This pre-solicitation notice is for a construction project to vertically expand an existing building and renovate patient rooms at the Robert J. Dole VA Medical Center in Wichita, Kansas. The Department of Veterans Affairs will competitively award a total small business set-aside contract to construct two additional floors on Building 1C for administrative space and renovate the third floor east wing of Building 1 to provide private patient rooms. The general contractor will be responsible for demolition, construction, finishes, mechanical and electrical work. The performance period is 730 calendar days with an estimated project cost between $5-10 million. The solicitation will be issued on or around October 20, 2020 with a response due date approximately 30 days later. An organized site visit will be scheduled. The NAICS code is 236220 and it is reserved for Service-Disabled Veteran-Owned Small Businesses.

View the file

Other files

File Type Posted
281300 - Physical Access Control System.pdf PDF
18.1019.05 - Addendum 5 Dwgs - Pages 8-14.pdf PDF
18.1019.05 - Addendum 5 Revised AE601.pdf PDF
589-701 PRE BID SIGN IN SHEET.pdf PDF
36C25520R0115 0005.docx DOCX document
000110 Table of Contents revised for A0005.pdf PDF
022113 - Site Surveys.pdf PDF
As builts bldg 19 to bldg 2 connecting cor dwgs.pdf PDF
18.1019.05 Addendum 5 Dwgs pages 1-7.pdf PDF
P09 589-701 Revised Drawings Pg 81-90.pdf PDF
36C25520R0115 0004.docx DOCX document
230923.pdf PDF
P09 589-701 Revised Drawings Pg 11-20.pdf PDF
P09 589-701 Revised Drawings Pg 41-50.pdf PDF
P09 589-701 Revised Drawings Pg 71-80.pdf PDF
P09 589-701 Revised Drawings Pg 91-100.pdf PDF
226300.pdf PDF
000110 Table of Contents.pdf PDF
P09 589-701 Revised Drawings Pg 31-40.pdf PDF
P09 589-701 Revised Drawings Pg 61-70.pdf PDF
P09 589-701 Revised Drawings Pg 101-117.pdf PDF
P09 589-701 Revised Drawings Pg 51-60.pdf PDF
P09 589-701 Revised Drawings Pg 21-30.pdf PDF
18.1019.05 - 2020.11.16 - List of Changes.docx DOCX document
226200.pdf PDF
36C25520R0115 0003.docx DOCX document
36C25520R0115 0002.docx DOCX document
RFI received 11-2-2020.docx DOCX document
S02 36C25520R0115_2.docx DOCX document
36C25520R0115 0001.docx DOCX document
P09 589-701 Drawings Pg 41-50.pdf PDF
P09 589-701 Drawings Pg 11-20.pdf PDF
P09 589-701 Drawings Pg 21-30.pdf PDF
P09 589-701 Drawings Pg 31-40.pdf PDF
P09 589-701 Drawings Pg 1-10.pdf PDF
P09 589-701 Drawings Pg 91-100.pdf PDF
P09 589-701 Drawings Pg 51-60.pdf PDF
P09 589-701 Drawings Pg 101-116.pdf PDF
P09 589-701 Drawings Pg 61-70.pdf PDF
P09 Bid Docs - Specs Vol 2.pdf PDF
P09 589-701 Drawings Pg 81-90.pdf PDF
P09 SOW 589-701rev_01.pdf PDF
P09 Bid Docs - Specs Vol 1.pdf PDF
36C25520R0115_2.docx DOCX document
P09 589-701 Drawings Pg 71-80.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2ND FLOOR

ADDITION

SHADE INDICATES

EXISTING AREA BEYOND

PRIMARY SCOPE OF

WORK, TYPICAL

1ST FLOOR

2ND FLOOR

3RD FLOOR

3RD FLOOR

ADDITION

AREA OF RENOVATION

BUILDING 1C

BUILDING 1

AREA OF RENOVATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

GI000

COVER SHEET

GUIDON DESIGN INC.

1221 N PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

(317)-800-6388

CMTA CONSULTING ENGINEERS

10411 MEETING STREET

PROSPECT, KY 40059

(502)-326-3085

VA WICHITA - MED/SURG BEDS

FOR PATIENT PRIVACY

WICHITA, KANSAS

589-701

1 & 1C

05/22/2020 JDF JDJ

BID DOCUMENTS

ROBERT J. DOLE VA MEDICAL CENTER

WICHITA, KANSAS

BID DOCUMENTS

VA WICHITA - MED/SURG BEDS FOR

PATIENT PRIVACY

589-701

SHEET LIST

SHEET

NUMBER SHEET NAME

FIRE PROTECTION

FA001 FIRE SUPPRESSION LEGEND

FA102 SECOND FLOOR FIRE PROTECTION PLAN

FA103 THIRD FLOOR FIRE PROTECTION PLAN

PLUMBING

MG101 THIRD FLOOR MEDICAL GAS DEMOLITION PLAN

MG102 THIRD FLOOR MEDICAL GAS PLAN

PL001 PLUMBING LEGEND

PL102 SECOND FLOOR PLUMBING DEMOLITION PLAN

PL103 THIRD FLOOR PLUMBING DEMOLITION PLAN

PL201 FIRST FLOOR PLUMBING PLAN

PL202 SECOND FLOOR PLUMBING PLAN

PL203 THIRD FLOOR PLUMBING PLAN

PL301 DOMESTIC COLD WATER RISER - RENOVATED AREA

PL302 DOMESTIC HOT WATER RISER - RENOVATED AREA

PL303 DOMESTIC COLD WATER RISER - NEW ADDITION

PL304 DOMESTIC HOT WATER RISER - NEW ADDITION

PL305 FILTERED COLD WATER/DIALYSIS LOOP RISER DIAGRAM

PL306 SANITARY WASTE AND VENT RISER DIAGRAM - RENOVATED AREA

PL307 SANITARY WASTE AND VENT RISER DIAGRAM - NEW ADDITION

MECHANICAL

MM001 MECHANICAL NOTES AND LEGEND

MD101 HVAC DEMOLITION - BASEMENT

MD102 HVAC DEMOLITION - SECOND FLOOR

MD103 HVAC DEMOLITION - ATTIC

MD104 HVAC DEMOLITION - THIRD FLOOR

MD203 HVAC DEMOLITION - THIRD FLOOR HYDRONICS

MH100 HVAC PLAN - BASEMENT

MH101 HVAC PLAN - SECOND FLOOR

MH102 HVAC PLAN - THIRD FLOOR

MH103 HVAC PLAN - ROOF

MH104 HVAC PLAN - ROOF

MH200 MECHANICAL SECTIONS

MP100 HYDRONICS PLAN - BASEMENT

MP101 HYDRONICS PLAN - SECOND FLOOR

MP102 HYDRONICS PLAN - THIRD FLOOR

MH500 MECHANICAL DETAILS

MH501 MECHANICAL DETAILS

MH502 MECHANICAL DETAILS

MH503 MECHANICAL DETAILS

MH504 MECHANICAL DETAILS

MH505 MECHANICAL CONTROLS

MH506 MECHANICAL CONTROLS

MH600 MECHANICAL SCHEDULES

ELECTRICAL

E-001 ELECTRICAL LEGEND

ED101 SECOND FLOOR PLAN - ELECTRICAL DEMOLITION

ED102 THIRD FLOOR PLAN - ELECTRICAL DEMOLITION

ES201 SECOND FLOOR PLAN - LIGHTING

ES202 THIRD FLOOR PLAN - LIGHTING

ES301 SECOND FLOOR PLAN - POWER

ES302 THIRD FLOOR PLAN - POWER

ES303 ROOF PLAN - ELECTRICAL

ES401 SECOND FLOOR PLAN - SYSTEMS

ES402 THIRD FLOOR PLAN - SYSTEMS

ES500 BASEMENT AND FIRST FLOOR - ELECTRICAL INTERCONNECTIONS

ES501 SECOND AND THIRD FLOOR - ELECTRICAL INTERCONNECTIONS

ES502 ENLARGED PLANS

ES601 POWER DISTRIBUTION RISER DIAGRAM AND DETAILS

ES701 LIGHT FIXTURE SCHEDULE AND DETAILS

ES702 PANELBOARD SCHEDULES

ES801 TELECOMMUNICATION DETAILS

ES802 ELECTRICAL DETAILS

ES803 ELECTRICAL DETAILS

SHEET LIST

SHEET

NUMBER SHEET NAME

GENERAL

GI000 COVER SHEET

GI101 CODE ANALYSIS AND LIFE SAFETY PLANS

GI102 BID DEDUCTS

GC101 INFECTION CONTROL/PHASING PLANS

GC102 SUPPLEMENTAL PHASING / CONSTRUCTION LOGISTICS

CIVIL

CC001 CONSTRUCTION ACCESS PLAN

CS101 GROUND LEVEL ACCESS PLAN

STRUCTURAL

SI001 STRUCTURAL ABBREVIATIONS AND SYMBOLS

SI002 STRUCTURAL GENERAL NOTES

SI003 LOAD MAPS

SF101 EXISTING ROOF - SECOND FLOOR SLAB PLAN

SF102 THIRD FLOOR FRAMING PLAN

SF103 ROOF FRAMING PLAN

SF301 BUILDING ELEVATIONS

SF302 BRACE ELEVATIONS AND DETAILS

SF501 SECTIONS AND DETAILS

SF502 SECTIONS AND DETAILS

SF901 ISOMETRICS

ARCHITECTURAL

AE001 ARCHITECTURAL SYMBOLS AND ABBREVIATIONS

AE002 WALL TYPES

AD101 2ND FLOOR DEMOLITION PLAN

AD102 3RD FLOOR DEMOLITION PLAN

AD111 2ND FLOOR DEMOLTION CEILING PLAN

AD112 3RD FLOOR DEMOLITION CEILING PLAN

AD301 DEMOLITION WALL SECTIONS

AE101 2ND FLOOR DIMENSION PLAN

AE102 2ND FLOOR ARCHITECTURAL PLAN

AE103 3RD FLOOR DIMENSION PLAN

AE104 3RD FLOOR ARCHITECTURAL PLAN

AE105 4TH FLOOR AND ROOF PLAN

AE111 2ND FLOOR CEILING PLAN

AE112 3RD FLOOR CEILING PLAN

AE201 BUILDING ELEVATIONS

AE301 BUILDING SECTIONS

AE311 WALL SECTIONS

AE321 WALL SECTION DETAILS

AE501 ENLARGED PLANS AND TOILET ACCESSORY SCHEDULE

AE502 ENLARGED PLANS

AE601 DOOR AND WINDOW SCHEDULE

AE801 INTERIOR ELEVATIONS

AE802 INTERIOR ELEVATIONS

AE803 INTERIOR ELEVATIONS

AE804 INTERIOR SECTIONS, AND DETAILS

AI101 2ND FLOOR FLOOR FINISH PLAN

AI102 3RD FLOOR FLOOR FINISH PLAN

AI103 2ND FLOOR WALL FINISH PLAN

AI104 3RD FLOOR WALL FINISH PLAN

AI601 FINISH SCHEDULE

AI901 2ND FLOOR SIGNAGE & ARTWORK PLAN

AI902 3RD FLOOR SIGNAGE & ARTWORK PLAN

AI903 SIGNAGE TYPES

QH101 2ND FLOOR EQUIPMENT PLAN

QH102 3RD FLOOR EQUIPMENT PLAN

Contact:Contact: Contact:

CMTA DESIGN TEAM

Andy Myers MEP Project Manager

MECHANICAL,

ELECTRICAL &

PLUMBING

DEPARTMENT OF VETERAN'S

AFFAIRS

Maggie Day

COR

5500 E Kellogg Ave Wichita, KS 67218 p: 316.685.2221 e: Maggie.Day@va.gov

OWNER

GUIDON DESIGN INC.

Mark VanderWoude Project Manager p: 317.800.6388 x 119 e: mvanderwoude@guidondesign.com

ARCHITECTURE,

CIVIL &

STRUCTURAL

10411 Meeting Street Prospect, KY 40059 p: 502-326-3085 e: amyers@cmta.com

AREA MAP

VICINITY MAP

2ND AND 3RD

FLOOR ADDITION

INTERIOR RENOVATION

OF A PORTION OF 2ND

AND 3RD FLOOR

EXISTING BUILDING

SCALE: 1" = 100'-0"

KEYPLAN ISOMETRIC

Tyler Sanders Project Architect

1221 North Pennsylvania Street Suite 200 Indianapolis, IN 46202 p: 317.800.6388 x 109 e: dcounsell@guidondesign.com p: 317.800.6388 x 126 e: tsanders@guidondesign.com

David Counsell Civil Engineer

Revisions: Date:

UP

UP

DN

DN

DN

LIFE SAFETY PLAN LEGEND

FEC

EXIT EGRESS EXIT SIGNAGE

FIRE EXTINGUISHER CABINET

DIAGONAL DISTANCE

EXIT SEPARATION DISTANCE

EGRESS PATH

2 HR - FIRE SEPARATION

1 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

REFER TO VA MANUAL PG-18-3 FOR ADDITIONAL CODES, STANDARDS, GUIDELINES AND

REGULATIONS, BELOW LISTING IS NOT COMPREHENSIVE.

ICC, INTERNATIONAL BUILDING CODES, 2018 EDITION (IBC)

ASCE-07-10

ACI 318-11

ACI 530-11

AISC 341-10

AISC 360-10

PCI MNL 120-10, DESIGN HANDBOOK

NFPA 10, STANDARD FOR PORTABLE FIRE EXTINGUISHERS, 2013 EDITION

NFPA 13, STANDARD FOR THE INSTALLATION OF SPRINKLER SYSTEMS, 2016 EDITION

NFPA 14, STANDARD FOR THE INSTALLATION OF STANDPIPE AND HOSE SYSTEM, 2016

EDITION

NFPA 20, STANDARD FOR THE INSTALLATION OF STATIONARY PUMPS FOR FIRE

PROTECTION, 2016 EDITION

NFPA 24, STANDARD FOR THE INSTALLATION OF PRIVATE FIRE SERVICE MAINS AND

THEIR APPURTENANCE, 2016 EDITION.

NFPA 54 NATOINAL FUEL GAS CODE, 2015 EDITION

NFPA 70, NATIONAL ELECTRIC CODE, 2014 EDITION

NFPA 72, NATIONAL FIRE ALARM CODE, 2016 EDITION

NFPA 75, STANDARD FOR THE PROTECTION OF ELECTRICAL COMPUTER/DATA

PROCESSING EQUIPMENT, 2017 EDITION

NFPA 77, RECOMMENDED PRACTICE ON STATIC ELECTRICITY, 2014 EDITION

NFPA 80, STANDARD FOR FIRE DOORS AND FIRE WINDOWS, 2016 EDITION

NFPA 90A, STANDARD FOR THE INSTALLATION OF AIR-CONDITIONING AND VENTILATING

SYSTEMS, 2015 EDITION.

NFPA 92, STANDARD FOR SMOKE CONTROL SYSTEMS, 2015 EDITION

NFPA 99, STANDARD FOR HEALTHCARE FACILITIES, 2015 EDITION

NFPA,99B, STANDARD FOR HYPOBARIC FACILITIES, 2015 EDITION

NFPA 101, LIFE SAFETY CODE, 2015 EDITION

NFPA 110, STANDARD FOR EMERGENCY AND STANDBY POWER SYSTEMS

NFPA 220, STANDARD TYPES OF BUILDING CONSTRUCTION, 2015 EDITION.

NFPA 780, STANDARD FOR INSTALLATION OF LIGHTING PROTECTION SYSTEMS, 2017

EDITION

NFPA 54 TYPE 2 CLOTHES DRYER UL 705 DEDPY, 2015 EDITION

MOST RECENT EDITION OF NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA

5000 AND NFPA 900

ASHRAE 90.1-2016 HVAC SYSTEMS

ASHRAE 180 - 2012 VENTILATION FOR HEALTH CARE FACILITIES

ASHRAE 62.1 - 2016 VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY

ASHRAE 1.1 - 2007 HVAC & R TECHNICAL REQUIREMENTS FOR COMMISSIONING

PROCESS

ASHRAE 0 - 2013 COMMISSIONING PROCESS

ASHRAE 55- 2013 THERMAL ENVIRONMENTAL CONDITIONS FOR HUMAN OCCUPANCY

ASHRAE 15 – 2013 SAFETY STANDARD FOR REFRIGERATION SYSTEMS

ANSI A117.1-2009 STANDARD ON ACCESSIBLE & USABLE BUILDINGS AND FACILITIES

2010 ADA STANDARDS FOR ACCESSIBLE DESIGN

OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS

ENERGY POLICY ACT OF 2005 (EPACT)

EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL, ENERGY, AND

TRANSPORTATION MANAGEMENT.

VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD

STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL

INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

VA MENTAL HEALTH FACILITIES DESIGN GUIDE, DECEMBER 2010 (REV. 08/01/2014)

VA BARRIER FREE DESIGN GUIDE PG-18-13, ABAAS

ARCHITECTURAL, AUGUST 1, 2014

ASBESTOS ABATEMENT, JULY 2011

CMP SCHEDULE AND RISK MANAGEMENT, VOL. 1 & 2, DECEMBER 2012

ELECTRICAL, DECEMBER 2015

ENERGY SUSTAINABILITY, MAY 2014

EQUIPMENT, JANUARY 2006

ESTIMATING, MARCH 8, 2011

NFPA INTERIM GUIDANCE FOR PROJECTS, PG-18-17, SEPTEMBER 30, 2010

FIRE PROTECTION, SEVENTH EDITION REVISED DECEMBER 2015

HVAC FOR NEW, REPLACEMENT, ADD. AND REN. OF EXIST. CA FACILITIES, MARCH 2011

INTERIOR DESIGN, MAY 2008

PHYSICAL SECURITY DESIGN MANUAL, JANUARY 2015

PLUMBING, NOVEMBER 2014

STRUCTURAL, FEBRUARY 1, 2014

WAY FINDING AND SIGNAGE, INTERIOR, DECEMBER 2012

SEISMIC DESIGN REQUIREMENTS, H-18-8, AUGUST 2013

ENVIRONMENTAL PLANNING GUIDANCE PG-18-17 NEPA INTERIM GUIDELINES FOR

PROJECTS SEPTEMBER 30, 2010

ELEVATOR DESIGN MANUAL, AUGUST 2016

EPA GUIDELINES CHECKLIST

VA DESIGN MANUALS PG-18-10:

GOVERNING CODES:

SMOKE COMPARTMENT DIVISION

CODE CRITERIA

GENERAL: THIS SUMMARY OF CODE REQUIREMENTS IS BASED PRIMARILY ON NFPA 101 (LSC). DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE IDENTIFIED. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD

PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES.

NOTES:

CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

CODE REVIEW

THE 2018 EDITION OF THE LIFE SAFETY CODE, NFPA 101, HAS BEEN USED TO REVIEW THIS PROJECT FOR COMPLIANCE WITH THE FIRE AND LIFE SAFETY REQUIREMENTS.

FOR FEATURES NOT ADDRESSED BY NFPA 101 AND THE REFERENCED NATIONAL FIRE CODES, THE 2018 EDITION OF THE INTERNATIONAL BUILDING CODE HAS BEEN

USED.

PROJECT SCOPE

THE PROJECT SCOPE INCLUDES TO VERTICALLY EXPAND BUILDING 1C TWO STORIES OVER A RECENTLY COMPLETED FIRST FLOOR EXPANSION. THE TWO ADDITIONAL FLOORS ARE BEING BUILT TO PROVIDE OFF UNIT PROGRAM SPACE FOR ADMINISTRATIVE, MEDICAL STAFF, RESPIRATORY THERAPY SUPPORT SPACE, PHYSICAL THERAPY ROOM FOR INPATIENTS, CHAPEL AND FAMILY SPACE. THIS OFF UNIT SPACE SUPPORTS THE IN-PROGRESS AND PROJECTED MEDICAL/SURGICAL INPATIENT UNITS’ INTERIOR RENOVATION IN BUILDING 1. THIS PROJECT’S SCOPE OF WORK ALSO INCLUDES THE RENOVATION OF THE MED/SURG UNIT ON THE THIRD FLOOR, EAST

WING OF BUILDING 1.

CODE ANALYSIS

THE CONSTRUCTION TYPE IS DETERMINED BASED UPON THE ALLOWABLE AREA AND HEIGHT REQUIREMENTS OF CHAPTER 5 OF THE 2018 IBC. CONSTRUCTION TYPE AND MATERIALS SHALL BE PER CHAPTER 6 OF THE IBC FOR TYPE 1-B AND LSC TYPE II (222) CONSTRUCTION AS FOLLOWS:

1. OCCUPANCY TYPE: I-2 INSTITUTIONAL, IBC CHAPTER 3/LSC CHAPTER 18 HEALTHCARE

2. CONSTRUCTION TYPE: 1-B (IBC CHAPTER 5)

3. FIRE RESISTIVE RATINGS TYPE 1-B CONSTRUCTION, CHAPTER 6 IBC/NFPA 101:

STRUCTURAL FRAME: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE (SEE SPRAY APPLIED FIRE RESISTIVE ASSEMBLIES SIMILAR TO UL X701)

BEARING WALLS

EXTERIOR: NONCOMBUSTIBLE, 2 -HOUR FIRE RESISTIVE

INTERIOR: NONCOMBUSTIBLE, 2 -HOUR FIRE RESISTIVE

NON-BEARING WALLS AND PARTITIONS

EXTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE RESISTIVE

INTERIOR: NONCOMBUSTIBLE, 0-HOUR FIRE-RESISTIVE

FLOOR: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE (SEE SPRAY APPLIED FIRE RESISTIVE ASSEMBLIES SIMILAR TO UL D703) ROOF: NONCOMBUSTIBLE, 2-HOUR FIRE RESISTIVE (SEE SPRAY APPLIED FIRE RESISTIVE ASSEMBLIES SIMILAR TO UL P701)

SHAFT ENCLOSURES 2-HOUR FIRE RESISTIVE >4 STORIES (IBC 713.4, LSC 12.3.6)

SHAFT ENCLOSURES 1-HOUR FIRE RESISTIVE <4 STORIES (IBC 713.4, LSC 12.3.6)

4. STRUCTURAL DESIGN SHALL COMPLY WITH CHAPTER 16 OF THE IBC.

5. ALLOWABLE HEIGHT: 160 FT (IBC, TABLE 504.3) ACTUAL HEIGHT: 143'

6. ALLOWABLE NUMBER OF STORIES ABOVE GRADE PLAN: 4 (IBC, TABLE 504.4) ACTUAL NUMBER OF STORIES: 4

7. ALLOWABLE AREA: BASED UPON I-2 OCCUPANCY, 1-B CONSTRUCTION TYPE, AND FULLY SPRINKLED: ALLOWABLE AREA: UNLIMITED (IBC, TABLE 506.2) ACTUAL AREA:

17,400 SF

8. BUILDING SEPARATION: BASED ON A 10' TO 30' FIRE SEPARATION DISTANCE A 1 -HOUR FIRE RESISTANCE WALL RATING IS REQUIRED. (IBC, TABLE 602)

9. PER IBC 2018 TABLE 705.8: 45% OF THE EXTERIOR WALL IS PERMITTED TO HAVE UNPROTECTED OPENINGS IN A FULLY SPRINKLERED BUILDING THAT IS 10 TO LESS THAN 15 FEET FROM AN ADJACENT BUILDING. 25% OF THE EXTERIOR WALL IS PERMITTED TO HAVE UNPROTECTED OPENINGS IN A FULLY SPRINKLERED BUILDING THAT IS 5 TO LESS THAN 10 FEET FROM AN ADJACENT BUILDING. AT THE CLOSEST LOCATION, ABOUT 4% OF THE WALL WILL CONTAIN UNPROTECTED OPENINGS.

9. OCCUPANCY SEPARATION: NONE REQUIRED.

ADDITIONS SHALL BE SEPARATED FROM ANY EXISTING STRUCTURE NOT CONFORMING TO THE PROVISIONS WITHIN CHAPTER 19 BY A FIRE BARRIER HAVING NOT LESS THAN A 2-HOUR FIRE RESISTANCE RATING AND CONSTRUCTED OF MATERIALS AS REQUIRED FOR THE ADDITION. (LSC 18.1.1.4.1) SECTIONS OF HEALTH CARE FACILITIES SHALL BE PERMITTED TO BE CLASSIFIED AS OTHER OCCUPANCIES, PROVIDED THAT THEY MEET BOTH OF THE FOLLOWING

CONDITIONS: (LSC 18.1.3.3)

(1) THEY ARE NOT INTENDED TO PROVIDE SERVICES SIMULTANEOUSLY FOR FOUR OR MORE INPATIENTS FOR PURPOSES OF HOUSING, TREATMENT, OR CUSTOMARY

ACCESS BY INPATIENTS INCAPABLE OF SELF-PRESERVATION.

(2) THEY ARE SEPARATED FROM AREAS OF HEALTH CARE OCCUPANCIES BY CONSTRUCTION HAVING A MINIMUM 2-HOUR FIRE RESISTANCE RATING IN ACCORDANCE

WITH CHAPTER 8.18.1.3.4 CONTIGUOUS NON-HEALTH CARE OCCUPANCIES.

10. MEANS OF EGRESS

• CLEAR WIDTH OF CORRIDORS SHALL BE CLEAR 8 FEET.

• AISLES, CORRIDORS, AND RAMPS IN ADJUNCT AREAS NOT INTENDED FOR THE HOUSING, TREATMENT, OR USE OF INPATIENTS SHALL BENT LESS THAN 44 IN.

(1120 MM) IN CLEAR AND UNOBSTRUCTED WIDTH.

• CLEAR WIDTH OF DOORS SHALL BE CLEAR 42 INCHES FROM SLEEPING ROOMS; DIAGNOSTIC AND TREATMENT AREAS, SUCH AS X-RAY, SURGERY, OR PHYSICAL

THERAPY;.

• CLEAR WIDTH OF DOORS SHALL BE CLEAR 32 INCHES

• NOT LESS THAN 2 EXITS SHALL BE PROVIDED PER FLOOR.

• ADDITION OCCUPANCY LOAD: <500 THEREFORE 2 EXITS REQUIRED (LSC 7.4.1)

• MAXIMUM TRAVEL DISTANCE, FULLY SPRINKLED: 200 FEET (LSC 18.2.6.2.1)

• COMMON PATH OF TRAVEL SHALL NOT EXCEED 100 FEET (LSC 18.2.5.3)

• DEAD END CORRIDORS SHALL NOT EXCEED 30 FEET. (LSC 18.2.5.2)

• MEANS OF EGRESS SHALL BE ILLUMINATED PER 7.9. (LSC 18.2.6.2.1)

• EMERGENCY LIGHTING SHALL BE PER 7.9. (LSC 18.2.9)

• EXIT SIGNAGE SHALL BE PROVIDED 7.10. (LSC 18.2.10)

11. WHERE GENERAL ANESTHESIA OR LIFE SUPPORT EQUIPMENT IS USED AND ESSENTIAL ELECTRICAL SYSTEM PER NFPA 99 SHALL BE PROVIDED.

12. HAZARDOUS AREAS. ANY HAZARDOUS AREAS SHALL BE PROTECTED IN ACCORDANCE WITH SECTION 8.7, AND THE AREAS DESCRIBED IN TABLE 18.3.2.1 SHALL BE

PROTECTED AS INDICATED. (LSC 18.3.2.2)

TABLE 18.3.2.1

• HAZARDOUS AREA PROTECTION:

1. CENTRAL/BULK LAUNDRIES LARGER THAN 100 FT2 (9.3 M2): 1 HOUR

• ROOMS WITH SOILED LINEN IN VOLUME EXCEEDING 64 GAL (242 L): 1 HOUR

• STORAGE ROOMS LARGER THAN 50 FT2(4.6 M2) BUT NOT EXCEEDING 100 FT2 (9.3 M2) AND STORING COMBUSTIBLE MATERIAL SEE 18.3.6.3.11.

• STORAGE ROOMS LARGER THAN 100 FT2 (9.3 M2) AND STORING COMBUSTIBLE MATERIAL 1 HOUR

• ROOMS WITH COLLECTED TRASH IN VOLUME EXCEEDING 64 GAL (242 L)1 HOUR† MINIMUM FIRE RESISTANCE RATING.

13. INTERIOR FINISH

• WALLS AND CEILINGS: INTERIOR FINISH FLAME SPREAD SHALL BE LIMITED PER CHAPTER 10.2 OF THE NFPA 101 TO CLASS A MATERIALS. (LSC 18.4.3.6.2)

• · CLASS A: FLAME SPREAD 0-25; SMOKE DEVELOPED 0-450.

• FLOORS: INTERIOR FLOOR FINISH SHALL BE CLASS I.

• FABRIC DRAPERIES, CURTAINS (EXCLUDING SHOWER CURTAINS, BUT INCLUDING CUBICLE CURTAINS), AND OTHER LOOSELY HANGING FABRICS AND FILMS

SERVING AS FURNISHINGS OR DECORATIONS IN HEALTH CARE OCCUPANCIES MUST MEET THE FLAME RESISTANCE REQUIREMENTS OF NFPA 701, STANDARD

METHODS OF FIRE TESTS FOR FLAME-RESISTANT TEXTILES AND FILMS.

• UPHOLSTERED FURNITURE AND MATTRESSES. UPHOLSTERED FURNITURE AND MATTRESSES MUST ALSO MEET SPECIFIED REQUIREMENTS, BASED ON NFPA

260, NFPA 261, NFPA 266, 16 CFR 1632, ASTME E1537, AND ASTME E1590

14. EXTINGUISHMENTS REQUIREMENTS, PORTABLE FIRE EXTINGUISHERS SHALL BE PROVIDED PER NFPA 10.

15. DETECTION, ALARM, AND COMMUNICATIONS SYSTEMS.

• FIRE ALARM SYSTEM SHALL BE PROVIDED LSC, NFPA 70 (NEC) AND NFPA 72. (LSC 9.6.1)

• FIRE ALARM MAY BE BY MANUAL MEANS (LSC 18.3.4.2.1)(LSC 9.6.2)

• OCCUPANT NOTIFICATION SHALL BE THROUGH AUTOMATIC MEANS PER 9.6.3. (LSC 18.3.4.3)

• SMOKE DETECTION SHALL BE PROVIDED PER NFPA 72.

• EMERGENCY RESPONDER NOTIFICATION SHALL BE NOTIFIED BY ALARM AND DETECTION SYSTEM PER 9.6.4. (LSC 18.3.4.3.2)

16. FIRE SUPPRESSION:

SPRINKLER SYSTEM: BUILDING IS REQUIRED TO BE SPRINKLED THROUGHOUT IN ACCORDANCE WITH NFPA 13.

THE SPRINKLER SYSTEM SHALL BE HYDRAULICALLY DESIGNED IN ACCORDANCE WITH 2013 EDITION OF NFPA 13 AND THE SIXTH EDITION OF THE DEPARTMENT OF

VETERANS AFFAIRS FIRE PROTECTION DESIGN MANUAL: MINIMUM DESIGN REQUIREMENTS:

STORAGE MECHANICAL AND ELECTRICAL ROOMS SHALL BE PROTECTED AS:

ORDINARY HAZARD OCCUPANCY, GROUP 1: 0.15 GPM/FT2 OVER 1,500 FT2.

HOSE STREAM ALLOWANCE: 250 GPM

ALL OTHER AREAS SHALL BE PROTECTED AS:

LIGHT HAZARD OCCUPANCY: 0.10 GPM/FT2 OVER 1,500 FT2.

HOSE STREAM ALLOWANCE: 100 GPM

ALL SPRINKLERS WITHIN THE SMOKE ZONE SHALL BE QUICK RESPONSE SPRINKLERS.

17. CONSTRUCTION BARRIERS CONSTRUCTED ALONG MEANS OF EGRESS SHALL BE CONSTRUCTED AND MAINTAINED PER NFPA 241.

**VARIANCES - SEE DISTANCE NOTED ON 3RD FLOOR

BECAUSE THIS IS AN EXISTING MEDICAL CENTER AND IS NOT FEASIBLE OR COST PROHIBITIVE TO CHANGE THE LOCATION OF THE EXIT. IT IS PERMITTED TO EXCEED THE 30 FEET DISTANCE. BASED ON MY CONSULTATION WITH THE CENTRAL OFFICE SUBJECT MATTER EXPERT, A DEVIATION WAIVER IS NOT, REQUIRED TO BE SUBMITTED

BECAUSE THIS IS AN EXISTING MEDICAL CENTER.

3/31/2020

ERIC ROY SR., M.S., ED.S.P./T.ED

VISN 15 SAFETY ENGINEER

1201 WALNUT STREET, SUITE 800

KANSAS CITY, MO 64106

(816) 701-3035 OFFICE

CODE ANALYSIS - NFPA 101, INSTITUTIONAL HEALTHCARE CHAPTER 18

7' - 5 3/16"

EX

IT

EXIT

EX

IT

TRAVEL DISTANCE = 118'

EXISTING STAIR EXISTING STAIR EXISTING STAIR

EXISTING

BUILDING

EXISTING

BUILDING

AREA OF RENOVATION 1,049 SF

INPATIENT TREATMENT AREA

240 GROSS SF PER OCCUPANT

5 OCCUPANTS

FEC

EXISTING SMOKE

COMPARTMENT DIVISION

AREA OF ADDITION 4,236 SF

BUSINESS AREA

150 GROSS SF PER OCCUPANT

29 OCCUPANTS

8' - 0"

17' - 5 3/4"

HI/LO DRINKING FOUNTAINS

TOTAL 2ND FLOOR AREA: 20,395 SF

SMOKE

COMPARTMENT

12,4141 SF SMOKE

COMPARTMENT

7,981 SF

5'

- 0

EX

IT

EXISTING STAIR EXISTING STAIR EXISTING STAIR

EXIT

TRAVEL DISTANCE = 118'

AREA OF ADDITION 4,236 SF

BUSINESS AREA

150 GROSS SF PER OCCUPANT

29 OCCUPANTS

AREA OF RENOVATION 8,080 SF

INPATIENT TREATMENT AREA

240 GROSS SF PER OCCUPANT

34 OCCUPANTS

FEC

FEC

FEC

TRAVEL DISTANCE = 105'TRAVEL DISTANCE = 120'

TOTAL 3RD FLOOR AREA: 20,395 SF

HI/LO DRINKING FOUNTAINS

NEW SMOKE

COMPARTMENT DIVISION

SMOKE

COMPARTMENT

12,4141 SF

SMOKE

COMPARTMENT

7,981 SF

1/ 4"

TRAVEL

DISTANCE = 136'

2ND FLOOR

ADDITION

SHADE INDICATES

EXISTING AREA BEYOND

PRIMARY SCOPE OF

WORK, TYPICAL

1ST FLOOR

2ND FLOOR

3RD FLOOR

3RD FLOOR

ADDITION

AREA OF RENOVATION

BUILDING 1C

BUILDING 1

AREA OF RENOVATION

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

GI101

CODE ANALYSIS AND LIFE SAFETY

PLANSGUIDON DESIGN INC.

1221 N PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

(317)-800-6388

CMTA CONSULTING ENGINEERS

10411 MEETING STREET

PROSPECT, KY 40059

(502)-326-3085

VA WICHITA - MED/SURG BEDS

FOR PATIENT PRIVACY

WICHITA, KANSAS

589-701

1 & 1C

05/22/2020 JDF JDJ

BID DOCUMENTS

SCALE: 1/16" = 1'-0"GI101

1 2ND FLOOR LIFE SAFETY PLAN

SCALE: 1/16" = 1'-0"GI101

2 3RD FLOOR LIFE SAFETY PLAN

SCALE: 1" = 100'-0"

KEYPLAN ISOMETRIC

TYP.

TYP.

OPEN OFFICE

2505 SF

EXISTING 1ST

FLOOR ROOF

BELOW

EXISTING 2ND

FLOOR ROOF

BELOW

EXISTING 2ND

FLOOR ROOF

BELOW

OPEN OFFICE

2505 SF

CHANGE FAÇADE OF NEW EXPANSION FROM BRICK TO METAL PANEL. THE BASIS OF DESIGN FOR THE METAL PANEL IS THE BERRIDGE FW-12 PANEL, 22 GAUGE, DARK BRONZE OR EQUAL. USE THE MANUFACTURER’S TYPICAL DETAILS AND

CONSTRUCTION.

CONTRACTOR SHALL BE REQUIRED TO PROVIDE ALL REQUIRED CHANGES ASSOCIATED WITH THIS BID ALTERNATE MATERIAL CHANGE. ALL ATTACHMENTS, GIRTS OR ADDITIONAL STUDS IF REQUIRED, AND ALL OTHER COMPONENTS TO INSTALL THE

METAL PANEL OVER RIGID INSULATION AS DETAILED ON THESE DRAWINGS.

PROVIDE FLASHING AND MANUFACTURER'S RECOMMENDED INSTALLATION AT TRANSITIONS TO OTHER MATERIALS, EXISTING

BUIDINGS, AND AN ALUMINUM COPING APPROPRIATE FOR THE METAL PANEL.

BID DEDUCTIVE ALTERNATE 1

SEE MEP DRAWINGS FOR DESCRIPTION OF BID DEDUCTIVE ALTERNATE 2

BID DEDUCTIVE ALTERNATE 2

FOR THE 3RD FLOOR OF B1C, FULLY BUILD OUT ROOMS C306, C307, C308, C309 AND C310. THE REMAINDER OF THE INTERIOR SPACE TO BE FINISHED WITH CARPET TILE, PAINT, AND ACT CEILINGS, WITH SMALL POWER POLES FOR ELECTRIC AND DATA.

THE HVAC TO BE REDUCED TO 3 ZONES IN THIS SPACE. FULLY BUILD OUT THE 2ND FLOOR.

BID DEDUCTIVE ALTERNATE 3

FOR THE 3RD FLOOR OF B1C, FULLY BUILD OUT ROOMS C306, C307, C308, C309 AND C310. FOR THE 2ND FLOOR OF B1C, FULLY BUILD OUT ROOMS C207 AND C208. THE REMAINDER OF THE INTERIOR SPACES TO BE FINISHED WITH CARPET TILE, PAINT, AND ACT CEILINGS, WITH SMALL POWER POLES FOR ELECTRIC AND DATA. THE HVAC TO BE REDUCED TO 3 ZONES IN EACH

SPACE.

BID DEDUCTIVE ALTERNATE 4

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

GI102

BID DEDUCTS

GUIDON DESIGN INC.

1221 N PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

(317)-800-6388

CMTA CONSULTING ENGINEERS

10411 MEETING STREET

PROSPECT, KY 40059

(502)-326-3085

VA WICHITA - MED/SURG BEDS

FOR PATIENT PRIVACY

WICHITA, KANSAS

589-701

1 & 1C

05/22/2020 JDF JDJ

BID DOCUMENTS

NOT TO SCALEGI102

1 PERSPECTIVE MASSING - METAL PANEL DEDUCT

SCALE: 1/8" = 1'-0"GI102

2 2ND FLOOR BID DEDUCT PLAN

SCALE: 1/8" = 1'-0"GI102

3 3RD FLOOR BID DEDUCT PLAN

ADDENDUM 2020/11/16

UP

DN

DN

DN

INFECTION CONTROL /PHASING PLAN NOTES #

INFECTION CONTROL PROJECT INFORMATION

PROVIDE TEMPORARY 1 HR FIRE RATED SMOKE BARRIER WALL

CONSTRUCTION PER NFPA 241. REFER TO DETAIL 2/GI102.

PROVIDE TEMPORARY INFECTION CONTROL CONSTRUCTION DOOR WITH CARD

READER ACCESS. REFER TO ELEVATION 3/G102.

PROVIDE TEMPORARY INFECTION CONTROL BARRIER WALL CONSTRUCTION.

REFER TO DETAIL 1/GI102.

PROVIDE TEMPORARY INFECTION CONTROL PLASTIC BARRIER WALL

CONSTRUCTION. REFER TO SPECIFICATION FOR ADDITIONAL INFORMATION.

REFER TO DRAWINGS, SPECIFICATIONS AND DOOR HARDWARE SCHEDULE

FOR ADDITIONAL INFORMATION.

PROJECT SHALL BE COMPLETED IN TWO PHASES.

COORDINATE FULL SCOPE OF WORK WITH ENGINEERING DRAWINGS AND

FIELD VERIFICATION. CONTRACTOR IS RESPONSIBLE FOR SCOPE OF ABOVE

CEILING WORK REQUIRED ABOVE AND BELOW THE FLOOR PLATE OF THE

PROJECT BOUNDARY.

COORDINATE LOCATION OF TEMPORARY INFECTION CONTROL (IC) BARRIER

WALL CONSTRUCTION AND INFECTION CONTROL (IC) MEASURES WITH COR

AND PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE. TEMPORARY

IC BARRIER WALL CONSTRUCTION LOCATIONS IN DRAWINGS ARE

APPROXIMATE. CONTRACTOR SHALL PROVIDE DRAWING TO COR AND

PATIENT SAFETY/ INFECTION CONTROL REPRESENTATIVE ONCE ICRA

PROTOCOLS AND PLAN IS APPROVED.

SCHEDULE AND TIME OF CONSTRUCTION WORK TO BE APPROVED BY COR

AND NURSING STAFF BEFORE CONSTRUCTION MAY BEGIN. PROVIDE PHASING

INFORMATION FOR ABOVE CEILING WORK IN THE CONTRACTOR PROVIDED

CPM SCHEDULE FOR WORK ALSO REQUIRED ABOVE AND BELOW THE FLOOR

PLATE OF THE PROJECT BOUNDARY.

ABOVE CEILING WORK SHALL TAKE PLACE BETWEEN THE HOURS OF 5:00 PM

AND 5:00 AM. IN AREAS THAT REQUIRE ABOVE CEILING WORK WHERE

CEILINGS ARE TO REMAIN, CEILING TILES SHALL BE REMOVED AND STORED IN

A SAFE MANNER UNTIL CEILING TILES CAN BE REINSTALLED. DAMAGED AND

BROKEN CEILING TILES SHALL BE REPLACED BY CONTRACTOR.

EXIT/ACCESS FOR ADJACENT OPERATIONAL AREAS SHALL BE MAINTAINED

DURING NORMAL BUSINESS HOURS. SEE SPECIFICATION FOR HOURS OF

OPERATION.

WORK REQUIRING VIBRATION OR LOUD NOISE SHALL TAKE PLACE DURING

THE DAY AS PATIENTS WILL BE SLEEPING AT NIGHT. COORDINATE NEW

WORK WITH PET CT SCANNER. EVERY EFFORT SHALL BE MADE TO KEEP

NOISE AND VIBRATION TO A MINIMUM. COORDINATE UTILITY OUTAGES OR

OTHER IMPACTFUL REQUIREMENTS WITH VA FOR OFF HOURS.

PROVIDE A 24"X36" STICKY WALK OFF MAT AND HAND SANITIZER AT EACH

TEMPORARY DOOR LOCATION. MAT SHALL BE REPLACED OR CLEANED AS

NECESSARY

PROVIDE THE VA AND OSHA REQUIRED TEMPORARY SIGNAGE AT EACH

TEMPORARY DOOR LOCATION.

CONTRACTOR SHALL SUPPLY SPILL KIT TO INCLUDE SHOP VAC, MULTI-

PURPOSE SPILL CONTROL SORBENTS TO ABSORB NON AGGRESSIVE LIQUIDS

UP TO 30 GALLONS.

ALL NEW MATERIAL MOVED THROUGH THE FACILITY SHALL BE COVERED WITH

6 MIL. POLY SHEET.

ALL DEMOLITION MATERIAL SHALL BE REMOVED FROM THE PROJECT

BOUNDARY THROUGH THE FACILITY TO DUMPSTER ALONG VA APPROVED

ROUTE IN ENCLOSED DUMPSTER CART DESIGNED FOR SUCH PURPOSE WITH

A LID.

ALL MATERIAL, DEBRIS AND HAZARDOUS MATERIALS SHALL BE PROPERLY

STORED IN DESIGNATED AREAS AND APPROVED CONTAINERS. FLAMMABLE

MATERIALS SHALL NOT BE STORED IN THE FACILITY.

PROVIDE CONTAINMENT CART FOR ABOVE CEILING ACCESS OUTSIDE

PROJECT BOUNDARY.

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

INFECTION CONTROL/PHASING GENERAL NOTES

IC/PHASING LEGEND

TEMPORARY FILM BARRIER. SEE PLAN

AND PLAN NOTES

TEMPORARY CONSTRUCTION ACCESS

DOORS AND WALLS

BEYOND PROJECT BOUNDARY

PHASE 1

PHASE 2B

PHASE 2A

CONTINUOUS FIRESAFE SEALANT

TOP AND BOTTOM, & BOTH SIDES

3 1/2" SOUND ATTENUATION

BATT.

5/8" TYPE X GYPSUM BOARD, BOTH

SIDES

3 5/8" METAL STUD @ 16" O.C.

WITH RUNNER CHANNELS ALONG

TOP AND BOTTOM

CONSTRUCTION

SIDE

PUBLIC

SIDE

6 MIL. FIRE RETARDANT VISQUEEN

MEMBRANE. CONTINUOUSLY

ADHERE TO THE STRUCTURAL DECK

ABOVE AND TO THE FLOOR BELOW

WITH TAPE.

UNDERSIDE OF STRUCTURAL DECK

UL LISTING: U465

COORDINATE WITH EXISTING

CEILING

TEMPORARY IC BARRIER WALL

CONSTRUCTION (DUST WALL)

5/8" TYPE X GYP BD

3 5/8" STEEL STUDS @ 16"

O.C.

BEAD OF CONT. SEALANT

6-MIL FIRE RETARDENT POLY

INTERIOR SIDE

CEILING

2" DEEP LEG 3 5/8" STEEL SLIP TRACK

3 5/8" STEEL STUD TRACK

6" M

IN

CONTINUOUSLY ADHERE 6-MIL. FIRE

RETARDANT POLY TO DECK WITH TAPE

CONTINUOUSLY ADHERE FIRE RETARDENT

POLY TO FLOOR WITH TAPE

EXISTING DECK

CONSTRUCTION

SIDE

OCCUPIED

SIDE

PUBLIC SIDE

1 HOUR FIRE RATED METAL DOOR ASSEMBLY

AND FRAME WITH SEALS, KEYED LOCK,

HARDWARE AND CLOSER

AIR PRESSURE MONITOR

HAND SANITIZER

SEAL ALL EDGES WITH TAPE

SEAL ALL EDGES WITH TAPE

REFER TO TEMPORARY BARRIER TYPE

FOR REQUIRED CONDITION TO

STRUCTURE ABOVE

VA / OSHA TEMPORARY SIGNAGE

7' - 5 3/16"

EX

IT

EXIT

EX

IT

PHASE 1: 2ND AND 3RD FLOOR ADDITION

AND 2ND FLOOR RENOVATION

ABOVE CEILING WORK IS REQUIRED TO

ACCOMMODATE PLUMBING CONNECTIONS, SEE

PLUMBING DRAWINGS

PHASE 2B: 2ND FLOOR RENOVATION DONE

AFTER HOURS TO ALLOW ACCESS TO

ACTIVE 2ND FLOOR AREA FROM ELEVATOR

PHASE 2A: 2ND FLOOR RENOVATIONS

TEMPORARY WALLS ON EITHER SIDE OF

COORIDOR CANNOT EXIST AT THE SAME

TIME UNLESS 6'-0" CLEAR IS MAINTAINED.

5'

- 0

5' - 0 1/8"

5'

- 0

1/ 8"

EX

IT

EXIT

PHASE 1: 2ND AND 3RD FLOOR ADDITION,

AND A PORTION OF 3RD FLOOR

RENOVATION AS INDICATED BY HATCH

PHASE 2B: 3RD FLOOR RENOVATION DONE

AFTER HOURS TO ALLOW ACCESS TO WEST

HALF OF 3RD FLOOR FROM ELEVATOR

PHASE 2A: 3RD FLOOR RENOVATIONS

TEMPORARY WALLS ON EITHER SIDE OF

COORIDOR CANNOT EXIST AT THE SAME

TIME UNLESS 6'-0" CLEAR IS MAINTAINED.

2ND FLOOR

ADDITION

SHADE INDICATES

EXISTING AREA BEYOND

PRIMARY SCOPE OF

WORK, TYPICAL

1ST FLOOR

2ND FLOOR

3RD FLOOR

3RD FLOOR

ADDITION

AREA OF RENOVATION

BUILDING 1C

BUILDING 1

AREA OF RENOVATION

PHASE 1: 2ND AND 3RD FLOOR

ADDITION, AND ASSOCIATED 4TH

FLOOR RENOVATION

6-MIL FIRE

RETARDENT

POLY

CEILING

COORDINATE WITH EXISTING

CEILING. PROVIDE CONTINUOUS

FIRESAFE SEALANT TOP AND

BOTTOM, BOTH SIDES

PUBLIC SIDE

CONSTRUCTION

SIDE

PHASE 2: TEMPORARY

AHU INSTALLATION AND

REPLACEMENT OF AHU

IN BASEMENT

*AREA INCLUDES ABOVE THE CEILING

MECHANICAL / PLUMBING WORK AS

PART OF THE SCOPE OF WORK -

COORDINATE WITH MECHANCIAL

PLUMBING DRAWINGS.

*EXISTING CEILING HEIGHT IS 8'-0"

UNLESS OTHERWISE NOTED.

APPROXIMATE LOCATION OF ABOVE

CEILING PIPING WORK - SEE

PLUMBING DRAWINGS

APPROXIMATE LOCATION OF ABOVE

CEILING PIPING WORK - SEE

PLUMBING DRAWINGS

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

GC101

INFECTION CONTROL/PHASING

PLANSGUIDON DESIGN INC.

1221 N PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

(317)-800-6388

CMTA CONSULTING ENGINEERS

10411 MEETING STREET

PROSPECT, KY 40059

(502)-326-3085

VA WICHITA - MED/SURG BEDS

FOR PATIENT PRIVACY

WICHITA, KANSAS

589-701

1 & 1C

05/22/2020 JDF JDJ

BID DOCUMENTS

SCALE: 1 1/2" = 1'-0"GC101

1 TEMP. 1 HR FIRE RATED SMOKE BARRIER WALL

SCALE: 1 1/2" = 1'-0"GC101

2 TEMP. INFECTION CONTROL BARRIER WALL

SCALE: 1/4" = 1'-0"GC101

3 TEMPORARY WALL ELEVATION

SCALE: 1/16" = 1'-0"GC101

8 2ND FLOOR PHASING PLAN

SCALE: 1/16" = 1'-0"GC101

9 3RD FLOOR PHASING PLAN

SCALE: 1" = 100'-0"

KEYPLAN ISOMETRIC

SCALE: 1/16" = 1'-0"GC101

7 4TH FLOOR AND ROOF PLAN - PHASING

SCALE: 1 1/2" = 1'-0"GC101

4 TEMPORARY FILM BARRIER

SCALE: 1/16" = 1'-0"GC101

5 BASEMENT PHASING PLAN

SCALE: 1/16" = 1'-0"GC101

6 1ST FLOOR PHASING PLAN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant:

GC102

SUPPLEMENTAL PHASING /

CONSTRUCTION LOGISTICSGUIDON DESIGN INC.

1221 N PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

(317)-800-6388

CMTA CONSULTING ENGINEERS

10411 MEETING STREET

PROSPECT, KY 40059

(502)-326-3085

VA WICHITA - MED/SURG BEDS

FOR PATIENT PRIVACY

WICHITA, KANSAS

589-701

1 & 1C

05/22/2020 JDF JDJ

BID DOCUMENTS

TEMPORARY AHU LOCATION

PROVIDE CONSTRUCTION FENCING

AROUND FULL PERIMETER.

COORDINATE WITH VA.

FEED TEMPORARY AHU TO BASEMENT

AND EXISTING VERTICAL RISERS

THROUGH EXISTING AREAWAY

NOT TO SCALEGC102

1 PHASE 2 - CONSTRUCTION LOGISTICS

NOT TO SCALEGC102

2 PHASE 2 - TEMPORARY AHU COORDINATION VIEW

FEED TEMPORARY AHU TO BASEMENT

AND EXISTING VERTICAL RISERS

TEMPORARY AHU TO FEED 2ND

AND 3RD FLOORS TO REPLACE

EXISTING AHU

EXISTING OA PLENUM. TEMPORARY AHU

TO FEED THROUGH EXISTING AREAWAY

NOT TO SCALEGC102

3 PHASE 1 - 3D COORDINATION VIEW

EXISTING BUILDING 1C

CONTRACTOR SHALL MINIMIZE SHUT DOWNS TO THE EXISTING PET/CT AREA IN

BUILDING 1C, AS IT WILL REMAIN OPERATIONAL FOR THE DURATION OF THIS

PROJECT. LEAVE EXISTING ROOFING ASSEMBLY INTACT AS MUCH AS POSSIBLE

WHILE PROVIDING NEW STRUCTURE ABOVE. PROVIDE NEW ROOFING ASSEMBLY,

PERMANENT OR TEMPORARY CURBS/ MOUNTING FOR NEW MECHANICAL UNITS,

AND ALL OTHER NEW ITEMS TO REDUCE DISRUPTION TO ONGOING OPERATIONS.

SEE STRUCTURAL AND MEP DRAWINGS FOR ADDITIONAL INFORMATION.

NEW 2ND AND 3RD FLOOR ADDITION

PROJECT SITE

NOTE ACCESS TO

SITE LIMITATIONS -

WILL HAVE TO TAKE

CONSTRUCTION MATERIALS

UNDER OR OVER EXISTING

STRUCTURES, SEE CIVIL

DRAWINGS

Bldg.

#61

Bldg.

#26

Bldg.

#03

Bldg.

#01

Bldg.

#19

Bldg.

#02

Bldg.

#34

Bldg.

#04

Bldg.

#60

Bldg.

#01C

Bldg.

#01

EAST KELLOG DRIVE

SO

U

TH

E

D G

EM

O

O R

S

TR

EE

T

EAST WATERMAN STREET

Bldg.

#01B

Bldg. #26

Bldg. #03 Bldg. #01

Bldg. #19 Bldg. #02

Bldg.

#01C

Bldg. #01B

Bldg.

#01C

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC.

1221 N PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

(317)-800-6388

Consultant:

CMTA CONSULTING ENGINEERS

10411 MEETING STREET

PROSPECT, KY 40059

(502)-326-3085

VA WICHITA - MED/SURG BEDS

FOR PATIENT PRIVACY

WICHITA, KANSAS

589-701

1 & 1C

5/22/2020 DWC DSMRevisions: Date:

BID DOCUMENTS

CC001

CONSTRUCTION ACCESS PLAN

PROJECT

SITE

PROJECT

SITE

N

0 80400 200100

0 2010

Bldg. #19 Bldg. #19

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

Fi le

P at h 6/

/2

:3

9:

P M

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

GUIDON DESIGN INC.

1221 N PENNSYLVANIA STREET

INDIANAPOLIS, IN 46202

(317)-800-6388

Consultant:

CMTA CONSULTING ENGINEERS

10411 MEETING STREET

PROSPECT, KY 40059

(502)-326-3085

VA WICHITA - MED/SURG BEDS

FOR PATIENT PRIVACY

WICHITA, KANSAS

589-701

1 & 1C

5/22/2020 DWC DSMRevisions: Date:

BID DOCUMENTS

CS101

GROUND LEVEL ACCESS PLAN

N

Bldg.

#02

0 2010

Bldg.

#01C

Bldg.

#02

0 2010

Bldg.

#01C

N

File details come from the government source that posted it. Updated .