00 OBVAMC 6 7 8 CD Spec Submittal Package (2020-05-12).pdf
PDF 19 MB Posted
- Attached to
- Z2DA-- Renovate Inpatient Wards 6W, 7W & 8W
- Solicitation number
- 36C25620R0128
About this file
This federal contract opportunity solicitation requests proposals to renovate inpatient wards at the Overton Brooks VA Medical Center in Shreveport, Louisiana. The solicitation is set aside 100% for Service-Disabled Veteran-Owned Small Businesses and seeks firms to provide all labor, materials, equipment and services necessary to complete renovations of Wards 6W, 7W and 8W. Proposals are due by September 10, 2020 for the estimated $5-10 million contract and work must be completed within 810 calendar days of the notice to proceed. Offerors must be registered and verified as a Service-Disabled Veteran-Owned Small Business in the Vendor Information Pages database and System for Award Management to be considered. The solicitation will be posted on beta.SAM and any amendments issued; interested firms should check the site for updates. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16 is the contracting agency.
View the file
Other files
Show all 33
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1011 N Causeway Blvd, Suite 19 Mandeville, Louisiana 70471 Phone: 985.624.5001 Fax: 985.624.5303
PRINCIPAL Infrastructure™
Architecture Engineering Construction www.pi-aec.com info@pi-aec.com
Mrs. Stacy M. Walden, P.E., Supervisory Project Engineer Overton Brooks VA Medical Center 510 E. Stoner Ave (90C) Shreveport, LA 71101
Re: 100% Construction Document Package Prepared For:
Overton Brooks Veterans Affairs Medical Center Renovate Inpatient Wards for Privatization 6W, 7W, & 8W Contract No. – 36C25618C0091 VA Project No. ‐ 667‐18‐105
Submittal Date: May 12, 2020 100% Construction Document Package
Dear Mrs. Walden, PRINCIPAL Engineering is pleased to submit our 100% Construction Document Package (attached) for the above referenced project for review and comments. The Design Development Package was prepared based on our understanding of the written scope of work, discussions with the project manager and Staff, a review of existing floor plans and site visits.
If you have any questions regarding the attached 100% Construction Document Package or require additional information please contact me at the office at (985) 624‐5001 or on my cell at (504) 915‐5812 or Marty Hardy at (228) 215‐1851 or his cell at (601) 941‐9366. We look forward to discussing this project further with your team and truly appreciate the opportunity to assist the Department of Veterans Affairs with improving the infrastructure and medical facilities under their jurisdiction that support and care for our veterans.
Sincerely, PRINCIPAL Engineering, Inc.
Henry I. DiFranco, Jr, PE President
Department of Veterans Affairs
OVERTON BROOKS MEDICAL CENTER
Shreveport, LA
Renovate Inpatient Wards for Privatization 6W, 7W & 8W
Project no. 667-18-105
Construction Documents May 12, 2020
A/E Team
Principal Engineering, Inc.
DiFranco-Hardy Group, LLC
Hardy and Associates Architect, PLLC RBR Engineering, Inc.
Welcon Electrical Consultants, PLLC
Volume 1
DiFranco-Hardy Group, LLC Hardy and Associates Architect, PLLC
Volume 2
DiFranco-Hardy Group, LLC Hardy and Associates Architect, PLLC
Table of Contents
0. Cover
1. Cover Letter
2. FPE Letter
3. Cost Estimate
4. Specifications
5. Asbestos Survey
a. 5th Floor West
b. 6th Floor West
c. 7th Floor West
d. 8th Floor West
e. Asbestos Reinspection Report
6. Equipment Spec Sheet
a. Amico Headwall Drawings – Typical Room
b. Refrigerator Spec Sheet
c. Microwave spec sheet
d. TV and Arm Bracket
e. TV – LG and Wall Bracket
f. Omnicell
7. 100% Construction Document Drawings – See attached
2. FPE Letter
PRINCIPAL Infrastructure®
Mrs. Stacy M. Walden, P.E., Supervisory Project Engineer Overton Brooks VA medical Center 510 E. Stoner Ave (90C) Shreveport, LA 71101
Re: 100% Construction Documents Prepared For:
Overton Brooks Veterans Affairs Medical Center Renovate Inpatient Wards for Privatization 6W, 7W, & 8W Contract No. – 36C25618C0091 VA Project No. ‐ 667‐18‐105
Dear Mrs. Walden, PRINCIPAL Engineering is pleased to submit our 100% Construction Documents Fire Protection Engineer Review for the above referenced project drawings and specs dated May 12, 2020 for review and comments. The Fire Protection Engineering Review was prepared based on our understanding of the written scope of work, discussions with the project manager and Staff, a review of existing floor plans and site visits.
The submittal has been reviewed for compliance with the applicable codes and standards.
Based on my review, I would like to recommend the submittal for approval.
If you have any questions please feel free to contact us.
Andrew S. Carmean
Andrew S. Carmean, P.E.
Fire Protection Engineer
3. Cost Estimate
Re: 100% Construction Document Package Prepared For:
Overton Brooks Veterans Affairs Medical Center Renovate Inpatient Wards for Privatization 6W, 7W, & 8W Contract No. – 36C25618C0091 VA Project No. ‐ 667‐18‐105
Submittal Date: May 12, 2020 100% Construction Document Package
This Cost Estimate has been prepared based on the “Manual for Preparation of Cost Estimates and Related Documents for VA Facilities”.
The VA Allowable Construction Cost (ACC) for this project per the Estimated Cost of Construction (ECC) is $5,126,878.00 based on 26,617+‐ square feet of renovation area noted in the scope of work. Per the scope of Work issued, the cost per square foot is approximately $192.62.
This Cost Estimate has been prepared with information from published sources, recent experience on similar projects and other published similar projects.
The Estimated Cost of Construction (ECC) is based on the Scope of Work prepared by OBVMAC , Design Narrative, Space Program, Specification Sections, and Design Development Drawings to date. With approximately 26,617 square feet of renovation area, the Estimated Cost of Construction is $5,601,180.00. The average cost of $210.44 per square foot confirms that the OBVAMC ECC is low for the scope of work noted. We recommend that the project budget be increased to this amount.
Please see attached cost breakdown.
Please let us know if you have any questions or need additional information.
Henry I. DiFranco, Jr, PE President
Overton Brooks Renovate 6W, 7W 8W Inpatient Wards
Cost Estimate Summary
Project Name: Overton Brooks VAMC Renovate 6, 7 & 8 West Estimate to Use: Base Construction Type:
Project Number: 667‐18‐105
Due Date: 5/5/2020 Project SF:
Estimator: Marty Hardy Per SF Cost:
Raw Cost % of Total Cost Cost per SF Total Cost by DIV
550,250$ 15.50% 20.67$ 868,183$
142,000$ 4.00% 9.37$ 224,047$
35,500$ 1.00% 1.33$ 56,012$
17,750$ 0.50% 0.67$ 28,006$
17,750$ 0.50% 0.67$ 28,006$
35,500$ 1.00% 1.33$ 56,012$ 0.50%
53,250$ 1.50% 2.00$ 84,018$ 0.25%
479,250$ 13.50% 18.01$ 756,159$ 0.35%
798,750$ 22.50% 30.01$ 1,260,266$ 0.50%
177,500$ 5.00% 6.67$ 280,059$ 0.00%
‐$ 0.00% ‐$ ‐$
301,750$ 8.50% 11.34$ 476,100$ 0%
‐$ 0.00% ‐$ ‐$ 28.00%
35,500$ 1.00% 1.33$ 56,012$ 0.0%
‐$ 0.00% ‐$ ‐$ 0.0%
‐$ 0.00% ‐$ ‐$
53,250$ 1.50% 2.00$ 84,018$
177,500$ 5.00% 6.67$ 280,059$
159,750$ 4.50% 6.00$ 252,053$ 10.00%
‐$ 0.00% ‐$ ‐$ 10.00%
443,750$ 12.50% 16.67$ 700,148$
35,500$ 1.00% 1.33$ 56,012$ 2.00%
26,625$ 0.75% 1.00$ 42,009$
‐$ 0.00% ‐$ ‐$ 0%
‐$ 0.00% ‐$ ‐$
8,875$ 0.25% 0.33$ 14,003$
‐$ 0.00% ‐$ ‐$
‐$ 0.00% ‐$ ‐$
‐$ 0.00% ‐$ ‐$
‐$ 0.00% ‐$ ‐$
3,550,000$ 5,601,180$
3,550,000$ 100.00% 137.41$ 5,601,180$
Cost of Goods Total Con. Cost
General Construction
26617
$210.44
Division 48 ‐ Elec. Power Gen.
Total
Division 31 ‐ Earthwork
Division 32 ‐ Exterior Improvements
Division 33 ‐ Utilities
Division 34 ‐ Transportation
Division 35 Through 47
Division 24 Through 25
Division 26 ‐ Electrical
Division 27 ‐ Communications
Division 28 ‐ Electronic Safety and Security
Division 29 Through 30
Division 15 Through 19
Division 20 ‐ Fire Protection, Plumb & HVAC Gen Provisions
Division 21 ‐ Fire Suppression
Division 22 ‐ Plumbing
Sub Contractor Markup
Labor Burden
Building Estimate Subtotal
Builders Risk Insurance
General Liability Insurance
Subcontractor Liability
Summary By Expenses
Division 5 ‐Metals
Division 6 ‐ Wood, Plastics and Composites
Division 7 ‐ Thermal and Moisture Protection
Division 8 ‐ Doors and Windows
Division 9 ‐ Finishes
Summary by Division
Division 1 ‐ General Requirements
Division 2 ‐ Site Construction (Demolition)
Division 3 ‐ Concrete
Division 4 ‐ Masonry
Division 14 ‐ Conveying Systems MPC Tax
Building Permit
Total Construction Cost
Profit
Division 23 ‐ Heating, Ventilating and Air Conditioning
Division 10 ‐ Specialties
Division 11 ‐ Equipment
Division 12 ‐ Furnishings
Division 13 ‐ Special Construction
Subtotal Construction Cost
Bonds escalate for future bid date
Total Construction Cost
Contingency
Overhead sub total with burdens
Equipment Liability Insurance
Labor (35%)
Material (25%)
Equipment/Other (10%)
Subcontract (30%)
1,242,500$
887,500$
355,000$
1,065,000$
3,550,000$
17,750$
8,875$
3,728$
1,775$
994,000$
4,576,128$
457,613$
457,613$
5,491,353$
109,827.06$
5,601,180$
CONSTRUCTION COST ESTIMATE DATE PREPARED
PROJECT BASIS FOR ESTIMATE
Renovate Inpatient Wards for Privatization 6W, 7W & 8W 35%
LOCATION 65%
Overton Brooks VA Medical Center, Shreveport LA 95% XX
ARCHITECT ENGINEER FINAL
Principal Engineering, Inc. OTHER:
DRAWING NO. ESTIMATOR CHECKED BY
Summary Marty Hardy Henry DiFranco
SUMMARY TOTAL PERCENTAGE TOTAL PERCENTAGE TOTAL PERCENTAGE TOTAL PERCENTAGE TOTAL
COST
Division 01 - General Requirements
01 00 00 General Requirements $96,293.75 50% $68,781.25 50% $27,512.50 50% $82,537.50 50% $275,125.00 01 32 16.15 Project Schedules (Small Projects - Design/Bid/Build) $1,925.88 1% $1,375.63 1% $550.25 1% $1,650.75 1% $5,502.50 01 33 23 Shop Drawings, Product Data, and Samples $5,777.63 3% $4,126.88 3% $1,650.75 3% $4,952.25 3% $16,507.50 01 35 26 Safety Requirements $3,851.75 2% $2,751.25 2% $1,100.50 2% $3,301.50 2% $11,005.00 01 42 19 Reference Standards $1,925.88 1% $1,375.63 1% $550.25 1% $1,650.75 1% $5,502.50 01 45 00 Quality Control $5,777.63 3% $4,126.88 3% $1,650.75 3% $4,952.25 3% $16,507.50 01 45 29 Testing Laboratory Services $5,777.63 3% $4,126.88 3% $1,650.75 3% $4,952.25 3% $16,507.50 01 57 19 Temporary Environmental Controls $25,036.38 13% $17,883.13 13% $7,153.25 13% $21,459.75 13% $71,532.50 01 58 16 Temporary Interior Signage $1,925.88 1% $1,375.63 1% $550.25 1% $1,650.75 1% $5,502.50 01 74 19 Construction Waste Management $19,258.75 10% $13,756.25 10% $5,502.50 10% $16,507.50 10% $55,025.00 01 81 13 Sustainable Construction Requirements $9,629.38 5% $6,878.13 5% $2,751.25 5% $8,253.75 5% $27,512.50 01 91 00 General Commissioning Requirements $15,407.00 8% $11,005.00 8% $4,402.00 8% $13,206.00 8% $44,020.00 Division 01 - Total $192,587.50 100% $137,562.50 100% $55,025.00 100% $165,075.00 100% $550,250.00
Division 02 - Existing Conditions 02 41 00 Demolition $24,850.00 50% $17,750.00 50% $7,100.00 50% $21,300.00 50% $71,000.00 02 82 11 Traditional Asbestos Abatement $12,425.00 25% $8,875.00 25% $3,550.00 25% $10,650.00 25% $35,500.00 02 82 13.19 Asbestos Floor Tile and Mastic Abatement $11,928.00 24% $8,520.00 24% $3,408.00 24% $1,704.00 4% $25,560.00 02 82 13.31 Asbestos Transite Abatement $497.00 1% $355.00 1% $142.00 1% $426.00 1% $1,420.00 Division 02 - Total $49,700.00 100% $35,500.00 100% $14,200.00 100% $42,600.00 80% $142,000.00
Division 03 - Concrete 03 30 00 Cast-in-Place Concrete $12,425.00 100% $8,875.00 100% $3,550.00 100% $10,650.00 100% $35,500.00 Division 03 - Total $12,425.00 100% $8,875.00 100% $3,550.00 100% $10,650.00 100% $35,500.00
Division 04 - Masonry 04 05 13 Masonry Mortaring $1,553.13 25% $1,109.38 25% $443.75 25% $1,331.25 25% $4,437.50 04 20 20 UNIT MASONRY $4,659.38 75% $3,328.13 75% $1,331.25 75% $3,993.75 75% $13,312.50 Division 04 - Total $6,212.50 100% $4,437.50 100% $1,775.00 100% $5,325.00 100% $17,750.00
Division 05 - Metals 05 50 00 Metal Fabrications $6,212.50 100% $4,437.50 100% $1,775.00 100% $5,325.00 100% $17,750.00 Division 05 - Total $6,212.50 100% $4,437.50 100% $1,775.00 100% $5,325.00 100% $17,750.00
Division 06 - Wood, Plastics and Composites 06 10 00 Rough Carpentry $9,318.75 75% $6,656.25 75% $2,662.50 75% $7,987.50 75% $26,625.00 06 16 63 Cememtitious Sheathing $3,106.25 25% $2,218.75 25% $887.50 25% $2,662.50 25% $8,875.00 Division 06 - Total $12,425.00 100% $8,875.00 100% $3,550.00 100% $10,650.00 100% $35,500.00
Division 07 - Thermal and Moisture Protection 07 11 13 Bituminous Dampproofing $2,609.25 14% $1,863.75 14% $745.50 14% $2,236.50 14% $7,455.00 07 21 13 Thermal Insulation $4,845.75 26% $3,461.25 26% $1,384.50 26% $4,153.50 26% $13,845.00 07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable $931.88 5% $665.63 5% $266.25 5% $798.75 5% $2,662.50 07 60 00 Flashing and Sheet Metal $931.88 5% $665.63 5% $266.25 5% $798.75 5% $2,662.50 07 84 00 Fire-stopping $1,863.75 10% $1,331.25 10% $532.50 10% $1,597.50 10% $5,325.00 07 92 00 Joint Sealants $3,727.50 20% $2,662.50 20% $1,065.00 20% $3,195.00 20% $10,650.00 07 95 13 Expansion Joint Cover Assemblies $3,727.50 20% $2,662.50 20% $1,065.00 20% $3,195.00 20% $10,650.00 Division 07 - Total $18,637.50 100% $13,312.50 100% $5,325.00 100% $15,975.00 100% $53,250.00
Division 08 - Openings 08 11 13 Hollow Metal Doors and Frames $30,192.75 18% $21,566.25 18% $8,626.50 18% $25,879.50 18% $86,265.00 08 14 00 Interior Wood Doors $50,321.25 30% $35,943.75 30% $14,377.50 30% $43,132.50 30% $143,775.00 08 17 10 Integrated Door Assemblies $33,547.50 20% $23,962.50 20% $9,585.00 20% $28,755.00 20% $95,850.00 08 31 13 Access Doors and Frames $8,386.88 5% $5,990.63 5% $2,396.25 5% $7,188.75 5% $23,962.50 08 71 00 Door Hardware $41,934.38 25% $29,953.13 25% $11,981.25 25% $35,943.75 25% $119,812.50 08 80 00 Glazing $3,354.75 2% $2,396.25 2% $958.50 2% $2,875.50 2% $9,585.00 Division 08 - Total $167,737.50 100% $119,812.50 100% $47,925.00 100% $143,775.00 100% $479,250.00
Division 09 - Finishes 09 05 16 Subsurface Preparation for Floor Finishes $8,386.88 3% $5,990.63 3% $2,396.25 3% $7,188.75 3% $23,962.50 09 06 00 Schedule for Finishes $2,795.63 1% $1,996.88 1% $798.75 1% $2,396.25 1% $7,987.50 09 22 16 Non-Structural Metal Framing $13,978.13 5% $9,984.38 5% $3,993.75 5% $11,981.25 5% $39,937.50 09 24 00 Portland Cement Plastering $5,591.25 2% $3,993.75 2% $1,597.50 2% $4,792.50 2% $15,975.00 09 29 00 Gypsum Board $69,890.63 25% $49,921.88 25% $19,968.75 25% $59,906.25 25% $199,687.50 09 30 13 Ceramic/Porcelain Tiling $5,591.25 2% $3,993.75 2% $1,597.50 2% $4,792.50 2% $15,975.00 09 51 00 Acoustical Ceilings $44,730.00 16% $31,950.00 16% $12,780.00 16% $38,340.00 16% $127,800.00 09 65 13 Resilient Base and Accessories $5,591.25 2% $3,993.75 2% $1,597.50 2% $4,792.50 2% $15,975.00 09 65 16 Resilient Sheet Flooring $25,160.63 9% $17,971.88 9% $7,188.75 9% $21,566.25 9% $71,887.50 09 65 19 Resilient Tile Flooring $69,890.63 25% $49,921.88 25% $19,968.75 25% $59,906.25 25% $199,687.50 09 91 00 Painting $27,956.25 10% $19,968.75 10% $7,987.50 10% $23,962.50 10% $79,875.00 Division 09 - Total $279,562.50 100% $199,687.50 100% $79,875.00 100% $239,625.00 100% $798,750.00
SUBTOTAL THIS SHEET ------------------------------------------------------ $745,500.00 ------------------ $532,500.00 ------------------ $213,000.00 ------------------ $639,000.00 ------------------ $2,130,000.00
LABOR MATERIAL EQUIPMENT SUBCONTRACT
15-Apr-20
Renovate Inpatient Wards for Privatization 6W, 7W & 8W 35%
LOCATION 65%
Overton Brooks VA Medical Center, Shreveport LA 95%
ARCHITECT ENGINEER FINAL
Principal Engineering, Inc. OTHER:
BALANCE FORWARD FROM PREVIOUS SHEET $745,500.00 -------------------- $532,500.00 -------------------- $213,000.00 ------------------ $639,000.00 ---------------------- $2,130,000.00
Division 10 - Specialties 10 14 00 Signage $1,242.50 2% $887.50 2% $355.00 2% $1,065.00 2% $3,550.00 10 21 23 Cubicle Curtain Tracks $9,318.75 15% $6,656.25 15% $2,662.50 15% $2,662.50 5% $21,300.00 10 25 13 Patient Bed Service Walls $37,275.00 60% $26,625.00 60% $10,650.00 60% $31,950.00 60% $106,500.00 10 26 00 Wall and Door Protection $6,212.50 10% $4,437.50 10% $1,775.00 10% $5,325.00 10% $17,750.00 10 28 00 Toilet, Bath, and Laundry Accessories $3,106.25 5% $2,218.75 5% $887.50 5% $2,662.50 5% $8,875.00 10 44 13 Fire Extinguisher Cabinets $621.25 1% $443.75 1% $177.50 1% $532.50 1% $1,775.00 Division 10 - Total $62,125.00 93% $44,375.00 93% $17,750.00 93% $53,250.00 83% $177,500.00
Division 11 - Equipment - Not Used $0.00 0% $0.00 0% $0.00 0% $0.00 0% $0.00
Division 12 - Furnishings 12 24 00 Window Shades $2,112.25 2% $1,508.75 2% $603.50 2% $1,810.50 2% $6,035.00 12 32 00 Manufactured Wood Casework $79,209.38 75% $56,578.13 75% $22,631.25 75% $67,893.75 75% $226,312.50 12 36 00 Countertops $24,290.88 23% $17,350.63 23% $6,940.25 23% $20,820.75 23% $69,402.50 Division 12 - Total $105,612.50 100% $75,437.50 100% $30,175.00 100% $90,525.00 100% $301,750.00
Division 13 - Special Construction - Not Used $0.00 0% $0.00 0% $0.00 0% $0.00 0% $0.00
Division 14 - Conveying Equipement 14 91 33 Laundry and Linen Chutes $12,425.00 100% $8,875.00 100% $3,550.00 100% $10,650.00 100% $35,500.00 Division 14 - Total $12,425.00 100% $8,875.00 100% $3,550.00 100% $10,650.00 100% $35,500.00
Division 15 - 20 - Not Used $0.00 0% $0.00 0% $0.00 0% $0.00 0% $0.00
Division 21 - Fire Suppression 21 13 13 - Wet-Pipe Sprinkler Systems $13,978.13 75% $9,984.38 75% $3,993.75 75% $11,981.25 75% $39,937.50 21 08 00 Commissioning of Fire Suppression Systems $4,659.38 25% $3,328.13 25% $1,331.25 25% $3,993.75 25% $13,312.50 Division 21 - Total $18,637.50 100% $13,312.50 100% $5,325.00 100% $15,975.00 100% $53,250.00
Division 22 - Plumbing
22 05 11 Common Work Results for Plumbing $9,318.75 15% $6,656.25 15% $2,662.50 15% $7,987.50 15% $26,625.00 22 05 23 General - Duty Valves for Plumbing Piping $3,727.50 6% $2,662.50 6% $1,065.00 6% $3,195.00 6% $10,650.00 22 07 11 Plumbing Insulation $2,485.00 4% $1,775.00 4% $710.00 4% $2,130.00 4% $7,100.00 22 08 00 Commissioning of Plumbing Systems $6,212.50 10% $4,437.50 10% $1,775.00 10% $5,325.00 10% $17,750.00 22 11 00 Facility Water Distribution $6,212.50 10% $4,437.50 10% $1,775.00 10% $5,325.00 10% $17,750.00 22 13 00 Facility Sanitary and Vent Piping $6,212.50 10% $4,437.50 10% $1,775.00 10% $5,325.00 10% $17,750.00 22 40 00 Plumbing Fixtures $27,956.25 45% $19,968.75 45% $7,987.50 45% $23,962.50 45% $79,875.00 Division 22 - Total $62,125.00 100% $44,375.00 100% $17,750.00 100% $53,250.00 100% $177,500.00
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC) 23 05 11 Common work Results for HVAC $5,591.25 10% $3,993.75 10% $1,597.50 10% $4,792.50 10% $15,975.00 23 05 41 Noise and Vibration Control for HVAC Piping and Equipment $2,795.63 5% $1,996.88 5% $798.75 5% $2,396.25 5% $7,987.50 23 05 93 Testing, Adjusting, and Balancing for HVAC $5,591.25 10% $3,993.75 10% $1,597.50 10% $4,792.50 10% $15,975.00 23 07 11 HVAC and Boiler Plant Insulation $2,795.63 5% $1,996.88 5% $798.75 5% $2,396.25 5% $7,987.50 23 08 00 commissioning of HVAC Systems $5,591.25 10% $3,993.75 10% $1,597.50 10% $4,792.50 10% $15,975.00 23 09 23 Direct-Digital Control System for HVAC $8,386.88 15% $5,990.63 15% $2,396.25 15% $7,188.75 15% $23,962.50 23 21 13 Hydronic Piping $2,795.63 5% $1,996.88 5% $798.75 5% $2,396.25 5% $7,987.50 23 31 00 HVAC Ducts and Casings $5,591.25 10% $3,993.75 10% $1,597.50 10% $4,792.50 10% $15,975.00 23 34 00 HVAC Fans $2,795.63 5% $1,996.88 5% $798.75 5% $2,396.25 5% $7,987.50 23 36 00 Air Terminal Units $5,591.25 10% $3,993.75 10% $1,597.50 10% $4,792.50 10% $15,975.00 23 37 00 Air Outlets and Inlets $5,591.25 10% $3,993.75 10% $1,597.50 10% $4,792.50 10% $15,975.00 23 40 00 HVAC Air Cleaning Services $2,795.63 5% $1,996.88 5% $798.75 5% $2,396.25 5% $7,987.50 Division 23 - Total $55,912.50 100% $39,937.50 100% $15,975.00 100% $47,925.00 100% $159,750.00
Division 24 and 25 - Not Used $0.00 0% $0.00 0% $0.00 0% $0.00 0% $0.00
Division 26 - Electrical 26 05 11 Requirements for Electrical Installations $6,212.50 4% $4,437.50 4% $1,775.00 4% $5,325.00 4% $17,750.00 26 05 19 Low-Voltage Electrical Power Conductors and Cables $23,296.88 15% $16,640.63 15% $6,656.25 15% $19,968.75 15% $66,562.50 26 05 26 Grounding and Bonding for Electrical Systems $7,765.63 5% $5,546.88 5% $2,218.75 5% $6,656.25 5% $22,187.50 26 05 33 Raceway and Boxes for Electrical Systems $15,531.25 10% $11,093.75 10% $4,437.50 10% $13,312.50 10% $44,375.00 26 05 73 Overcurrent Protective Device Coordination Study $4,659.38 3% $3,328.13 3% $1,331.25 3% $3,993.75 3% $13,312.50 26 08 00 Commissioning of Electrical Systems $4,659.38 3% $3,328.13 3% $1,331.25 3% $3,993.75 3% $13,312.50 26 09 23 Lighting Controls $7,765.63 5% $5,546.88 5% $2,218.75 5% $6,656.25 5% $22,187.50 26 24 16 Panelboards $15,531.25 10% $11,093.75 10% $4,437.50 10% $13,312.50 10% $44,375.00 26 27 26 Wiring Devices $23,296.88 15% $16,640.63 15% $6,656.25 15% $19,968.75 15% $66,562.50 26 29 21 Enclosed Switches and Circuit Breakers $15,531.25 10% $11,093.75 10% $4,437.50 10% $13,312.50 10% $44,375.00 26 51 00 Interior Lighting $31,062.50 20% $22,187.50 20% $8,875.00 20% $26,625.00 20% $88,750.00 Division 26 - Total $155,312.50 100% $110,937.50 100% $44,375.00 100% $133,125.00 100% $443,750.00
SUBTOTAL THIS SHEET ------------------------------------------------------ $1,217,650.00 -------------------- $869,750.00 -------------------- $347,900.00 ------------------ $1,043,700.00 ---------------------- $3,479,000.00
Renovate Inpatient Wards for Privatization 6W, 7W & 8W 35%
LOCATION 65%
Overton Brooks VA Medical Center, Shreveport LA 95%
ARCHITECT ENGINEER FINAL
Principal Engineering, Inc. OTHER:
BALANCE FORWARD FROM PREVIOUS SHEET $1,217,650.00 $869,750.00 $347,900.00 $1,043,700.00 $3,479,000.00
Division 27 - Communications
27 05 11 Requirements for Communications Installations $621.25 5% $443.75 5% $177.50 5% $532.50 5% $1,775.00 27 05 26 Grounding and Bonding for Communications Systems $1,242.50 10% $887.50 10% $355.00 10% $1,065.00 10% $3,550.00 27 05 33 Raceways and Boxes for Communications Systems $2,485.00 20% $1,775.00 20% $710.00 20% $2,130.00 20% $7,100.00 27 10 00 Structured Cabling $1,242.50 10% $887.50 10% $355.00 10% $1,065.00 10% $3,550.00 27 15 00 Communications Structured Cabling $2,485.00 20% $1,775.00 20% $710.00 20% $2,130.00 20% $7,100.00 27 51 23 Intercom and Program Systems $1,863.75 15% $1,331.25 15% $532.50 15% $1,597.50 15% $5,325.00 27 52 23 Nurse Call Systems $2,485.00 20% $1,775.00 20% $710.00 20% $2,130.00 20% $7,100.00 Division 27 - Total $12,425.00 100% $8,875.00 100% $3,550.00 100% $10,650.00 100% $35,500.00
Division 28 - Electronic Safety and Security 28 05 00 Common Work Results for Electronic Safety & Security $465.94 5% $332.81 5% $133.13 5% $399.38 5% $1,331.25 28 05 13 Conductors & Cables for Electronic Safety & Security $1,863.75 20% $1,331.25 20% $532.50 20% $1,597.50 20% $5,325.00 28 05 26 Grounding & Bonding for Electronic Safety & Security $1,397.81 15% $998.44 15% $399.38 15% $1,198.13 15% $3,993.75 28 05 28.33 Conduits & Backboxes for Electronic Safety & Security $1,863.75 20% $1,331.25 20% $532.50 20% $1,597.50 20% $5,325.00 28 08 00 Commissioning of Electronic Safety & Security Systems $931.88 10% $665.63 10% $266.25 10% $798.75 10% $2,662.50 28 31 00 Fire Detection & Alarm $2,795.63 30% $1,996.88 30% $798.75 30% $2,396.25 30% $7,987.50 Division 28 - Total $9,318.75 100% $6,656.25 100% $2,662.50 100% $7,987.50 100% $26,625.00
Division 29-31 - Not Used $0.00 0% $0.00 0% $0.00 0% $0.00 0% $0.00
Division 32 - Exterior Improvements
32 31 13 Chain Link and Gates $3,106.25 100% $2,218.75 100% $887.50 100% $2,662.50 100% $8,875.00 Division 32 - Total $3,106.25 100% $2,218.75 100% $887.50 100% $2,662.50 100% $8,875.00
Division 33-48 - Not Used $0.00 0% $0.00 0% $0.00 0% $0.00 0% $0.00
SUBTOTAL THIS SHEET ------------------------------------------------------ $1,242,500.00 ------------------- $887,500.00 ------------------- $355,000.00 ------------------- $1,065,000.00 -------------------- $3,550,000.00
4. Specifications
12-1-18
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
OBVAMC – Renovate Inpatient Ward 6W, 7W, & 8W
TABLE OF CONTENTS
Section 00 01 10
DIVISION 00 - SPECIAL SECTIONS DATE
00 01 15 List of Drawing Sheets 07-15
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 12-18 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 04-13 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 02-17 01 42 19 Reference Standards 05-16 01 45 00 Quality Control 03-19 01 45 29 Testing Laboratory Services 01-11 01 57 19 Temporary Environmental Controls 01-18 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 09-13 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements 10-15
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17 02 82 11 Traditional Asbestos Abatement 04-19 02 82 13.19 Asbestos Floor Tile and Mastic Abatement 09-15 02 82 13.31 Asbestos Transite Abatement 09-15
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete 12-15
DIVISION 04 – MASONRY
04 05 13 Masonry Mortaring 10-17
04 20 20 UNIT MASONRY 08-17
DIVISION 05 – METALS
05 50 00 Metal Fabrications 08-18
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17 06 16 63 Cementitious Sheathing 02-16
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 11 13 Bituminous Dampproofing 02-16 07 21 13 Thermal Insulation 10-17
00 01 10-2
07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 02-16 07 60 00 Flashing and Sheet Metal 09-18 07 84 00 Fire-stopping 02-16 07 92 00 Joint Sealants 10-17 07 95 13 Expansion Joint Cover Assemblies 02-16
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 08-16 08 14 00 Interior Wood Doors 02-16 08 17 10 Integrated Door Assemblies 02-16 08 31 13 Access Doors and Frames 02-16 08 71 00 Door Hardware 01-16 08 80 00 Glazing 10-15
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 02-15 09 06 00 Schedule for Finishes 04-15 09 22 16 Non-Structural Metal Framing 06-18 09 24 00 Portland Cement Plastering 10-15 09 29 00 Gypsum Board 09-18 09 30 13 Ceramic/Porcelain Tiling 12-18 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 02-16 09 65 16 Resilient Sheet Flooring 05-18 09 65 19 Resilient Tile Flooring 05-18 09 91 00 Painting 01-16
DIVISION 10 – SPECIALTIES
10 14 00 Signage 12-19 10 21 23 Cubicle Curtain Tracks 05-15 10 25 13 Patient Bed Service Walls 08-18 10 26 00 Wall and Door Protection 10-15 10 28 00 Toilet, Bath, and Laundry Accessories 02-16 10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 11 – EQUIPMENT – NOT USED
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades 08-17 12 32 00 Manufactured Wood Casework 09-15 12 36 00 Countertops 12-18
DIVISION 13 - SPECIAL CONSTRUCTION – NOT USED
DIVISION 14– CONVEYING EQUIPEMENT
14 91 33 Laundry and Linen Chutes 06-12
DIVISION 15–20 – NOT USED
00 01 10-3
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15 21 08 00 Commissioning of Fire Suppression Systems 11-16
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 09-15 22 05 23 General-Duty Valves for Plumbing Piping 09-15 22 07 11 Plumbing Insulation 09-15 22 08 00 Commissioning of Plumbing Systems 06-13 22 11 00 Facility Water Distribution 09-15 22 13 00 Facility Sanitary and Vent Piping 09-15 22 40 00 Plumbing Fixtures 09-15 22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 02-15 23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment 02-15
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15 23 07 11 HVAC and Boiler Plant Insulation 02-15 23 08 00 Commissioning of HVAC Systems 06-13 23 09 23 Direct-Digital Control System for HVAC 09-11 23 21 13 Hydronic Piping 09-12 23 31 00 HVAC Ducts and Casings 03-13 23 34 00 HVAC Fans 02-15 23 36 00 Air Terminal Units 02-15 23 37 00 Air Outlets and Inlets 02-15 23 40 00 HVAC Air Cleaning Services 02-12
DIVISION 24 – NOT USED
DIVISION 25 – INTEGRATED AUTOMATION – NOT USED
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 05 73 Overcurrent Protective Device Coordination Study 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 24 16 Panelboards 01-18 26 27 26 Wiring Devices 01-16 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 51 00 Interior Lighting 01-18
00 01 10-4
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 06-15 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 10 00 Structured Cabling 12-05 27 15 00 Communications Structured Cabling 01-16 27 51 23 Intercom and Program Systems 06-15 27 52 23 Nurse Call Systems 10-18
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and
Security 10-18
28 05 26 Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
09-11
28 08 00 Commissioning of Electronic Safety and Security Systems 11-16 28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK – NOT USED
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 31 13 Chain Link Fences and Gates 05-18
DIVISION 33 – UTILITIES – NOT USED
DIVISION 34 – TRANSPORTATION – NOT USED
DIVISION 35-47 - NOT USED
DIVISION 48 – Electrical Power Generation – NOT USED
12-19-18
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
COVER SHEET
1-GI-001 - ARCH INFORMATION : SHEET INDEX, ABBREVIATIONS, CODE AND GENERAL
NOTES
1-GI-002 - GENERAL CONSTRUCTION DETAILS
1-GI-003 - GENERAL CONSTRUCTION DETAILS
1-GI-004 - AMERICANS WITH DISABILITIES ACT STANDARD DETAILS
1-GI-005 – GENERAL DEMOLITION NOTES
1-GI-007 – GENERAL NEW CONSTRUTCTION NOTES
1-GI-101 – 6-WEST, 7-WEST, 8-WEST OVERLL PLANS AND SYMBOLS – 1” = 40’-0”
1-GI-106 – 6-WEST INFECTION CONTROL FLOOR PLAN – 1/8”
1-GI-107 – 7-WEST INFECTION CONTROL FLOOR PLAN – 1/8”
1-GI-108 – 8-WEST INFECTION CONTROL FLOOR PLAN – 1/8”
1-GI-116 – 6-WEST PHASING PLAN – 1/8”
1-GI-117 – 7-WEST PHASING PLAN – 1/8”
1-GI-118 – 8-WEST PHASING PLAN – 1/8”
1-AD-106 – 6-WEST DEMOLITION FLOOR PLAN - 1/8"
1-AD-107 – 7-WEST DEMOLITION FLOOR PLAN - 1/8"
1-AD-108 – 8-WEST DEMOLITION FLOOR PLAN - 1/8"
1-AD-116 – 6-WEST ASBESTOS ABATEMENT FLOOR PLAN - 1/8"
1-AD-117 – 7-WEST ASBESTOS ABATEMENT FLOOR PLAN - 1/8"
1-AD-118 – 8-WEST ASBESTOS ABATEMENT FLOOR PLAN - 1/8"
1-AS-016 – 6-WEST NEW LIFE SAFETY PLAN – 1/8”
1-AS-017 – 7-WEST NEW LIFE SAFETY PLAN – 1/8”
1-AS-018 – 8-WEST NEW LIFE SAFETY PLAN – 1/8”
1-AS-106 – 6-WEST WALL TYPES PLAN AND WALL SCHEDULE - 1/8"
1-AS-107 – 7-WEST WALL TYPES PLAN AND WALL SCHEDULE - 1/8"
1-AS-108 – 8-WEST WALL TYPES PLAN AND WALL SCHEDULE - 1/8"
1-AS-116.1 – 6-WEST DIMENSIONED PARTIAL FLOOR PLAN - 1/4"
1-AS-116.2 – 6-WEST DIMENSIONED PARTIAL FLOOR PLAN - 1/4"
1-AS-117.1 – 7-WEST DIMENSIONED PARTIAL FLOOR PLAN - 1/4"
1-AS-117.2 – 7-WEST DIMENSIONED PARTIAL FLOOR PLAN - 1/4"
1-AS-118.1 – 8-WEST DIMENSIONED PARTIAL FLOOR PLAN - 1/4"
00 01 15 - 2
1-AS-118.2 – 8-WEST DIMENSIONED PARTIAL FLOOR PLAN - 1/4"
1-AS-136 – 6-WEST REFLECTED CEILING PLAN - 1/8"
1-AS-137 – 7-WEST REFLECTED CEILING PLAN - 1/8"
1-AS-138 – 8-WEST REFLECTED CEILING PLAN - 1/8"
1-AS-151 – EQUIPMENT LIST
1-AS-152 – SIGNAGE SCHEDULE
1-AS-153 – SIGNAGE SCHEDULE
1-AS-156.1 – 6-WEST EQUIPMENT AND SIGNAGE PARTIAL FLOOR PLAN - 1/4"
1-AS-156.2 – 6-WEST EQUIPMENT AND SIGNAGE PARTIAL FLOOR PLAN - 1/4"
1-AS-157.1 – 7-WEST EQUIPMENT AND SIGNAGE PARTIAL FLOOR PLAN - 1/4"
1-AS-157.2 – 7-WEST EQUIPMENT AND SIGNAGE PARTIAL FLOOR PLAN - 1/4"
1-AS-158.1 – 8-WEST EQUIPMENT AND SIGNAGE PARTIAL FLOOR PLAN - 1/4"
1-AS-158.2 – 8-WEST EQUIPMENT AND SIGNAGE PARTIAL FLOOR PLAN - 1/4"
1-AS-161 – ENLARGED PATIENT ROOM AND ISOLATION ROOM PLANS - 1/2"
1-AS-162 – ENLARGED NURSE STATION AND SUPPORT AREA PLANS - 1/2"
1-AS-163 – ENLARGED PATIENT ROOM AND ISOLATION ROOM REFLECTED CEILING PLANS -
1/2"
1-AS-500 - INTERIOR ELEVATIONS – 1/4"
1-AS-501 – INTERIOR ELEVATIONS – 1/4"
1-AS-551 – MILLWORK SECTIONS – 1 1/2"
1-AS-552 – MILLWORK SECTIONS – 1 1/2"
1-AS-900 – NEW FINISHES SCHEDULES AND MATERIAL FINISH LEGEND
1-AS-901 – NEW FINISHES SCHEDULES
1-AS-902 – NEW FINISHES SCHEDULES
1-AS-903 – NEW FINISHES SCHEDULES
1-AS-916 – NEW FINISH PLAN AND DETAILS – 1/8”
1-AS-917 – NEW FINISH PLAN – 1/8”
1-AS-918 – NEW FINISH PLAN – 1/8”
1-PL-0 - SYMBOLS, ABBREVIATIONS, AND NOTES
1-PL-1 – 6-WEST PLUMBING – PLUMBING WASTE DEMOLITION
1-PL-2 – 6-WEST PLUMBING – MEDICAL GAS DEMOLITION
1-PL-3 – 6-WEST PLUMBING – PLUMBING NEW WORK
1-PL-4 – 6-WEST PLUMBING – FIRE PROTECTION
1-PL-5 – 7-WEST PLUMBING – PLUMBING WASTE DEMOLITION
1-PL-6 – 7-WEST PLUMBING – MEDICAL GAS DEMOLITION
1-PL-7 – 7-WEST PLUMBING – PLUMBING NEW WORK
1-PL-8 – 7-WEST PLUMBING – FIRE PROTECTION
1-PL-9 – 8-WEST PLUMBING – PLUMBING WASTE DEMOLITION
00 01 15 - 3
1-PL-10 – 8-WEST PLUMBING – MEDICAL GAS DEMOLITION
1-PL-11 – 8-WEST PLUMBING – PLUMBING NEW WORK
1-PL-12 – 8-WEST PLUMBING – FIRE PROTECTION
1-PL-13 – PLUMBING SCHEDULES AND DETAILS
1-MH-0 – HVAC SYMBOLS, ABBREVIATIONS, AND NOTES
1-MH-1 – 6-WEST FLOOR PLAN – HVAC DEMOLITION
1-MH-2 – 6-WEST FLOOR PLAN – HVAC PIPING DEMOLITION
1-MH-3 – 6-WEST FLOOR PLAN – HVAC EXHAUST DEMOLITION
1-MH-4 – 6-WEST FLOOR PLAN – HVAC NEW WORK
1-MH-5 – 6-WEST FLOOR PLAN – HVAC PIPING NEW WORK
1-MH-6 – 6-WEST FLOOR PLAN - HVAC EXHAUST
1-MH-7 – 7-WEST FLOOR PLAN – HVAC DEMOLITION
1-MH-8 – 7-WEST FLOOR PLAN – HVAC PIPING DEMOLITION
1-MH-9 – 7-WEST FLOOR PLAN – HVAC EXHAUST DEMOLITION
1-MH-10 – 7-WEST FLOOR PLAN – HVAC NEW WORK
1-MH-11 – 7-WEST FLOOR PLAN – HVAC PIPING NEW WORK
1-MH-12 – 7-WEST FLOOR PLAN - HVAC EXHAUST
1-MH-13 – 8-WEST FLOOR PLAN – HVAC DEMOLITION
1-MH-14 – 8-WEST FLOOR PLAN – HVAC PIPING DEMOLITION
1-MH-15 – 8-WEST FLOOR PLAN – HVAC EXHAUST DEMOLITION
1-MH-16 – 8-WEST FLOOR PLAN – HVAC NEW WORK
1-MH-17 – 8-WEST FLOOR PLAN – HVAC PIPING NEW WORK
1-MH-18 – 8-WEST FLOOR PLAN - HVAC EXHAUST
1-MH-19 – MECHANICAL DETAILS
1-MH-20 – MECHANICAL DETAILS
1-MH-21 – MECHANICAL DETAILS
1-MH-22 – MECHANICAL SCHEDULES
1-MH-23 – MECHANICAL SCHEDULES
1-MH-24 – MECHANICAL SCHEDULES
1-ES-000 – ELECTRICAL PLANS AND DETAILS
1-ES-001 – ELECTRICAL SCHEDULES AND DETAILS
1-ES-002 – ELECTRICAL SCHEDULES AND DETAILS
1-ES-003 – ELECTRICAL DETAILS
1-ES-100 – 6-WEST ELECTRICAL DEMOLITION PLAN
1-ES-101 – 7-WEST ELECTRICAL DEMOLITION PLAN
1-ES-102 – 8-WEST ELECTRICAL DEMOLITION PLAN
1-ES-200 – 6-WEST LIGHTING PLAN
00 01 15 - 4
1-ES-201 – 7-WEST LIGHTING PLAN
1-ES-202 – 8-WEST LIGHTING PLAN
1-ES-300 – 6-WEST POWER AND COMMUNICATIONS PLAN
1-ES-301 – 7-WEST POWER AND COMMUNICATIONS PLAN
1-ES-302 – 8-WEST POWER AND COMMUNICATIONS PLAN
1-ES-303 – ENLARGED POWER AND COMMUNICATIONS PLAN
1-ES-304 – ENLARGED POWER AND COMMUNICATIONS PLAN
1-ES-400 – 6-WEST MECH. SYSTEMS & FIRE ALARM PLAN
1-ES-401 – 7-WEST MECH. SYSTEMS & FIRE ALARM PLAN
1-ES-402 – 8-WEST MECH. SYSTEMS & FIRE ALARM PLAN
SUPPLEMENTAL DRAWINGS
1-SD-900 – SUPPLEMENTAL DRAWINGS- EXISITNG FINISHES SCHEDULES
1-SD-901 – SUPPLEMENTAL DRAWINGS- EXISITNG FINISHES SCHEDULES
1-SD-902 – SUPPLEMENTAL DRAWINGS- EXISITNG FINISHES SCHEDULES
1-SD-903 – SUPPLEMENTAL DRAWINGS- EXISITNG FINISHES SCHEDULES
EXISTING NURSE CALL SYSTEM DRAWINGS
2508-1 – SYMBOLS, SCHEDULES, AND TYPICAL DETAILS
2508-8 – SIXTH FLOOR NURSE CALL LAYOUT
2508-9 – SEVENTH FLOOR NURSE CALL LAYOUT
2508-10 – EIGHT FLOOR NURSE CALL LAYOUT
- - - END - - -
12-01-18 i
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.1 SAFETY REQUIREMENTS
1.2 GENERAL INTENTION
1.3 STATEMENT OF BID ITEM(S)
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.5 CONSTRUCTION SECURITY REQUIREMENTS
1.6 OPERATIONS AND STORAGE AREAS
1.7 ALTERATIONS
1.8 DISPOSAL AND RETENTION
1.9 RESTORATION
1.10 AS-BUILT DRAWINGS
1.11 WARRANTY MANAGEMENT
1.12 USE OF ROADWAYS
1.13 RESIDENT ENGINEER'S FIELD OFFICE
1.14 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
1.15 TEMPORARY USE OF EXISTING ELEVATORS
1.16 TEMPORARY TOILETS
1.17 AVAILABILITY AND USE OF UTILITY SERVICES
1.18 TESTS
1.19 INSTRUCTIONS
1.20 GOVERNMENT-FURNISHED PROPERTY
1.21 RELOCATED EQUIPMENT ITEMS
1.22 SAFETY SIGN
1.23 FINAL ELEVATION Digital Images
ii
1.24 FINAL ELEVATION Digital Images
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for ___The project know as
Renovate Inpatient Wards for Privatization 6W, 7W & 8W__as required by drawings and specifications.
B. Visits to the site by Bidders may be made only by appointment with the
Medical Center Engineering Officer.
C. Offices of __Principal Engineering, Inc._____, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the
Government without affirmations by Contracting Officer or his duly authorized representative.
D. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the Resident Engineer or COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection. Such prior notice shall be not less than three work days unless otherwise designated by the Resident Engineer or COR.
E. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
01 00 00 -2
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION: Work includes general construction, all labor, material and supervision, equipment, alterations, demolition, new construction, new walls, new flooring, new base, Fire Protection, necessary removal of existing structures and construction and certain other items as noted in the drawings and specifications.
ITEM II, Electrical Work: Work includes all labor, material, equipment and supervision to perform the required electrical construction work on this project including demolition, new lighting, new power, new data, and certain other items as noted in the drawings and specifications.
ITEM III, Mechanical Work: Work includes all labor, material, equipment and supervision to perform the required Mechanical construction work on this project including demolition, new plumbing, new plumbing fixtures, new HVAC, new piping, new medical gases and certain other items as noted in the drawings and specifications.
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
01 00 00 -3
2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security, escort, or arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
C. Guards:
1. The General Contractor shall provide unarmed guards at the project site 24 hours a days, 7 days a week after construction hours.
2. The Contractor shall provide the guards and VA police with communication devices as directed.
3. The general Contractor shall install equipment for recording guard rounds to ensure systematic checking of the premises.
D. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative, Resident
Engineer or COR for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71
00, DOOR HARDWARE and coordinate.
E. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the
01 00 00 -4 approach to following goals and maintaining confidentiality of
“sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.
Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting
Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document
Management Software (EDMS).
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the
EDMS system.
b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
F. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
01 00 00 -5
2. A limited number of (2 to 5) permits shall be issued for General
Contractor and its employees for parking in designated areas only.
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the
Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the
Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the
Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting
Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the Contracting
Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting
Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The
Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as shown on the drawings or as determined by the Resident Engineer or COR.
E. Workmen are subject to rules of Medical Center applicable to their conduct.
F. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, 01 00 00 -6 and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by Resident Engineer or COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of
Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center and areas required to remain in operation.
3. Where access by Medical Center or personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
G. Phasing:
The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.
It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
To insure such executions, Contractor shall furnish the Resident
Engineer or COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the Resident Engineer or COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to insure accomplishment of this work in successive phases mutually agreeable to COR and Contractor, as follows:
01 00 00 -7
Phase I: Building 1, Inpatient Ward 6-West, 6th Floor, and barriers in corridor. There shall be two main sub-phases, 6A and 6B, to complete the entire work in Phase I prior to starting Phase II 7-West work.
Phase 6A shall be completed during normal working hours. Phase 6B shall be completed in multiple sub-phases after normal working hours and concurrent with Phase 6A. Please refer to general phasing notes on Sheet 1-GI-116 for additional information.
Phase I project duration, inclusive of sub-phases, shall be 210 calendar days.
Contractor to include 30 days between phases I and II for owner coordination and relocation work.
Phase II: Building 1, Inpatient Ward 7-West, 7th Floor, and barriers in corridor. There shall be three main sub-phases, 7A, 7B and 7C, to complete the entire work in Phase II prior to starting Phase III 8-West work. Phase 7A and 7B shall be completed during normal working hours.
Phase 7C shall be completed in multiple sub-phases after normal working hours and concurrent with phases 7A and 7B. The Palliative Care Unit at the end of 7-West shall remain in operation for the duration of construction on 7-West. Please refer to general phasing notes on Sheet 1-GI-116 for additional information.
Phase II project duration, inclusive of sub-phases, shall be 330 calendar days. This includes 150 calendar days for completion of sub-phase 7A, 30 calendar days for owner coordination and relocation work, and 150 calendar days for completion of sub-phase 7B.
Contractor to include 30 days between phases II and III for owner coordination and relocation work.
Phase III: Building 1, Inpatient Ward 8-West, 8th Floor, and barriers in corridor. There shall be two main sub-phases, 8A and 8B, to complete the entire work in Phase III. Phase 8A shall be completed during normal working hours. Phase 8B shall be completed in multiple sub-phases after normal working hours and concurrent with phase 8A. Please refer to general phasing notes on Sheet 1-GI-116 for additional information.
Phase III project duration, inclusive of sub-phases, shall be 210 calendar days.
Total project duration, inclusive of Phases I, II, III, and owner coordination and relocation, shall be 810 days.
H. Building(s) No.(s) _One (1)_ will be occupied during performance of work, but immediate areas of alterations will be vacated.
1. Certain areas of Building(s) No. (s) _One(1)__ will be occupied by
Medical Center personnel for various periods as listed below:
01 00 00 -8
AREA PERIOD
(a) Inpatient Wards 6 West, 7 West and 8 West - Entire duration of
Construction
Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc to facilitate patient and staff access. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the construction period.
2. Immediate areas of alterations not mentioned in preceding
Subparagraph 1 will be temporarily vacated while alterations are performed.
I. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence to enclose construction material, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings.