20201211_ADDENDUM_1.pdf
PDF 5 MB Posted
- Attached to
- Y1DA--Project No. 580-17-121 Upgrade/Renovate/Relocate Sterile Processing Services (SPS)
- Solicitation number
- 36C25621R0014
About this file
This is a solicitation for upgrade, renovation, and relocation of Sterile Processing Services (SPS) at the Michael E. DeBakey Veterans Affairs Medical Center in Houston, Texas. The project will renovate approximately 16,500 square feet of SPS, logistics, and laundry areas in the basement of Building 100. All construction work must adhere to the latest JCAHO, NFPA, and life safety requirements and be performed without affecting the medical center's operations. Interested parties should respond with pricing and plans to upgrade existing spaces for SPS, logistics, and laundry functions while meeting regulatory standards, on or before the response date. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16 is the contracting agency.
View the file
Other files
Show all 32
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MEDICAL CENTER ASSOC. DIRECTOR
CHIEF OF STAFF
ASSOC. DIRECTOR OF PATIENT CARE
CHIEF FES
PROJECT SECTION SUPV.
PROJECT MANAGER
GENERAL UTILITIES FOREMAN
PATIENT CARE FOREMAN
MEDICAL CENTER DIRECTOR GENERAL PROPERTIES FOREMAN
FIRE CHIEF
SUPERVISOR BIO-MED SERVICE
CHIEF LOGISTICS
PATIENTSAFETY MANAGER
SAFETY OFFICE
CIO OFFICER
INFECTION PREVENTION
CONTRACTING OFFICER
VA APPROVAL
MICHAEL E. DEBAKEY
VA MEDICAL CENTER
MICHAEL E. DEBAKEY
VA MEDICAL CENTER
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#
PROJECT SITE MAP PROJECT LOCATION MAP
PROJECT IMAGE
/1 /2
:3
:4
P M
G-001
COVER
1 7
ANGEL DIAZ - COR
JJG
UPGRADE/RENOVATE/RELOCATE
SPS
Michael E. DeBakey VA Medical Center 2002 Holcombe Blvd.
Houston, TX 77030 December 11, 2020
BID DOCUMENTS
580-17-12118-317
UPGRADE/RENOVATE/RELOCATE SPS
Michael E. DeBakey VA Medical Center 2002 Holcombe Blvd.
Houston, TX 77030
VA PROJECT #: 580-17-121 APOGEE PROJECT #: 18-317
TM
MICHAEL E. DEBAKEY
VA MEDICAL CENTER
DRAWING LIST
No. Description Dwg of Dwg
PW104 UNDERSLAB DRAIN, WASTE, AND VENT PLAN - PHASE 4 7 21
PW105 UNDERSLAB DRAIN, WASTE, AND VENT PLAN - PHASE 5 8 21
PW106 UNDERSLAB DRAIN, WASTE, AND VENT PLAN - PHASE 6 9 21
PP101 BASEMENT FLOOR DOMESTIC WATER PLAN - PHASE 1 10 21
PP102 BASEMENT FLOOR DOMESTIC WATER PLAN - PHASE 2 11 21
PP103 BASEMENT FLOOR DOMESTIC WATER PLAN - PHASE 3 12 21
PP104 BASEMENT FLOOR DOMESTIC WATER PLAN - PHASE 4 13 21
PP105 BASEMENT FLOOR DOMESTIC WATER PLAN - PHASE 5 14 21
PP106 BASEMENT FLOOR DOMESTIC WATER PLAN - PHASE 6 15 21
PG101 BASEMENT FLOOR MEDICAL GAS PLAN - PHASE 1 16 21
PG102 BASEMENT FLOOR MEDICAL GAS PLAN - PHASE 4 17 21
PG103 BASEMENT FLOOR MEDICAL GAS PLAN - PHASE 6 18 21
P-501 PLUMBING DETAILS 19 21
P-901 SANITARY PIPE RISERS 20 21
P-902 DOMESTIC PIPE RISERS 21 21
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 19
MD101 BASEMENT FLOOR MECHANICAL DEMOLITION PLAN - PHASE 1 2 19
MD103 BASEMENT FLOOR MECHANICAL DEMOLITION PLAN - PHASE 3 3 19
MD104 BASEMENT FLOOR MECHANICAL DEMOLITION PLAN - PHASE 4 4 19
MD105 BASEMENT FLOOR MECHANICAL DEMOLITION PLAN - PHASE 5 5 19
MH101 BASEMENT FLOOR HVAC PLAN - PHASE 1 6 19
MH102 BASEMENT FLOOR HVAC PLAN - PHASE 2 7 19
MH103 BASEMENT FLOOR HVAC PLAN - PHASE 3 8 19
MH104 BASEMENT FLOOR HVAC PLAN - PHASE 4 9 19
MH105 BASEMENT FLOOR HVAC PLAN - PHASE 5 10 19
MH106 BASEMENT FLOOR HVAC PLAN - PHASE 6 11 19
MP101 BASEMENT FLOOR MECHANICAL PIPING PLAN - PHASE 1 12 19
MP102 BASEMENT FLOOR MECHANICAL PIPING PLAN - PHASE 2 13 19
MP103 BASEMENT FLOOR MECHANICAL PIPING PLAN - PHASE 3 14 19
MP104 BASEMENT FLOOR MECHANICAL PIPING PLAN - PHASE 4 15 19
MP105 BASEMENT FLOOR MECHANICAL PIPING PLAN - PHASE 5 16 19
M-501 MECHANICAL DETAILS 17 19
M-502 MECHANICAL CONTROLS AND DETAILS 18 19
M-601 MECHANICAL SCHEDULES 19 19
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 27
ED101 BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN - PHASE 1 2 27
ED102 BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN - PHASE 2 3 27
ED103 BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN - PHASE 3 4 27
ED104 BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN - PHASE 4 5 27
ED105 BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN - PHASE 5 6 27
ED106 BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN - PHASE 6 7 27
EP101 BASEMENT FLOOR ELECTRICAL POWER PLAN - PHASE 1 8 27
EP102 BASEMENT FLOOR ELECTRICAL POWER PLAN - PHASE 2 9 27
EP103 BASEMENT FLOOR ELECTRICAL POWER PLAN - PHASE 3 10 27
EP104 BASEMENT FLOOR ELECTRICAL POWER PLAN - PHASE 4 11 27
EP105 BASEMENT FLOOR ELECTRICAL POWER PLAN - PHASE 5 12 27
EP106 BASEMENT FLOOR ELECTRICAL POWER PLAN - PHASE 6 13 27
EP107 ABOVE-CEILING PLATFORM POWER PLAN 14 27
EL101 BASEMENT FLOOR ELECTRICAL LIGHTING PLAN - PHASE 1 15 27
EL102 BASEMENT FLOOR ELECTRICAL LIGHTING PLAN - PHASE 2 16 27
EL103 BASEMENT FLOOR ELECTRICAL LIGHTING PLAN - PHASE 3 17 27
EL104 BASEMENT FLOOR ELECTRICAL LIGHTING PLAN - PHASE 4 18 27
EL105 BASEMENT FLOOR ELECTRICAL LIGHTING PLAN - PHASE 5 19 27
EL106 BASEMENT FLOOR ELECTRICAL LIGHTING PLAN - PHASE 6 20 27
EL107 ABOVE-CEILING PLATFORM LIGHTING PLAN 21 27
EM101 MECHANICAL EQUIPMENT CONNECTION PLAN 22 27
E-401 ELECTRICAL ENLARGEMENTS-1 23 27
E-402 ELECTRICAL ENLARGEMENTS-2 24 27
E-403 ELECTRICAL ENLARGEMENTS-3 25 27
E-501 ELECTRICAL DETAILS 26 27
E-601 ELECTRICAL SCHEDULES AND ONE-LINE DIAGRAM 27 27
TECHNOLOGY
T-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 9
T-100 BASEMENT OVERALL TELECOMMUNICATIONS PLAN 2 9
T-101 BASEMENT FLOOR TECHNOLOGY PLAN - PHASE 1 3 9
T-102 BASEMENT FLOOR TECHNOLOGY PLAN - PHASE 2 4 9
T-103 BASEMENT FLOOR TECHNOLOGY PLAN - PHASE 3 5 9
T-104 BASEMENT FLOOR TECHNOLOGY PLAN - PHASE 4 6 9
T-105 BASEMENT FLOOR TECHNOLOGY PLAN - PHASE 5 7 9
T-106 BASEMENT FLOOR TECHNOLOGY PLAN - PHASE 6 8 9
T-501 TECHNOLOGY DETAILS 9 9
FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 5
FA101 BASEMENT FLOOR FIRE ALARM PLAN - PHASE 1 2 5
FA102 BASEMENT FLOOR FIRE ALARM PLAN - PHASE 2 3 5
FA103 BASEMENT FLOOR FIRE ALARM PLAN - PHASE 3 4 5
FA105 BASEMENT FLOOR FIRE ALARM PLAN - PHASE 5 5 5
DRAWING LIST
No. Description Dwg of Dwg
GENERAL
G-001 COVER 1 7
G-101 GENERAL INFORMATION 2 7
G-102 PRE CONSTRUCTION RISK ASSESSMENT (PCRA) 3 7
G-103 INFECTION CONTROL RISK ASSESSMENT 4 7
GL101 OVERALL LIFE SAFETY PLAN 5 7
GL102 BASEMENT LIFE SAFETY PLAN 6 7
GC100 PHASING PLANS 7 7
STRUCTURAL
S-001 GENERAL NOTES 1 7
S-101 CATWALK FRAMING PLAN 2 7
S-102 CATWALK SUPPORT FRAMING PLAN 3 7
S-201 CATWALK SUPPORT FRAMING SECTION 4 7
S-202 CATWALK SUPPORT FRAMING SECTION 5 7
S-301 CATWALK SUPPORT FRAMING DETAIL 6 7
S-302 STRUCTURAL DETAIL 7 7
ARCHITECTURAL
AG001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 46
AD101 BASEMENT FLOOR DEMOLITION PLAN - PHASE 1 2 46
AD102 BASEMENT FLOOR DEMOLITION PLAN - PHASE 2 3 46
AD103 BASEMENT FLOOR DEMOLITION PLAN - PHASE 3 4 46
AD104 BASEMENT FLOOR DEMOLITION PLAN - PHASE 4 5 46
AD105 BASEMENT FLOOR DEMOLITION PLAN - PHASE 5 6 46
AD106 BASEMENT FLOOR DEMOLITION PLAN - PHASE 6 7 46
AD121 BASEMENT REFLECTED CEILING DEMOLITION PLAN - PHASE 1 8 46
AD122 BASEMENT REFLECTED CEILING DEMOLITION PLAN - PHASE 2 9 46
AD123 BASEMENT REFLECTED CEILING DEMOLITION PLAN - PHASE 3 10 46
AD124 BASEMENT REFLECTED CEILING DEMOLITION PLAN - PHASE 4 11 46
AD125 BASEMENT REFLECTED CEILING DEMOLITION PLAN - PHASE 5 12 46
AD126 BASEMENT REFLECTED CEILING DEMOLITION PLAN - PHASE 6 13 46
AE101 BASEMENT FLOOR PLAN - NEW CONDITION - PHASE 1 14 46
AE102 BASEMENT FLOOR PLAN - NEW CONDITION - PHASE 2 15 46
AE103 BASEMENT FLOOR PLAN - NEW CONDITION - PHASE 3 16 46
AE104 BASEMENT FLOOR PLAN - NEW CONDITION - PHASE 4 17 46
AE105 BASEMENT FLOOR PLAN - NEW CONDITION - PHASE 5 18 46
AE106 BASEMENT FLOOR PLAN - NEW CONDITION - PHASE 6 19 46
AE121 BASEMENT REFLECTED CEILING PLAN - PHASE 1 20 46
AE122 BASEMENT REFLECTED CEILING PLAN - PHASE 2 21 46
AE123 BASEMENT REFLECTED CEILING PLAN - PHASE 3 22 46
AE124 BASEMENT REFLECTED CEILING PLAN - PHASE 4 23 46
AE125 BASEMENT REFLECTED CEILING PLAN - PHASE 5 24 46
AE126 BASEMENT REFLECTED CEILING PLAN - PHASE 6 25 46
AE127 CATWALK PLAN 26 46
AE301 BUILDING SECTION 27 46
AE401 ENLARGED PLANS 28 46
AE402 ENLARGED PLANS 29 46
AE403 ENLARGED PLANS 30 46
AE410 INTERIOR ELEVATIONS 31 46
AE411 INTERIOR ELEVATIONS 32 46
AE412 INTERIOR ELEVATIONS 33 46
AE501 WALL SECTIONS AND DETAILS 34 46
AE601 DOOR SCHEDULE, ELEVATIONS AND DETAILS 35 46
AE800 BASEMENT FINISH SCHEDULE 36 46
AE801 BASEMENT FINISH PLAN - PHASE 1 37 46
AE802 BASEMENT FINISH PLAN - PHASE 2 38 46
AE803 BASEMENT FINISH PLAN - PHASE 3 39 46
AE804 BASEMENT FINISH PLAN - PHASE 4 40 46
AE805 BASEMENT FINISH PLAN - PHASE 5 41 46
AE806 BASEMENT FINISH PLAN - PHASE 6 42 46
AE807 SIGNAGE 43 46
AE808 SIGNAGE 44 46
QH101 BASEMENT EQUIPMENT PLAN 45 46
QH102 EQUIPMENT SCHEDULE 46 46
FIRE PROTECTION
FX001 FIRE PROTECTION GENERAL INFORMATION 1 6
FX101 BASEMENT FLOOR FIRE PROTECTION PLAN - PHASE 1 2 6
FX102 BASEMENT FLOOR FIRE PROTECTION PLAN - PHASE 2 3 6
FX103 BASEMENT FLOOR FIRE PROTECTION PLAN - PHASE 3 4 6
FX104 BASEMENT FLOOR FIRE PROTECTION PLAN - PHASE 4 5 6
FX105 BASEMENT FLOOR FIRE PROTECTION PLAN - PHASE 5 6 6
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 21
PD101 BASEMENT FLOOR PLUMBING DEMOLITION PLAN - PHASE 4 2 21
PD102 BASEMENT FLOOR PLUMBING DEMOLITION PLAN - PHASE 5 3 21
PW101 UNDERSLAB DRAIN, WASTE, AND VENT PLAN - PHASE 1 4 21
PW102 UNDERSLAB DRAIN, WASTE, AND VENT PLAN - PHASE 2 5 21
PW103 UNDERSLAB DRAIN, WASTE, AND VENT PLAN - PHASE 3 6 21
1 ADDENDUM # 1 12/11/2020
DocuSign Envelope ID: CE664B7C-FEF2-44CE-B98B-2ECE54393E63
12/14/2020
Engineers Architects
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1 /2
:3
:4
P M
AE807
SIGNAGE SCHEDULE
43 46
ANGEL DIAZ - COR
HM
UPGRADE/RENOVATE/RELOCATE
SPS
Michael E. DeBakey VA Medical Center 2002 Holcombe Blvd.
Houston, TX 77030 December 11, 2020
BID DOCUMENTS
580-17-12118-317
CK
Scale: No Scale
ROOM SIGN WITH INDICATOR
Scale: No Scale
SECONDARY ROOM IDENTIFICATION
A. ALL SIGNAGE SHALL BE CONTRACTOR FURNISHED
AND INSTALLED.
B. PERMANENT ROOM SIGNAGE MUST INCLUDE
RAISED LETTERS AND BRAILLE. SIGNAGE SHALL
BE LOCATED AT LATCH SIDE OF DOOR AND MUST
BEMOUNTED IN ACCORDANCE WITH ALL CURRENT
ADA STANDARDS.
C. IF WALL SPACE IS NOT AVAILABLE FOR SIGNAGE
ON LATCH SIDE OF DOOR PER MOUNTING
STANDARDS, SIGNS SHALL BE INSTALLED PER
CURRENT ADA STANDARDS ON NEAREST
ADJACENT WALL.
D. CONTRACTOR TO PROVIDE A UNIT COST FOR
ENTIRE SIGNAGE PACKAGE.
Scale: No Scale
PRIMARY ROOM IDENTIFICATION
Scale: No Scale
PROHIBITED, INSTRUCTIONAL AND CONTROL
Scale: No Scale
RESTROOM INDENTIFICATION
1 ADDENDUM # 1 12/11/2020
Scale: 3" = 1'-0"
PRIMARY ROOM IDENTIFICATION WITH INSERT
Scale: 3" = 1'-0"
PERPENDICULAR (FLAG) MOUND
Scale: 3" = 1'-0"
PICTOGRAM AND SYMBOL
ZBF02
UP
TD
TD
UP
C3
C3 F1
B2 B
UP
1017 111213141516
G
H
J
K
BB-285
SUPPLY
PROCESSING AND
DISTRIBUTION
BB-220C
HAC
BB-230D
FEMALE LOCKER
BB-230E
TLT
BB-230
LOCKER
BB-242B
FEMALE TOILET
BB-240
VEST
BB-240A
MEN TOILET
BB-240B
MEN LOCKER
BB-242A
FEMALE LOCKER
BB-242
VEST
BB-262
ANTEROOM
BB-263
LOCKER
BB-264
TLT
BB-265
LOCKER
BB-266
TLT
BA-201
UNIFORM STORAGE
BC-350A
REP
CBA-200
PASSENGER
ELEVATOR LOBBY
BC-350C
MECHANIAL ROOM
BC-350B
HAC
BC-352A
OFFICE
BC-352B
OFFICE, SHARED
BC-352
SPS OFFICE
BB-248A
LOGISTIC OFFICE
BB-248B
RECEIVING
BB-260A
EQ STORAGE &
TEST
BB-230B
MT
BB-230A
MEN LOCKER
BB-290
ATS CONT
BB-350F
MACH ROOM
BB-220B
EQ WASH
BB-230C
ELEVATOR MACH.
BB-261B
HAC
BB-220
DECONTAMINATION
BB-210
PREP/ASSEMBLY
BB-261
STERILE STORAGE
BA-203
PATIENT CLOTHING
RM & LUGGAGE
STORAGE
BB-231A
ANTE ROOM
BB-248C
ANTE ROOM
BA-203A
PATIENT STORAGE
BC-352C
MULTI-PURPOSE
BB-261A
COOLING ROOM
BB-260
VESTIBULE
BB-260B
DISTRIBUTION
OFFICE
BA-201A
PASSAGE
BB-210A
STERILIZER ROOM
1 1
SIGNAGE TYPE (NUMBER INDICATES
DETAIL ON AE808)
X
Engineers Architects
N
AREA OF WORK
KEY PLAN
Revisions: Date
Drawing Title
Approved: Project Director
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1 /2
:3
:4
P M
AE808
BASEMENT SIGNAGE PLAN
44 46
ANGEL DIAZ - COR
CK,HM
UPGRADE/RENOVATE/RELOCATE
SPS
Michael E. DeBakey VA Medical Center 2002 Holcombe Blvd.
Houston, TX 77030 December 11, 2020
BID DOCUMENTS
580-17-12118-317
CK
Scale: 1/8" = 1'-0"
BASEMENT SIGNAGE PLAN 0 4 8 16
NORTH
PLAN
SIGNAGE LEGEND
A. ALL SIGNAGE SHALL BE CONTRACTOR FURNISHED
AND INSTALLED.
B. PERMANENT ROOM SIGNAGE MUST INCLUDE
RAISED LETTERS AND BRAILLE. SIGNAGE SHALL
BE LOCATED AT LATCH SIDE OF DOOR AND MUST
BEMOUNTED IN ACCORDANCE WITH ALL CURRENT
ADA STANDARDS.
C. IF WALL SPACE IS NOT AVAILABLE FOR SIGNAGE
ON LATCH SIDE OF DOOR PER MOUNTING
STANDARDS, SIGNS SHALL BE INSTALLED PER
CURRENT ADA STANDARDS ON NEAREST
ADJACENT WALL.
D. CONTRACTOR TO PROVIDE A UNIT COST FOR
ENTIRE SIGNAGE PACKAGE.
E. SIGNAGE TYPES REFER TO DETAIL NUMBERS ON
SHEETS AE807.
1 ADDENDUM # 1 12/11/2020
| Sheets |
| G-001 - COVER |
| AE807 - SIGNAGE SCHEDULE |
| AE808 - BASEMENT SIGNAGE PLAN |
| 2020-12-14T05:52:11-0800 | |
| Digitally verifiable PDF exported from www.docusign.com |