About this file

This is a solicitation for upgrade, renovation, and relocation of Sterile Processing Services (SPS) at the Michael E. DeBakey Veterans Affairs Medical Center in Houston, Texas. The project will renovate approximately 16,500 square feet of SPS, logistics, and laundry areas in the basement of Building 100. All construction work must adhere to the latest JCAHO, NFPA, and life safety requirements and be performed without affecting the medical center's operations. Interested parties should respond with pricing and plans to upgrade existing spaces for SPS, logistics, and laundry functions while meeting regulatory standards, on or before the response date. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16 is the contracting agency.

View the file

Other files

File Type Posted
087100 Door Hardware Revised.pdf PDF
36C25621R0014 0005.docx DOCX document
580-17-12_Renovate SPS_Project Drawings_1-15-21.pdf PDF
36C25621R0014 0004.docx DOCX document
36C25621R0014 0003.docx DOCX document
QH102.pdf PDF
36C25621R0014 0002.pdf PDF
Area B-F-compressed.pdf PDF
S3185_Steris_Vision1327-CartWash.pdf PDF
S9610_Steris_PrepTable.pdf PDF
S5505A_STERRAD-100NX.pdf PDF
S0235_Steris_Amsco400.pdf PDF
Area B-G-compressed.pdf PDF
Slab Infill Detail.pdf PDF
S0940_Steris_Amsco7052HPWasher.pdf PDF
105113 MetalLockers.docx DOCX document
Clarifications 12-15-2020.pdf PDF
S9815B_Steris_Amsco600.pdf PDF
Equipment Drawing - Vision 1327 - STEAM PIT.pdf PDF
S5505B_STERRAD-100S.pdf PDF
Site Visit Attendees.docx DOCX document
DE-1R.pdf PDF
S5505C_STERRAD-NX.pdf PDF
36C25621R0014 0001.pdf PDF
580-17-121_Renovate SPS_Combined Specifications.pdf PDF
DOL Wate Determinations TX20200253 dated 9-11-20.pdf PDF
36C25621R0014.pdf PDF
580-17-121_Renovate SPS_Specifications.pdf PDF
Site Visit Instructions _ Renovate SPS_1.docx DOCX document
580-17-121 _ Renovate SPS _ Statement of Work.docx DOCX document
SF24 BID BOND.pdf PDF
580-17-121 _ Renovate SPS _ Drawings.pdf PDF
Show all 32

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MEDICAL CENTER ASSOC. DIRECTOR

CHIEF OF STAFF

ASSOC. DIRECTOR OF PATIENT CARE

CHIEF FES

PROJECT SECTION SUPV.

PROJECT MANAGER

GENERAL UTILITIES FOREMAN

PATIENT CARE FOREMAN

MEDICAL CENTER DIRECTOR GENERAL PROPERTIES FOREMAN

FIRE CHIEF

SUPERVISOR BIO-MED SERVICE

CHIEF LOGISTICS

PATIENTSAFETY MANAGER

SAFETY OFFICE

CIO OFFICER

INFECTION PREVENTION

CONTRACTING OFFICER

VA APPROVAL

MICHAEL E. DEBAKEY

VA MEDICAL CENTER

MICHAEL E. DEBAKEY

VA MEDICAL CENTER

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#

PROJECT SITE MAP PROJECT LOCATION MAP

PROJECT IMAGE

/1 /2

:3

:4

P M

G-001

COVER

1 7

ANGEL DIAZ - COR

JJG

UPGRADE/RENOVATE/RELOCATE

SPS

Michael E. DeBakey VA Medical Center 2002 Holcombe Blvd.

Houston, TX 77030 December 11, 2020

BID DOCUMENTS

580-17-12118-317

UPGRADE/RENOVATE/RELOCATE SPS

Michael E. DeBakey VA Medical Center 2002 Holcombe Blvd.

Houston, TX 77030

VA PROJECT #: 580-17-121 APOGEE PROJECT #: 18-317

TM

MICHAEL E. DEBAKEY

VA MEDICAL CENTER

DRAWING LIST

No. Description Dwg of Dwg

PW104 UNDERSLAB DRAIN, WASTE, AND VENT PLAN - PHASE 4 7 21

PW105 UNDERSLAB DRAIN, WASTE, AND VENT PLAN - PHASE 5 8 21

PW106 UNDERSLAB DRAIN, WASTE, AND VENT PLAN - PHASE 6 9 21

PP101 BASEMENT FLOOR DOMESTIC WATER PLAN - PHASE 1 10 21

PP102 BASEMENT FLOOR DOMESTIC WATER PLAN - PHASE 2 11 21

PP103 BASEMENT FLOOR DOMESTIC WATER PLAN - PHASE 3 12 21

PP104 BASEMENT FLOOR DOMESTIC WATER PLAN - PHASE 4 13 21

PP105 BASEMENT FLOOR DOMESTIC WATER PLAN - PHASE 5 14 21

PP106 BASEMENT FLOOR DOMESTIC WATER PLAN - PHASE 6 15 21

PG101 BASEMENT FLOOR MEDICAL GAS PLAN - PHASE 1 16 21

PG102 BASEMENT FLOOR MEDICAL GAS PLAN - PHASE 4 17 21

PG103 BASEMENT FLOOR MEDICAL GAS PLAN - PHASE 6 18 21

P-501 PLUMBING DETAILS 19 21

P-901 SANITARY PIPE RISERS 20 21

P-902 DOMESTIC PIPE RISERS 21 21

MECHANICAL

M-001 MECHANICAL GENERAL INFORMATION 1 19

MD101 BASEMENT FLOOR MECHANICAL DEMOLITION PLAN - PHASE 1 2 19

MD103 BASEMENT FLOOR MECHANICAL DEMOLITION PLAN - PHASE 3 3 19

MD104 BASEMENT FLOOR MECHANICAL DEMOLITION PLAN - PHASE 4 4 19

MD105 BASEMENT FLOOR MECHANICAL DEMOLITION PLAN - PHASE 5 5 19

MH101 BASEMENT FLOOR HVAC PLAN - PHASE 1 6 19

MH102 BASEMENT FLOOR HVAC PLAN - PHASE 2 7 19

MH103 BASEMENT FLOOR HVAC PLAN - PHASE 3 8 19

MH104 BASEMENT FLOOR HVAC PLAN - PHASE 4 9 19

MH105 BASEMENT FLOOR HVAC PLAN - PHASE 5 10 19

MH106 BASEMENT FLOOR HVAC PLAN - PHASE 6 11 19

MP101 BASEMENT FLOOR MECHANICAL PIPING PLAN - PHASE 1 12 19

MP102 BASEMENT FLOOR MECHANICAL PIPING PLAN - PHASE 2 13 19

MP103 BASEMENT FLOOR MECHANICAL PIPING PLAN - PHASE 3 14 19

MP104 BASEMENT FLOOR MECHANICAL PIPING PLAN - PHASE 4 15 19

MP105 BASEMENT FLOOR MECHANICAL PIPING PLAN - PHASE 5 16 19

M-501 MECHANICAL DETAILS 17 19

M-502 MECHANICAL CONTROLS AND DETAILS 18 19

M-601 MECHANICAL SCHEDULES 19 19

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 27

ED101 BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN - PHASE 1 2 27

ED102 BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN - PHASE 2 3 27

ED103 BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN - PHASE 3 4 27

ED104 BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN - PHASE 4 5 27

ED105 BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN - PHASE 5 6 27

ED106 BASEMENT FLOOR ELECTRICAL DEMOLITION PLAN - PHASE 6 7 27

EP101 BASEMENT FLOOR ELECTRICAL POWER PLAN - PHASE 1 8 27

EP102 BASEMENT FLOOR ELECTRICAL POWER PLAN - PHASE 2 9 27

EP103 BASEMENT FLOOR ELECTRICAL POWER PLAN - PHASE 3 10 27

EP104 BASEMENT FLOOR ELECTRICAL POWER PLAN - PHASE 4 11 27

EP105 BASEMENT FLOOR ELECTRICAL POWER PLAN - PHASE 5 12 27

EP106 BASEMENT FLOOR ELECTRICAL POWER PLAN - PHASE 6 13 27

EP107 ABOVE-CEILING PLATFORM POWER PLAN 14 27

EL101 BASEMENT FLOOR ELECTRICAL LIGHTING PLAN - PHASE 1 15 27

EL102 BASEMENT FLOOR ELECTRICAL LIGHTING PLAN - PHASE 2 16 27

EL103 BASEMENT FLOOR ELECTRICAL LIGHTING PLAN - PHASE 3 17 27

EL104 BASEMENT FLOOR ELECTRICAL LIGHTING PLAN - PHASE 4 18 27

EL105 BASEMENT FLOOR ELECTRICAL LIGHTING PLAN - PHASE 5 19 27

EL106 BASEMENT FLOOR ELECTRICAL LIGHTING PLAN - PHASE 6 20 27

EL107 ABOVE-CEILING PLATFORM LIGHTING PLAN 21 27

EM101 MECHANICAL EQUIPMENT CONNECTION PLAN 22 27

E-401 ELECTRICAL ENLARGEMENTS-1 23 27

E-402 ELECTRICAL ENLARGEMENTS-2 24 27

E-403 ELECTRICAL ENLARGEMENTS-3 25 27

E-501 ELECTRICAL DETAILS 26 27

E-601 ELECTRICAL SCHEDULES AND ONE-LINE DIAGRAM 27 27

TECHNOLOGY

T-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 9

T-100 BASEMENT OVERALL TELECOMMUNICATIONS PLAN 2 9

T-101 BASEMENT FLOOR TECHNOLOGY PLAN - PHASE 1 3 9

T-102 BASEMENT FLOOR TECHNOLOGY PLAN - PHASE 2 4 9

T-103 BASEMENT FLOOR TECHNOLOGY PLAN - PHASE 3 5 9

T-104 BASEMENT FLOOR TECHNOLOGY PLAN - PHASE 4 6 9

T-105 BASEMENT FLOOR TECHNOLOGY PLAN - PHASE 5 7 9

T-106 BASEMENT FLOOR TECHNOLOGY PLAN - PHASE 6 8 9

T-501 TECHNOLOGY DETAILS 9 9

FIRE ALARM

FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 5

FA101 BASEMENT FLOOR FIRE ALARM PLAN - PHASE 1 2 5

FA102 BASEMENT FLOOR FIRE ALARM PLAN - PHASE 2 3 5

FA103 BASEMENT FLOOR FIRE ALARM PLAN - PHASE 3 4 5

FA105 BASEMENT FLOOR FIRE ALARM PLAN - PHASE 5 5 5

DRAWING LIST

No. Description Dwg of Dwg

GENERAL

G-001 COVER 1 7

G-101 GENERAL INFORMATION 2 7

G-102 PRE CONSTRUCTION RISK ASSESSMENT (PCRA) 3 7

G-103 INFECTION CONTROL RISK ASSESSMENT 4 7

GL101 OVERALL LIFE SAFETY PLAN 5 7

GL102 BASEMENT LIFE SAFETY PLAN 6 7

GC100 PHASING PLANS 7 7

STRUCTURAL

S-001 GENERAL NOTES 1 7

S-101 CATWALK FRAMING PLAN 2 7

S-102 CATWALK SUPPORT FRAMING PLAN 3 7

S-201 CATWALK SUPPORT FRAMING SECTION 4 7

S-202 CATWALK SUPPORT FRAMING SECTION 5 7

S-301 CATWALK SUPPORT FRAMING DETAIL 6 7

S-302 STRUCTURAL DETAIL 7 7

ARCHITECTURAL

AG001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 46

AD101 BASEMENT FLOOR DEMOLITION PLAN - PHASE 1 2 46

AD102 BASEMENT FLOOR DEMOLITION PLAN - PHASE 2 3 46

AD103 BASEMENT FLOOR DEMOLITION PLAN - PHASE 3 4 46

AD104 BASEMENT FLOOR DEMOLITION PLAN - PHASE 4 5 46

AD105 BASEMENT FLOOR DEMOLITION PLAN - PHASE 5 6 46

AD106 BASEMENT FLOOR DEMOLITION PLAN - PHASE 6 7 46

AD121 BASEMENT REFLECTED CEILING DEMOLITION PLAN - PHASE 1 8 46

AD122 BASEMENT REFLECTED CEILING DEMOLITION PLAN - PHASE 2 9 46

AD123 BASEMENT REFLECTED CEILING DEMOLITION PLAN - PHASE 3 10 46

AD124 BASEMENT REFLECTED CEILING DEMOLITION PLAN - PHASE 4 11 46

AD125 BASEMENT REFLECTED CEILING DEMOLITION PLAN - PHASE 5 12 46

AD126 BASEMENT REFLECTED CEILING DEMOLITION PLAN - PHASE 6 13 46

AE101 BASEMENT FLOOR PLAN - NEW CONDITION - PHASE 1 14 46

AE102 BASEMENT FLOOR PLAN - NEW CONDITION - PHASE 2 15 46

AE103 BASEMENT FLOOR PLAN - NEW CONDITION - PHASE 3 16 46

AE104 BASEMENT FLOOR PLAN - NEW CONDITION - PHASE 4 17 46

AE105 BASEMENT FLOOR PLAN - NEW CONDITION - PHASE 5 18 46

AE106 BASEMENT FLOOR PLAN - NEW CONDITION - PHASE 6 19 46

AE121 BASEMENT REFLECTED CEILING PLAN - PHASE 1 20 46

AE122 BASEMENT REFLECTED CEILING PLAN - PHASE 2 21 46

AE123 BASEMENT REFLECTED CEILING PLAN - PHASE 3 22 46

AE124 BASEMENT REFLECTED CEILING PLAN - PHASE 4 23 46

AE125 BASEMENT REFLECTED CEILING PLAN - PHASE 5 24 46

AE126 BASEMENT REFLECTED CEILING PLAN - PHASE 6 25 46

AE127 CATWALK PLAN 26 46

AE301 BUILDING SECTION 27 46

AE401 ENLARGED PLANS 28 46

AE402 ENLARGED PLANS 29 46

AE403 ENLARGED PLANS 30 46

AE410 INTERIOR ELEVATIONS 31 46

AE411 INTERIOR ELEVATIONS 32 46

AE412 INTERIOR ELEVATIONS 33 46

AE501 WALL SECTIONS AND DETAILS 34 46

AE601 DOOR SCHEDULE, ELEVATIONS AND DETAILS 35 46

AE800 BASEMENT FINISH SCHEDULE 36 46

AE801 BASEMENT FINISH PLAN - PHASE 1 37 46

AE802 BASEMENT FINISH PLAN - PHASE 2 38 46

AE803 BASEMENT FINISH PLAN - PHASE 3 39 46

AE804 BASEMENT FINISH PLAN - PHASE 4 40 46

AE805 BASEMENT FINISH PLAN - PHASE 5 41 46

AE806 BASEMENT FINISH PLAN - PHASE 6 42 46

AE807 SIGNAGE 43 46

AE808 SIGNAGE 44 46

QH101 BASEMENT EQUIPMENT PLAN 45 46

QH102 EQUIPMENT SCHEDULE 46 46

FIRE PROTECTION

FX001 FIRE PROTECTION GENERAL INFORMATION 1 6

FX101 BASEMENT FLOOR FIRE PROTECTION PLAN - PHASE 1 2 6

FX102 BASEMENT FLOOR FIRE PROTECTION PLAN - PHASE 2 3 6

FX103 BASEMENT FLOOR FIRE PROTECTION PLAN - PHASE 3 4 6

FX104 BASEMENT FLOOR FIRE PROTECTION PLAN - PHASE 4 5 6

FX105 BASEMENT FLOOR FIRE PROTECTION PLAN - PHASE 5 6 6

PLUMBING

P-001 PLUMBING GENERAL INFORMATION 1 21

PD101 BASEMENT FLOOR PLUMBING DEMOLITION PLAN - PHASE 4 2 21

PD102 BASEMENT FLOOR PLUMBING DEMOLITION PLAN - PHASE 5 3 21

PW101 UNDERSLAB DRAIN, WASTE, AND VENT PLAN - PHASE 1 4 21

PW102 UNDERSLAB DRAIN, WASTE, AND VENT PLAN - PHASE 2 5 21

PW103 UNDERSLAB DRAIN, WASTE, AND VENT PLAN - PHASE 3 6 21

1 ADDENDUM # 1 12/11/2020

DocuSign Envelope ID: CE664B7C-FEF2-44CE-B98B-2ECE54393E63

12/14/2020

Engineers Architects

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1 /2

:3

:4

P M

AE807

SIGNAGE SCHEDULE

43 46

ANGEL DIAZ - COR

HM

UPGRADE/RENOVATE/RELOCATE

SPS

Michael E. DeBakey VA Medical Center 2002 Holcombe Blvd.

Houston, TX 77030 December 11, 2020

BID DOCUMENTS

580-17-12118-317

CK

Scale: No Scale

ROOM SIGN WITH INDICATOR

Scale: No Scale

SECONDARY ROOM IDENTIFICATION

A. ALL SIGNAGE SHALL BE CONTRACTOR FURNISHED

AND INSTALLED.

B. PERMANENT ROOM SIGNAGE MUST INCLUDE

RAISED LETTERS AND BRAILLE. SIGNAGE SHALL

BE LOCATED AT LATCH SIDE OF DOOR AND MUST

BEMOUNTED IN ACCORDANCE WITH ALL CURRENT

ADA STANDARDS.

C. IF WALL SPACE IS NOT AVAILABLE FOR SIGNAGE

ON LATCH SIDE OF DOOR PER MOUNTING

STANDARDS, SIGNS SHALL BE INSTALLED PER

CURRENT ADA STANDARDS ON NEAREST

ADJACENT WALL.

D. CONTRACTOR TO PROVIDE A UNIT COST FOR

ENTIRE SIGNAGE PACKAGE.

Scale: No Scale

PRIMARY ROOM IDENTIFICATION

Scale: No Scale

PROHIBITED, INSTRUCTIONAL AND CONTROL

Scale: No Scale

RESTROOM INDENTIFICATION

1 ADDENDUM # 1 12/11/2020

Scale: 3" = 1'-0"

PRIMARY ROOM IDENTIFICATION WITH INSERT

Scale: 3" = 1'-0"

PERPENDICULAR (FLAG) MOUND

Scale: 3" = 1'-0"

PICTOGRAM AND SYMBOL

ZBF02

UP

TD

TD

UP

C3

C3 F1

B2 B

UP

1017 111213141516

G

H

J

K

BB-285

SUPPLY

PROCESSING AND

DISTRIBUTION

BB-220C

HAC

BB-230D

FEMALE LOCKER

BB-230E

TLT

BB-230

LOCKER

BB-242B

FEMALE TOILET

BB-240

VEST

BB-240A

MEN TOILET

BB-240B

MEN LOCKER

BB-242A

FEMALE LOCKER

BB-242

VEST

BB-262

ANTEROOM

BB-263

LOCKER

BB-264

TLT

BB-265

LOCKER

BB-266

TLT

BA-201

UNIFORM STORAGE

BC-350A

REP

CBA-200

PASSENGER

ELEVATOR LOBBY

BC-350C

MECHANIAL ROOM

BC-350B

HAC

BC-352A

OFFICE

BC-352B

OFFICE, SHARED

BC-352

SPS OFFICE

BB-248A

LOGISTIC OFFICE

BB-248B

RECEIVING

BB-260A

EQ STORAGE &

TEST

BB-230B

MT

BB-230A

MEN LOCKER

BB-290

ATS CONT

BB-350F

MACH ROOM

BB-220B

EQ WASH

BB-230C

ELEVATOR MACH.

BB-261B

HAC

BB-220

DECONTAMINATION

BB-210

PREP/ASSEMBLY

BB-261

STERILE STORAGE

BA-203

PATIENT CLOTHING

RM & LUGGAGE

STORAGE

BB-231A

ANTE ROOM

BB-248C

ANTE ROOM

BA-203A

PATIENT STORAGE

BC-352C

MULTI-PURPOSE

BB-261A

COOLING ROOM

BB-260

VESTIBULE

BB-260B

DISTRIBUTION

OFFICE

BA-201A

PASSAGE

BB-210A

STERILIZER ROOM

1 1

SIGNAGE TYPE (NUMBER INDICATES

DETAIL ON AE808)

X

Engineers Architects

N

AREA OF WORK

KEY PLAN

Revisions: Date

Drawing Title

Approved: Project Director

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1 /2

:3

:4

P M

AE808

BASEMENT SIGNAGE PLAN

44 46

ANGEL DIAZ - COR

CK,HM

UPGRADE/RENOVATE/RELOCATE

SPS

Michael E. DeBakey VA Medical Center 2002 Holcombe Blvd.

Houston, TX 77030 December 11, 2020

BID DOCUMENTS

580-17-12118-317

CK

Scale: 1/8" = 1'-0"

BASEMENT SIGNAGE PLAN 0 4 8 16

NORTH

PLAN

SIGNAGE LEGEND

A. ALL SIGNAGE SHALL BE CONTRACTOR FURNISHED

AND INSTALLED.

B. PERMANENT ROOM SIGNAGE MUST INCLUDE

RAISED LETTERS AND BRAILLE. SIGNAGE SHALL

BE LOCATED AT LATCH SIDE OF DOOR AND MUST

BEMOUNTED IN ACCORDANCE WITH ALL CURRENT

ADA STANDARDS.

C. IF WALL SPACE IS NOT AVAILABLE FOR SIGNAGE

ON LATCH SIDE OF DOOR PER MOUNTING

STANDARDS, SIGNS SHALL BE INSTALLED PER

CURRENT ADA STANDARDS ON NEAREST

ADJACENT WALL.

D. CONTRACTOR TO PROVIDE A UNIT COST FOR

ENTIRE SIGNAGE PACKAGE.

E. SIGNAGE TYPES REFER TO DETAIL NUMBERS ON

SHEETS AE807.

1 ADDENDUM # 1 12/11/2020

Sheets
G-001 - COVER
AE807 - SIGNAGE SCHEDULE
AE808 - BASEMENT SIGNAGE PLAN
2020-12-14T05:52:11-0800
Digitally verifiable PDF exported from www.docusign.com

File details come from the government source that posted it. Updated .