36C25221B0023 0003.docx

DOCX document 35 KB Posted

Attached to
Z1DA--578-15-037-(Construction) GU Clinic Renovation
Solicitation number
36C25221B0023
Issued by

About this file

This document contains a solicitation for construction services and responses to questions from potential offerors. The solicitation seeks offers for a construction project to renovate a GU Clinic at the Edward Hines Jr. VA Hospital in Hines, Illinois. The renovation includes adding two new exam rooms and a dedicated HVAC system. The period of performance is 570 calendar days from notice to proceed. The estimated price range is between $1,000,000 and $2,000,000. The solicitation will be issued on July 8, 2021 with bids due on August 12, 2021. The set-aside is for Service-Disabled Veteran-Owned Small Businesses. Responses to questions clarify medical gas piping sizes, crawl space dimensions, existing sanitary piping locations, and voice/data cabling requirements.

View the file

Other files

File Type Posted
36C25221B0023 0007.docx DOCX document
36C25221B0023 0006.docx DOCX document
36C25221B0023 0005.docx DOCX document
RAULAND - BORG. MODEl NCS4010.jpg JPG image
Attachment203.jpg JPG image
Attachment202.jpg JPG image
36C25221B0023 0004.docx DOCX document
Attachment201.jpg JPG image
Abatement survey.docx DOCX document
PD 101 P2 - PLUMBING BASEMENT DEMOLITION PLAN PHASE 2.pdf PDF
PP 101 P2 - PLUMBING BASEMENT PIPING PLAN PHASE 2.pdf PDF
PD 101 P1 - PLUMBING BASEMENT DEMOLITION PLAN PHASE 1.pdf PDF
PD 100 P1 - PLUMBING EXISTING SUB BASEMENT WASTE PLAN.pdf PDF
RFI 3 1ST FLOOR ELEVATOR LOCATIONS 2021.07.21.pdf PDF
RFI 2 Elevator Locations 2021.07.21.pdf PDF
36C25221B0023 0002.docx DOCX document
S04 sign in sheet 578-15-037 GU Clinic site visit 2021.07.15.pdf PDF
36C25221B0023 0001.docx DOCX document
19) 578-15-037 100_ Combined DWGS Set 2021.03.23.pdf PDF
18) 578-15-037 GU Clinic 100_ Combined Specs 2021.03.23.pdf PDF
11) AE Design Checklist.pdf PDF
Photo 1.jpg JPG image
3) Safety and Health During Construction Activities.pdf PDF
2) Pre-Construction Checklist.pdf PDF
8) Infection Control Risk Assessment (ICRA).doc DOC document
Photo 7.jpg JPG image
7) Interim Life Safety Measures (ILSM).docx DOCX document
Photo 10.jpg JPG image
12) OIT Horizontal Cable Requirements.pdf PDF
Photo 5.jpg JPG image
1) Hines VA Campus Site Plan.pdf PDF
9) Contractor PIV Instructions and Form.pdf PDF
Photo 2.jpg JPG image
Photo 3.jpg JPG image
36C25221B0023_1.docx DOCX document
4) Cutting Welding and Other Hot Work.pdf PDF
15) Floor plans_GU clinic.pdf PDF
0) P01 SOW 578-15-037 Construction 5-27-21 EDITED.docx DOCX document
Photo 9.jpg JPG image
Photo 11.jpg JPG image
10) Contractor Parking.pdf PDF
16) statement of condision.pdf PDF
P07 Wage Determination.txt 7.7.21.txt TXT text file
Photo 8.jpg JPG image
Photo 6.jpg JPG image
13) Fire Protection Code Reviews.pdf PDF
Photo 4.jpg JPG image
5) Above Ceiling Entry and Wall Construction Permits.pdf PDF
6) Pre-Construction Risk Assessment (PCRA).docx DOCX document
14) 200_BASEMENT Floor plan.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 08-06-2021 578-21-4-6897-0033 578-15-037 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S. 84th Street, Suite 101 Milwaukee WI 53214-1476 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S. 84th Street, Suite 101 Milwaukee WI 53214-1476 To all Offerors/Bidders

36C25221B0023 07-08-2021

X X X August 16, 2021 12:00PM CST X Solicitation: 36C25221B0023 - Project 578-15-037 GU Clinic Renovation (Construction) at the Edward Hines Jr. VA Hospital

Revised Bid Schedule with Tax Exempt Language Responses to RFI Questions Bid Due Date/Time changed to 8/16/21 at 12:00PM CST. Bid Opening Location - See Block 7.

See Continuation Pages

Kristi Kluck Contracting Officer BID SCHEDULE (Revised)

SOLICITATION:36C25221B0023
PROJECT:578-15-037 (Construction) GU Clinic Renovation

The contractor shall provide for and furnish all labor, supervision, materials, tools, equipment, licenses, certification, insurance and temporary protection to renovate the GU Clinic as required by the drawings and specifications and other terms and conditions as applicable. Provide work in accordance with federal, state, and local authorities as detailed in the attached project scope of work, specifications and drawings at the Edward Hines Jr. VA Hospital in Hines, IL.

All work shall be completed within 570 calendar days after receipt of the Notice to Proceed.

All-Inclusive Base Bid LUMP SUM: $ ___________________________

NOTICE TO BIDDERS: Award will be made to the responsible bidder who submitted the lowest responsive bid.

NOTICE TO BIDDERS: Work shall not commence until all required submittals are approved by the Contracting Officer or the Contracting Officer’s Representative (COR). An approved cost-loaded, Critical Path Method (CPM) construction schedule is required prior to commencement of construction. See specifications for details. CPM schedule shall be approved by the Contracting Officer or the Contracting Officer’s Representative. See specifications for details.

*Illinois State Sales Tax Exemption:

The Illinois Administrative Code, 130.2075 allows construction contractors to be exempt from Retailers Occupation Tax and Use Tax within the State of Illinois when the materials are for Incorporation into real estate owned by Governmental bodies. For purposes of this authority, a Construction Contractor is defined as a General Contractor or a Subcontractor 86 Ill.Adm.Code 130.1940(a)(1). Materials, are defined as all of the tangible personal property, including fixtures, which enter into a structure or otherwise become incorporated into real estate 86 Ill.Adm.Code 130.1940(a)(5), but do not include tools, fuel, lumber for forms and other end use or consumption items which are not incorporated into the real property 86 Ill.Adm.Code 130.2075(d)(3).

Prospective offerors are notified that under 86 Ill.Adm.Code 130.2075, purchase of applicable materials within the State of Illinois to be incorporated into the real property of Edward Hines Jr. VA Hospital, Hines, IL 60141 may be exempt from Illinois Retailers’ Occupation Tax and Use Tax. VA will furnish a Certificate to the successful awardee under this solicitation that contains appropriate information that will allow the awardee to take advantage of this tax exemption within the State of Illinois for the project identified in this solicitation. Prime contractors may furnish the certificate to its subcontractors for use on this project. All bids received in response to this solicitation are presumed to reflect any tax benefit that may be realized upon receipt of this certificate.

Answers to RFI’s

1. Spec Section 01 35 26- Where is the closest window to exhaust HEPA air machines to the exterior of the building? The are no windows.

a. Or what is other options? However, the contractor can connect the exhaust HEPA air machines to the bathroom exhaust in rooms B 024F and B0221.

2. Spec Section 02 41 00- Is there a freight elevator close by to transport demolition debris? I do not see one on the drawings. Elevator F-11 located at the west end of Corridor CC01B.

3. Spec Section 02 41 00- Where will the debris dumpsters be located?

Loading Dock area west-northwest of 1st Floor Service Area C124, west of Elevator F-11.

4. Spec Section 02 41 00- Are there any load bearing CMU walls scheduled to be removed? They look like drywall in the pictures. Based on the A/E visual surveys of the space, there does not appear to be any load bearing CMU walls within the GU Clinic.

5. Spec Section 22 13 00- Drawings are missing the sanitary waste system, where are the existing sanitary waste lines? The basement "vent and waste plans" show a vent, NO sanitary waste. The Basement "crawl space" has all of the sanitary piping. Space is approximately 10 feet tall.

6. Spec Section 22 13 00- Where is the existing sanitary located in the crawl space? All over the crawl space but the new layout should easily connect to existing. Most of the small branch lines run near top of space, mains are located approximately 3 feet from floor, about 6 feet from ceiling.

7. Spec Section 22 13 00- What is the size of the existing waste lines? The main sanitary branch is 6" but most sanitary lines are 4".

8. Spec Section 22 13 00- Where are we to disconnect and reconnect to the waste line? The diagram plan is of no help for that either. The connection and disconnection points will be in the crawl space. The existing sanitary mains run throughout the space directly under the clinic with slope traveling from East to West.

9. Spec Section 22 13 00- What is the existing material for the existing sanitary, vent, and water piping? The sanitary piping system is consists of PVC for branch lines and Cast Iron for mains. Water Piping is copper. Vent piping is PVC.

a. Service weight soil pipe, PVC, copper, galvanized? The sanitary piping system is consists of PVC for branch lines and Cast Iron for mains.

10. Spec Section 22 13 00- How much vertical space is in the crawl space? Approximately 10 feet tall but there are pipes that run through at different elevations that will require some navigation.

a. Are we dealing with walking room, or is it literally a crawl area? Most is walkable but some low pipes cross overhead.

11. The basement “vent and waste plan” shows a vent, NO sanitary waste, the sanitary waste system is missing from plumbing drawings. Can you provide drawings specifying the location and size of the existing sanitary waste system in the crawl space? See drawing PD 100 P1.

a. What is the size of the crawls space, how much vertical space is there? Approximately 10 feet tall but there are pipes that run through at different elevations that will require some navigation. Most is walkable but some low pipes cross overhead.

12. Please provide specific location for where the disconnection and new connection should be made? See drawing PD 100 P1.

13. What material is the existing sanitary waste system, vent, and water piping made from? The sanitary piping system is consists of PVC for branch lines and Cast Iron for mains. Water Piping is copper. Vent piping is PVC.

14. Disconnection of any gas, compressed air, oxygen, med gas, vacuum, nitrogen, etc, piping systems falls under the jurisdiction of the mechanical contractor and should be reflected on the mechanical drawings. Plans indicate medical gas and vacuum piping on plumbing plans. Mechanical contractor shall utilize those plans for work scope.

15. Note 12 on E001 states to "Provide an insulated ground wire with all circuits" The "Branch Circuit Notes" only show (1) one ground with each network, not one per circuit. Please confirm if we are to furnish and install a dedicated ground per circuit or one ground per "homerun" or "network". Typically, we install (1) one ground per network on Hines Campus. It’s acceptable to run a ground per network.

16. Note 3 on TN 101 P1 states "All voice data cables shall be installed in conduit. All conduit shall terminate at existing telecommunication closet BO37A, coordinate with VA telecommunication for exact IT closet prior to any rough-ins." Note 9 ALSO states "Provide a 1" conduit from each tele/data JB up to the nearest accessible corridor ceiling space. Please advise whether it is acceptable to install voice and data with free air cabling to the nearest accessible ceiling space. Typically, the voice/data cabling is free air, in accessible ceilings, on Hines campus. All Voice/Data conduit shall stub-out of the clinic area with bushings at end of conduit. Voice/Data cabling can run free air in accessible ceiling in corridor back to IT closet.

17. Warranty: Part 1.10 states “The Contractor shall warrant the installation to be free from defect in material and workmanship for a period of two (2) years from the date of acceptance of the project by the owner.” and Part 4.3 B-1 states “The Contractor shall warranty that all provided material and equipment will be free from defects, workmanship and will remain so for a period of one year from date of final acceptance of the System by the VA.”. Can the government confirm that the warranty statement in Part 1.10 is referring to the installation only and Part 4.2 B-1 is referring to the material and equipment? Part 1.10 refers to the installation and Part 4.2 B-1 refers to the actual material and equipment itself.

18. The design documents show Med-gas work on the plumbing plans, but they do not include the medical gas piping or pipe sizes; we need this information in order to complete this work. O2 lines throughout will be 1/2", Med Air Piping will have 3/4" main and 1/2" on branchlines feeding the outlets. Vacuum will be 2" throughout.

19. With regards to the Med-gas work, we also need revised drawings showing where we will connect the new to or we need the existing sheets showing where the piping runs in this area; please clarify. Existing piping layout is unknown. There are no plans available. New work shall utilize the existing zone valve boxes as starting point for main connection.

20. On the plumbing plans there isn’t any information/drawings showing the sanitary sewer existing nor new work that is required for this project; please clarify. See plan PD 100 P1 for existing line locations and sizing.

21. Also, they show the vent piping on the basement plans but no sanitary sewer piping information; we need all of the existing sanitary piping shown on the drawings and the new piping and sizes for our plumbers to complete this work. See plan PD 100 P1 for existing line locations and sizing.

22. If any sanitary work is to be completed in the crawlspace area, we will need the vertical height dimensions of that space. Height of space is approximately 10'-0"

23. Also, for clarification the mechanical piping contractor needs the gas piping, compressed air work, oxygen piping, med-gas, vacuum piping, etc. for the medical piping/equipment work; by jurisdiction this is the responsibility of the mechanical piping subcontractor, not the plumber. O2 lines throughout will be 1/2", Med Air Piping will have 3/4" main and 1/2" on branchlines feeding the outlets. Vacuum will be 2" throughout.

24. In the S.O.W. #1, Constraints, Item #5: Buy American. Is this a requirement or is it a goal for this project? Yes, it is a requirement.

a. If it is a requirement; what is the procedure if the product listed is not manufactured in America? There is a process for granting exceptions spelled out in the VA Acquisition Manual (Part M825.2 Buy American Act - Construction Materials) that need to be coordinated with the COR.

25. Existing Responder 3 head-end is located in Storage B026 – Demolition drawings do not indicate changes to this room (Sterile Supply B023D). In lieu of installing a new nurse call head-end cabinet in Electrical Room B037A, can prime contractor re-use the existing nurse call cabinet, and expand on the existing Responder 5 nurse call cabinet/head-end servicing the Pacemaker Clinic across the hall. No.

26. Which material and what depth? the dimensional letters, the specs say acrylic; the drawings say brushed aluminum letters; neither give a depth. 1/8" thick brushed aluminum letters.

27. Are both sets of letters to be the same height? Yes.

a. AE201 specifically says 4” tall; AE522 no note, but scales to between 2 and 3 inches tall; AI 102 finish plan note 7 for both? AE 201 & AE 522 both shall be the same height of 4". Note 7 for both is correct.

28. Please confirm the medical gas piping sizes for this project. O2 lines throughout will be 1/2", Med Air Piping will have 3/4" main and 1/2" on branchlines feeding the outlets. Vacuum will be 2" throughout.

a. Can prime contractor receive medical gas as built drawings to accurately price tie in sizes. As-built drawings were not located, and existing conditions are not known.

29. Know what the Wood Door Veneer should be (ie, Oak, Maple, Birch, Cherry etc) for these doors the Wood Door Specs do not say anything. Pricing varies, depending on the veneer that is wanted. The doors should be plain-sliced maple, stained to match PL-1.

30. Can you clarify which note is correct. Note 3 on TN 101 P1 calls for complete conduit system back for all data. And Note 9 on sheet TN101 calls out that you can take stubs for Voice/data system to the nearest accessible ceiling. We want to clarify which note is correct. All Voice/Data conduit shall stub-out of the clinic area with bushings at end of conduit. Voice/Data cabling can run free air in accessible ceiling in corridor back to IT closet.

31. Please confirm the medical gas piping sizes for this project. Can prime contractor receive medical gas as built drawings to accurately price tie in sizes. O2 lines throughout will be 1/2", Med Air Piping will have 3/4" main and 1/2" on branchlines feeding the outlets. Vacuum will be 2" throughout.

See attached document: RFI 2 Elevator Locations 2021.07.21.

See attached document: RFI 3 1ST FLOOR ELEVATOR LOCATIONS 2021.07.21.

See attached document: PD 100 P1 - PLUMBING EXISTING SUB BASEMENT WASTE PLAN.