PD 100 P1 - PLUMBING EXISTING SUB BASEMENT WASTE PLAN.pdf

PDF 710 KB Posted

Attached to
Z1DA--578-15-037-(Construction) GU Clinic Renovation
Solicitation number
36C25221B0023
Issued by

About this file

This document contains details for a federal construction contract opportunity with the Department of Veterans Affairs. The project involves renovating the GU Clinic at the Edward Hines Jr. VA Hospital in Hines, Illinois to allow for a more efficient and comfortable patient care environment. Specifically, the project will add two new exam rooms and a dedicated HVAC system. The period of performance is 570 calendar days from notice to proceed. The estimated price range for construction is between $1 million and $2 million. The solicitation will be issued on July 8, 2021 with bids due on August 12, 2021. The contract is set aside for Service-Disabled Veteran-Owned Small Businesses.

View the file

Other files

File Type Posted
36C25221B0023 0007.docx DOCX document
36C25221B0023 0006.docx DOCX document
36C25221B0023 0005.docx DOCX document
RAULAND - BORG. MODEl NCS4010.jpg JPG image
Attachment203.jpg JPG image
Attachment202.jpg JPG image
36C25221B0023 0004.docx DOCX document
Attachment201.jpg JPG image
Abatement survey.docx DOCX document
PD 101 P2 - PLUMBING BASEMENT DEMOLITION PLAN PHASE 2.pdf PDF
PP 101 P2 - PLUMBING BASEMENT PIPING PLAN PHASE 2.pdf PDF
PD 101 P1 - PLUMBING BASEMENT DEMOLITION PLAN PHASE 1.pdf PDF
36C25221B0023 0003.docx DOCX document
RFI 3 1ST FLOOR ELEVATOR LOCATIONS 2021.07.21.pdf PDF
RFI 2 Elevator Locations 2021.07.21.pdf PDF
36C25221B0023 0002.docx DOCX document
S04 sign in sheet 578-15-037 GU Clinic site visit 2021.07.15.pdf PDF
36C25221B0023 0001.docx DOCX document
19) 578-15-037 100_ Combined DWGS Set 2021.03.23.pdf PDF
18) 578-15-037 GU Clinic 100_ Combined Specs 2021.03.23.pdf PDF
11) AE Design Checklist.pdf PDF
Photo 1.jpg JPG image
3) Safety and Health During Construction Activities.pdf PDF
2) Pre-Construction Checklist.pdf PDF
8) Infection Control Risk Assessment (ICRA).doc DOC document
Photo 7.jpg JPG image
7) Interim Life Safety Measures (ILSM).docx DOCX document
Photo 10.jpg JPG image
12) OIT Horizontal Cable Requirements.pdf PDF
Photo 5.jpg JPG image
1) Hines VA Campus Site Plan.pdf PDF
9) Contractor PIV Instructions and Form.pdf PDF
Photo 2.jpg JPG image
Photo 3.jpg JPG image
36C25221B0023_1.docx DOCX document
4) Cutting Welding and Other Hot Work.pdf PDF
15) Floor plans_GU clinic.pdf PDF
0) P01 SOW 578-15-037 Construction 5-27-21 EDITED.docx DOCX document
Photo 9.jpg JPG image
Photo 11.jpg JPG image
10) Contractor Parking.pdf PDF
16) statement of condision.pdf PDF
P07 Wage Determination.txt 7.7.21.txt TXT text file
Photo 8.jpg JPG image
Photo 6.jpg JPG image
13) Fire Protection Code Reviews.pdf PDF
Photo 4.jpg JPG image
5) Above Ceiling Entry and Wall Construction Permits.pdf PDF
6) Pre-Construction Risk Assessment (PCRA).docx DOCX document
14) 200_BASEMENT Floor plan.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BCDEFGH

4" SAN

S A

N

4" SAN

2" SAN

S A

N

S A

N

2" SAN

S A

N

S A

N

S A

N

S A

N

S A

N

6" SAN

S A

N

S A

N

6" SAN

4" SAN

S A

N

4" SAN

4" S

A N3

S

A N

4" SAN

S A

N 3" SAN

4" SAN

S A

N

4" SAN

S A

N

S A

N

2" SAN

S A

N

4" SAN

6" SAN DOWN BELOW GRADE

CAST IRON PIPE

CAST IRON PIPE

CAST IRON PIPE

CAST IRON PIPE

CAST IRON PIPE

PVC PIPE UP

PVC PIPE UP

PVC PIPE UP

CAST IRON PIPE

PVC PIPE UP

PVC PIPE UP

GROUP OF PENETRATIONS

HERE. ALL PIPING PVC.

PVC PIPE

CAST IRON PIPE

CAST IRON PIPE PVC PIPE UP PVC PIPE UP

PVC PIPE UP

PVC PIPE

PVC PIPE UP

PVC PIPE UP

PVC PIPE UP

CAST IRON PIPE

PVC PIPE UP

PVC PIPE UP

1. EXISTING PLUMBING FIXTURES ARE TIED TO SANITARY PIPING

ROUTED IN CRAWL SPACE LOCATED BELOW FLOOR.

DEMOLITION OF SANITARY PIPING THROUGH FLOOR SHALL

ALLOW FOR RECONNECTION OF NEW FIXTURES TO

BRANCHLINES WHEREVER POSSIBLE. COORDINATE

RECONECTION POINTS IN FIELD PRIOR TO DEMOLISHING

EXISTING.

GENERAL DEMOLITION NOTES:

N

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Edward Hines Jr.

VA Hospital 5th and Roosevelt Rd.

Hines, IL 60141-5115

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA MEDICAL CENTER

HINES, ILLINOIS

537-15-037 36C25219D0020

V ir tu a l E n e rg y S o lu ti o n s

IN

C

845 Design Group P.C.

106 Calendar Court, #131 LaGrange, Illinois 60525

845designgroup.com

5600 North River Rd, Suite 950 Rosemont, IL 60018

312.445.0000

KEYPLAN

N.T.S.

AREA OF WORK

GU CLINIC - PHASE 1

AREA OF WORK

GU CLINIC - PHASE 2

B

IM

/1

-M A

T O

C -5

-1

-0

-H in e s G

U C lin ic

R e n

/1

-H in e s G

U P

F P

.r v t

/2

/2

:5

:1

P

M

PD 100

P1

PLUMBING EXISTING SUB

BASEMENT WASTE PLAN

GU CLINIC

RENOVATION

08/02/21

EPSAJSAJ

1/4" = 1'-0"

1 PLUMBING SUB BASEMENT EXISTING VENT AND WASTE PLAN

0 2' 4' 8'

Revisions Date

Issued for Pre-bid RFI 08/02/21

SANITARY PLUMBING NOTES:

1. SANITARY PIPING SHOWN IS BASED ON LIMITED FIELD SURVEYS

AND PHOTOS OF THE EXISTING SPACE. PIPE LOCATION ACCURACY

AND SIZES ARE APPROXIMATE AND SHALL BE VERIFIED PRIOR TO

DOING ANY WORK.

2. SUB BASEMENT SPACE IS READILY ACCESSIBLE AND CAN BE

WALKED THROUGH FOR WORK.

3. EXISTING SANITARY PIPING CONSISTS OF CAST IRON FOR

PRIMARY MAINS AND PVC FOR PIPING ROUTED UP TO EXISTING

FIXTURES. NEW WORK SHALL INSTALL PVC PIPING FOR SANITARY

PIPING AND SHALL CONNECT TO EXISTING CAST IRON OR

EXISTING PVC WHERE APPLICABLE.

4. DEMOLISHION OF EXISITNG SANITARY SHALL BE DONE TO ALLOW

FOR NEW CONNECTIONS.

5. NO DEAD END LEGS OF SANITARY PIPING SHALL REMAIN AFTER

NEW PIPING IS INSTALLED.

6. ELEVATION OF EXISTING SANITARY MAINS IS APPROXIMATELY 36"

A.F.F. FIELD VERIFICATION WILL BE REQUIRED, BRANCHLINES

ELEVATIONS VARY BUT MOST ROUTE CLOSE TO CEILING, WHICH IS

APPROXIMATELY 10'-0" A.F.F.

7. NEW SANITARY PIPING SHALL ROUTE AS HIGH AS POSSIBLE

BEFORE DROPPING DOWN TO CONNECT TO EXISTING MAINS.

Sheets
PD 100 P1 - PLUMBING EXISTING SUB BASEMENT WASTE PLAN

File details come from the government source that posted it. Updated .