000110 Table of Contents.pdf

PDF 166 KB Posted

Attached to
Z2DA--Construct and Renovate Med/Surg Beds for Patient Privacy, B1 and B1C P/N:589-701
Solicitation number
36C25520R0115
Issued by

About this file

This notice provides details for a competitive total set-aside federal construction contract opportunity for the Department of Veterans Affairs. The solicitation will be issued for project number 589-701 to construct and renovate medical/surgical beds for patient privacy at the Robert J. Dole VA Medical Center in Wichita, Kansas. The general scope of work involves vertically expanding an existing building by two stories and renovating the east wing of an inpatient unit to provide all new private patient rooms and administrative spaces. Construction services are required, including general construction, demolition, new interior finishes, mechanical and electrical systems, medical equipment installation, and other items as outlined in project drawings and specifications. The project cost range is between $5 million and $10 million. The estimated period of performance is 730 calendar days after notice to proceed. The contract will be awarded using best value tradeoff source selection to a Service-Disabled Veteran-Owned Small Business. The solicitation is expected to be issued on or around October 20, 2020 with proposals due approximately 30 days thereafter.

View the file

Other files

File Type Posted
281300 - Physical Access Control System.pdf PDF
18.1019.05 - Addendum 5 Dwgs - Pages 8-14.pdf PDF
18.1019.05 - Addendum 5 Revised AE601.pdf PDF
589-701 PRE BID SIGN IN SHEET.pdf PDF
36C25520R0115 0005.docx DOCX document
000110 Table of Contents revised for A0005.pdf PDF
022113 - Site Surveys.pdf PDF
As builts bldg 19 to bldg 2 connecting cor dwgs.pdf PDF
18.1019.05 Addendum 5 Dwgs pages 1-7.pdf PDF
P09 589-701 Revised Drawings Pg 81-90.pdf PDF
36C25520R0115 0004.docx DOCX document
230923.pdf PDF
P09 589-701 Revised Drawings Pg 1-10.pdf PDF
P09 589-701 Revised Drawings Pg 11-20.pdf PDF
P09 589-701 Revised Drawings Pg 41-50.pdf PDF
P09 589-701 Revised Drawings Pg 71-80.pdf PDF
P09 589-701 Revised Drawings Pg 91-100.pdf PDF
226300.pdf PDF
P09 589-701 Revised Drawings Pg 31-40.pdf PDF
P09 589-701 Revised Drawings Pg 61-70.pdf PDF
P09 589-701 Revised Drawings Pg 101-117.pdf PDF
P09 589-701 Revised Drawings Pg 51-60.pdf PDF
P09 589-701 Revised Drawings Pg 21-30.pdf PDF
18.1019.05 - 2020.11.16 - List of Changes.docx DOCX document
226200.pdf PDF
36C25520R0115 0003.docx DOCX document
36C25520R0115 0002.docx DOCX document
RFI received 11-2-2020.docx DOCX document
S02 36C25520R0115_2.docx DOCX document
36C25520R0115 0001.docx DOCX document
P09 589-701 Drawings Pg 41-50.pdf PDF
P09 589-701 Drawings Pg 11-20.pdf PDF
P09 589-701 Drawings Pg 21-30.pdf PDF
P09 589-701 Drawings Pg 31-40.pdf PDF
P09 589-701 Drawings Pg 1-10.pdf PDF
P09 589-701 Drawings Pg 91-100.pdf PDF
P09 589-701 Drawings Pg 51-60.pdf PDF
P09 589-701 Drawings Pg 101-116.pdf PDF
P09 589-701 Drawings Pg 61-70.pdf PDF
P09 Bid Docs - Specs Vol 2.pdf PDF
P09 589-701 Drawings Pg 81-90.pdf PDF
P09 SOW 589-701rev_01.pdf PDF
P09 Bid Docs - Specs Vol 1.pdf PDF
36C25520R0115_2.docx DOCX document
P09 589-701 Drawings Pg 71-80.pdf PDF
Show all 45

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Wichita KS VAMC May 22, 2020

VA Project No. 589-701 Bid Documents

Construct & Renovate Med/Surg Beds for Patient Privacy 09-01-19

00 01 10 - 1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

VOLUME 1

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 12-18

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 04-13

01 33 23 Shop Drawings, Product Data, and Samples 05-17

01 35 26 Safety Requirements 02-17

01 42 19 Reference Standards 09-19

01 45 00 Quality Control 03-19

01 45 29 Testing Laboratory Services 11-18

01 45 35 Special Inspections 03-19

01 57 19 Temporary Environmental Controls 01-11

01 58 16 Temporary Interior Signage 07-15

01 74 19 Construction Waste Management 09-13

01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 07-19

DIVISION 04 – MASONRY

04 01 00 Maintenance of Masonry 02-16

04 05 13 Masonry Mortaring 10-17

04 05 16 Masonry Grouting 02-16

04 20 00 Unit Masonry 08-17

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 11-18

05 31 00 Steel Decking 02-16

05 36 00 Composite Metal Decking 10-15

05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17

06 20 00 Finish Carpentry 08-16

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 21 13 Thermal Insulation 10-17

07 22 00 Roof and Deck Insulation 02-16

07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 02-16

07 54 23 Thermoplastic Polyolefin (TPO) Roofing 08-16

Construct & Renovate Med/Surg Beds for Patient Privacy 09-01-19

00 01 10 - 2

07 60 00 Flashing and Sheet Metal 07-14

07 71 00 Roof Specialties 10-15

07 72 00 Roof Accessories 10-15

07 81 00 Applied Fireproofing 10-17

07 84 00 Firestopping 02-16

07 92 00 Joint Sealants 10-17

07 95 13 Expansion Joint Cover Assemblies 02-16

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16

08 14 00 Interior Wood Doors 02-16

08 31 13 Access Doors and Frames 02-16

08 51 13 Aluminum Windows 02-16

08 71 00 Door Hardware 08-19

08 71 13.11 Low Energy Power Assist Door Operators 08-16

08 80 00 Glazing 10-15

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 02-15

09 06 00 Schedule for Finishes 04-15

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 06-18

09 30 13 Ceramic/Porcelain Tiling 09-15

09 51 00 Acoustical Ceilings 12-18

09 65 13 Resilient Base and Accessories 02-16

09 65 16 Resilient Sheet Flooring 05-18

09 65 19 Resilient Tile Flooring 05-18

09 84 33 Sound-Absorbing Wall Units 10-15

09 91 00 Painting 01-16

DIVISION 10 – SPECIALTIES

10 11 13 Chalkboards and Markerboards 10-15

10 11 23 Tackboards 10-15

10 13 00 Directories 05-15

10 14 00 Signage 10-15

10 21 23 Cubicle Curtain Tracks 05-15

10 25 13 Patient Bed Service Walls 08-18

10 26 00 Wall and Door Protection 10-15

10 28 00 Toilet, Bath, and Laundry Accessories 02-16

10 44 13 Fire Extinguisher Cabinets 08-18

DIVISION 12 – FURNISHINGS

12 24 00 Window Shades 08-17

12 36 00 Countertops 12-18

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components

01-14

Construct & Renovate Med/Surg Beds for Patient Privacy 09-01-19

00 01 10 - 3

VOLUME 2

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-16

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 07-16

22 05 23 General-Duty Valves for Plumbing Piping 09-15

22 07 11 Plumbing Insulation 09-19

22 08 00 Commissioning of Plumbing Systems 11-16

22 11 00 Facility Water Distribution 09-15

22 13 00 Facility Sanitary and Vent Piping 09-15

22 14 00 Facility Storm Drainage 09-15

22 40 00 Plumbing Fixtures 09-15

22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15

22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 08-17

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

02-20

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

02-15

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15

23 07 11 HVAC and Boiler Plant Insulation 02-20

23 08 00 Commissioning of HVAC Systems 11-16

23 09 23 Direct-Digital Control System for HVAC 09-11

23 21 13 Hydronic Piping 08-17

23 21 23 Hydronic Pumps 08-17

23 22 13 Steam and Condensate Heating Piping 02-20

23 25 00 HVAC Water Treatment 02-15

23 31 00 HVAC Ducts and Casings 03-13

23 34 00 HVAC Fans 02-15

23 36 00 Air Terminal Units 02-15

23 37 00 Air Outlets and Inlets 02-15

23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units 04-11

23 81 00 Decentralized Unitary HVAC Equipment 02-11

23 82 16 Air Coils 04-11

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16

26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17

26 05 26 Grounding and Bonding for Electrical Systems 01-17

26 05 33 Raceway and Boxes for Electrical Systems 01-18

26 05 73 Overcurrent Protective Device Coordination Study 01-18

26 08 00 Commissioning of Electrical Systems 11-16

26 09 23 Lighting Controls 01-18

26 22 00 Low-Voltage Transformers 01-18

26 24 16 Panelboards 01-18

26 27 26 Wiring Devices 01-18

26 29 11 Motor Controllers 01-18

Construct & Renovate Med/Surg Beds for Patient Privacy 09-01-19

00 01 10 - 4

26 29 21 Enclosed Switches and Circuit Breakers 01-17

26 41 00 Facility Lightning Protection 01-17

26 43 13 Surge Protective Devices 01-17

26 51 00 Interior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 09-19

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Raceways and Boxes for Communications Systems 10-18

27 08 00 Commissioning of Communications Systems 11-16

27 10 00 Control, Communication and Signal Wiring 06-15

27 11 00 Communications Equipment Room Fittings 06-15

27 15 00 Communications Structured Cabling 01-16

27 52 23 Nurse Call and Code Blue Systems 10-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

28 05 13 Conductors and Cables for Electronic Safety and

Security

10-18

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 08 00 Commissioning of Electronic Safety and Security Systems 11-16

28 13 00 Physical Access Control System 10-11

28 23 00 Video Surveillance 09-11

28 26 00 Electronic Personal Protection System 09-11

28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 11 Earthwork (Short Form) 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16

File details come from the government source that posted it. Updated .