19) 578-15-037 100_ Combined DWGS Set 2021.03.23.pdf

PDF 29 MB Posted

Attached to
Z1DA--578-15-037-(Construction) GU Clinic Renovation
Solicitation number
36C25221B0023
Issued by

About this file

This document provides details of a federal construction solicitation. The solicitation involves renovations to the GU Clinic at the Edward Hines Jr. VA Hospital in Hines, Illinois. The project scope includes a redesigned clinic layout adding two exam rooms and a dedicated HVAC system. The performance period is 570 calendar days from notice to proceed. The solicitation will be posted on July 8, 2021 with bids due on August 12, 2021 and an estimated price range between $1 million to $2 million. This opportunity is set aside for service-disabled veteran-owned small businesses and falls under NAICS code 236220 for general construction with a $39.5 million size standard. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12 is the issuing agency.

View the file

Other files

File Type Posted
36C25221B0023 0007.docx DOCX document
36C25221B0023 0006.docx DOCX document
36C25221B0023 0005.docx DOCX document
RAULAND - BORG. MODEl NCS4010.jpg JPG image
Attachment203.jpg JPG image
Attachment202.jpg JPG image
36C25221B0023 0004.docx DOCX document
Attachment201.jpg JPG image
Abatement survey.docx DOCX document
PD 101 P2 - PLUMBING BASEMENT DEMOLITION PLAN PHASE 2.pdf PDF
PP 101 P2 - PLUMBING BASEMENT PIPING PLAN PHASE 2.pdf PDF
PD 101 P1 - PLUMBING BASEMENT DEMOLITION PLAN PHASE 1.pdf PDF
36C25221B0023 0003.docx DOCX document
PD 100 P1 - PLUMBING EXISTING SUB BASEMENT WASTE PLAN.pdf PDF
RFI 3 1ST FLOOR ELEVATOR LOCATIONS 2021.07.21.pdf PDF
RFI 2 Elevator Locations 2021.07.21.pdf PDF
36C25221B0023 0002.docx DOCX document
S04 sign in sheet 578-15-037 GU Clinic site visit 2021.07.15.pdf PDF
36C25221B0023 0001.docx DOCX document
18) 578-15-037 GU Clinic 100_ Combined Specs 2021.03.23.pdf PDF
11) AE Design Checklist.pdf PDF
Photo 1.jpg JPG image
3) Safety and Health During Construction Activities.pdf PDF
2) Pre-Construction Checklist.pdf PDF
8) Infection Control Risk Assessment (ICRA).doc DOC document
Photo 7.jpg JPG image
7) Interim Life Safety Measures (ILSM).docx DOCX document
Photo 10.jpg JPG image
12) OIT Horizontal Cable Requirements.pdf PDF
Photo 5.jpg JPG image
1) Hines VA Campus Site Plan.pdf PDF
9) Contractor PIV Instructions and Form.pdf PDF
Photo 2.jpg JPG image
Photo 3.jpg JPG image
36C25221B0023_1.docx DOCX document
4) Cutting Welding and Other Hot Work.pdf PDF
15) Floor plans_GU clinic.pdf PDF
0) P01 SOW 578-15-037 Construction 5-27-21 EDITED.docx DOCX document
Photo 9.jpg JPG image
Photo 11.jpg JPG image
10) Contractor Parking.pdf PDF
16) statement of condision.pdf PDF
P07 Wage Determination.txt 7.7.21.txt TXT text file
Photo 8.jpg JPG image
Photo 6.jpg JPG image
13) Fire Protection Code Reviews.pdf PDF
Photo 4.jpg JPG image
5) Above Ceiling Entry and Wall Construction Permits.pdf PDF
6) Pre-Construction Risk Assessment (PCRA).docx DOCX document
14) 200_BASEMENT Floor plan.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

B038E

B038D

B038C B038F

B038A B038H

B038

B038G

B029B

B029

B028A

B028

B025B

B027

B025A

B026

B037

B022CB022B

B020B

B022A

B020A B021A B022I

B019C B019B

B017

B018

B003

B019

B016A

B016

B036

B022D

B019D

B022H

B020

B007

B006A

B006

B009

B014B010

B039

B029A

B027A

BC01G B023

AC01G

BC01A

AC01F

BC01C

B036A

B006B

B037A

NORTH

EAST

WING

NORTH

WEST

WING

SOUTH

WEST

WING

SOUTH

WEST

WING

NORTH

WEST

WING

SOUTH

EAST

WING

NORTH

EAST

WING

SOUTH

EAST

WING

B

CART

WASH

A025C 90E

200_0B_41

EQUIPMENT

TESTING

A022A 90E

200_0B_61

SOILED

COLLECTION

A007

200_0B_9

SCRUB

A016

200_0B_19

STRETCHER

ALCOVE

A019

200_0B_17

CORRIDOR

AC01E

200_0B_2

OPERATING

ROOM

A015

200_0B_15

SOILED

COLLECTION

A013

200_0B_13

JAN.

A020

200_0B_18

SCRUB

A014

200_0B_14

OPERATING

ROOM

A012

200_0B_12

OPERATING

ROOM

A010

200_0B_10

CORRIDOR

AC01D

200_0B_6

SOILED HOLDING

AND RETURNING

A021

200_0B_35

DISPATCH

200_0B_33

CORRIDOR

AC01B

200_0B_62

OPERATING

ROOM

A018

200_0B_21

EQUIPMENT

A017

200_0B_20

OPERATING

ROOM

A011

200_0B_22

STERILIZATION

SET-UP

A009

200_0B_24

ETD

A022B

200_0B_37

CART

WASH

A023F 90E

200_0B_39

HAC

A023E

200_0B_38

PREPARATION

AND STERILIZATION

200_0B_60

PREPARATION

AND STERILIZATION

A022C

200_0B_40

STAIR #8

200_0B_1

OPERATING

ROOM

A006

200_0B_8

DARK ROOM

A029

200_0B_5

SCRUB

A008

200_0B_11

SCRUB

A028

200_0B_7

OPERATING

ROOM

A004

200_0B_4

ISOLATION

ROOM

A001E

200_0B_49

CLEAN

SUPPLIES

A001C

200_0B_28

OPERATING

ROOM

A005

200_0B_23

SOIL

HOLDING

A001D

200_0B_29

OPERATING

ROOM

A003

200_0B_25

SURGICAL NURSE

AND CLERK

A002

200_0B_48

RECOVERY

ROOM

A001

200_0B_51

NURSE

A001A

200_0B_31

EQUIPMENT

A001B

200_0B_30

ISOLATION

ROOM

A001F

200_0B_50

200_0B_58

200_0B_57

LOUNGE

A024

200_0B_54

SOILED

LINEN

A024C

200_0B_52

DOCTORS'

TOILET

B014A

200_0B_57

LOUNGE

B012

200_0B_59

DOCTORS'

LOUNGE

B011

200_0B_58

NURSES'

TOILET

B010A

200_0B_60

E.C.

200_0B_2

STAIR

200_0B_5

S.C.

B037A

200_0B_4

ELEV.

S9

200_0B_18

AUDIO VISUAL

STUDIO

B041

200_0B_12

CLINIC

D

B040

200_0B_13

NEG. DARK

ROOM

B040A

200_0B_14

SERVICE

ELEV.

S7

200_0B_35

J.C.

B030

200_0B_22

TLT.

B032

E.C.

200_0B_23

THERAPEUTIC

POOL

B031

200_0B_15

UPPER PART OF

MECHANICAL ROOM AIR CONDITIONING

C019

200_0B_54

STORAGE

C032D

200_0B_36

COOK'S

REFRIGERATOR

CO32F

200_0B_49

MEAT

PREPARATION

C032I

200_0B_53

TRAY ASSEMBLY LINES

C032B

200_0B_30

ELEV.

200_0B_31

ELEVATOR LOBBY

C001

TRASH

ROOM

C003

200_0B_29

CART WASH

200_0B_23

SECT'Y

C005

200_0B_64

CHIEF

C006

200_0B_24

DIET SERVICE

C011

200_0B_22

DISHWASHING

C032A

200_0B_33

SKULLERY

C032J

200_0B_51

DIET SERVICE

C013

200_0B_19

OFFICE

200_0B_21

JAN. CLOS.

C032G

200_0B_48

MAIN KITCHEN

C032

200_0B_34

OFFICE

C032K

200_0B_47

DIETETIC OFFICE

C018

200_0B_35

SWITCH GEAR ROOM

C022

EXAMINING RM.

C007

200_0B_7

OFFICE

C012C

200_0B_12

C008

200_0B_55

EXAMINING ROOM

C009

200_0B_8

STAIR

200_0B_3

SUPPLIES

C012D

200_0B_9

OFFICE

C021B

200_0B_11

TRANSFORMER ROOM

C023

200_0B_58

MECHANICAL

C017

200_0B_16

E.C.

C020

200_0B_52

200_0B_57

ELEV.

F-11

200_0B_60

FROZEN MEAT

& VEGETABLES

C031A

200_0B_46

GENERAL SUPPLY

C032E

200_0B_43

MEAT

REFRIGERATOR

C031

200_0B_45

200_0B_62

MALE

TLT.

C025

CORRIDOR

CC01B

200_0B_42

ELEVATOR

MACHINE

C026

200_0B_59

EGG & DAIRY

REFRIG.

D024

200_0B_68

STORAGE

D023

200_0B_60

VEGETABLE

PREPARATION

D025

200_0B_67

GROSS

SPECIMEN

D012

200_0B_43

CORRIDOR

DC01E

200_0B_47

TLT.

D008E

200_0B_29

TLT.

D008F

200_0B_30

STORAGE

ROOM

D008A 114B

200_0B_23

DRESS.

ROOM

D008C 114B

200_0B_25

PLANNING

DOSIMETRY RM.

D008M 114B

200_0B_12

CONTROL

ROOM

D008G 114B

200_0B_20

CONTROL

ROOM

D008N 114B

200_0B_18

CORRIDOR

DC01H

200_0B_16

EXAM RM.

D008J 114B

200_0B_15

EXAM RM.

D008K 114B

200_0B_14

D008L 114B

200_0B_13

WAITING AREA

D008

200_0B_21

COBALT

THERAPY RM.

D008I 114B

200_0B_17

LINEAR

ACCELERATOR

D010L 114B

200_0B_38

BETATRON

ROOM

D008H 114B

200_0B_19

STAFF PHYSICIAN

& RES. OFFICES

D010E 114B

200_0B_31

ELEV.

200_0B_22

CORR.

DC01I

200_0B_28

D010A 114B

200_0B_33

WAITING

AREA

D010

200_0B_32

WAITING

ROOM

D010H

200_0B_90

EXAM

ROOM

D010D 114B

200_0B_36

STOR.

D010I 114B

200_0B_37

EXAM

ROOM

D010C 114B

200_0B_35

AUTOPSY

D014

200_0B_88

EMPLOY.

LOCK.

D010F 114B

200_0B_44

D010B 114B

200_0B_34

COLD ROOM

D013

200_0B_46

DARK RM.

D007B 114B

200_0B_85

STAIR 2

D003

SIMULATOR

ROOM

D007A 114B

200_0B_8

DEEP

THERAPY

D006A 114B

200_0B_10

HYPERTHERMIA

D006 114B

200_0B_11

CONTROL

D007 114B

200_0B_86

SECTION

CHIEF

D009F

200_0B_9

DIETETICS

SECTION

D005

200_0B_7

EMPLOYEE

DINING

D009A

200_0B_5

ELEV.

200_0B_1

RADIOTHERAPY

OFFICE SUITE

D011G 114B

200_0B_75

TLT.

D011B 114B

200_0B_77

SIMULATOR

ROOM

D007D 114B

200_0B_84

SUPPLIES

D011E

200_0B_80

STAFF

OFFICES

D011A 114B

200_0B_82

CONTROL

D007C 114B

200_0B_83

COMPUTER

TRANSCRIPTION

114B

200_0B_81

OFFICE

D011F 114B

200_0B_78

SALAD

REFRIG.

D009G

200_0B_70

DESSERT

REFRIG.

D009I

200_0B_61

DEEP

FREEZE

D009H

200_0B_62

COLD ORDER

PREPARATION

D009B

200_0B_74

PATIENTS'

DINING ROOM

D009

200_0B_79

ELEV.

MACHINE

D021

ELEC.

EQUIP. RM.

D010K

200_0B_39

CONTROL

ROOM

D010J

200_0B_40

UPPER PART OF

PNEUMATIC TUBE ROOM

D019

200_0B_89

REFRIGERATION

EQUIPMENT

D018

M. TLT.

D015

200_0B_49

JAN. CLOS.

D016

200_0B_51

ELEC.

D018B

STAIR 3

D020

VEG. & FRUIT

REFRIG.

D025B

200_0B_65

GARBAGE

REF.

200_0B_71

TRASH RM.

& CAN WASH

D022

200_0B_59

CORRIDOR

DC01D

200_0B_53

ELEV.

M10

200_0B_96

CORRIDOR

DC01B

200_0B_66

CHILLED VEG.

REFRIG.

D025A

200_0B_64

EXAM

EXAM

EXAM INTERVIEW

SECRETARY

OFFICE

RECEPTION/

WAITING

INTERVIEW

SUB

STERILE

CYSTO

X-RAY

CYSTO

SOILED

UTILITY

MINOR PROCEDURE/

CYSTO

CLEAN

UTILITY

STORAGE

EXISTING

STORAGE

EXAMEXAM

TOILET

CONSULTING

OFFICE

TOILET OFFICE TOILET

OFFICE

OFFICE LIN.

ANESTHESIA

CONFERENCE

ANESTHESIA

WORKROOM

ANESTHESIA

ADMINISTRATION

NURSE

STATION

HOLDING

ANESTHESIA

STORAGE

EXAM

ULTRA

SOUND

TEL. CLS

URODYNAMIC

LAB

G.U. CLINIC

WAITING

ROOM

BLOOD GAS

E.C.

J.C.

STAFF LOUNGE

MEN'S

LOCKER ROOM

WOMEN'S

LOCKER ROOM

EXISTING

BED STORAGE

SCRUB

SCRUB

CORRIDOR

CORRIDOR

STERILE

CORR.

CORRIDOR

RESTRICTED

CORRIDOR

OFFICE

FMS ROOM

ELECTRICAL

ROOM

ELEV.

F-12

C014

D011

ELEV MAIN

B033

ROOM

C003

UP

UP

DN

DN

DN

DN

DN

UP

RAILING

LADDER

RAMP DN

RAMP DN

RAMP

DN

UP

DN

DN

DN

DN

UP

PASSAGE WAY "A"

PASSAGE WAY "B"

TO BLUILDING 228

IP

IP

IP

LADDER

AREA OF WORK:

GU CLINIC

60'0 30'

Phase 1Phase 2

Phase 3

BUILDING 200

03/22/2021 exp. 11/30/2022

ARCHITECTURE MECHANICAL, PLUMBING,

& FIRE PROTECTION

ELECTRICAL

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Edward Hines Jr.

VA Hospital 5th and Roosevelt Rd.

Hines, IL 60141-5115

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA MEDICAL CENTER

HINES, ILLINOIS

537-15-037 36C25219D0020

V ir tu a l E n e rg y S o lu ti o n s

IN

C

845 Design Group P.C.

106 Calendar Court, #131 LaGrange, Illinois 60525

845designgroup.com

5600 North River Rd, Suite 950 Rosemont, IL 60018

312.445.0000

B

IM

/1

-M A

T O

C -5

-1

-0

-H in e s G

U C lin ic

R e n

/1

-H in e s G

U A rc h M a in

.r v t

-0

-2

:5

:4

GI 001

COVER SHEETGU CLINIC

RENOVATION

6/19/20

MJGIDGID

1" = 30'-0"

AREA OF WORK - BASEMENT LEVEL

BUILDING 200 - GU CLINIC PHASE 1, 2, &

NTS

SITE LOCATION MAP

GU CLINIC RENOVATION

Phase 1, 2 & 3

EDWARD HINES JR. VETERANS AFFAIRS HOSPITAL

Project Number: 578-15-037

5000 5th Avenue, Hines, Illinois 60141

Architectural Sheet Index

Sheet Number Sheet Name Issued For Issue Date

GI 001 COVER SHEET Issued for 100% Design 3/23/21

GI 002 CODE ANALYSIS, SYMBOLS & GENERAL NOTES Issued for 100% Design 3/23/21

GI 003 ABBREVIATIONS Issued for 100% Design 3/23/21

GI 004 ACCESSIBILITY REQUIREMENTS Issued for 100% Design 3/23/21

GC 001 PHASING PLANS PHASE 1, 2 & 3 Issued for 100% Design 3/23/21

AE 001 BASEMENT LIFE SAFETY PLAN Issued for 100% Design 3/23/21

AD 101 P1 BASEMENT DEMOLITION PLAN PHASE 1 Issued for 100% Design 3/23/21

AD 102 P1 BASEMENT DEMOLITION REFLECTED CEILING PLAN

PHASE 1

Issued for 100% Design 3/23/21

AE 101 P1 BASEMENT PLAN PHASE 1 Issued for 100% Design 3/23/21

AC 101 P1 BASEMENT REFLECTED CEILING PLAN PHASE 1 Issued for 100% Design 3/23/21

AE 201 P1 INTERIOR ELEVATIONS PHASE 1 Issued for 100% Design 3/23/21

AE 202 P1 INTERIOR ELEVATIONS PHASE 1 Issued for 100% Design 3/23/21

AE 203 P1 INTERIOR ELEVATIONS PHASE 1 Issued for 100% Design 3/23/21

AE 204 P1 INTERIOR ELEVATIONS PHASE 1 Issued for 100% Design 3/23/21

AE 401 P1 ENLARGED PLANS PHASE 1 Issued for 100% Design 3/23/21

AE 501 PARTITION TYPES & TYPICAL DETAILS PHASE 1 & 2 Issued for 100% Design 3/23/21

AE 502 P1 DETAILS PHASE 1 Issued for 100% Design 3/23/21

AE 520 P1 MILLWORK ELEVATIONS, SECTIONS & DETAILS PHASE

Issued for 100% Design 3/23/21

AE 521 P1 MILLWORK ELEVATIONS, SECTIONS, & DETAILS PHASE

Issued for 100% Design 3/23/21

AE 601 P1 DOOR SCHEDULE & DETAILS PHASE 1 Issued for 100% Design 3/23/21

AD 101 P2 BASEMENT DEMOLITION PLAN PHASE 2 Issued for 100% Design 3/23/21

AD 102 P2 BASEMENT DEMOLITION REFLECTED CEILING PLAN

PHASE 2

Issued for 100% Design 3/23/21

AE 101 P2 BASEMENT PLAN PHASE 2 Issued for 100% Design 3/23/21

AC 101 P2 BASEMENT REFLECTED CEILING PLAN PHASE 2 Issued for 100% Design 3/23/21

AE 201 P2 INTERIOR ELEVATIONS PHASE 2 Issued for 100% Design 3/23/21

AE 202 P2 INTERIOR ELEVATIONS PHASE 2 Issued for 100% Design 3/23/21

AE 203 P2 INTERIOR ELEVATIONS PHASE 2 Issued for 100% Design 3/23/21

AE 204 P2 INTERIOR ELEVATIONS PHASE 2 Issued for 100% Design 3/23/21

AE 401 P2 ENLARGED PLANS PHASE 2 Issued for 100% Design 3/23/21

AE 402 P2 ENLARGED PLANS PHASE 2 Issued for 100% Design 3/23/21

AE 502 P2 DETAILS PHASE 2 Issued for 100% Design 3/23/21

AE 520 P2 MILLWORK ELEVATIONS, SECTIONS, & DETAILS PHASE

Issued for 100% Design 3/23/21

AE 521 P2 MILLWORK ELEVATIONS, SECTIONS, & DETAILS PHASE

Issued for 100% Design 3/23/21

AE 522 P2 MILLWORK ELEVATIONS, SECTIONS, & DETAILS PHASE

Issued for 100% Design 3/23/21

AE 523 P2 MILLWORK ELEVATIONS, SECTION, & DETAILS PHASE

Issued for 100% Design 3/23/21

AE 601 P2 DOOR SCHEDULE & DETAILS PHASE 2 Issued for 100% Design 3/23/21

AE 101 P3 BASEMENT PLAN PHASE 3 Issued for 100% Design 3/23/21

QH 101 P1 EQUIPMENT PLAN PHASE 1 Issued for 100% Design 3/23/21

QH 101 P2 EQUIPMENT PLAN PHASE 2 Issued for 100% Design 3/23/21

QH 101 P3 EQUIPMENT PLAN PHASE 3 Issued for 100% Design 3/23/21

Total Sheets: 40

Mechanical Sheet Index

Sheet Number Sheet Name Issued For Issue Date

M001 MECHANICAL SYMBOLS AND ABBREVIATIONS Issued for 100% Design 3/23/21

MD 101 P1 MECHANICAL BASEMENT DEMOLITION PLAN PHASE 1 Issued for 100% Design 3/23/21

MH 101 P1 MECHANICAL BASEMENT VENTILATION PLAN PHASE 1 Issued for 100% Design 3/23/21

MP 101 P1 MECHANICAL BASEMENT PIPING PLAN PHASE 1 Issued for 100% Design 3/23/21

MH102 P1 MECHANICAL PENTHOUSE PLAN PHASE 1 Issued for 100% Design 3/23/21

MD 101 P2 MECHANICAL BASEMENT DEMOLITION PLAN PHASE 2 Issued for 100% Design 3/23/21

MH 101 P2 MECHANICAL BASEMENT VENTILATION PLAN PHASE 2 Issued for 100% Design 3/23/21

MP 101 P2 MECHANICAL BASEMENT PIPING PLAN PHASE 2 Issued for 100% Design 3/23/21

MD 101 P3 MECHANICAL BASEMENT DEMOLITION PLAN PHASE 3 Issued for 100% Design 3/23/21

MH 101 P3 MECHANICAL BASEMENT VENTILATION PLAN PHASE 3 Issued for 100% Design 3/23/21

MP 101 P3 MECHANICAL BASEMENT PIPING PLAN PHASE 3 Issued for 100% Design 3/23/21

M501 MECHANICAL DETAILS Issued for 100% Design 3/23/21

M502 MECHANICAL DETAILS Issued for 100% Design 3/23/21

M601 MECHANICAL SCHEDULES Issued for 100% Design 3/23/21

Total Sheets: 14

Electrical Sheet Index

Sheet Number Sheet Name Issued For Issue Date

E001 ELECTRICAL SYMBOLS AND ABBREVIATIONS Issued for 100% Design 3/23/21

E 100 ELECTRICAL PARTIAL OVERALL PLAN Issued for 100% Design 3/23/21

ED 101 P1 ELECTRICAL LOWER LEVEL DEMOLITION PLAN PHASE

Issued for 100% Design 3/23/21

EL 101 P1 ELECTRICAL LOWER LEVEL LIGHTING PLAN PHASE 1 Issued for 100% Design 3/23/21

EP 101 P1 ELECTRICAL LOWER LEVEL POWER PLAN PHASE 1 Issued for 100% Design 3/23/21

E102 P1 ELECTRICAL PENTHOUSE PLANS PHASE 1 Issued for 100% Design 3/23/21

ED 101 P2 ELECTRICAL LOWER LEVEL DEMOLITION PLAN PHASE

Issued for 100% Design 3/23/21

EL 101 P2 ELECTRICAL LOWER LEVEL LIGHTING PLAN PHASE 2 Issued for 100% Design 3/23/21

EP 101 P2 ELECTRICAL LOWER LEVEL POWER PLAN PHASE 2 Issued for 100% Design 3/23/21

ED 101 P3 ELECTRICAL LOWER LEVEL DEMOLITION PLAN PHASE

Issued for 100% Design 3/23/21

EL 101 P3 ELECTRICAL LOWER LEVEL LIGHTING PLAN PHASE 3 Issued for 100% Design 3/23/21

EP 101 P3 ELECTRICAL LOWER LEVEL POWER PLAN PHASE 3 Issued for 100% Design 3/23/21

TN 101 P1 ELECTRICAL LOWER LEVEL TECHNOLOGY PLAN

PHASE 1

Issued for 100% Design 3/23/21

TN 101 P2 ELECTRICAL LOWER LEVEL TECHNOLOGY PLAN

PHASE 2

Issued for 100% Design 3/23/21

TN 101 P3 ELECTRICAL LOWER LEVEL TECHNOLOGY PLAN

PHASE 3

Issued for 100% Design 3/23/21

E501 ELECTRICAL DETAILS Issued for 100% Design 3/23/21

E601 ELECTRICAL SCHEDULES Issued for 100% Design 3/23/21

E602 ELECTRICAL SCHEDULES Issued for 100% Design 3/23/21

Total Sheets: 18

Plumbing Sheet Index

Sheet Number Sheet Name Issued For Issue Date

P001 PLUMBING SYMBOLS AND ABBREVIATIONS Issued for 100% Design 3/23/21

PD 101 P1 PLUMBING BASEMENT DEMOLITION PLAN PHASE 1 Issued for 100% Design 3/23/21

PP 101 P1 PLUMBING BASEMENT PIPING PLAN PHASE 1 Issued for 100% Design 3/23/21

PW 101 P1 PLUMBING BASEMENT WASTE & VENT PLAN PHASE 1 Issued for 100% Design 3/23/21

PD 101 P2 PLUMBING BASEMENT DEMOLITION PLAN PHASE 2 Issued for 100% Design 3/23/21

PP 101 P2 PLUMBING BASEMENT PIPING PLAN PHASE 2 Issued for 100% Design 3/23/21

PW 101 P2 PLUMBING BASEMENT WASTE & VENT PLAN PHASE 2 Issued for 100% Design 3/23/21

PD 101 P3 PLUMBING BASEMENT DEMOLITION PLAN PHASE 3 Issued for 100% Design 3/23/21

P501 PLUMBING DETAILS Issued for 100% Design 3/23/21

P601 PLUMBING SCHEDULES Issued for 100% Design 3/23/21

Total Sheets: 10

Fire Protection Sheet Index

Sheet Number Sheet Name Issued For Issue Date

FP001 FIRE PROTECTION SYMBOLS AND ABBREVIATIONS Issued for 100% Design 3/23/21

FPD 101 P1 FIRE PROTECTION BASEMENT DEMOLITION PLAN

PHASE 1

Issued for 100% Design 3/23/21

FP 101 P1 FIRE PROTECTION BASEMENT PLAN PHASE 1 Issued for 100% Design 3/23/21

FPD 101 P2 FIRE PROTECTION BASEMENT PLAN PHASE 2 Issued for 100% Design 3/23/21

FP 101 P2 FIRE PROTECTION BASEMENT PLAN PHASE 2 Issued for 100% Design 3/23/21

FP501 FIRE PROTECTION DETAILS Issued for 100% Design 3/23/21

Total Sheets: 6

Interiors Sheet Index

Sheet Number Sheet Name Issued For Issue Date

AI 103 P3 ARCHITECTURAL INTERIORS ISSUED FOR 100% DESIGN 3/23/2021

AI 102 P2 ARCHITECTURAL INTERIORS ISSUED FOR 100% DESIGN 3/23/2021

AI 101 P1 ARCHITECTURAL INTERIORS ISSUED FOR 100% DESIGN 3/23/2021

AG 101 ARCHITECTURAL GRAPHICS ISSUED FOR 100% DESIGN 3/23/2021

AF101 INTERIOR FURNISHINGS ISSUED FOR 100% DESIGN 3/23/2021

Total Sheets: 5

Revisions Date

Issued for 30% Design 4/7/20

60% Design Phase (Design Development) 6/19/20

Issued for 90% Review 8/24/20

Issued for 100% Design 3/23/21

View of Waiting Area & Reception - GU Clinic

A101

SIM

Name Elevation

Room name

A101

SIM

A101

View Name 1/8" = 1'-0"

1i

NORTH ARROW

GRID LINE

(x DENOTES EXISTING)

FLOOR/LEVEL ELEVATION

SPOT/ CEILING ELEVATION

VIEW NAME TAG & SCALE

ENLARGED PLAN CALL-OUT

DETAIL CALL-OUT

SECTION MARK

ELEVATION VIEW

KEYNOTE

DOOR TAG

PARTITION TAG

FIRE RESISTIVE RATED WALLS, 1 HOUR

SIMILAR OR OPPOSITE HAND

1 Ref

R e f

1 Ref

R e f

SYMBOLS LEGEND

X

PLAN

NORTH

1i FURNITURE, FIXTURE, & EQUIPMENT

INDICATOR

4'0 8' 16'

GRAPHIC SCALE (1/8" = 1'-0")

CENTERLINE

FIRE RESISTIVE RATED WALLS, 2 HOUR

FIRE RESISTIVE RATED WALLS, 3 HOUR

FIRE RESISTIVE RATED WALLS, 4 HOUR

SMOKE BARRIER WALLS, 1 HOUR CONSTRUCTION

SIMILAR OR OPPOSITE HAND

A101

SIM

DETAIL CALL-OUT

SIMILAR OR OPPOSITE HAND

Room name

ROOM NAME/NUMBER

P-2 FINISH TAG - SEE SHEET AF 101

FINISH SPECIFICATIONS

1. THE GENERAL CONTRACTOR SHALL VISIT THE SITE AND BE KNOWLEDGEABLE OF CONDITIONS THEREOF. HE SHALL INVESTIGATE, VERIFY AND BE RESPONSIBLE FOR ALL CONDITIONS OF THE

PROJECT AND SHALL NOTIFY THE ARCHITECT IMMEDIATELY OF ANY INCONSISTENCIES OR

DISCREPANCIES WITH THE PLANS IN RELATION TO THE EXISTING FIELD CONDITIONS OR ANY

CONDITIONS REQUIRING MODIFICATION BEFORE PROCEEDING WITH THE WORK. COMMENCEMENT

OF WORK SHALL CONSTITUTE ACCEPTANCE OF EXISTING CONDITIONS. GC TO BRING AREA TO A

"SHELL" CONDITION" IN ORDER TO ACCEPT NEW LAYOUT AS PER PLANS.

2. SURVEY THE CONDITION OF THE BUILDING TO DETERMINE WHETHER REMOVING ANY ELEMENT MIGHT RESULT IN A STRUCTURAL DEFICIENCY OR UNPLANNED COLLAPSE OF ANY PORTION OF THE

STRUCTURE OR ADJACENT STRUCTURES DURING DEMOLITION AND NOTIFY COR & ARCHITECT

BEFORE PROCEEDING. PERFORM SURVEYS AS THE WORK PROGRESSES TO DETECT HAZARDS

RESULTING FROM DEMOLITION ACTIVITIES.

3. CONTRACTOR TO COORDINATE & REVIEW ALL CONSTRUCTION DOCUMENTS, AS A WHOLE, TO

DETERMINE THE EXTENT OF DEMOLITION WORK, RELATION TO NEW WORK, & BECOME FAMILIAR

WITH THEM THOROUGHLY BEFORE PERFORMING ANY DEMOLITION WORK. BY THE ACT OF

SUBMITTING A BID, THE CONTRACTOR WILL BE DEEMED TO HAVE COMPLIED WITH THE FOREGOING

TO HAVE ACCEPTED SUCH CONDITIONS AND TO HAVE MADE ALLOWANCES THEREFORE IN

PREPARING HIS BID.

4. PLANS SHOW GENERAL DEMOLITION WORK TO BE PERFORMED AND DOES NOT RELIEVE THE

CONTRACTOR FROM OTHER DEMOLITION WORK REQUIRED TO PRODUCE THE BUILDING

MODIFICATIONS SHOWN ON THE REMAINING CONTRACT DOCUMENTS, INCLUDING THE PLUMBING,

MECHANICAL & ELECTRICAL DRAWINGS. WORK INCLUDES REMOVAL AND LEGAL DISPOSAL OF ALL EXISTING CONSTRUCTION ITEMS THAT ARE NOT UTILIZED IN THE FINISHED PROJECT. REMOVE ALL

ITEMS SPECIFICALLY INDICATED IN THE DRAWINGS AND ITEMS WHICH ARE NECESSARY TO BE

REMOVED IN ORDER TO FACILITATE THE FINISHED PROJECT.

5. FIELD VERIFY ALL DIMENSIONS AND BRING ANY DISCREPANCIES TO THE ATTENTION OF THE

COR & ARCHITECT. DO NOT SCALE DRAWINGS. ALL DIMENSIONS LOCATING WALLS ARE TAKEN

FROM OUTSIDE FINISHED FACE OF EXISTING PARTITIONS UNLESS OTHERWISE INDICATED.

6. COMPLY WITH GOVERNING EPA NOTIFICATION REGULATIONS BEFORE STARTING DEMOLITION.

COMPLY WITH HAULING AND DISPOSAL REGULATIONS OF AUTHORITIES HAVING JURISDICTION.

REMOVE AND LEGALLY DISPOSE OF ITEMS EXCEPT THOSE INDICATED TO BE REINSTALLED,

SALVAGED, OR TO REMAIN THE VA'S PROPERTY.

7. EXCEPT FOR ITEMS OR MATERIALS INDICATED TO BE REUSED, SALVAGED, OR DETERMINED BY COR

TO REMAIN THE VA'S PROPERTY, DEMOLISHED MATERIALS SHALL BECOME THE CONTRACTOR'S

PROPERTY AND SHALL BE REMOVED FROM THE SITE. PROMPTLY DISPOSE OF DEMOLISHED

MATERIALS. DO NOT ALLOW DEMOLISHED MATERIALS TO ACCUMULATE ON SITE. TRANSPORT

DEMOLISHED MATERIALS OFF VA'S PROPERTY AND LEGALLY DISPOSE OF THEM TO ENSURE MINIMAL

INTERFERENCE WITH ROADS, STREETS, WALKS, AND OTHER ADJACENT OCCUPIED AND USED

FACILITIES. REMOVE & TRANSPORT DEBRIS IN A MANNER THAT WILL PREVENT SPILLAGE ON

ADJACENT SURFACES AND AREAS.

8. STORAGE OR SALE OF REMOVED ITEMS OR MATERIALS ON-SITE IS NOT PERMITTED.

9. EXECUTE THE WORK IN A CAREFUL AND ORDERLY MANNER. COORDINATE ALL WORK WITH THE

COR TO VERIFY USE OF POWER, TEMPORARY STORAGE, SITE ACCESS, HOURS OF WORK ETC..

10. SUBMIT WRITTEN REQUEST TO COR IN ADVANCE OF CUTTING OR ALTERING ELEMENTS WHICH

AFFECT:

a. STRUCTURAL INTEGRITY OF ELEMENT

b. INTEGRITY OF WEATHER EXPOSED OR MOISTURE RESISTANT ELEMENTS.

11. PROVIDE TEMPORARY BRACING AND SHORING WITH CONNECTIONS OF SUFFICIENT STRENGTH TO BEAR IMPOSED LOADS, AND TO PROTECT ALL PERSONS AND PROPERTY, AND TO ENSURE PROPER ALIGNMENT. COMPLY WITH ALL STATE, O.S.H.A., VA REQUIREMENTS, AND LOCAL CODES. THE

CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR PROVIDING ADEQUATE BRACING OF WALLS

DURING DEMOLITION AND ERECTION TO PREVENT DAMAGE DUE TO HIGH WINDS OR OTHER LATERAL

LOADS AND CONSTRUCTION IMPACTS. CONTRACTOR SHALL ASSUME ALL RESPONSIBILITY FOR

DAMAGE DUE TO HIS FAILURE TO TAKE SUCH PRECAUTIONS.

12. SURVEY THE CONDITION OF THE BUILDING TO DETERMINE WHETHER REMOVING ANY ELEMENT MIGHT RESULT IN STRUCTURAL DEFICIENCY OR UNPLANNED COLLAPSE OF ANY PORTION OF THE

STRUCTURE OR ADJACENT STRUCTURES DURING DEMOLITION.

13. REMOVE & REINSTALL ITEMS INDICATED; CLEAN, SERVICE, AND OTHERWISE PREPARE THEM FOR

REUSE; STORE AND PROTECT AGAINST DAMAGE. REINSTALL ITEMS IN LOCATIONS INDICATED.

14. THE CONTRACTOR SHALL PROTECT ALL UNALTERED PORTIONS OF THE EXISTING CONDITIONS, AS

NECESSARY. CONTRACTOR SHALL BE RESPONSIBLE FOR ALL DAMAGE TO EXISTING WORK AND

WORK BY OTHERS.

15. MAINTAIN EXISTING UTILITIES WHERE APPLICABLE TO REMAIN IN SERVICE AND PROTECT THEM AGAINST DAMAGE DURING SELECTIVE DEMOLITION OPERATIONS. VERIFY THAT SERVICE IS NOT

DISCONNECTED IN OTHER ADJACENT SPACES DURING DEMOLITION.

16. PROVIDE TEMPORARY WEATHER PROTECTION, DURING INTERVAL BETWEEN DEMOLITION AND

REMOVAL OF EXISTING CONSTRUCTION, ON EXTERIOR SURFACES AND NEW CONSTRUCTION TO

ENSURE THAT NO WATER DAMAGE OCCURS TO STRUCTURE, EXTERIOR, OR INTERIOR AREAS. G.C.

TO PLACE WALK-OFF MATS AT EXITS TO CONTROL THE TRACKING OF DUST, DIRT AND DEBRIS INTO

THE FACILITY'S COMMON AREAS.

17. PROTECT WALLS, FLOORS AND OTHER EXISTING FINISH WORK THAT ARE TO REMAIN AND ARE

EXPOSED DURING SELECTIVE DEMOLITION OPERATIONS. GENERAL CONTRACTOR TO REVIEW

CONDITION OF CONCRETE SLABS WITH COR AFTER DEMOLITION OF EXISTING WALLS, FLOORS, &

CEILINGS IS COMPLETE. GENERAL CONTRACTOR TO REVIEW PATCH LOCATIONS & COLOR FOR:

LOCATIONS FOR NEW PLUMBING; NON-COMPLIANT CODE CONDITIONS; AND SIGNIFICANT COSMETIC DEFECTS WITH COR & ARCHITECT/ENGINEER OF RECORD. ANY EXISTING FINISHED SURFACES TO REMAIN THAT ARE AFFECTED BY SELECTIVE DEMOLITION SHALL BE PATCHED TO MATCH EXISTING

ADJACENT SURFACES & FINISHES UNLESS CONCEALED BY NEW CONSTRUCTION.

18. WHERE NEW WORK ADJOINS EXISTING WORK, THE CONTRACTOR SHALL DO ALL NECESSARY

CUTTING, PATCHING AND FITTING. JUNCTURES OF NEW AND EXISTING OR OTHER WORK SHALL BE REPAIRED AND PATCHED TO MATCH ADJACENT EXISTING SURFACES. EXISTING WALLS REQUIRING MODIFICATION OF ANY KIND SHALL BE REFINISHED TO THE NEAREST OUTSIDE OR INSIDE CORNER.

19. DISCONNECT AND REMOVE AND/OR CAP ALL EXISTING UTILITIES (ELECTRIC, GAS, WATER, SANITARY

& STORM) WHERE SCHEDULED NOT TO BE REUSED, IN ACCORDANCE WITH AHJ AND GOVERNING

CODE.

20. PROVIDE TEMPORARY LIGHTING/POWER AS REQUIRED, DURING AND AFTER DEMOLITION FOR ALL AREAS WITHIN LIMITS OF THIS CONTRACT. SUCH SERVICE SHALL BE TAKEN FROM EXISTING PANEL

BOARDS, AND EXISTING EQUIPMENT MAY BE UTILIZED WHERE FEASIBLE. GC SHALL OBTAIN

APPROVAL FROM COR PRIOR TO CONNECTING TO PANELS.

21. ALL EXISTING CONDUIT AND WIRE INTERFERING WITH THE NEW WORK SHALL BE REROUTED &

CONCEALED IN THE NEW CONSTRUCTION AND MUST BE COORDINATED WITH THE COR.

22. ALL UNUSED CONDUIT AND WIRE REMOVED SHALL BE REMOVED COMPLETELY BACK TO SOURCE, AND BRANCH OVER-CURRENT PROTECTIVE DEVICES PROPERLY LABELED "SPARE".

23. UPON COMPLETION OF THE NEW INSTALLATION WORK, DISCONNECT, REMOVE, AND PROPERLY

DISPOSE OF ALL TEMPORARY LIGHTING, POWER, AND WIRING. PROVIDE PHOTOGRAPHS OR

VIDEOTAPE, SUFFICIENTLY DETAILED, OF EXISTING CONDITIONS OF ADJOINING CONSTRUCTION AND

SITE IMPROVEMENTS THAT MIGHT BE MISCONSTRUED AS DAMAGE CAUSED BY DEMOLITION

OPERATIONS.

24. CLEAN ALL HORIZONTAL SURFACES OF ACCUMULATED DUST AND DEBRIS. SWEEP THE BUILDING

BROOM CLEAN ON COMPLETION OF DEMOLITION OPERATION.

25. G.C. TO COORDINATE FIRE ALARM SYSTEM MODIFICATION WITH THE VA PREFERRED FIRE ALARM

CONTRACTOR PER NEW FLOOR PLAN.

26. G.C. SHALL COORDINATE WORK WITH COR TO INSURE MINIMAL DISRUPTION TO FACILITY

OPERATIONS AND ADJACENT USERS. G.C. TO REUSE ANY EXISTING IMPROVEMENTS, EQUIPMENT

AND UTILITY SYSTEMS, PROVIDED THEY ACKNOWLEDGE RESPONSIBILITY FOR THE REPAIR,

REPLACEMENT OR UPGRADE OF SUCH IF DETERMINED TO BE NON COMPLAINT WITH LATEST CODE, NOT DESIGNED OR APPLICABLE FOR PROPOSED APPLICATION, DAMAGED OR NON OPERATIONAL

DEMOLITION GENERAL NOTES GENERAL NOTES

1. THE TERM "WORK" AS USED IN THESE NOTES SHALL INCLUDE ALL REVISIONS AS DRAWN OR SPECIFIED IN THESE DOCUMENTS AS WELL AS ALL OTHER PROVISIONS SPECIFICALLY INCLUDED BY

THE COR IN THE FORM OF DRAWINGS, SPECIFICATIONS, AND WRITTEN INSTRUCTIONS.

2. GC, CM AND SUBCONTRACTORS SHALL VISIT JOB SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS BEFORE SUBMITTING BIDS. ANY DISCREPANCIES WITHIN THESE DRAWINGS AND/OR

BETWEEN THESE DRAWINGS AND EXISTING CONDITIONS SHALL BE BROUGHT TO THE IMMEDIATE

ATTENTION OF THE ARCHITECT PRIOR TO SUBMITTING BIDS AND THE START OF ANY WORK.

3. GC, CM & SUBCONTRACTORS SHALL FIELD VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION. IF THE CONTRACT DRAWINGS APPEAR TO BE UNCLEAR, AMBIGUOUS, OR CONTRADICTORY, THE GC, CM AND SUBCONTRACTORS MUST REQUEST CLARIFICATION FROM THE ARCHITECT IN WRITING BEFORE SUBMITTING BIDS AND PROCEEDING WITH THAT PART OF THE WORK. IN CASE OF ANY APPARENT

DISCREPANCIES OR CONFLICTS, GC & CM MUST NOTIFY ARCHITECT IMMEDIATELY BEFORE

SUBMITTING BIDS AND PROCEEDING WITH ANY WORK.

4. GENERAL CONTRACTOR SHALL BECOME FAMILIAR WITH THE CORS & VA'S REQUIREMENTS PRIOR

TO BIDDING AND SHALL BE RESPONSIBLE FOR COMPLIANCE WITH THESE REQUIREMENTS.

5. ALL WORK SHALL BE PERFORMED AS TO COMPLY WITH ALL GOVERNING STATUTES,

ORDINANCES, GOVERNMENTAL AND JURISDICTIONAL PERMITS AND APPROVALS AS

OBTAINED. CONTRACTORS SHALL NOT SUBMIT A BID FOR THIS WORK UNLESS THEY ARE FULLY

QUALIFIED AND LICENSED BY THE JURISDICTION IN WHICH THE WORK IS TO BE PERFORMED.

6. ALL WORK SHALL BE PERFORMED IN A PROFESSIONAL MANNER AND SHALL BE IN GOOD AND USABLE

CONDITION AT THE DATE OF COMPLETION THEREOF.

7. GENERAL CONTRACTOR SHALL BE RESPONSIBLE FOR REVIEWING APPROVED

PLANS AS APPROVED AND FOR ALL REVISIONS AND OTHER CHANGES. NO WORK SHALL BEGIN

PRIOR TO RECEIPT OF COR APPROVAL.

8. DIMENSIONS ARE BASED ON THE FOLLOWING CRITERIA:

A. GRID DIMENSIONS ARE TO CENTERLINE OF STRUCTURAL GRID LINE UNLESS

OTHERWISE NOTED.

B. DIMENSIONS ARE TO FACE OF FINISHED WALL.

C. DO NOT SCALE DRAWINGS. IF DIMENSIONS ARE NOT SHOWN AND CANNOT BE

DETERMINED BY LAYOUT CRITERIA, CONTACT THE ARCHITECT FOR

CLARIFICATION.

D. DIMENSIONING LAYOUT BEGINS WHERE THE START POINT IS INDICATED ON THE

DRAWINGS

E. WHERE A DIMENSION IS NOTED AS "HOLD" THIS DIMENSION SHALL INDICATE

CLEARANCES AT COMPLETED CONDITIONS, TAKING FINISH MATERIALS INTO

ACCOUNT.

F. DIMENSIONS ARE BASED UPON SPECIFIED MATERIALS AND EQUIPMENT.

SUBSTITUTIONS MAY AFFECT DIMENSIONS. SUBSTITUTION REQUESTS SHALL

INDICATE THE IMPACT OF THE SUBSTITUTIONS UPON DIMENSIONS AND

CLEARANCES.

9. ELEVATIONS REFER TO THE BUILDING DATUM AS INDICATED. FLOOR ELEVATIONS NOTED ARE TO TOP

OF CONCRETE SLAB, OR INDIVIDUAL TOP OF WOOD SUBFLOOR, UNLESS OTHERWISE NOTED.

10. A SITE SURVEY (IF PROVIDED) SHOWING SITE BOUNDARIES, BOUNDARY LENGTHS, DECLINATIONS, SITE CONDITIONS AND GRADES AT THE TIME OF SURVEY WAS FURNISHED TO THE DESIGN TEAM BY

THE COR. CONTRACTOR SHALL VERIFY SITE CONDITIONS PRIOR TO STARTING ANY WORK.

11. GEOTECHNICAL INFORMATION (IF PROVIDED) REGARDING GEOTECHNICAL AND SOIL CONDITIONS AT

THE SITE AT THE TIME OF THE REPORT WAS FURNISHED TO THE DESIGN TEAM BY THE COR.

CONTRACTOR SHALL VERIFY SITE CONDITIONS PRIOR TO STARTING ANY WORK.

12. FIRE SPRINKLER WORK SHALL BE DESIGN-BUILD. PERMIT DRAWINGS FOR THIS WORK SHALL BE A DEFERRED SUBMITTAL MADE BY THE CONTRACTOR. THE VA SHALL ENTER INTO SERVICE CONTRACTS WITH QUALIFIED AND LICENSED FIRE SPRINKLER AND FIRE ALARM CONTRACTORS TO PROVIDE THE MAINTENANCE AND TESTING OF BOTH THE FIRE SPRINKLER SYSTEM AND THE FIRE ALARM SYSTEM.

DOCUMENTATION VERIFYING THE SERVICE CONTRACTS SHALL BE SUBMITTED TO THE FIRE

INSPECTOR PRIOR TO BUILDING OCCUPANCY.

13. PROVIDE BACKING AND BLOCKING FOR WALL MOUNTED ELEMENTS AS REQUIRED FOR

ATTACHMENT AND FOR SEISMIC BRACING OF NON-STRUCTURAL ELEMENTS.

14. IF MATERIALS SUSPECTED OF CONTAINING HAZARDOUS MATERIALS ARE ENCOUNTERED, DO NOT DISTURB; IMMEDIATELY NOTIFY ARCHITECT AND COR. HAZARDOUS MATERIALS WILL BE REMOVED BY

VA UNDER A SEPARATE CONTRACT.

15. THE CONTRACTOR SHALL, UPON RECEIPT, CAREFULLY REVIEW ALL OF THE CONTRACT

DOCUMENTS AND SHALL IMMEDIATELY NOTIFY THE ARCHITECT REGARDING ANY APPARENT ERRORS, INCONSISTENCIES, OR OMISSIONS DISCOVERED.

16. THE CONTRACT DOCUMENTS ARE CONSIDERED A WHOLE AND AS SUCH, THE GENERAL CONTRACTOR

AND SUB-CONTRACTORS MUST COORDINATE ALL INTERRELATED WORK.

17. WHERE NEW CONSTRUCTION ABUTS EXISTING CONSTRUCTION TO REMAIN, OR WORK DONE UNDER

SEPARATE CONTRACT, ALL CONDITIONS AFFECTING WORK PROGRESS AND CONFORMANCE TO

PLANS AND SPECIFICATIONS SHALL BE VERIFIED BY CONTRACTOR PRIOR TO START OF ANY WORK.

18. ALL WORK AND MATERIALS SHALL BE IN ACCORDANCE WITH CURRENT RULES AND

REGULATIONS OF FEDERAL, STATE, AND LOCAL CODES, LAWS, ORDINANCES, STATUES, AND

REGULATIONS. NOTHING IN THE CONTRACT DOCUMENTS SHALL BE CONSTRUED AS REQUIRING OR

AUTHORIZING WORK CONTRARY TO THESE RULES, REGULATIONS, AND CODES.

19. THE DRAWINGS INDICATE LOCATIONS, DIMENSIONS AND TYPICAL DETAILS OF CONSTRUCTION. THE DRAWINGS DO NOT ILLUSTRATE EVERY CONDITION; WORK NOT EXPRESSLY DETAILED SHALL BE OF CONSTRUCTION SIMILAR TO PARTS THAT ARE DETAILED. WHERE APPARENT DISCREPANCIES OCCUR, THEY SHALL BE REPORTED TO THE ARCHITECT IMMEDIATELY FOR RESOLUTION BEFORE

PROCEEDING WITH THE WORK.

20. GRAPHICS (OTHER THAN SIGNAGE) ITEMS SHALL BE FURNISHED AND INSTALLED BY CONTRACTOR.

CONTRACTOR SHALL PROVIDE BACKING AS REQUIRED FOR PROPER INSTALLATION.

21. THE CONTRACTOR SHALL EXAMINE WORK IN PLACE ON WHICH ADDITIONAL SPECIFIED

CONSTRUCTION IS TO BE APPLIED TO ENSURE THAT SUBSTRATE CONDITIONS ARE

SATISFACTORY FOR THE INSTALLATION OF SPECIFIED FINISH MATERIALS. VERIFY THAT

SUBSTRATES, APPURTENANCES, AND OTHER ACCESSORIES ARE IN PLACE AS REQUIRED BY

FINISH MATERIALS. REPORT IN WRITING ANY DEFECTS, OR CONDITIONS WHICH MAY DELAY

COMPLETION OF PERFORMANCE OF SPECIFIED FINISH WORK. FAILURE OF SUCH NOTIFICATION WILL

BE CONSTRUED AS ACCEPTANCE OF SUBSTRATES AND WORK IN PLACE. CORRECTIVE WORK

REQUIRED BY ARCHITECT, VA OR COR DUE TO CONTRACTOR'S ACCEPTANCE OF UNSATISFACTORY SUBSTRATE AND WORK IN PLACE CONDITIONS SHALL BE MADE AT NO ADDITIONAL COST TO THE VA.

22. SEPARATE CONTRACTS: THE CONTRACTOR SHALL COORDINATE AND COOPERATE WITH THE WORK

OF SEPARATE CONTRACTS SUCH AS IMPROVEMENTS AND PUBLIC UTILITIES, ETC.

23. FLOORING AND FINISH PROTECTION: THE CONTRACTOR SHALL PROTECT NEW FLOORING AND FINISHES INSTALLED UNDER THIS CONTRACT AND SHALL REPAIR AND REPLACE OR REPAIR ANY

DAMAGED FLOORING OR FINISHES AT NO ADDITIONAL COST TO THE VA UNTIL COR'S FINAL

ACCEPTANCE OF FLOORING AND FINISHES AT CONCLUSION OF WORK.

24. FIRESTOPPING AND FIRE RATED PENETRATIONS REQUIRED AT ALL FIRE RATED WALLS & FLOORS

SHALL COMPLY WITH ALL APPLICABLE CODES. CONTRACTOR SHALL SUBMIT MANUFACTURER'S

LITERATURE INCLUDING DATA FOR MATERIALS AND PREFABRICATED DEVICES, UNDERWRITER'S

LABORATORY APPROVAL NUMBERS FOR REQUIRED FIRE RATINGS, SHOP DRAWINGS FOR

MANUFACTURER'S INSTALLATION DETAILS AND CERTIFICATES OF COMPLIANCE SHOWING MATERIAL OR COMBINATION OF MATERIALS USED MEETS REQUIREMENTS SPECIFIED FOR FIRE RESISTANCE.

25. CONTRACTOR SHALL SUBMIT TO THE VA ELECTRONIC COPIES ON A CD OF THE DRAWINGS OF RECORD FOR THE BUILDING. THESE SHALL INCLUDE SITE PLAN, FIRE UNDERGROUND UTILITY PLANS, BUILDING PLANS, FIRE SPRINKLER PLAN AND FIRE ALARM PLAN AS APPLICABLE TO SCOPE.

26. ANY WOOD, WOOD BLOCKING, OR WOOD SHEATHING USED TO BE FIRE-RETARDANT TREATED WOOD.

27. USE MOISTURE/MOLD RESISTANT GYPSUM BOARD ON ALL WET WALLS AND AT ALL LOCATIONS

EXPOSED TO WATER, HUMIDITY OR MOISTURE.

28. EGRESS DOOR HARDWARE: ALL EGRESS DOORS SHALL BE OPERABLE FROM THE SIDE EGRESS IS

MADE WITHOUT THE USE OF A KEY OR SPECIAL KNOWLEDGE.

29. CONTRACTOR AND SUB-CONTRACTORS SHALL PHYSICALLY INSPECT & VERIFY ALL EXISTING

CONDITIONS INCLUDING, BUT NOT LIMITED TO, LOCATIONS OF WALLS, STRUCTURAL SYSTEMS & MEMBERS, MECHANICAL SYSTEMS, PLUMBING & ELECTRICAL SYSTEMS, FIRE PROTECTION MAINS, UTILITY CONNECTIONS AND METERING DEVICES PRIOR TO SUBMITTING BIDS, THE ORDERING OF ANY

MATERIALS, AND BEGINNING ANY WORK.

30. ACTIVE HOSPITAL ENVIRONMENT: GENERAL CONTRACTOR & SUBCONTRACTORS SHALL BE FAMILIAR WITH ALL VA WORKING REQUIREMENTS IN THE FACILITY INCLUDING BUT NOT LIMITED TO HOURS OF WORK, MOVEMENT, MATERIAL STORAGE AND HANDLING. GC SHALL OBTAIN THE APPROVAL OF COR

PRIOR TO BEGINNING ANY WORK.

CODES:

BUILDING CODE: 2018 INTERNATIONAL BUILDING CODE

FIRE CODE: 2018 INTERNATIONAL FIRE CODE

LIFE SAFETY: NFPA 101 LIFESAFETY CODE

ELECTRICAL CODE: 2020 NATIONAL ELECTRIC CODE (NFPA 70)

PLUMBING CODE: 2018 INTERNATIONAL PLUMING CODE

MECHANICAL CODE: 2015 INTERNATIONAL MECHANICAL CODE

FUEL GAS CODE: 2015 INTERNATIONAL FUEL GAS CODE

ENERGY CODE: 2018 INTERNATIONAL ENERGY CONSERVATION CODE

ACCESSIBILITY: ARCHITECTURAL BARRIERS ACT STANDARDS 2015 (ABAAS) & VA BARRIER FREE DESIGN

STANDARD 2017 (PG-18-13)

GENERAL PROJECT DESCRIPTION: RENOVATION OF AN EXISTING AMBULATORY GU CLINIC CONSISTING OF EXAM

ROOMS, LOBBY & RECEPTION AREAS, STAFF OFFICES, PREP & RECOVERY AREA,

PROCEDURE ROOMS, AND SUPPORT AREAS

CONSTRUCTION TYPE: I-B (EXISTING)

FIRE RESISTIVE CONSTRUCTION (TABLE 601, IBC 2018)

STRUCTURAL FRAME: 2 HOUR (EXISTING)

EXTERIOR BEARING WALLS: 2 HOUR (EXISTING)

INTERIOR BEARING WALLS: 2 HOUR (EXISTING)

NON-BEARING INTERIOR WALLS: 0 HOURS (NEW & EXISTING)

FLOOR STRUCTURE: 2 HOUR (EXISTING)

OCCUPANCY CLASSIFICATION: B - BUSINESS, AMBULATORY CARE FACILITIES

FULLY SPRINKLED BUILDING: YES

GROSS AREA OF CLINIC SUITE: 6,390 SF GROSS (AREA OF WORK 4,791 SF GROSS)

OCCUPANCY LOAD: 6,390 SF NET TOTAL

6,390 SF @ 100 SF PER PERSON = 64 TOTAL OCCUPANTS

EXITS REQUIRED: 2

EXITS PROVIDED: 5

EXIT ACCESS TRAVEL DISTANCE: MAXIMUM - 200'

FINISHES:

WALL AND CEILING: CLASS 2 26 TO 75 FLAME SPREAD RATING, 0-450 SMOKE DEVELOPED

FLOOR COVERINGS: CLASS A

DECORATIVE TRIM: CLASS 1

PENETRATIONS: ALL PENETRATIONS THROUGH RATED ASSEMBLIES AND SMOKE BARRIERS SHALL

BE PROTECTED EQUAL TO THE ASSEMBLY WITH FIRESTOPPING OR

FIRESTOPPING SYSTEM. ALSO SEE PROJECT MANUAL

PROJECT INFORMATION

CODE ANALYSIS

03/22/2021 exp. 11/30/2022

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Edward Hines Jr.

VA Hospital 5th and Roosevelt Rd.

Hines, IL 60141-5115

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA MEDICAL CENTER

HINES, ILLINOIS

537-15-037 36C25219D0020

V ir tu a l E n e rg y S o lu ti o n s

IN

C

845 Design Group P.C.

106 Calendar Court, #131 LaGrange, Illinois 60525

845designgroup.com

5600 North River Rd, Suite 950 Rosemont, IL 60018

312.445.0000

B

IM

/1

-M A

T O

C -5

-1

-0

-H in e s G

U C lin ic

R e n

/1

-H in e s G

U A rc h M a in

.r v t

-0

-2

:1

:2

GI 002

CODE ANALYSIS, SYMBOLS &

GENERAL NOTES

GU CLINIC

RENOVATION

6/19/20

GCGIDGID

Revisions Date

Issued for 30% Design 4/7/20

60% Design Phase (Design Development) 6/19/20

Issued for 90% Review 8/24/20

A LABEL CLASS A DOOR

A/C AIR CONDITION

A/C UNIT AIR CONDITIONING UNIT

A/E ARCHITECT/ENGINEER

AAMA AMERICAN ARCHITECTURAL

MANUFACTURERS ASSOCIATION

AB ANCHOR BOLT

ABC AGGREGATE BASE COURSE

AC ASBESTOS CEMENT OR ASPHALTIC

CONCRETE

ACI AMERICAN CONCRETE INSTITUTE

ACS DR ACCESS DOOR

ACS FLR ACCESS FLOOR

ACS PNL ACCESS PANEL

ACST ACOUSTIC

ACT ACOUSTICAL CEILING TILE

AD AREA DRAIN

ADA AMERICANS WITH DISABILITIES ACT

ADC AUTOMATIC DOOR CLOSER

ADDL ADDITIONAL

ADDN ADDITION

ADH ADHESIVE

ADJ ADJACENT, ADJOINING, OR ADJUSTABLE

ADMIN ADMINISTRATION

ADB AUTOMATIC DOOR BOTTOM

AFC ABOVE FINISHED COUNTER

AFF ABOVE FINISHED FLOOR

AFG ABOVE FINISHED GRADE

AFS ABOVE FINISHED SLAB

AGA AMERICAN GAS ASSOCIATION

AGC ASSOCIATED GENERAL CONTRACTORS

AGGR AGGREGATE

AHJ AUTHORITY HAVING JURISDICTION

AHR ANCHOR

AHU AIR HANDLING UNIT

AIA AMERICAN INSTITUTE OF ARCHITECTS

AISC AMERICAN INSTITUTE OF STEEL

CONSTRUCTION

ALT ALTERNATE

ALT NO ALTERNATE NUMBER

ALUM ALUMINUM

AMP AMPERE

AMT AMOUNT

ANOD ANODIZE

ANSI AMERICAN NATIONAL STANDARDS

INSTITUTE

ANT ANTENNA

APA AMERICAN PLYWOOD ASSOCIATION

APPD APPROVED

APPROX APPROXIMATE

APT APARTMENT

AR AS REQUIRED

ARCH ARCHITECT

ASB ASBESTOS

ASI ARCHITECT'S SUPPLEMENTAL

INSTRUCTION

ASKLR AUTOMATIC SPRINKLER

ASPH ASPHALT

ASSN ASSOCIATION

ASTM AMERICAN SOCIETY FOR TESTING AND

MATERIALS

ATCH ATTACHMENT

ATM AUTOMATIC TELLER MACHINE

ATS AUTOMATIC TRANSFER SWITCH

AUTO AUTOMATIC

AUX AUXILIARY

AV AUDIO VISUAL

AVE AVENUE

AVG AVERAGE

AW ACID WASTE

AWI ARCHITECTURAL WOODWORKING

INSTITUTE

AWPA AMERICAN WOOD PRESERVERS'

ASSOCIATION

AWS AMERICAN WELDING SOCIETY

AWT ACOUSTICAL WALL TREATMENT

B LABEL CLASS B DOOR

B PL BASE PLATE

BALC BALCONY

BAT BATTEN

BB BULLETIN BOARD

BD BOARD

BD FT BOARD FEET (FOOT)

BEV BEVEL

BHMA BUILDER'S HARDWARE

MANUFACTURER'S ASSOCIATION

BI FLD DR BIFOLDING DOORS

BITUM BITUMINOUS

BKG BACKING

BLD BUILD

BLDG BUILDING

BLKT BLANKET

BLVD BOULEVARD

BM BEAM OR BENCHMARK

BOT BOTTOM

BR BEDROOM

BRCG BRACING

BRDG BRIDGING

BRDG JST BRIDGING JOIST

BRG BEARING

BRG PL BEARING PLATE

BRKT BRACKET

BRZ BRONZE

BSMT BASEMENT

BTWN BETWEEN

BU BUSHEL

BUR BUILT-UP ROOFING

C CELSIUS CHANNEL

C CHANNEL CELSIUS

C CONC CAST CONCRETE

C LABEL CLASS C DOOR

C TO C CENTER TO CENTER

CAB CABINET

CAC CEILING ATTENUATION CLASS

CB CATCH BASIN OR CORNER BEAD

CBB CEMENTITIOUS (BACKER) BOARD

CC CUBIC CENTIMETER

CCTV CLOSED CIRCUIT TELEVISION

CCW COUNTERCLOCKWISE

CD CONSTRUCTION DOCUMENTS OR

CONTRACT DOCUMENTS

CEM CEMENT

CEM PLAS CEMENT PLASTER

CER CERAMIC

CF CONTRACTOR FURNISHED

CF/CI CONTRACTOR FURNISHED/CONTRACTOR

INSTALLED

CF/OI CONTRACTOR FURNISHED/OWNER

INSTALLED

CFLG COUNTERFLASHING

CFM CUBIC FEET PER MINUTE

CFMF COLD-FORMED METAL FRAMING

CFS CUBIC FEET PER SECOND

CG CENTER OF GRAVITY OR CORNER

GUARD

CGSFU CERAMIC GLAZED STRUCTURAL FACING

UNITS

CH BD CHALKBOARD

CHEM CHEMICAL

CHFR CHAMFER

CHK CHECK

CI CAST IRON

CIP CAST-IN-PLACE

CIR CIRCLE

CIRC CIRCULAR

CJ CONSTRUCTION JOINT OR CONTROL

JOINT

CL CENTER LINE

CLDG CLADDING

CLG CEILING

CLG HT CEILING HEIGHT

CLR CLEAR

cm² SQUARE CENTIMETER cm³ CUBIC CENTIMETER

CM CONSTRUCTION MANAGEMENT

CMU CONCRETE MASONRY UNIT

CNR CORNER

CNTR COUNTER

CO CARBON MONOXIDE, CERTIFICATE OF

OCCUPANCY, CLEANOUT, OR COMPANY

CO 2 CARBON DIOXIDE

COL COLUMN

COM COMMON

COMB COMBINATION, COMBINED

COMM COMMUNICATION

COMP COMPONENT

CONC CONCRETE

CONC FLR CONCRETE FLOOR

COND CONDENSER OR CONDITION

CONF CONFERENCE

CONN CONNECT

CONSTR CONSTRUCTION

CONT CONTINUE

CONTR CONTRACTOR

COORD COORDINATE

CORR CORRIDOR

CPM CRITICAL PATH METHOD

CPRS COMPRESSIBLE

CPT CARPET

CRS COLD ROLLED STEEL

CRSI CONCRETE REINFORCING STEEL

INSTITUTE

CSB CONCRETE SPLASH BLOCK

CSG CASING

CSI CONSTRUCTION SPECIFICATIONS

INSTITUTE

CSK COUNTER SUNK

CSMT CASEMENT

CSWK CASEWORK

CT CERAMIC TILE

CTB CERAMIC TILE BASE

CTF CERAMIC TILE FLOOR

CTG COATING

CTR CENTER CONTOUR

CTRL CONTROL

CTV CABLE TELEVISION

CU COPPER C

CU FT CUBIC FEET

CU IN CUBIC INCH

CU YD CUBIC YARD

CURT CURTAIN

CYL CYLINDER

CYL L CYLINDER LOCK

D DEPTH OR PENNY (NAIL)

D LABEL CLASS D DOOR

DAT DATUM

DB DECIBEL

DBL DOUBLE

DBL GLZ DOUBLE GLAZE

DC DIRECT CURRENT

DEG DEGREE

DEL DELETE

DEMO DEMOLITION

DEPT DEPARTMENT

DET DETAIL

DF DRINKING FOUNTAIN

DIA DIAMETER

DIAG DIAGONAL DIAGRAM

DIAG DIAGRAM DIAGONAL

DIFF DIFFERENCE OR DIFFUSER

DIM DIMENSION

DIR DIRECTION

DISP DISPENSER

DIST DISTANCE

DIV DIVIDE OR DIVISION

DL DEAD LOAD

DOC DOCUMENT

DOUG FIR DOUGLAS FIR

DOZ DOZEN

DR DOOR, DRAIN, DRESSING ROOM, OR

DRIVE

DR CL DOOR CLOSER

DR FR DOOR FRAME

DR OPNG DOOR OPENING

DS DOWNSPOUT

DSGN DESIGN

DW DISHWASHER

DWG DRAWING

DWTR DUMBWAITER

E EAST

E LABEL CLASS E DOOR

EA EACH

EFF EFFICIENCY

EFS EXTERIOR FINISH SYSTEM

EIFS EXTERIOR INSULATION AND FINISH

SYSTEM

EJ EXPANSION JOINT

EL ELEVATION

ELAST ELASTOMERIC

ELEC ELECTRIC

ELEC DR OP ELECTRIC DOOR OPENER

ELEV ELEVATOR

EMER EMERGENCY

EMER SHR EMERGENCY SHOWER

ENCL ENCLOSURE

ENGR ENGINEER

ENVIR ENVIRONMENT

EPA ENVIRONMENTAL PROTECTION AGENCY

EPDM ETHYLENE PROPYLENE DIENE MONOMER

EPO EMERGENCY POWER OFF

EPS EXPANDED POLYSTYRENE BOARD

(INSULATION)

EQ EQUAL

EQL SP EQUALLY SPACED

EQUIP EQUIPMENT

EQUIV EQUIVALENT

ERD EXISTING ROOF DRAIN

ESC ESCAPE OR ESCUTCHEON

ESCAL ESCALATOR

ESMT EASEMENT

ESP ESPECIALLY

EST ESTIMATE

ETC AND SO FORTH OR ET CETERA

EW EACH WAY

EWC ELECTRIC WATER COOLER

EWS EYE WASH STATION

EXH EXHAUST

EXIST EXISTING

EXP EXPANSION OR EXPOSED

EXP BT EXPANSION BOLT

EXST GR EXISTING GRADE

EXT EXTERIOR, EXTERNAL, OR

EXTINGUISHER

EXT GR EXTERIOR GRADE

F FAHRENHEIT OR FEMALE

FA FIRE ALARM

FAB FABRIC

FAC FACTOR

FACIL FACILITY

FAS FASCIA

FAS BD FASCIA BOARD

FCO FLOOR CLEANOUT

FCTY FACTORY

FD FLOOR DRAIN

FDC FIRE DEPARTMENT CONNECTION

FDTN FOUNDATION

FE FIRE EXTINGUISHER

FEC FIRE EXTINGUISHER CABINET

FF FINISH FACE

FF EL FINISH FLOOR ELEVATION

FF&E FURNITURE, FIXTURE, AND EQUIPMENT

FH FLAT HEAD OR FLAT HEAD SCREWS

FHC FIRE HOSE CABINET

FHMS FLAT HEAD MACHINE SCREW

FHP FULL HEIGHT PARTITION

FHWS FLAT HEAD WOOD SCREW

FIG FIGURE

FIL FILLET

FIN FINISH

FIN FLR FINISH FLOOR

FIN GR FINISH GRADE

FIN WD FINISH WOOD

FIXT FIXTURE

FL FLOORLINE

FLASH FLASHING

FLDG FOLDING

FLEX FLEXIBLE

FLG FLOORING

FLR FLOOR

FLR FIN FLOOR FINISH

FLR SK FLOOR SINK

FLUOR FLUORESCENT

FLUOR FIX FLUORESCENT FIXTURE

FM FACTORY MUTUAL

FM-G FACTORY MUTUAL GLOBAL

FO FINISHED OPENING

FOC FACE OF CONCRETE OR FACE OF

CURB

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF SLAB OR FACE OF STUD

FOUNT FOUNTAIN

FOW FACE OF WALL

FP FIRE PROTECTION OR FIREPROOF

FPM FEET PER MINUTE

FPS FEET PER SECOND

FR FIRE RATING, FIRE RESISTANT, OR

FRAME

FR SNK FLUSHING RIM SINK

FREQ FREQUENCY

FRMG FRAMING

FRP FIBER REINFORCED POLYESTER OR

FIBERGLASS REINFORCED PLASTIC

FRZ FREEZER

FS FEDERAL SPECIFICATION

FSTNR FASTENER

FT FEET OR FOOT

FTG FOOTING

FURG FURRING

FURN FURNISH OR FURNITURE

FUT FUTURE

FWC FABRIC WALLCOVERING

GA GAGE OR GYPSUM ASSOCIATION

GAL GALLON

GALV GALVANIC OR GALVANIZED

GALV STL GALVANIZED STEEL

GB GRAB BAR

GC GENERAL CONTRACTOR

GD GUARD

GDR GUARD RAIL

GEN GENERAL OR GENERATOR

GFRC GLASS-FIBER-REINFORCED CONCRETE

GFRG GLASS-FIBER-REINFORCED GYPSUM

GFRP GLASS-FIBER-REINFORCED PLASTIC

GI GALVANIZED IRON

GL GLASS

GL BLK GLASS BLOCK

GLU LAM GLUED LAMINATED WOOD

GR FL GROUND FLOOR

GRAN GRANITE

GRTG GRATING

GSB GYPSUM SHEATHING BOARD

GSM GALVANIZED SHEET METAL

GSU GLAZED STRUCTURAL UNIT

GT GROUT

GUAR GUARANTEE

GUT GUTTER

GYP GYPSUM

GYP BD GYPSUM BOARD

GYP PLAS GYPSUM PLASTER

H HIGH

H PLAM HIGH PRESSURE PLASTIC LAMINATE

HAZ MAT HAZARDOUS MATERIALS

HB HOSE BIBB

HC HOLLOW CORE

HCWD HOLLOW CORE WOOD DOOR

HDBD HARDBOARD

HDNR HARDENER

HDO HIGH DENSITY OVERLAY

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HEPA HIGH EFFICIENCY PARTICULATE AIR

(FILTER)

HEX HEXAGON

HF HIGH FREQUENCY

HGR HANGER

HM HECTOMETER

HM HOLLOW METAL

HMD HOLLOW METAL DOOR

HMDF HOLLOW METAL DOOR AND FRAME

HMF HOLLOW METAL FRAME

HNDRL HANDRAIL

HO HOLD OPEN

HORIZ HORIZONTAL

HOSP HOSPITAL

HP HIGH PRESSURE OR HORSEPOWER

HQ HEADQUARTERS

HS HEAT-STRENGTHENED (GLASS) OR

HIGH STRENGTH

HSE HOUSE

HSKPG HOUSEKEEPING

HST HOIST

HT HEIGHT

HVAC HEATING, VENTILATING, AND AIR

CONDITIONING

HVY HEAVY

HW HOT WATER

HYD HYDRANT

HYDR HYDRAULIC

I INTERSTATE (HIGHWAY) OR MOMENT

OF INERTIA

IAQ INDOOR AIR QUALITY

IBC INTERNATIONAL BUILDING CODE

ID IDENTIFICATION, INSIDE DIAMETER,

OR INTERIOR DESIGN

ID NO IDENTIFICATION NUMBER

ILLUM ILLUMINATION

INCL INCLUDED

IND INDEPENDENT OR INDUSTRIAL

INFO INFORMATION

INSUL INSULATION

INT INTERIOR

INTERCOM INTERCOMMUNICATION

INTL INTERNATIONAL

IRMA INVERTED ROOF MEMBRANE

ASSEMBLY

IWH INSTANTANEOUS WATER HEATER

JAN JANITOR

J-BOX JUNCTION BOX

KD KILN DRIED OR KNOCKED DOWN

KIT KITCHEN

KO KNOCKOUT

KPL KICKPLATE

L ANGLE

LAB LABORATORY

LAD LADDER

LAM LAMINATE

LAM GL LAMINATED GLASS

LAU LAUNDRY

LAV LAVATORY

LBR LUMBER

LBS POUND

LD BRG LOAD-BEARING

LDR LEADER

LED LIGHT EMITTING DIODE

LF LINEAR FEET (FOOT)

LF LINEAR FEET (FOOT)

LH LEFT HAND

LHR LEFT HAND REVERSE

LHR LEFT HAND REVERSE LATENT HEAT

RATIO

LIB LIBRARY

LIN LINEAR

LINO LINOLEUM

LIQ LIQUID

LKR LOCKER

LKR RM LOCKER ROOM

LKWASH LOCKWASHER

LL LEAD LINED

LLH LONG LEG HORIZONTAL

LLV LONG LEG VERTICAL

LMST LIMESTONE

LNDSCP LANDSCAPE

LR LIVING ROOM

LRG LARGE

LRV LOUVERED ROOF VENT

LS LUMP SUM

LT LIGHT

LT GA LIGHT GAGE

LT WT LIGHTWEIGHT

LTG LIGHTING

LTNG LIGHTNING

LVD LOUVERED

LVR LOUVER

LWC LIGHTWEIGHT CONCRETE

LWIC LIGHTWEIGHT INSULATING CONCRETE

LYR LAYER

MACH MACHINE

MACH RM MACHINE ROOM

MAINT MAINTENANCE

MAN MANUAL

MATL MATERIAL

MATV MASTER ANTENNA TELEVISION SYSTEM

MAX MAXIMUM

MB MACHINE BOLT

MCB METAL CORNER BEAD

MD METAL DECK

ME MECHANICAL ENGINEER

MEAS MEASURE

MECH MECHANICAL

MECH RM MECHANICAL ROOM

MED MEDICAL MEDIUM

MED MEDIUM MEDICAL

MEK METHYL ETHYL KETONE

MEL MELAMINE

MEMB MEMBRANE

MEMO MEMORANDUM

MEZZ MEZZANINE

MF MILL FINISH

MFD MANUFACTURED

MFG MANUFACTURING

MFR MANUFACTURER

MFR REC MANUFACTURER'S RECOMMENDATION

MGT MANAGEMENT

MH MANHOLE

MIC MICROPHONE

MID MIDDLE

MIL STD MILITARY STANDARD

MIN MINIMUM MINUTE

MIN MINUTE MINIMUM

MIRR MIRROR

MISC MISCELLANEOUS

MIT MITER

MKR MARKER

ML METAL LATH

MLDG MOLDING (MOULDING)

MLWK MILLWORK

mm MILLIMETER

MO MASONRY OPENING OR MOTOR

OPERATED

MOD MODEL, MODIFY OR MODULE

MOD BIT MODIFIED BITUMEN

MON MONITOR

MOPR MOP RACK

MR MOISTURE RESISTANT

MS MACHINE SCREW OR MOP SINK

MTD MOUNTED

MTG MOUNTING

MTL METAL

MULL MULLION

MW MICROWAVE

MWP MEMBRANE WATERPROOFING

N NORTH

NA NOT APPLICABLE

NAAMM NATIONAL ASSOCIATION OF

ARCHITECTURAL METAL

MANUFACTURERS

NAT NATURAL

NATL NATIONAL

NC NOISE CRITERIA

NCOMBL NONCOMBUSTIBLE

NEC NATIONAL ELECTRICAL CODE

NEG NEGATIVE

NEMA NATIONAL ELECTRICAL MANUFACTURERS

ASSOCIATION

NEUT NEUTRAL

NFC NATIONAL FIRE CODE

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NIC NOT IN CONTRACT

NO NUMBER

NOM NOMINAL

NR NOISE REDUCTION

NRC NOISE REDUCTION COEFFICIENT

NRCA NATIONAL ROOFING CONTRACTORS

ASSOCIATION

NRP NONREMOVABLE

NS NARROW STILE

NUM NUMERAL

O/O OUT TO OUT

O OXYGEN

OA OUTSIDE AIR OR OVERALL

OC ON CENTER

OCC OCCUPY

OCT OCTAGON

OD OUTSIDE DIAMETER OUTSIDE DIMENSION

OD OUTSIDE DIMENSION OUTSIDE DIAMETER

OF/CI OWNER FURNISHED/CONTRACTOR

INSTALLED

OFD OVERFLOW DRAIN

OFF OFFICE

OF/OI OWNER FURNISHED/OWNER INSTALLED

OH OVERHANG

OH DR OVERHEAD (COILING) DOOR

OPH OPPOSITE HAND

OPNG OPENING

OPP OPPOSITE

OPR OPERABLE

OPT OPTIONAL

OR OPERATING ROOM OR OUTSIDE RADIUS

ORD ORDNANCE OR OVERFLOW ROOF DRAIN

ORG ORGANIC

ORIG ORIGINAL

ORN ORNAMENTAL

OSHA OCCUPATIONAL SAFETY AND HEALTH

ADMINSTRATION

OUT OUTLET

OZ OUNCE

PAR PARALLEL OR PARAPET

PARA PARAGRAPH

PART PARTIAL

PAT PATTERN

PB PUSHBUTTON

PBD PARTICLEBOARD

PC PIECE, POLYCARBONATE OR PORTLAND

CEMENT

PCA PORTLAND CEMENT ASSOCIATION

PCC PRECAST CONCRETE

PCCP CONCRETE PAVEMENT

PCD PAPER CUP DISPENSER

PCF POUNDS PER CUBIC FOOT

PCP PORTLAND CEMENT PLASTER

PED PEDESTAL

PEN PENETRATE

PEND PENDANT

PERF PERFORATED

PERIM PERIMETER

PERP PERPENDICULAR

PGBD PEGBOARD

PHAR PHARMACY

PHOTO PHOTOGRAPH

PHS PHILLIPS HEAD SCREW

PKG PACKAGE

PL PROPERTY LINE

PL GL PLATE GLASS

PLAM PLASTIC LAMINATE

PLAS PLASTER OR PLASTIC

PLBG PLUMBING

PLYWD PLYWOOD

PMTL PAINTED METAL

PNEU PNEUMATIC

PNL PANEL

PO POST OFFICE PURCHASE ORDER

PO PURCHASE ORDER POST OFFICE

POLY POLYETHYLENE (PLASTIC)

PRCST PRECAST

PREFAB PREFABRICATE

PREFIN PREFINISH

PRELIM PRELIMINARY

PREP PREPARATION

PRESS PRESSURE

PREV PREVIOUS

PRKG PARKING

PRMLD PREMOLDED

PROJ PROJECT

PROP PROPERTY

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT PAINT, PNEUMATIC TUBE, OR

PRESSURE TREATED

PTD PAPER TOWEL DISPENSER

PTN PARTITION

PVC POLYVINYL CHLORIDE (PLASTIC)

PVG PAVING

PWR POWER

QA QUALITY ASSURANCE

QC QUALITY CONTROL

QRY QUARRY

QT QUARRY TILE

QTB QUARRY TILE BASE

QTF QUARRY TILE FLOOR

QTR QUARTER

QTY QUANTITY

QUAD QUADRANT

QUAL QUALITY

R RADIUS OR RISER

RA RETURN AIR

RAD RADIATOR

RB RESILIENT BASE OR RUBBER BASE

RB HK ROBE HOOK

RBM REINFORCED BRICK MASONRY

RBR RUBBER

RC REMOTE CONTROL

RCP REFLECTED CEILING PLAN

RCVR RECEIVER

RD ROAD OR ROOF DRAIN

REC RECESSED

RECD RECEIVED

RECPT RECEPTACLE

RECT RECTANGLE

REF REFERENCE OR REFRIGERATOR

REFR REFRACTORY REFRIGERATION

REFR REFRIGERATION REFRACTORY

REG REGISTER

REINF REINFORCE

REP REPAIR

REPL REPLACE

REQ REQUIRE

REQD REQUIRED

RESIL RESILIENT

RET RETURN

REV REVISION

RF RADIO FREQUENCY

RFG ROOFING

RFI REQUEST FOR INFORMATION

RFP REQUEST FOR PROPOSAL

RH RIGHT HAND

RHMS ROUND HEAD MACHINE SCREW

RHR RIGHT HAND REVERSE

RHWS ROUND HEAD WOOD SCREW

RL ROOF LEADER

RLG RAILING

RM ROOM

RND ROUND

RO ROUGH OPENING

ROW RIGHT OF WAY

RPM REVOLUTIONS PER MINUTE

RS ROUGH SAWN

RT RIGHT

RV ROOF VENT

RVS REVERSE

RWD REDWOOD

RWL RAIN WATER LEADER

SA SUPPLY AIR

SALV SALVAGE

SAMP SAMPLE

SAN SANITARY

SAT SUSPENDED ACOUSTICAL TILE

SATC SUSPENDED ACOUSTICAL TILE CEILING

SB SPLASH BLOCK

SBS STYRENE BUTADIEN STYRENE

SBSTR SUBSTRATE

SC SHADING COEFFICIENT OR SOLID CORE

SCH SCHOOL

SCHED SCHEDULE

SCHEM SCHEMATIC

SCP SCUPPER

SCRN SCREEN

SCT STRUCTURAL CLAY TILE

SCWD SOLID CORE WOOD DOOR

SD SHOP DRAWINGS, SMOKE DETECTOR,

OR SOAP DISPENSER

SDG SIDING

SECT SECTION

SEG SEGMENT

SEL SELECT

SEP SEPARATE

SF SQUARE FOOT (FEET)

SFTWD SOFTWOOD

SGD SLIDING GLASS DOOR

SGL SINGLE

SHR SHOWER

SHR HD SHOWER HEAD

SHRD SHOWER DRAIN

SHT SHEET

SHT MTL FLASH SHEET METAL (FLASHING)

SHTHG SHEATHING

SHV SHELVING

SIM SIMILAR

SJ SCORED JOINT

SJI STEEL JOIST INSTITUTE

SK SKETCH

SKLT SKYLIGHT

SLD WDW HORIZONTAL SLIDING WINDOW

SLDG SLIDING

SLNT SEALANT

SM SHEET METAL

SMK SMOKE

SND SANITARY NAPKIN DISPENSER

SND INS SOUND INSULATION

SNDU SANITARY NAPKIN DISPOSAL UNIT

SPEC SPECIFICATION

SPKLR SPRINKLER

SPKR SPEAKER

SPLY SUPPLY

SQ SQUARE

SQ IN SQUARE INCH

SQ YD SQUARE YARD

SS SANITARY SEWER OR SERVICE SINK

SST STAINLESS STEEL

ST STAIRS OR STREET

STC SOUND TRANSMISSION CLASS

STD STANDARD

STIF STIFFENER

STL JST STEEL JOIST

STL LNTL STEEL LINTEL

STL PL STEEL PLATE

STL RF DK STEEL ROOF DECK

STL TB STEEL TUBE

STL TR STEEL TRUSS

STNLS STAINLESS

STOR STORAGE

STR STRINGERS

STRUCT STRUCTURAL

STRUCT STL STRUCTURAL STEEL

SUB SUBSTITUTE

SURF SURFACE

SUSP SUSPEND

SUSP CLG SUSPENDED CEILING

SV SHEET VINYL

SW SWITCH

SWDR SWING DOOR

SYM SYMBOL

SYNTH SYNTHETIC

SYS SYSTEM

T TREAD

T&G TONGUE AND GROOVE

T&M TIME AND MATERIALS

TB THROUGH BOLT OR TOWEL BAR

TCA TILE COUNCIL OF AMERICA

TCP TELEPHONE CONTROL PANEL

TEMPERATURE CONTROL PANEL;

TRAFFIC CONTROL PLAN

TD TOWEL DISPENSER

TECH TECHNICAL

TEL TELEPHONE

TEMP TEMPERATURE OR TEMPORARY

TER TERRAZZO

THD THREAD

THERM THERMAL

THK THICKNESS

THRES THRESHOLD

THRU THROUGH

THRUOUT THROUGHOUT

TK BD TACKBOARD

TMPD TEMPERED

TMPD GL TEMPERED GLASS

TN TRUE NORTH

TO TOP OF ___

TO FDN TOP OF FOUNDATION

TOB TOP OF BEAM

TOM TOP OF MASONRY

TOP TOP OF PARAPET

TOS TOP OF STEEL

TOW TOP OF WALL

TPD TOILET PAPER DISPENSER

TPH TOILET PAPER HOLDER

TR TOWEL RACK

TRANS TRANSOM

TRANS WD FIN TRANSPARENT WOOD FINISH

TRTD TREATED

TS TENSILE STRENGTH OR TUBE STEEL

TSTAT THERMOSTAT

TV TELEVISION

TYP TYPICAL

U HEAT TRANSFER COEFFICIENT

UC UNDERCUT

UCD UNDERCUT DOOR

UGND UNDERGROUND

UL UNDERWRITERS LABORATORIES

ULT ULTIMATE

UNFIN UNFINISH

UON UNLESS OTHERWISE NOTED

UPS UNINTERRUPTIBLE POWER SUPPLY

UR URINAL

UTIL UTILITY

UV ULTRAVIOLET

V VOLT

VAC VACUUM

VAR VARIES

VCT VINYL COMPOSITION TILE VITRIFIED

CLAY TILE

VEH VEHICLE

VENT VENTILATION

VERT VERTICAL

VEST VESTIBULE

VFAT VINYL FACED ACOUSTICAL TILE

VIC VICINITY

VID VIDEO

VIF VERIFY IN FIELD

VNR VENEER

VOC VOLATILE ORGANIC COMPOUND

VOL VOLUME

VOLT VOLTAGE

VP VENEER PLASTER

VR VAPOR RETARDER

VTR VENT THROUGH ROOF

VWC VINYL WALL COVERING

VWF VINYL WALL FABRIC

W WIDE OR WEST

W/ WITH

W/O WITHOUT

WARR WARRANTY

WBL WOOD BLOCKING

WC WALL COVERING OR WATER CLOSET

WC WL HNG WATER CLOSET, WALL HUNG

WCHR WATER CHILLER

WCL WL MTD WATER COOLER, WALL HUNG

WD WOOD

WDW WINDOW

WF WIDE FLANGE

WFAB WALL FABRIC

WFR WOOD FRAME

WFS WOOD FURRING STRIPS

WH WATER HEATER

WHSE WAREHOUSE

WLD WELDED

WM WIRE MESH

WP WATERPROOFING

WPD WATER PRESSURE DROP

WPM WATERPROOF MEMBRANE

WR WEATHER RESISTANT

WS WEATHERSTRIP

WSCT WAINSCOT

WT WEIGHT

WWF WELDED WIRE FABRIC

X BRACE CROSS BRACE

XPS EXTRUDED POLYSTYRENE BOARD

(INSULATION)

YD YARD

YR YEAR

ABBREVIATIONS

03/22/2021 exp. 11/30/2022

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Edward Hines Jr.

VA Hospital 5th and Roosevelt Rd.

Hines, IL 60141-5115

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA MEDICAL CENTER

HINES, ILLINOIS

537-15-037 36C25219D0020

V ir tu a l E n e rg y S o lu ti o n s

IN

C

845 Design Group P.C.

106 Calendar Court, #131 LaGrange, Illinois 60525

845designgroup.com

5600 North River Rd, Suite 950 Rosemont, IL 60018

312.445.0000

B

IM

/1

-M A

T O

C -5

-1

-0

-H in e s G

U C lin ic

This is the start of the file's text. The full file is on GovTribe.