2) Pre-Construction Checklist.pdf

PDF 107 KB Posted

Attached to
Z1DA--578-15-037-(Construction) GU Clinic Renovation
Solicitation number
36C25221B0023
Issued by

About this file

This document contains a preconstruction checklist for a construction project and details of a related federal contract opportunity notice. The preconstruction checklist outlines requirements and processes for a VA construction project to renovate a GU clinic, including designating contracting officer authority, requiring submission of cost and progress schedules, payment request procedures, safety and change order policies. The related federal contract opportunity is a pre-solicitation notice for the construction project with a performance period of 570 calendar days and estimated price range of $1,000,000 to $2,000,000. Interested parties should monitor the solicitation on SAM.gov which is expected to be issued on July 8th, 2021, with bids due on August 12th, 2021. The project is set aside for Service-Disabled Veteran-Owned Small Businesses and falls under NAICS 236220 for general construction.

View the file

Other files

File Type Posted
36C25221B0023 0007.docx DOCX document
36C25221B0023 0006.docx DOCX document
36C25221B0023 0005.docx DOCX document
RAULAND - BORG. MODEl NCS4010.jpg JPG image
Attachment203.jpg JPG image
Attachment202.jpg JPG image
36C25221B0023 0004.docx DOCX document
Attachment201.jpg JPG image
Abatement survey.docx DOCX document
PD 101 P2 - PLUMBING BASEMENT DEMOLITION PLAN PHASE 2.pdf PDF
PP 101 P2 - PLUMBING BASEMENT PIPING PLAN PHASE 2.pdf PDF
PD 101 P1 - PLUMBING BASEMENT DEMOLITION PLAN PHASE 1.pdf PDF
36C25221B0023 0003.docx DOCX document
PD 100 P1 - PLUMBING EXISTING SUB BASEMENT WASTE PLAN.pdf PDF
RFI 3 1ST FLOOR ELEVATOR LOCATIONS 2021.07.21.pdf PDF
RFI 2 Elevator Locations 2021.07.21.pdf PDF
36C25221B0023 0002.docx DOCX document
S04 sign in sheet 578-15-037 GU Clinic site visit 2021.07.15.pdf PDF
36C25221B0023 0001.docx DOCX document
19) 578-15-037 100_ Combined DWGS Set 2021.03.23.pdf PDF
18) 578-15-037 GU Clinic 100_ Combined Specs 2021.03.23.pdf PDF
11) AE Design Checklist.pdf PDF
Photo 1.jpg JPG image
3) Safety and Health During Construction Activities.pdf PDF
8) Infection Control Risk Assessment (ICRA).doc DOC document
Photo 7.jpg JPG image
7) Interim Life Safety Measures (ILSM).docx DOCX document
Photo 10.jpg JPG image
12) OIT Horizontal Cable Requirements.pdf PDF
Photo 5.jpg JPG image
1) Hines VA Campus Site Plan.pdf PDF
9) Contractor PIV Instructions and Form.pdf PDF
Photo 2.jpg JPG image
Photo 3.jpg JPG image
36C25221B0023_1.docx DOCX document
4) Cutting Welding and Other Hot Work.pdf PDF
15) Floor plans_GU clinic.pdf PDF
0) P01 SOW 578-15-037 Construction 5-27-21 EDITED.docx DOCX document
Photo 9.jpg JPG image
Photo 11.jpg JPG image
10) Contractor Parking.pdf PDF
16) statement of condision.pdf PDF
P07 Wage Determination.txt 7.7.21.txt TXT text file
Photo 8.jpg JPG image
Photo 6.jpg JPG image
13) Fire Protection Code Reviews.pdf PDF
Photo 4.jpg JPG image
5) Above Ceiling Entry and Wall Construction Permits.pdf PDF
6) Pre-Construction Risk Assessment (PCRA).docx DOCX document
14) 200_BASEMENT Floor plan.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PRECONSTRUCTION CHECKLIST

PROJECT:

DATE: CONTRACT:

I. AUTHORITY OF GOVERNMENT PERSONNEL:

); a. The Contracting Officer is the only person authorized to bind the U.S. Government, and then only to the extent of the authority invested in him/her by the appointment.

) b. The VA Project Manager is designated as the Contracting Officer's representative for the purpose of technical supervision and acceptance. The VA Project Manager is responsible for the inspection of the work called for in the contract schedules, including related specifications and contract terms regarding on-site work requirements. Pursuant to the delegation of authority (attached), the Project Manager does not have the authority to make changes to the contract in amount or time.

c. The VA Project Manager for this project is j'd. No other office or individual has the authority to act in any manner on behalf of the U.S. Government in the performance of this contract. The VA Project Manager will refer any changes or questions regarding this contract to the Contracting Officer.

2. CONTRACT PROGRESS SCHEDULES AND REPORTS:

( )d.. The Contractor shall submit a schedule of cost to the Contracting Officer within 10 calendar days after date of receipt of the Notice to Proceed, The approved cost schedule will be one of the bases for determining progress payments for work completed. In accordance with FAR 52.236-1, Performance of Work by the Contractor, the schedule must indicate what portion(s) of the work the contractor intends to perform with his/her own workforce to meet the -15% requirement.

( )1). The Contractor shall submit a progress chart, within 10 calendar days after issuance of a Notice to Proceed, which indicates the anticipated installation of work versus the elapsed contract time, which shall be represented in the form of a bar graph. The starting date of the schedule shall be the date of the Notice to Proceed and the ending date shall be the original contract completion date.

t. Submittals, samples and shop drawings. Project Engineer will explain distribution procedures

3. PAYMENT REQUESTS: ( )Payments shall be made monthly by the VA according to the value of completed work from the Contractor's approved Schedule of Costs. All invoices should be submitted to Austin Texas as outlined in the contract. In accordance with the Prompt Payment Act, the fourteen (14) day timettame for payment shall commence on the date a proper invoice is received by the C.O. Included with the pay request shall be the payroll sheets for the Contractor and Subcontractors.

5. PROTECTION OF SURROUNDING AREA:

(' a. In performing this contract, the Contractor shall provide for protecting the lives and health of employees and other persons; preventing damage to property, materials, supplies, and equipment and avoiding work interruptions.

( )1), Any damage caused by the Contractor or his personnel will be restored and repaired at the expense of the Contractor.

6.DAILY LOGS: ( ) The Contractor shall provide the VA Project Manager with daily logs. Project Engineer will explain frequency. The daily log shall identify the number of laborers, supervisors and each branch of work and will be used to verify payrolls submitted.

7. SAFETY( ) The VA Safety Officer has the authority to stop work if a serious safety violatiOn is being committed,

8. CHANGES:

a. The Contractiniz'Officer, from information furnished by the COTR may, by a written order, make changes to the drawings and/or specifications that are within the general scope of the contract. No other person is authorized to make revisions, changes, or deletions from the contract.

( )1.p, Proposals for changes in work shall be submitted to the Contracting Officer according to the requirements contained in Clauses 52.243-4 and 852.236-88 of the General Conditions. Proposals in excess of $1,000 must include:

1. Itemized breakdown of labor and material costs.

2. List of subcontractors performing the work,

3. Overhead & Profit percentages.

() c. Change Orders (Proceed Orders): There may be some instances (as described in Clause 52.343-4 of the General Conditions) where the need to proceed with a change in work is absolutely necessary. In these cases, written authorization will be issued by the Contracting Officer to proceed with the work. An equitable adjustment will be negotiated within 30 calendar days.

9. SUBCONTRACTORS: ( )The Contractor shall submit a list of subcontractors which will include names and addresses and the nature of work involved (SF 1413). The Contracting Officer reserves the right to disapprove any proposed Subcontractor who has had prior record of unsatisfactory work at this site, or any Federal or non-Federal Agency.

10. LABOR STANDARDS PROVISIONS AND PAYROLLS:

( )9, A copy of the rates and wages shall be posted by the Contractor in a prominent place at the work site, )6 Apprentices will be permitted to work only under a Bona Fide apprenticeship program. Concurrent with or prior to the first payroll listing, certificates of apprenticeship from a recognized council shall be submitted to the Contracting Officer.

11. CORRESPONDENCE:

All correspondence from the Contractor shall bear: (a) Contract Number, (b) Project Title, and (c) Project Name..

13. OTHER TOPICS SPECIFIC TO THIS PROJECT:

(Signature of Contracting Officer) (Date)

(Signature of Project Manager, COR) (Date)

(Signature of Contractor) (Date)

Page 1
Page 2
Page 3

File details come from the government source that posted it. Updated .