PP 101 P2 - PLUMBING BASEMENT PIPING PLAN PHASE 2.pdf
PDF 943 KB Posted
- Solicitation number
- 36C25221B0023
About this file
This document includes a pre-solicitation notice and project description for a federal construction contract opportunity with the Department of Veterans Affairs. The project involves renovating the GU Clinic at the Edward Hines Jr. VA Hospital in Hines, Illinois, to allow for a more efficient and comfortable patient care environment. The redesign will add two new exam rooms and a dedicated HVAC system. The period of performance is 570 calendar days from notice to proceed. The estimated price range for construction is between $1,000,000 and $2,000,000. The solicitation will be issued on July 8, 2021 with a bid opening on August 12, 2021. The pre-solicitation notice is set aside for Service-Disabled Veteran-Owned Small Businesses.
View the file
Other files
Show all 50
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BCDEFGH
L-1
WC-1
WC-1
L-1
SK-1
SK-1
SK-1
SK-1
SK-1
SK-2
ZVB-1
4 4 4 4 4
3" DHW
3" DCW 3" DCW
3" DHW
3" DCW
3" DHW
3" DCW
3" DHW
D C
W
/4
D
H W
D C
W
/4
D
H W
D C
W
/4
D
H W
/2
D
H W 2
D C
W
Exam
B022E
Exam
B022C
Exam
B022D
Corridor
BC01D
Office-2
B022J-2
Corridor
BC01G
Exam
B022F
NP Office
B022A
Exam
B022B
Toilet
B022L
Toilet
B020B
Lab
B022K
Reception
B021
Waiting Room
B020
NP Office
B020A
TP-1
TP-1
N
444 W. Lake St. Suite 1700 Chicago, IL 60606
312.583.7023 www.virtualenergysolutions.com
Edward Hines Jr.
VA Hospital 5th and Roosevelt Rd.
Hines, IL 60141-5115
Drawing No.
Scale:
Date:
Checked By:Drawn By:Designed By:
Drawing Title:
Contract No.
File No.Building No.
Client Project No.
Project Title:Approved: Chief, failites Management Services
Approved: Medical Center Director
Approved:
Approved: Location:
VES Project Number: 191006
AS NOTED
VA MEDICAL CENTER
HINES, ILLINOIS
537-15-037 36C25219D0020
V ir tu a l E n e rg y S o lu ti o n s
IN
C
845 Design Group P.C.
106 Calendar Court, #131 LaGrange, Illinois 60525
845designgroup.com
5600 North River Rd, Suite 950 Rosemont, IL 60018
312.445.0000
KEYPLAN
N.T.S.
AREA OF WORK
GU CLINIC - PHASE 2
B
IM
/1
-M A
T O
C -5
-1
-0
-H in e s G
U C lin ic
R e n
/1
-H in e s G
U P
F P
.r v t
/2
/2
:5
:3
P M
PP 101 P2
PLUMBING BASEMENT PIPING
PLAN PHASE 2
GU CLINIC
RENOVATION
3/23/21
EPSAJSAJ
PLUMBING KEYNOTES
NUMBER KEYNOTE
1 1/2" DCW, 1/2" DHW, 1 1/2" V, 2" SAN TO NEW SINK/LAVATORY
2 1 1/4" DCW, 2" V, 3" SAN TO NEW WATER CLOSET
4 PROVIDE NEW MEDICAL GAS OUTLETS IN ROOM. 1 MEDICAL AIR, 1 OXYGEN,
1 MEDICAL VACUUM W/SPARE. REFER TO DETAIL 3/P501 FOR ELEVATION
VIEW. MOUNT OUTLETS ON LEFT SIDE OF EXAM TABLE. REFER TO
ARCHITECTURAL PLANS FOR LOCATIONS.
5 INSTALL NEW ZONE VALVE BOX FOR MEDICAL GASES SHUT OFF VALVES IN
LAB SPACE. REFER TO DETAILS 4/P501 & 5/P501 FOR ADDITIONAL
INFORMATION.
6 INSTALL NEW MEDICAL GAS ALARM PANELS ON NORTH WALL IN NURSES'
STATION. COORDINATE WITH ARCHITECT AND FACILITY STAFF ON EXACT
LOCATION.
7 2" SAN AND 1 1/2" V TO FLOOR DRAIN. ROUTE IN CRAWL SPACE BELOW.
8 PROVIDE NEW MEDICAL GAS OUTLETS IN THESE TWO ROOMS. THREE
STATIONS EACH WITH 1 MEDICAL AIR, 1 OXYGEN, 1 MEDICAL VACUUM
W/SPARE. REFER TO DETAIL 3/P501 FOR ELEVATION VIEW. MOUNT
OUTLETS ON LEFT SIDE OF EXAM TABLE. REFER TO ARCHITECTURAL
PLANS FOR LOCATIONS.
0 2' 4' 8'
1/4" = 1'-0"
1 PLUMBING BASEMENT PIPING PLAN PHASE 2
Revisions Date
Issued for 90% Review 8/24/20
Issued for 100% Pricing 02/02/21
Issued for 100% Design 3/23/21
Scott Rectangle
| Sheets |
| FP001 - FIRE PROTECTION SYMBOLS AND ABBREVIATIONS |
| FP501 - FIRE PROTECTION DETAILS |
| FP 101 P1 - FIRE PROTECTION BASEMENT PLAN PHASE 1 |
| FP 101 P2 - FIRE PROTECTION BASEMENT PLAN PHASE 2 |
| FPD 101 P1 - FIRE PROTECTION BASEMENT DEMOLITION PLAN PHASE 1 |
| FPD 101 P2 - FIRE PROTECTION BASEMENT PLAN PHASE 2 |
| P001 - PLUMBING SYMBOLS AND ABBREVIATIONS |
| P501 - PLUMBING DETAILS |
| P601 - PLUMBING SCHEDULES |
| PD 101 P1 - PLUMBING BASEMENT DEMOLITION PLAN PHASE 1 |
| PD 101 P2 - PLUMBING BASEMENT DEMOLITION PLAN PHASE 2 |
| PD 101 P3 - PLUMBING BASEMENT DEMOLITION PLAN PHASE 3 |
| PP 101 P1 - PLUMBING BASEMENT PIPING PLAN PHASE 1 |
| PP 101 P2 - PLUMBING BASEMENT PIPING PLAN PHASE 2 |
| PW 101 P1 - PLUMBING BASEMENT WASTE & VENT PLAN PHASE 1 |
| PW 101 P2 - PLUMBING BASEMENT WASTE & VENT PLAN PHASE 2 |
File details come from the government source that posted it. Updated .