOCX document | |
| DOL Wage Determinations dated 5-18-26.pdf | ||
| 36C25626R0067 0001.docx | DOCX document | |
| Sign in Sheet 580-25-101.jpg | JPG image | |
| SF24 Bid Bond.pdf | ||
| 580-25-101 Project Specifications.pdf | ||
| 36C25626R0067_1.docx | DOCX document | |
| DOL Wage Determinations TX20260253 dated 1-2-26.pdf | ||
| 580-25-101 Statement of Work.docx | DOCX document | |
| 36C25626R0067.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
U.S. DEPARTMENT OF VETERANS AFFAIRS
VA Health Care System Approval:
H2B, INC.
1225 NORTH LOOP WEST, # 800
HOUSTON, TEXAS 77008
(713) 864-2900
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Drawing Number
Building Number
ARCHITECT MECH / ELEC / PLUMB / TELECOM
SPUR DESIGN
2519 MADISON AVE., STE 100
KANSAS CITY, MO 64108
(913) 369-7200
SPUR DESIGN
312 SW 25TH STREET
OKLAHOMA CITY, OK 73109
(405) 842-6100
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
CONSULTANTS: ENGINEER: STAMP:
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD
HOUSTON, TX 77030
FIRE PROTECTION ENGINEER
RATED ENGINEERING
609 S. KELLY AVENUE, STE H2
EDMOND, OK 73003
(405) 210-5814
INDUSTRIAL HYGENIST
RIVERFRONT SAFETY & HEALTH
11140 S TOWNE SQUARE, STE 100
ST. LOUIS, MO 63123
(314) 917-0148
TEXAS FIRM REGISTRATION #: 8856
FULLY SPRINKLERED
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
/1
/2
:2 :2
P
M
COVER SHEET
CABAJS
100% BID DOCUMENTS
REPLACE/UPGRADE CAMPUS
OVERHEAD PAGING SYSTEM
VA PROJECT NUMBER: 580-25-101
REPLACE/UPGRADE CAMPUS
OVERHEAD PAGING SYSTEM
07/21/2025
580-25-101
MICHAEL E. DEBAKEY VA MEDICAL CENTER
2002 HOLCOMBE BLVD.
HOUSTON, TX 77030
100% BID DOCUMENTS
GI000
H2B #: 23-133
Drawing # 1 OF 231
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
[01] GENERAL
1 GI000 COVER SHEET
2 GI001 GENERAL INFORMATION
3 GI002 ICRA CONSTRUCTION DETAILS
4 GI003 PHASING PLAN
[02] ENVIRONMENTAL
5 H1000 BUILDING 100 - ENVIRONMENTAL HAZARDS AND ABATEMENT - 1
6 H1001 BUILDING 100 - ENVIRONMENTAL HAZARDS AND ABATEMENT - 2
7 H1002 BUILDING 100 - ENVIRONMENTAL HAZARDS AND ABATEMENT - 3
8 H1003 BUILDING 100 - ENVIRONMENTAL HAZARDS AND ABATEMENT - 4
9 H1031 BUILDING 103 - LEVEL 1 - ENVIRONMENTAL HAZARDS AND ABATEMENT
10 H1041 BUILDINGS 104 & 105 - LEVEL 1 - ENVIRONMENTAL HAZARDS AND ABATEMENT
11 H1081 BUILDING 108 - LEVEL 1 - ENVIRONMENTAL HAZARDS AND ABATEMENT
12 H108A BUILDING 108A - LEVELS 1 & 2 - ENVIRONMENTAL HAZARDS AND ABATEMENT
13 H1091 BUILDING 109 - LEVEL 1 - ENVIRONMENTAL HAZARDS AND ABATEMENT
14 H1101 BUILDING 110 - LEVEL 1 - ENVIRONMENTAL HAZARDS AND ABATEMENT
15 H1201 BUILDING 120 - LEVEL 1 - ENVIRONMENTAL HAZARDS AND ABATEMENT
16 H1231 BUILDING 123 - LEVEL 1 - ENVIRONMENTAL HAZARDS AND ABATEMENT
17 H1251 BUILDING 125 - LEVEL 1 - ENVIRONMENTAL HAZARDS AND ABATEMENT
18 H1F11 FISHER HOUSES 1, 2, & 3 - ENVIRONMENTAL HAZARDS AND ABATEMENT
[03] ARCHITECTURAL
19 AS001 ARCHITECTURAL SITE PLAN
20 A-101 REFERENCE PLAN - BUILDING 100- BASEMENT LEVEL
21 A-102 REFERENCE PLAN - BUILDING 100 - LEVEL 1
22 A-103 REFERENCE PLAN - BUILDING 100 - LEVEL 2
23 A-104 REFERENCE PLAN - BUILDING 100 - LEVEL 3
24 A-105 REFERENCE PLAN - BUILDING 100 - LEVEL 4
25 A-106 REFERENCE PLAN - BUILDING 100 - LEVEL 5
26 A-107 REFERENCE PLAN - BUILDING 100- LEVEL 6
27 A-108 REFERENCE PLAN - BUILDING 100 - LEVEL 7
28 A-109 REFERENCE PLANS - BUILDINGS 103, 104 & 105
29 A-110 REFERENCE PLANS - BUILDINGS 108 & 108A - LEVEL 1 & 2
30 A-111 REFERENCE PLANS - BUILDING 109 - BASEMENT LEVEL, LEVELS 1 & 2
31 A-112 REFERENCE PLANS - BUILDING 110 - BASEMENT & LEVEL 1
32 A-113 REFERENCE PLANS - BUILDING 110 - LEVELS 2 & 3
33 A-114 REFERENCE PLAN - BUILDINGS 120, 123, & 125 - LEVELS 1 & 2
34 A-115 REFERENCE PLANS - FISHER HOUSE #1, #2, & #3 - LEVELS 1 & 2
[04] FIRE PROTECTION
35 FA001 FIRE ALARM NOTES MATRIX AND RISER DIAGRAM
[06] TELECOMM
36 T-001 TELECOMMUNICATIONS COVER SHEET
37 T-010 TELECOMMUNICATIONS SITE PLAN
38 TN101 TELECOMMUNICATIONS REFERENCE PLAN - BUILDING 100- BASEMENT LEVEL
39 TN102 TELECOMMUNICATIONS REFERENCE PLAN - BUILDING 100 - LEVEL 1
40 TN103 TELECOMMUNICATIONS REFERENCE PLAN - BUILDING 100 - LEVEL 2
41 TN104 TELECOMMUNICATIONS REFERENCE PLAN - BUILDING 100 - LEVEL 3
42 TN105 TELECOMMUNICATIONS REFERENCE PLAN - BUILDING 100 - LEVEL 4
43 TN106 TELECOMMUNICATIONS REFERENCE PLAN - BUILDING 100 - LEVEL 5
44 TN107 TELECOMMUNICATIONS REFERENCE PLAN - BUILDING 100- LEVEL 6
45 TND201 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -
AREA A
46 TND202 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -
AREA B
47 TND203 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -
AREA C
48 TND204 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -
AREA D
49 TND205 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -
AREA E
50 TND208 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -
AREA H
51 TND206 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -
AREA F
52 TND207 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -
AREA G
LOCATION
PLAN
AREA
PLAN
N
N
PROJECT LOCATION
BLDG 100
OLD SPANISH TRAIL
AL
ME
DA
R
OA
D
MI
XO
N
AV
ECA
MB
RI
DG
E
ST
RE
ET
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
53 TND209 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -
AREA J
54 TND210 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -
AREA K
55 TND211 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -
AREA L
56 TND212 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - BASEMENT LEVEL -
AREA N
57 TND213 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA A
58 TND214 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA B
59 TND215 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA C
60 TND216 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA D
61 TND217 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA E
62 TND218 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA F
63 TND219 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA G
64 TND220 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA H
65 TND221 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA J
66 TND222 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA K
67 TND223 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA L
68 TND224 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA M
69 TND225 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA N
70 TND226 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 1 - AREA P
71 TND227 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA A
72 TND228 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA B
73 TND229 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA C
74 TND230 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA D
75 TND231 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA E
76 TND232 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA F
77 TND233 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA G
78 TND234 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA H
79 TND235 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA J
80 TND236 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA K
81 TND237 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA L
82 TND238 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 2 - AREA N
83 TND239 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA A
84 TND240 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA B
85 TND241 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA C
86 TND242 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA D
87 TND243 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA E
88 TND244 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA F
89 TND245 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA G
90 TND246 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA H
91 TND247 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA J
92 TND248 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA K
93 TND249 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 3 - AREA L
94 TND250 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 4 - AREA A
95 TND251 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 4 - AREA B
96 TND252 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 4 - AREA C
97 TND253 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 4 - AREA D
98 TND254 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 4 - AREA E
99 TND255 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 4 - AREA F
100 TND256 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 4 - AREA G
101 TND257 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 4 - AREA H
102 TND258 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 4 - AREA K
103 TND259 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 4 - AREA L
104 TND260 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 5 - AREA A
105 TND261 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 5 - AREA B
106 TND262 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 5 - AREA C
107 TND263 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 5 - AREA D
108 TND264 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 5 - AREA E
109 TND265 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 5 - AREA F
110 TND266 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 5 - AREA G
111 TND267 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 5 - AREA H
112 TND268 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 5 - AREA K
113 TND269 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 6 - AREA A
114 TND270 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 6 - AREA B
115 TND271 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 6 - AREA C
116 TND272 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 6 - AREA D
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
117 TND273 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 6 - AREA E
118 TND274 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 6 - AREA F
119 TND275 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 6 - AREA G
120 TND276 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 6 - AREA H
121 TND277 TELECOMMUNICATIONS DEMOLITION PLANS - BUILDING 100 - LEVEL 6 - AREA K
122 TN108 TELECOMMUNICATIONS PLANS - BUILDINGS 103, 104 & 105
123 TN109 TELECOMMUNICATIONS PLANS - BUILDINGS 108 & 108A - LEVEL 1 & 2
124 TN110 TELECOMMUNICATIONS PLANS - BUILDING 109 - BASEMENT LEVEL, LEVELS 1 & 2
125 TN111 TELECOMMUNICATIONS PLANS - BUILDING 110 - BASEMENT & LEVEL 1
126 TN112 TELECOMMUNICATIONS PLANS - BUILDING 110 - LEVELS 2 & 3
127 TN113 TELECOMMUNICATIONS PLAN - BUILDINGS 120 & 125 - LEVELS 1 & 2
128 TN114 TELECOMMUNICATIONS PLANS - FISHER HOUSE #1, #2, & #3 - LEVELS 1 & 2
129 TN201 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA A
130 TN202 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA B
131 TN203 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA C
132 TN204 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA D
133 TN205 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA E
134 TN206 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA F
135 TN207 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA G
136 TN208 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA H
137 TN209 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA J
138 TN210 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA K
139 TN211 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA L
140 TN212 TELECOMMUNICATIONS PLANS - BUILDING 100 - BASEMENT LEVEL - AREA N
141 TN213 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA A
142 TN214 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA B
143 TN215 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA C
144 TN216 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA D
145 TN217 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA E
146 TN218 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA F
147 TN219 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA G
148 TN220 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA H
149 TN221 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA J
150 TN222 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA K
151 TN223 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA L
152 TN224 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA M
153 TN225 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA N
155 TN227 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA A
154 TN226 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 1 - AREA P
156 TN228 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA B
157 TN229 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA C
158 TN230 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA D
159 TN231 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA E
160 TN232 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA F
161 TN233 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA G
162 TN234 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA H
163 TN235 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA J
164 TN236 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA K
165 TN237 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA L
166 TN238 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 2 - AREA N
167 TN239 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA A
168 TN240 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA B
169 TN241 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA C
170 TN242 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA D
171 TN243 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA E
172 TN244 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA F
173 TN245 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA G
174 TN246 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA H
175 TN247 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA J
176 TN248 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA K
177 TN249 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 3 - AREA L
178 TN250 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 4 - AREA A
179 TN251 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 4 - AREA B
180 TN252 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 4 - AREA C
181 TN253 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 4 - AREA D
182 TN254 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 4 - AREA E
183 TN255 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 4 - AREA F
SHEET INDEX
SEQUENCE NUMBER SHEET NAME
184 TN256 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 4 - AREA G
185 TN257 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 4 - AREA H
186 TN259 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 4 - AREA L
187 TN258 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 4 - AREA K
188 TN260 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 5 - AREA A
189 TN261 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 5 - AREA B
190 TN262 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 5 - AREA C
191 TN263 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 5 - AREA D
192 TN264 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 5 - AREA E
193 TN265 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 5 - AREA F
194 TN266 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 5 - AREA G
195 TN267 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 5 - AREA H
196 TN268 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 5 - AREA K
197 TN269 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 6 - AREA A
198 TN270 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 6 - AREA B
199 TN271 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 6 - AREA C
200 TN272 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 6 - AREA D
201 TN273 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 6 - AREA E
202 TN274 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 6 - AREA F
203 TN275 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 6 - AREA G
204 TN276 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 6 - AREA H
205 TN277 TELECOMMUNICATIONS PLANS - BUILDING 100 - LEVEL 6 - AREA K
206 TN401 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - BASEMENT LEVEL
207 TN402 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - BASEMENT LEVEL
208 TN403 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - BASEMENT LEVEL
209 TN404 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 1
210 TN405 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 1
211 TN406 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 1
212 TN407 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 2
213 TN408 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 2
214 TN409 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 2
215 TN410 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 3
216 TN411 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 3
217 TN412 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 3
218 TN413 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 4
219 TN414 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 4
220 TN415 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 4
221 TN416 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 5
222 TN417 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 5
223 TN418 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 5
224 TN419 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 6
225 TN420 TELECOMMUNICATIONS ENLARGED PLANS - BUILDING 100 - LEVEL 6
226 TN501 TELECOMMUNICATIONS DETAILS
227 TN502 TELECOMMUNICATIONS DETAILS
228 TN601 CAMPUS BACKBONE RISER DIAGRAMS
229 TN602 BUILDING 100 PUBLIC ADDRESS RISER - MECH BAYS #1 - #6
230 TN603 BUJILDING 100 PUBLIC ADDRESS RISER - MECH BAYS #7 - #12
231 TN604 BUILDINGS 103, 104 & 105, 108, 108A, 109, 110, 120, 125 AND FISHER HOUSE 1, 2, & 3
PUBLIC ADDRESS RISERS
TOTAL SHEETS: 231
HOLCOMBE BLVD
WYNDALE STREET
OLD SPANISH TRAIL
AL
ME
DA
R
OA
D
HOLCOMBE BLVD
N M
AC
GR
EG
OR
W
AY
SOUTH FW
Y
FANNIS STREET
HOLCOMBE BLVD
FA
NN
IS
ST
RE
ET
No. REVISION DESCRIPTION DATE
ABBREVIATIONS CODES STANDARDS AND EXECUTIVE ORDERS
18" MIN
" M
IN
FRONT APPROACH,
PULL SIDE
36" MIN
" M
IN
HINGE APPROACH,
PULL SIDE
HINGE APPROACH,
PULL SIDE
*12" MIN48
" M
IN
FRONT APPROACH,
PUSH SIDE
**4 2"
M
IN
HINGE APPROACH,
PUSH SIDE
22" MIN 24" MIN*4
8"
M
IN
LATCH APPROACH,
PULL SIDE
24" MIN*4
2"
M
IN
LATCH APPROACH,
PUSH SIDE
*IF BOTH CLOSER
AND LATCH ARE
PROVIDED
*54" MIN IF CLOSER
IS PROVIDED
*48" IF CLOSER IS
PROVIDED
FRONT APPROACH,
PUSH SIDE
" M
IN
42" MIN
DOOR AND FIXTURE CLEARANCES
MATERIALS LEGEND
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO PARTICIPATE IN
VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND STANDARDS THAT VA FOLLOWS ON ITS PROJECTS. REFERENCE RELEVANT ADDNEDA FOR EACH OF THE ADOPTED CODES AND STANDARDS:
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL
INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• 2021 INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW)
• 2021 INTERNATIONAL EXISTING BUILDING CODE (IEBC) (IF APPLICABLE)
• 2021 NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW)
• 2022 NFPA 72 NATIONAL FIRE ALARM AND SIGNALING CODE
• 2021 NATIONAL FIRE CODES (NFPA)
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• 2023 VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• 2021 INTERNATIONAL MECHANICAL CODE
• 2023 NATIONAL ELECTRICAL CODE (NEC), NFPA 70
• 2021 INTERNATIONAL PLUMBING CODE (IPC)
• 2019 SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• 2022 ARCHITECTURAL BARRIERS ACT (ABA) STANDARDS INCLUDING VA SUPPLEMENT, VA BARRIER FREE DESIGN STANDARD (PG-18-13)
• 2022 ANSI ICC A117.1 ACCESSIBLE AND USABLE BUILDINGS AND FACILITIES
• 2022 BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE AND COMMENTARY, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318-19)
• 2017 STEEL CONSTRUCTION MANUAL (15TH EDITION), AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• 2007 DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE RESIDENTIAL BUILDINGS AND
NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• 2006 FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• 2018 EXECUTIVE ORDER 13834: EFFICIENT FEDERAL OPERATIONS
• 2021 THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 010000 OF THE VA MASTER CONSTRUCTION
SPECIFICATION.
• 2022 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 62.1
• 2022 SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15
• 2023 PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT
NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN.
DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES
EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
ASHRAE 90.1 - 2019 EDITION
BUILDING LOCATION: HOUSTON, TX
CLIMATE ZONE (TABLE ANNEX 1-1): ZONE 2A
INTERIOR DESIGN CONDITIONS:
THE INTERIOR DESIGN TEMPERATURES FOR HEATING AND COOLING AS DEPICTED IN THE PROJECT DESIGN CONDITIONS SCHEDULE IN THE MECHANICAL CONTROL DRAWINGS SHALL BE THE MAXIMUM
AND MINIMUM VALUES FOR THE ASSOCIATED TEMPERATURE CONTROL ZONES.
BUILDING ENVELOPE REQUIREMENTS (5.5 )
BUILDING ENVELOPE REQUIREMENTS FOR CLIMATE ZONE 4 (A,B,C)
ROOFS REQUIRED DESIGNED
INSULATION: R-30 c.i. EXISTING METAL BUILDINGS: R-19 + R-11 Ls or R-25 + R-8 Ls EXISTING
ATTIC AND OTHER: R-49 EXISTING
WALLS, ABOVE GRADE
MASS: R-9.5 c.i. EXISTING METAL BUILDING: R-0 + R-15.8 c.i. EXISTING STEEL-FRAMED: R-13 + R-7.5 c.i. EXISTING WOOD-FRAMED AND OTHER: R-13 + R-3.8 c.i. or R-20 EXISTING
WALL, BELOW GRADE
BELOW-GRADE WALL: R-7.5 c.i. EXISTING
FLOORS
MASS: R-14.6 c.i. EXISTING
STEEL-FRAMED: R-30 EXISTING
WOOD-FRAMED AND OTHER: R-30 EXISTING
SLAB-ON-GRADE FLOORS
UNHEATED SLABS: R-15 for 24 in. EXISTING HEATED SLABS: R-20 for 24 in. EXISTING
OPAQUE DOORS
SWINGING: U-0.370 EXISTING
NONSWINGING: U-0.310 EXISTING
FENESTRATION (TABLE 5.5-4):
VERTICAL FENESTRATION, U-FACTOR
FIXED: U-0.36 EXISTING
OPERABLE: U-0.45 EXISTING
ENTRANCE DOOR: U-0.63 EXISTING
DEFINITIONS
c.i = CONTINUOUS INSULATION Ls = LINEAR SYSTEM
NR = NO (INSULATION) REQUIREMENT
ENERGY REQUIREMENTS
N
1. DRAWINGS ARE PART OF A COMPLETE DOCUMENTS SET. CONTRACTOR SHALL CONFIRM
ALL ITEMS REQUIRED BASED UPON THE OVERALL DESIGN INTENT OF THE ENTIRE
DOCUMENT SET.
2. CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS, PRIOR TO BEGINNING ANY WORK,
TO CONFIRM THE ACCURACY OF THE DRAWINGS AND REPORT ANY DISCREPANCIES TO
THE ARCHITECT. DO NOT SCALE THE DRAWINGS. FIELD VERIFY ALL DIMENSIONS AND
EXISTING STRUCTURAL CONDITIONS.
3. ALL AREAS NOT INVOLVED IN THE SCOPE OF WORK FOR THIS PROJECT SHALL BE KEPT
CLEAN AND FREE OF OBSTRUCTIONS AT ALL TIMES.
4. ERECT BARRICADES AND WARNING SIGNS TO DIVERT AND WARN PASSERS-BY OF THE
CONSTRUCTION WORK. PROVIDE DUST PROOFING ENCLOSURES TO SEPARATE WORK
AREAS FROM THE EXISTING FACILITIES.
5. ALL TRASH AND DEBRIS TO BE REMOVED ON A DAILY BASIS.
6. PROVIDE PROTECTION FOR ALL EXISTING SURFACES AND CONDITIONS TO REMAIN IN
PLACE DURING THE SCOPE OF WORK. SHOULD ANY DAMAGE OCCUR, PATCH AND REPAIR
ANY DAMAGE TO ADJACENT FINISHES TO MATCH EXISTING.
7. ANY DAMAGE CAUSED TO THE BUILDING OR OWNER EQUIPMENT SHALL BE REPAIRED OR
REPLACED BACK TO ITS ORIGINAL CONDITIONS AT NO ADDITIONAL COST TO THE OWNER.
8. COVER ALL RETURN AIR GRILLES WITHIN THE AREA OF CONSTRUCTION TO PREVENT
PARTICULATE MATERIAL FROM EXHAUSTING INTO SURROUNDING SPACES.
9. APPROPRIATE LIGHT FIXTURES SHALL BE TEMPORARILY SUSPENDED TO PROVIDE
ADEQUATE LIGHTING LEVELS FOR CONSTRUCTION.
10. CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO COORDINATE WITH OTHER
DISCIPLINES TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS. DRAWINGS, AS A
WHOLE, REPRESENT A COMPLETE SET AND DEPICT REQUIREMENTS FOR COMPLETE AND
OPERATIONAL SYSTEMS. INDIVIDUAL DRAWINGS MAY NOT DEPICT COMPLETE AND
ACCURATE INFORMATION TO COORDINATE COMPLETE AND OPERATIONAL SYSTEMS, BUT
DO SO AS AN ENTIRE DOCUMENT TO BE REFERENCED WITH OTHER INDIVIDUAL DRAWINGS.
CONTRACTOR AND SUBCONTRACTORS ARE REQUIRED TO REFERENCE OTHER SHEETS
AND SPECIFICATIONS AS AN ENTIRE SET OF CONSTRUCTION DOCUMENTS THAT REFLECT
WORK REQUIRED TO ACHIEVE A COMPLETE AND OPERATIONAL GOAL. LACK OF
COORDINATION AND REVIEW OF DRAWINGS AND SPECIFICATIONS AS AN ENTIRE
DOCUMENT TO INSTALL COMPLETE AND OPERATIONAL SYSTEMS, BEING OBVIOUS AND
TYPICAL INDUSTRY STANDARD, IDENTIFIED IN THE DRAWINGS AND SPECIFICATIONS, SHALL
NOT BE IN ANY WAY AN ADDITIONAL COST TO THE GOVERNMENT.
11. CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, TO INTERRUPT ANY SUCH SERVICES
TO COR (CONTRACTING OFFICER’S REPRESENTATIVE) 48 HOURS IN ADVANCE OF
PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE, EXACT TIME OF, AND
APPROXIMATE DURATION OF SUCH INTERRUPTION. MAJOR INTERRUPTIONS OF ANY
SYSTEM MUST BE REQUESTED, IN WRITING, AT LEAST 60 CALENDAR DAYS PRIOR TO THE
DESIRED TIME AND SHALL BE PERFORMED AS DIRECTED BY THE COR. MAJOR
INTERRUPTIONS SHALL BE COORDINATED WITH OTHER MAJOR INTERRUPTIONS AND MAY
NOT BE SCHEDULED FOR ONE DISCIPLINE MORE THAN TWICE THROUGHOUT THE OVERALL
CONSTRUCTION SCHEDULE UNLESS REQUESTED IN WRITING AND APPROVED BY THE COR.
CONTRACTOR WILL BE ADVISED, IN WRITING, OF APPROVAL OF REQUEST, OR OF WHICH
OTHER DATE AND/OR TIME SUCH INTERRUPTION WILL CAUSE THE LEAST INCONVENIENCE
TO OPERATIONS OF THE MEDICAL CENTER. INTERRUPTION TIME APPROVED BY THE
MEDICAL CENTER MAY OCCUR AT TIMES OTHER THAN CONTRACTOR'S NORMAL WORKING
HOURS. SCHEDULE INTERRUPTION MAY BE ON WEEKENDS OR LATE HOURS AND MAY NOT
BE AN ADDITIONAL COST TO THE GOVERNMENT. COORDINATE ALL INTERRUPTIONS THAT
MAY AFFECT THE NORMAL OPERATION OF THE FACILITY WITH THE COR WHEN SUBMITTING
THE CONSTRUCTION SCHEDULE OR UPDATES TO THE CONSTRUCTION SCHEDULE.
12. NO ASBESTOS CONTAINING MATERIALS ARE TO BE USED ON THIS PROJECT. SPUR DESIGN, THE A/E OF RECORD, CAN CERTIFY THAT NO ASBESTOS CONTAINING BUILDING MATERIALS
(ACBM) OR LEAD BASED PAINT (LBP) PRODUCTS WERE DESIGNED/SPECIFIED AS BUILDING
MATERIAL IN ANY OF THE CONSTRUCTION DOCUMENTS.
13. REFER TO THE DESIGN BINDER FOR THE ICRA INFORMATION DOCUMENTATION.
GENERAL NOTES
AREA NAME
150 SF
A101
A101
1 SIM
A
00.0
A101
1 1
A101
LEVEL NAME
00'-00"
00'-00" 4B
3A
FIBERGLASS BATT
INSULATION
RIGID INSULATION
CONCRETE / PRECAST
CONCRETE
EARTH / SOIL
SAND, EIFS FINISH, OR
PLASTER FINISH
GYPSUM BOARD FINISH
BRICK
CONCRETE MASONRY
UNIT
STONE / CAST STONE
GYPSUM BOARD SECTION
EXTERIOR SHEATHING
BOARD SECTION
PLYWOOD SECTION
CLEAN UTILITY
000A
150 SF
/1 A101
X0000
ROOM TAG
AREA TAG
SPECIALTY EQUIPMENT TAG
DOOR TAG
KEYED NOTE TAG
WALL TAG
WINDOW TAG
A101
1 SIM 1
A101
SIM
A
ACB ACOUSTIC CEILING BAFFLE
ACP ACOUSTIC CEILING PANEL
ACST ACOUSTIC
ADA AMERICANS WITH DISABILITIES ACT
ACT ACOUSTICAL CEILING TILE
ADDL ADDITIONAL
ADDN ADDITION
ADJ ADJACENT, ADJOINING, OR
ADJUSTABLE
ADMIN ADMINISTRATION
AE ARCHITECT/ENGINEER
AF ACCESS FLOORING
AFF ABOVE FINISHED FLOOR
AFG ABOVE FINISHED GRADE
AHJ AUTHORITY HAVING JURISDICTION
AIA AMERICAN INSTITUTE OF
ARCHITECTS
ALT ALTERNATE
ALT NO ALTERNATE NUMBER
ALUM ALUMINIUM (TRIM)
AMT AMOUNT
APPROX APPROXIMATE
ARCH ARCHITECT
ASC ABOVE SUSPENDED CEILING
AT ACOUSTIC CEILING TILE
AVG AVERAGE
B
BD BOARD
BG BUMPER GUARD
BLDG BUILDING
BLKG BLOCKING
BLT IN BUILT-IN
BOS BOTTOM OF STEEL
BOT BOTTOM
BRKT BRACKET
BTWN BETWEEN
C
CAB CABINET
CAV CAVITY
CBB CONCRETE BACKER BOARD
CD CONSTRUCTION DOCUMENTS
CFM CUBIC FEET PER MINUTE
CFS CUBIC FEET PER SECOND
CG CORNER GUARD
CH BD CHALKBOARD
CIP CAST-IN-PLACE
CJ CONTROL JOINT
CL CENTERLINE
CLG CEILING
CLG HT CEILING HEIGHT
CLR CLEAR
CMU CONCRETE MASONRY UNIT
CO CONTRACTING OFFICER
COL COLUMN
COMM COMMUNICATION
CONC CONCRETE
CONT CONTINUOUS
COORD COORDINATE
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CP CONTRACTOR PROVIDED
CC CONTRACTOR PROVIDED /
CONTRACTOR INSTALLED
CPT CARPET/CARPET TILE
CS CONCRETE SEALED
CSWK CASEWORK
CT CERAMIC TILE
CTB CERAMIC TILE BASE
CTR CENTER
CU FT CUBIC FEET
D
DBL DOUBLE
DEMO DEMOLITION
DEPT DEPARTMENT
DET DETAIL
DIA DIAMETER
DIR DIRECTION
DIST DISTANCE
DOC DOCUMENT
DR DOOR
DS DOWNSPOUT
DWG DRAWING
DWP DIMENSIONAL WALL PANEL
E
EA EACH
EJ EXPANSION JOINT
EL ELEVATION
ELEV ELEVATOR
ENTR ENTRANCE
EPY EPOXY FLOORING
EQ EQUAL
ETR EXISTING TO REMAIN
EX EXISTING
EXP EXPOSED
EXT EXTERIOR
F
FAB FABRIC
FED FEDERAL
FF FINISH FACE
FF EL FINISH FLOOR ELEVATION
FIN FINISH
FIN BS FINISH BOTH SIDES
FIN FLR FINISH FLOOR
FIN GR FINISH GRADE
FIXT FIXTURE
FLDG FOLDING
FLEX FLEXIBLE
FLG FLOORING
FLMT FLUSH MOUNT
FLR FLOOR
FOC FACE OF CONCRETE
FOM FACE OF MASONRY
FP FIRE PROTECTION
FR FIRE RESISTANT
FT FEET
FTG FOOTING
FV FIELD VERIFY
FWC FABRIC WALL COVERING
G
GDR GUARDRAIL
GL GLASS/GLAZING
GRAN GRANITE
GR FL GROUND FLOOR
GT GROUT
GSM GALVANIZED SHEET METAL
GYP BD GYPSUM BOARD
H
HDW HARDWARE
HEPA HIGH EFFICIENCY
PARTICULATE AIR (FILTER)
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HANDRAIL
HT HEIGHT
I
IBC INTERNATIONAL BUILDING CODE
INSUL INSULATION
INT INTERIOR
ILO IN LIEU OF
J
J-BOX JUNCTION BOX
L
LAV LAVATORY
LBS POUND
LDG LANDING
LF LINEAR FEET (FOOT)
LIN LINEAR
LN LINOLEUM
LOC LOCATION
LT LIGHT
LVR LOUVER
LVT LUXURY VINYL TILE
M
MAT CARPET MAT / WALK-OFF MAT
MATL MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MEMB MEMBRANE
MFR MANUFACTURER
MID MIDDLE
MIL STD MILITARY STANDARD
MIN MINIMUM
MISC MISCELLANEOUS
MO MASONRY OPENING
MOD MODIFY
MTG MOUNTING
MTL METAL
MVBL MOVABLE
N
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NTS NOT TO SCALE
O
OA OVERALL
OC ON CENTER
OD OUTSIDE DIAMETER
OPNG OPENING
OPP OPPOSITE
OPR OPERABLE
ORD OVERFLOW ROOF DRAIN
ORIG ORIGINAL
P
P PAINT
PA PUBLIC ADDRESS
PBD PARTICLE BOARD
PCF POUNDS PER CUBIC FOOT
PCT PERCENT
PERF PERFORATED
PERIM PERIMETER
PERP PERPENDICULAR
PL PROPERTY LINE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PNL PANEL
PR PAIR
PRB PROFILE BASE
PRKG PARKING
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PORCELAIN TILE
PWR POWER
Q
QA QUALITY ASSURANCE
QC QUALITY CONTROL
QTY QUANTITY
REFERENCE SYMBOLS IDENTIFICATION TAGS
NOTE: NOT ALL ABBREVIATIONS OR SYMBOLS WILL BE UTILIZED FOR THIS PROJECT.
GRID HEAD AND
LINE
LEVEL INDICATOR
MATCH LINE AND
VIEW REFERENCE
NORTH ARROW W/
PROJECT NORTH
SPOT ELEVATION
DETAIL
SECTION
**48" MIN IF BOTH CLOSER
AND LATCH PROVIDED
WALL
SECTION
BUILDING
SECTION
DETAIL
ELEVATION
INTERIOR
ELEVATION
BUILDING
ELEVATION
1 1
" M
IN
R
RAF RESILIENT ATHLETIC FLOORING
RB RUBBER BASE/RESILIENT BASE
RCP REFLECTED CEILING PLAN
RD ROOF DRAIN
REC RECESSED
REF REFERENCE
REM REMOVABLE
REP REPAIR
REPL REPLACE
REQ REQUIRE
REQD REQUIRED
RES RESINOUS FLOORING
RES-W RESINOUS / EPOXY WALL / CEILING
RF RUBBER FLOORING
RFG ROOFING
RM ROOM
RO ROUGH OPENING
RP RESIN PANEL
RSF RESILIENT SHEET FLOORING
RV ROOF VENT
RWC RIGID VINYL WALLCOVERING
S
SC SPECIALTY COATING
SD STATIC DISSIPATIVE FLOORING/TILE
SCHED SCHEDULE
SECT SECTION
SF SQUARE FOOT (FEET)
SGL SINGLE
SIM SIMILAR
SJ SCORED JOINT
SLNT SEALANT
SM SHEET METAL
SPEC SPECIFICATION
SQ SQUARE
SQ IN SQUARE INCH
SQ YD SQUARE YARD
SS SOLID SURFACE
ST STONE
STD STANDARD
STOR STORAGE
SV SHEET VINYL (ROLLED OR TILE)
T
TEL TELEPHONE
TEMP TEMPORARY
TER TERRAZZO
TOF TOP OF FOOTING/ FOUNDATION
TOM TOP OF MASONRY
TOS TOP OF SLAB/ STEEL
U
UNO UNLESS NOTED OTHERWISE
UTIL UTILITY
V
VAR VARIES
VC VA PROVIDED / CONTRACTOR
INSTALLED
VCT VINYL COMPOSITION TILE
VFAT VINYL-FACED ACOUSTICAL TILE
VP VENEERED PLASTER
VT VINYL TILE
VV VA PROVIDED / VA INSTALLED
VWC VINYL WALLCOVERING
VWF VINYL WALL FABRIC
W
W/ WITH
W/O WITHOUT
W/C WATER CLOSET
WC WHEELCHAIR
WD WOOD
WFAB WALL FABRIC
WPM WATERPROOF MEMBRANE
WSF WELDED SHEET FLOOR
X
X BRACE CROSS BRACE
TRUE
NORTH
th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t o n e e ig h th in c h o n e fo o t
A
B
C
D
E
F
Veterans Health
Administration
VA FORM 08-6231
Drawing Title Project Title
Location
Date Checked Drawn
Project Number
VA Health Care System Approval:
H2B, INC.
1225 NORTH LOOP WEST, # 800
HOUSTON, TEXAS 77008
(713) 864-2900
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
A
B
C
D
E
F
Drawing Number
Building Number
ARCHITECT MECH / ELEC / PLUMB / TELECOM
SPUR DESIGN
2519 MADISON AVE., STE 100
KANSAS CITY, MO 64108
(913) 369-7200
SPUR DESIGN
312 SW 25TH STREET
OKLAHOMA CITY, OK 73109
(405) 842-6100
The information on this document is preliminary or incomplete, not for construction, recording purposes, or implementation.
CONSULTANTS: ENGINEER: STAMP:
MICHAEL E. DEBAKEY VAMC
2002 HOLCOMBE BLVD
HOUSTON, TX 77030
FIRE PROTECTION ENGINEER
RATED ENGINEERING
609 S. KELLY AVENUE, STE H2
EDMOND, OK 73003
(405) 210-5814
INDUSTRIAL HYGENIST
RIVERFRONT SAFETY & HEALTH
11140 S TOWNE SQUARE, STE 100
ST. LOUIS, MO 63123
(314) 917-0148
TEXAS FIRM REGISTRATION #: 8856
FULLY SPRINKLERED
PHYSICAL SECURITY
FORCE PROTECT
10901 FRONT BEACH RD, UNIT 1415
PANAMA CITY BEACH, FL 32407
(502) 836-4232
/1
/2
:2 :2
P
M
GENERAL INFORMATION
CABAJS
100% BID DOCUMENTS
REPLACE/UPGRADE CAMPUS
OVERHEAD PAGING SYSTEM
07/21/2025
580-25-101
GI001
H2B #: 23-133
Drawing # 2 OF 231
CONTROLS DEFINED BELOW FOR THE LEVEL OF PRECAUTIONS IDENTIFIED FOR THE ACTIVITY MUST BE IN PLACE BEFORE THE ACTIVITY BEGINS AND MAINTAINED UNTIL WORK IS COMPLETED AND THE AREA IS ACTIVATED. CONTROL MEASURES FOR EACH PRECAUTION LEVEL MUST ALSO INCLUDE THE CONTROL MEASURES IN THE PRECEDING LEVEL(S). AS THE ACTIVITY PROGRESSES, A FULL RE-
EVALUATION OF REMAINING ACTIVITY TYPE AND PATIENT RISK IS REQUIRED PRIOR TO
DOWNGRADING THE LEVEL OF PRECAUTIONS.
LEVEL I:
1. PERFORM WORK ACTIVITY IN A MANNER THAT DOES NOT CREATE DUST.
2. IMMEDIATELY REPLACE ANY CEILING TILE, CLOSE ACCESS PANELS, ETC., UPON COMPLETION
OF WORK.
3. ANY MATERIALS AND EQUIPMENT BEING BROUGHT INTO THE FACILITY MUST BE FREE OF
CONTAMINANTS AND LOOSE MATERIAL.
LEVEL II:
ALL CONTROL MEASURES IN LEVEL I AND THE FOLLOWING:
1. PROVIDE ACTIVE MEANS TO CONTROL AIRBORNE DUST FROM DISPERSING INTO OCCUPIED
AREAS AND/OR WATER MIST SURFACE TO CONTROL DUST (E.G., MOBILE DUST CONTAINMENT
CART OR SOME OTHER SYSTEM).
2. ENSURE WORKER CLOTHING IS CLEAN AND FREE OF VISIBLE DUST BEFORE LEAVING THE
WORK AREA.
3. REMOVE OR ISOLATE AIR DIFFUSERS (SUPPLY AND RETURN) TO PROTECT THE HVAC SYSTEM
FROM DUST AND REDUCE AIR TURBULENCE. REBALANCE SYSTEM TO ADDRESS DIFFUSER
ISOLATION.
4. WHEN THE WORK INVOLVES OR IMPACTS POTABLE WATER SYSTEMS INCLUDING
STAGNATION DUE TO REDUCED USAGE, THE PIPING SHALL BE FLUSHED TWICE A WEEK OR
ISOLATED FROM THE MAIN SYSTEM.
5. SEAL DOORS TO PREVENT DUST MIGRATION.
6. CONTAIN ALL TRASH AND DEBRIS IN THE WORK AREA. PERFORM DAILY CLEANING AND
DISPOSAL OF TRASH (COVERED) FROM WORK AREA USING AN IDENTIFIED EXIT ROUTE.
7. ANY EQUIPMENT, TOOLS, OR MATERIALS REMOVED FROM THE WORK AREA MUST BE IN
SEALED CONTAINERS AND/OR CLEANED OF DUST AND DEBRIS PRIOR TO REMOVAL FROM THE
AREA.
8. NONPOROUS/SMOOTH AND CLEANABLE CONTAINERS (WITH A HARD LID) MUST BE USED TO
TRANSPORT TRASH AND DEBRIS FROM THE CONSTRUCTION AREAS. THESE CONTAINERS
MUST BE DAMP-WIPED CLEANED AND FREE OF VISIBLE DUST/DEBRIS BEFORE LEAVING THE
CONTAINED WORK AREA.
9. INSTALL A STICKY (DUST COLLECTION) MAT AT ENTRANCE OF CONTAINED WORK AREA
BASED ON FACILITY POLICY. STICKY MATS MUST BE CHANGED ROUTINELY AND WHEN VISIBLY
SOILED.
1. MAINTAIN CLEAN SURROUNDINGS WHEN AREA IS NOT CONTAINED BY DAMP MOPPING OR
HEPA VACUUMING SURFACES AT LEAST DAILY.
LEVEL III:
ALL CONTROL MEASURES IN LEVELS I AND II AND THE FOLLOWING:
1. ENSURE AVAILABILITY OF EQUIPMENT FOR CLEANING HANDS.
2. CONSTRUCT AND COMPLETE CRITICAL BARRIERS MEETING NFPA 241 REQUIREMENTS.
BARRIERS MUST EXTEND TO THE CEILING OR IF CEILING TILE IS REMOVED, TO THE DECK
ABOVE.
3. ALL (PLASTIC OR HARD) BARRIER CONSTRUCTION ACTIVITIES MUST BE COMPLETED IN A
MANNER THAT PREVENTS DUST RELEASE. PLASTIC BARRIERS MUST BE EFFECTIVELY
AFFIXED TO FLOOR AND CEILING (OR FLOOR/ROOF DECK ABOVE) AND SECURE FROM
MOVEMENT OR DAMAGE.
4. SEAL ALL PENETRATIONS IN CONTAINMENT BARRIERS, INCLUDING FLOORS AND CEILING,
USING APPROVED MATERIALS (UL SCHEDULE FIRESTOP IF APPLICABLE FOR BARRIER TYPE).
5. MAINTAIN .01 INCHES /WATER GAUGE NEGATIVE PRESSURIZATION OF THE ENTIRE
WORKSPACE BY USE OF HEPA EXHAUST AIR SYSTEMS DIRECTED OUTDOORS, OR COMPLY
WITH THE ALTERNATIVE METHOD OUTLINED IN APPENDIX A OF THIS DOCUMENT. THESE
CONTROL MEASURES MUST BE MAINTAINED CONTINUOUSLY 24/7 FOR THE DURATION OF THE
PROJECT. HEPA FILTERED EXHAUST IF DISCHARGED DIRECTLY TO THE OUTDOORS MUST BE
AT A DISTANCE OF 25 FEET OR GREATER FROM ENTRANCES, AIR INTAKES AND OPERABLE
WINDOWS. EXHAUSTING DISCHARGED AIR INTO SHARED OR RECIRCULATING HVAC SYSTEMS,
OR OTHER SHARED EXHAUST SYSTEMS (E.G., BATHROOM EXHAUST) IS PROHIBITED.
6. INSTALL A DIFFERENTIAL PRESSURE SENSING DEVICE (E.G., MAGNEHELIC, MANOMETER, OR
DIGITAL MONITORING) ON EXTERIOR OF WORK CONTAINMENT TO CONTINUALLY MONITOR
AND DOCUMENT NEGATIVE PRESSURIZATION. THE “BALL IN THE WALL” OR SIMILAR
APPARATUS ARE NOT ACCEPTABLE.
LEVEL IV:
ALL CONTROL MEASURES IN LEVELS I, II AND III AND THE FOLLOWING:
1. BARRIERS MUST BE HARD BARRIERS UNLESS TEMPORARY TO INSTALL FINAL BARRIER.
2. CONTAINMENT MUST INCLUDE AN ANTEROOM TO ENSURE PRESSURE CONTROL. ANTEROOM
MUST BE LARGE ENOUGH FOR EQUIPMENT STAGING, CART CLEANING, WORKERS’ PPE AND
CLEANING.
3. WORKER CLOTHING AND/OR PPE MUST BE REMOVED OR CLEAN AND FREE OF VISIBLE DUST
BEFORE LEAVING THE WORK AREA ANTEROOM. HEPA VACUUMING OF CLOTHING OR USE OF
COVER SUITS IS ACCEPTABLE.
4. WORKERS MUST WEAR SHOE COVERS OR HAVE A METHOD TO CLEAN SHOES IN ANTEROOM.
SHOE COVERS MUST BE REMOVED PRIOR TO EXITING THE ANTEROOM TO THE OCCUPIED
SPACE (NON-WORK AREA). DAMAGED SHOE COVERS MUST BE CHANGED IMMEDIATELY.
GENERAL ICRA NOTES - LEVEL OF PRECAUTIONS & CONTROL MEASURES
CONTROLS DEFINED BELOW SHALL BE COMPLETED UPON COMPLETION OF THE ACTIVITY AND
INSPECTED PRIOR TO TERMINATING MEASURES DEFINED IN TABLE 5.
LEVELS I -II:
CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
HVAC SYSTEMS:
1. REMOVE ISOLATION OF HVAC SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
2. VERIFY THE HVAC SYSTEMS MEET ORIGINAL AIRFLOW AND AIR EXCHANGE DESIGN
SPECIFICATIONS.
WATER SYSTEMS:
1. UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL
CONTINUE AT LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
LEVELS III - IV:
CONSTRUCTION AREAS MUST BE INSPECTED BY AN INFECTION PREVENTIONIST AND
ENGINEERING REPRESENTATIVE (AND OTHERS AS DETERMINED BY THE FACILITY) FOR FINAL
ACTIVITY/PROJECT CLOSE OUT AND REMOVAL OF INFECTION PREVENTION AND CONTROL
MEASURES.
WORK AREA CLEANING:
1. CLEAN WORK AREAS INCLUDING ALL ENVIRONMENTAL SURFACES, HIGH HORIZONTAL
SURFACES AND FLOORING MATERIALS.
2. CHECK ALL SUPPLY AND RETURN AIR REGISTERS FOR DUST ACCUMULATION ON UPPER
SURFACES AS WELL AS AIR DIFFUSER SURFACES.
REMOVAL OF CRITICAL BARRIERS:
1. CRITICAL BARRIERS MUST REMAIN IN PLACE DURING ALL WORK INVOLVING DRYWALL
REMOVAL, CREATION OF DUST AND ACTIVITIES BEYOND SIMPLE TOUCH-UP WORK. THE
BARRIER MAY NOT BE REMOVED UNTIL A WORK AREA CLEANING HAS BEEN PERFORMED.
ADDITIONAL CLEANING MAY BE NEEDED AFTER REMOVAL OF BARRIER.
2. ALL (PLASTIC OR HARD) BARRIER REMOVAL ACTIVITIES MUST BE COMPLETED IN A MANNER
THAT PREVENTS DUST RELEASE. USE THE FOLLOWING PRECAUTIONS WHEN REMOVING
HARD BARRIERS:
1. CAREFULLY REMOVE SCREWS AND PAINTER TAPE.
2. IF DUST WILL BE GENERATED DURING SCREW REMOVAL, USE HAND-HELD HEPA
VACUUM.
3. DRYWALL CUTTING IS PROHIBITED DURING REMOVAL PROCESS.
4. CLEAN ALL STUD TRACKS WITH HEPA VACUUM BEFORE REMOVING OUTER HARD
BARRIER.
5. USE A PLASTIC BARRIER TO ENCLOSE AREA IF DUST COULD BE GENERATED.
NEGATIVE AIR REQUIREMENTS:
1. THE USE OF NEGATIVE AIR MUST BE DESIGNED TO REMOVE CONTAMINANTS FROM THE
WORK AREA.
2. NEGATIVE AIR DEVICES (FANS, FILTERS, MONITORING AND DOCUMENTATION EQUIPMENT)
MUST REMAIN OPERATIONAL AT ALL TIMES AND IN PLACE FOR A PERIOD AFTER COMPLETION
OF DUST CREATING ACTIVITIES TO REMOVE CONTAMINANTS FROM THE WORK AREA AND
BEFORE REMOVAL OF CRITICAL BARRIERS.
HVAC SYSTEMS:
1. UPON REMOVAL OF CRITICAL BARRIERS, REMOVE ISOLATION OF HVAC SYSTEM IN AREAS
WHERE WORK IS BEING PERFORMED.
2. VERIFY THAT HVAC SYSTEMS ARE CLEAN AND OPERATIONAL.
3. VERIFY AND DOCUMENT THROUGH A TAB THE HVAC SYSTEMS MEETS ORIGINAL AIRFLOW
AND AIR EXCHANGE DESIGN SPECIFICATIONS.
WATER SYSTEMS:
UNTIL THE POTABLE WATER SYSTEM IS ACTIVATED AND IN USE, FLUSHING SHALL CONTINUE AT
LEAST TWICE PER WEEK IN ACCORDANCE WITH VHA DIRECTIVE 1061.
MINIMUM INFECTION PREVENTION AND CONTROL MEASURES REQUIRED
UPON COMPLETION OF THE ACTIVITY
INSPECTION AND/OR FACILITY UPKEEP GENERALLY DEFINED AS FOLLOWS:
MATRIX OF PRECAUTIONS FOR CONSTRUCTION & RENOVATION
CATEGORY A
INCLUDES BUT NOT LIMITED TO:
• WORK CAN BE COMPLETED IN A SINGLE SHIFT, NOT TO EXCEED 10 HOURS.
• PATIENTS AND/OR EMPLOYEES MAY BE IN THE AREA DEPENDING ON THE ACTIVITY.
• WORK THAT DOES NOT CREATE DUST OR DEBRIS.
• REMOVAL OF CEILING TILE OR ACCESS TO MECHANICAL OR ELECTRICAL CHASE FOR VISUAL INSPECTION LIMITED TO 1 TILE
PER 50 SQUARE FEET WITH LIMITED EXPOSURE TIME (NOT TO EXCEED AN HOUR FOR EACH TILE) WITHIN THE SHIFT.
• MINOR INTERIOR UPDATES (E.G., REPLACING FLOOR OR CEILING TILES, CARPENTRY WORK TO INCLUDE HANGING SIGNAGE, AND PAINTING WITHOUT SANDING) THAT DO NOT CREATE DUST OR DEBRIS.
• LIMITED BUILDING SYSTEM MAINTENANCE SUCH AS BASIC PLUMBING ON POTABLE SYSTEMS (E.G., FAUCET REPLACEMENT)
OR BASIC ELECTRICAL WORK SUCH AS REPLACEMENT OF LIGHT BULBS, RECEPTACLES, OR SWITCHES.
GENERAL MAINTENANCE AND REPAIR WORK GENERALLY DEFINED AS FOLLOWS:CATEGORY B
INCLUDES BUT NOT LIMITED TO:
• PROLONGED INSPECTION AND WORK THAT MAY TAKE LONGER THAN A SINGLE SHIFT BUT NOT EXCEEDING A WEEK.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.
• WORK THAT CREATES MINIMAL DUST AND DEBRIS.
• INTERIOR FINISH OR SURFACE REPAIRS, UPDATES, OR MODIFICATIONS SUCH AS REPAIR OF FIREWALLS AND BARRIERS, AND
NEW FLOORING THAT PRODUCES MINIMAL DUST AND DEBRIS. CONTROLLED SANDING ACTIVITIES (E.G., WET OR DRY
SANDING) THAT PRODUCE MINIMAL DUST AND DEBRIS.
• PLUMBING WORK SUCH AS INSTALLATION OR REPLACEMENT OF A SINGLE FIXTURE OR PIPING FOR A SINGLE FIXTURE. ANY
WORK ON SANITARY PLUMBING INCLUDING SNAKING OF DRAINS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF CABLING/WIRING/CONDUIT FOR A SINGLE DEVICE, INSTALLATION OF NEW
DEVICE SUCH AS A LIGHT FIXTURE THAT PRODUCES MINIMAL DUST AND DEBRIS.
• AIR HANDLER AND/OR FAN SHUTDOWN/STARTUP AND HVAC WORK SUCH AS REPLACEMENT OF A SINGLE DIFFUSER, SINGLE
TERMINAL UNIT OR A SINGLE DEVICE THAT PRODUCES MINIMAL DUST AND DEBRIS.
SMALL-SCALE CONSTRUCTION, RENOVATION, OR MAINTENANCE GENERALLY DEFINED AS FOLLOWS:
INCLUDES BUT NOT LIMITED TO:
• WORK REQUIRING LONGER THAN A SINGLE WEEK TO COMPLETE BUT NOT EXCEEDING 6 MONTHS.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.
• DEMOLITION/REMOVAL OF PREEXISTING FLOOR COVERING, CASEWORK, LAY-IN CEILING, OR OTHER ARCHITECTURAL
ELEMENTS.
• DEMOLITION/REMOVAL OF MORE THAN 32 FT2 OF DRYWALL/FRAMING, HARD CEILINGS, AND DOORS/FRAMING AND MINIMAL
INFRASTRUCTURE SUCH AS ELECTRICAL CIRCUITS AND BRANCH PIPING.
• INSTALLATION OF NEW WALLS, CEILINGS AND DOORS INCLUDING FRAMING, DRYWALL/PLASTER AND ASSOCIATED WORK.
• PLUMBING WORK SUCH AS THE INSTALLATION OF NEW SINKS, SHOWERS AND TOILETS AND ASSOCIATED PLUMBING.
• SHUT DOWN OF SECTIONS OF POTABLE WATER SYSTEMS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF CONDUIT AND WIRE FOR LIGHTING, RECEPTACLES AND SWITCHES FOR AN
AREA, THE INSTALLATION OF CONDUIT AND WIRE FOR NEW DEVICES SUCH AS TERMINAL UNITS, FANS ETC.
• MODIFICATION OF EXISTING FIRE ALARM AND SUPPRESSION SYSTEMS.
• MECHANICAL WORK SUCH AS THE INSTALLATION OF DUCTWORK, DIFFUSERS, AND TERMINAL UNITS FOR AN AREA.
LARGE-SCALE CONSTRUCTION, RENOVATION, OR MAINTENANCE GENERALLY DEFINED AS FOLLOWS:
INCLUDES BUT NOT LIMITED TO:
• WORK EXCEEDING 6 MONTHS IN DURATION.
• PATIENTS AND EMPLOYEES ARE NOT TO BE IN THE AREA UNTIL ACTIVITY IS COMPLETED.
• LARGE-SCALE DEMOLITION OF BUILDING COMPONENTS AND INFRASTRUCTURE INCLUDING REMOVAL OF MULTIPLE DOORS, WALLS, FRAMING, CEILINGS, FLOORING, PIPING, ELECTRICAL AND HVAC.
• THE INSTALLATION BUILDING COMPONENTS SUCH AS NEW WALLS, CEILINGS AND DOORS INCLUDING FRAMING, DRYWALL AND
ASSOCIATED PLASTER WORK.
• PLUMBING WORK SUCH AS THE INSTALLATION OF:
• NEW MEDICAL GAS SYSTEMS,
• STEAM/HEATING HOT WATER, CONDENSATE SYSTEMS,
• MULTIPLE SINKS, SHOWERS AND TOILETS INCLUDING ASSOCIATED PLUMBING.
• SHUTDOWN OF POTABLE WATER, STEAM/HEATING HOT WATER, CONDENSATE, AND MEDICAL GAS SYSTEMS.
• ELECTRICAL WORK SUCH AS INSTALLATION OF ELECTRICAL FEEDERS, DISTRIBUTION PANELS, CONDUIT AND WIRE FOR
LIGHTING, RECEPTACLES AND SWITCHES FOR AN AREA, THE INSTALLATION OF CONDUIT AND WIRE FOR NEW DEVICES SUCH
AS TERMINAL UNITS, FANS ETC.
• INSTALLATION OF FIRE ALARM AND SUPPRESSION SYSTEMS.
• ELECTRICAL SHUTDOWN OF MULTIPLE PANELS.
• MECHANICAL WORK SUCH AS THE INSTALLATION OF AIR HANDLING EQUIPMENT, ASSOCIATED DUCTWORK, DIFFUSERS, HEAT
EXCHANGERS, TERMINAL UNITS AND CONTROLS.
CATEGORY C
CATEGORY D
LOW RISK
PATIENT RISK GROUPS
MEDIUM RISK HIGH RISK HIGHEST RISK
• PUBLIC HALLWAYS AND
GATHERING AREAS NOT
IN CLINICAL AREAS
• OFFICE AREAS NOT IN
CLINICAL AREAS
• BREAKROOMS NOT IN
CLINICAL AREAS
• BATHROOMS OR LOCKER
ROOMS NOT IN CLINICAL
AREAS
• MECHANICAL/ELECTRICAL
ROOMS NOT IN CLINICAL
AREAS
• WAITING AREAS
• CLINICAL ENGINEERING
(BIOMEDICAL)
• MATERIALS MANAGEMENT
• STERILE PROCESSING
DEPARTMENT – DIRTY
SIDE
• KITCHEN, CAFETERIA,
GIFT SHOP, COFFEE
SHOP, AND FOOD KIOSKS
• PATIENT CARE ROOMS AND
AREAS; INCLUDING SPINAL
CORD INJURY UNITS
• ALL ACUTE CARE UNITS,
INCLUDING MENTAL HEALTH
• ALL OUTPATIENT UNITS AND
CLINICS
• EMERGENCY DEPARTMENT
• COMMUNITY LIVING
CENTERS, DOMICILIARIES
AND TRANSITIONAL
RESIDENCES
• EMPLOYEE HEALTH
• PHARMACY – GENERAL
WORK ZONE
• MEDICATION ROOMS AND
CLEAN UTILITY ROOMS
• IMAGING SUITES –
DIAGNOSTIC IMAGING
• LABORATORY
• ALL TRANSPLANT UNITS
• ALL INTENSIVE CARE UNITS
• ALL ONCOLOGY UNITS AND
CHEMOTHERAPY/INFUSION
CENTERS
• OR THEATERS AND
RESTRICTED AREAS
• HEMODIALYSIS UNITS
• PROCEDURAL ROOMS*
• PHARMACY COMPOUNDING
AREA
• STERILE PROCESSING
DEPARTMENT – CLEAN SIDE
• TRANSFUSION SERVICES
• IMAGING SUITES –
INTERVENTIONAL IMAGING
• DEDICATED ISOLATION
WARDS/UNITS FOR
INFECTIOUS DISEASES
RISK RELATED GROUP TYPE A TYPE B TYPE C TYPE D
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
I
I
I
II
II
II
II
III
II
III
IV
IV
III
IV
IV
IV
CONSTRUCTION PROJECT TYPE
NOTE: AN INFECTION PREVENTION AND CONTROL PERMIT IS REQUIRED FOR LEVEL III AND LEVEL IV. CONSULT WITH INFECTION
PREVENTION AND CONTROL FOR LEVEL I AND LEVEL II.
NON-PATIENT CARE
AREAS SUCH AS:
PATIENT CARE SUPPORT
AREAS SUCH AS:
PATIENT CARE
AREAS SUCH AS:
PROCEDURAL, INVASIVE,
STERILE SUPPORT AND HIGHLY
COMPROMISED PATIENT CARE
AREAS SUCH AS:
OUTSIDE OF BUILDING
WEEKLY CHANGED
HEPA FILTER
HEPA NEGATIVE
AIR UNIT
WEEKLY CHANGED
(OR MORE AS
NEEDED) PRE FILTER
FIRE RATED PLYWOOD
FL
EX
D
UC
T
SUPPLY DUCTS EITHER KEEP
RUNNING OR COVER WHEN
RUNNING TO KEEP DUST OUT.
TAPE ALL SERVICES
TO PROTECT AGAINST
CONTAMINATION A
O
V
FIRE EXTINGUISHER ON PORTABLE
FLOOR BRACKET (ILSM MAY REQUIRE
MORE THAN ONE)
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
6 MIL PLASTIC
TEMPORARY DIGITAL MANOMETER FOR NEGATIVE
PRESSURE MONITORING OUTSIDE OF ICRA BARRIER
FOR VA'S INSPECTION. INDICATOR SHALL BE AT -0.01
OR GREATER (VERIFY DAILY). IF NOT, VERIFY ALL
OPENINGS, SUCH AS DOOR CLOSED, AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER.
PROVIDE STICKY MAT, DRY MAT, WET MAT
(CHANGED END OF SHIFT OR MORE IF
NECESSARYTO MAINTAIN CLEANLINESS)
PROVIDE WIPES AND SPRAY FOR WET MAT
POST ICRA ILSM FIRE
INSPECTION SHEETS
CONTAINER VISIBLE TO
PUBLIC
COVER ALL RETURNS AT THE
GRATE/DIFFUSERS
OPTIONAL EXHAUST DUCTS
(COVER THE GRATES AND THE DIFFUSERS)E
DOOR OPENING
VENT TO OUTSIDE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .