PD 101 P1 - PLUMBING BASEMENT DEMOLITION PLAN PHASE 1.pdf

PDF 689 KB Posted

Attached to
Z1DA--578-15-037-(Construction) GU Clinic Renovation
Solicitation number
36C25221B0023
Issued by

About this file

This document provides details for a construction project opportunity with the Department of Veterans Affairs. The solicitation is for a GU Clinic Renovation project at the Edward Hines Jr. VA Hospital in Hines, Illinois. Key aspects of the project include a redesigned layout to allow for more efficient patient care, adding two new exam rooms and a dedicated HVAC system. The period of performance is 570 calendar days from notice to proceed. The estimated price range for construction is between $1 million and $2 million. The NAICS code is 236220 for general construction. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses and will be issued on July 8, 2021 with bids due on August 12, 2021. A pre-bid conference will also be held.

View the file

Other files

File Type Posted
36C25221B0023 0007.docx DOCX document
36C25221B0023 0006.docx DOCX document
36C25221B0023 0005.docx DOCX document
RAULAND - BORG. MODEl NCS4010.jpg JPG image
Attachment203.jpg JPG image
Attachment202.jpg JPG image
36C25221B0023 0004.docx DOCX document
Attachment201.jpg JPG image
Abatement survey.docx DOCX document
PD 101 P2 - PLUMBING BASEMENT DEMOLITION PLAN PHASE 2.pdf PDF
PP 101 P2 - PLUMBING BASEMENT PIPING PLAN PHASE 2.pdf PDF
36C25221B0023 0003.docx DOCX document
PD 100 P1 - PLUMBING EXISTING SUB BASEMENT WASTE PLAN.pdf PDF
RFI 3 1ST FLOOR ELEVATOR LOCATIONS 2021.07.21.pdf PDF
RFI 2 Elevator Locations 2021.07.21.pdf PDF
36C25221B0023 0002.docx DOCX document
S04 sign in sheet 578-15-037 GU Clinic site visit 2021.07.15.pdf PDF
36C25221B0023 0001.docx DOCX document
19) 578-15-037 100_ Combined DWGS Set 2021.03.23.pdf PDF
18) 578-15-037 GU Clinic 100_ Combined Specs 2021.03.23.pdf PDF
11) AE Design Checklist.pdf PDF
Photo 1.jpg JPG image
3) Safety and Health During Construction Activities.pdf PDF
2) Pre-Construction Checklist.pdf PDF
8) Infection Control Risk Assessment (ICRA).doc DOC document
Photo 7.jpg JPG image
7) Interim Life Safety Measures (ILSM).docx DOCX document
Photo 10.jpg JPG image
12) OIT Horizontal Cable Requirements.pdf PDF
Photo 5.jpg JPG image
1) Hines VA Campus Site Plan.pdf PDF
9) Contractor PIV Instructions and Form.pdf PDF
Photo 2.jpg JPG image
Photo 3.jpg JPG image
36C25221B0023_1.docx DOCX document
4) Cutting Welding and Other Hot Work.pdf PDF
15) Floor plans_GU clinic.pdf PDF
0) P01 SOW 578-15-037 Construction 5-27-21 EDITED.docx DOCX document
Photo 9.jpg JPG image
Photo 11.jpg JPG image
10) Contractor Parking.pdf PDF
16) statement of condision.pdf PDF
P07 Wage Determination.txt 7.7.21.txt TXT text file
Photo 8.jpg JPG image
Photo 6.jpg JPG image
13) Fire Protection Code Reviews.pdf PDF
Photo 4.jpg JPG image
5) Above Ceiling Entry and Wall Construction Permits.pdf PDF
6) Pre-Construction Risk Assessment (PCRA).docx DOCX document
14) 200_BASEMENT Floor plan.pdf PDF
Show all 50

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BCDEFGH

1 1

2 2

8 9

10 10 10 10

10 10 10

1. EXISTING PLUMBING FIXTURES ARE TIED TO SANITARY PIPING

ROUTED IN CRAWL SPACE LOCATED BELOW FLOOR.

DEMOLITION OF SANITARY PIPING THROUGH FLOOR SHALL

ALLOW FOR RECONNECTION OF NEW FIXTURES TO

BRANCHLINES WHEREVER POSSIBLE. COORDINATE

RECONECTION POINTS IN FIELD PRIOR TO DEMOLISHING

EXISTING.

GENERAL DEMOLITION NOTES:

N

444 W. Lake St. Suite 1700 Chicago, IL 60606

312.583.7023 www.virtualenergysolutions.com

Edward Hines Jr.

VA Hospital 5th and Roosevelt Rd.

Hines, IL 60141-5115

Drawing No.

Scale:

Date:

Checked By:Drawn By:Designed By:

Drawing Title:

Contract No.

File No.Building No.

Client Project No.

Project Title:Approved: Chief, failites Management Services

Approved: Medical Center Director

Approved:

Approved: Location:

VES Project Number: 191006

AS NOTED

VA MEDICAL CENTER

HINES, ILLINOIS

537-15-037 36C25219D0020

V ir tu a l E n e rg y S o lu ti o n s

IN

C

845 Design Group P.C.

106 Calendar Court, #131 LaGrange, Illinois 60525

845designgroup.com

5600 North River Rd, Suite 950 Rosemont, IL 60018

312.445.0000

KEYPLAN

N.T.S.

AREA OF WORK

GU CLINIC - PHASE 1

B

IM

/1

-M A

T O

C -5

-1

-0

-H in e s G

U C lin ic

R e n

/1

-H in e s G

U P

F P

.r v t

/2

/2

:5

:1

P M

PD 101

P1

PLUMBING BASEMENT

DEMOLITION PLAN PHASE 1

GU CLINIC

RENOVATION

3/23/21

EPSAJSAJ

PLUMBING DEMOLITION KEYNOTES

NUMBER KEYNOTE

1 EXISTING WATER CLOSET TO BE DEMOLISHED. REMOVED EXISTING FIXTURE

PIPING AND ASSOCIATED APPURTENANCES. DEMOLISH SANITARY PIPING DOWN

BELOW FLOOR TO ACTIVE MAIN IN CRAWL SPACE AND CAP. REMOVE DOMESTIC

AND VENT PIPING UP TO ABOVE CEILING TO ACTIVE MAIN AND CAP.

2 EXISTING LAVATORY TO BE DEMOLISHED. REMOVE EXISTING FIXTURE PIPING AND

ASSOCIATED APPURTENANCES. DEMOLISH SANITARY PIPING DOWN BELOW FLOOR

TO ACTIVE MAIN IN CRAWL SPACE AND CAP. REMOVE DOMESTIC AND VENT PIPING

UP TO ABOVE CEILING TO ACTIVE MAIN AND CAP.

3 EXISTING DRINKING FOUNTAIN TO BE DEMOLISHED. REMOVE EXISTING FIXTURE

PIPING AND ASSOCIATED APPURTENANCES. DEMOLISH SANITARY PIPING DOWN

BELOW FLOOR TO ACTIVE MAIN IN CRAWL SPACE AND CAP. REMOVE DOMESTIC

AND VENT PIPING UP TO ABOVE CEILING TO ACTIVE MAIN AND CAP.

4 EXISTING LAB SINK TO BE DEMOLISHED. REMOVE EXISTING FIXTURE PIPING AND

ASSOCIATED APPURTENANCES. DEMOLISH SANITARY PIPING DOWN BELOW FLOOR

TO ACTIVE MAIN IN CRAWL SPACE AND CAP. REMOVE DOMESTIC AND VENT PIPING

UP TO ABOVE CEILING TO ACTIVE MAIN AND CAP.

5 EXISTING SINK TO BE DEMOLISHED. REMOVE EXISTING FIXTURE PIPING AND

ASSOCIATED APPURTENANCES. DEMOLISH SANITARY PIPING DOWN BELOW FLOOR

TO ACTIVE MAIN IN CRAWL SPACE AND CAP. REMOVE DOMESTIC AND VENT PIPING

UP TO ABOVE CEILING TO ACTIVE MAIN AND CAP.

6 EXISTING HAND WASHING SINK TO BE DEMOLISHED. REMOVE EXISTING FIXTURE

PIPING AND ASSOCIATED APPURTENANCES. DEMOLISH SANITARY PIPING DOWN

BELOW FLOOR TO ACTIVE MAIN IN CRAWL SPACE AND CAP. REMOVE DOMESTIC

AND VENT PIPING UP TO ABOVE CEILING TO ACTIVE MAIN AND CAP.

7 EXISTING SOILS SINK TO BE DEMOLISHED. REMOVE EXISTING FIXTURE PIPING AND

ASSOCIATED APPURTENANCES. DEMOLISH SANITARY PIPING DOWN BELOW FLOOR

TO ACTIVE MAIN IN CRAWL SPACE AND CAP. REMOVE DOMESTIC AND VENT PIPING

UP TO ABOVE CEILING TO ACTIVE MAIN AND CAP.

8 EXISTING SANITARY SINK TO BE DEMOLISHED. REMOVE EXISTING FIXTURE PIPING

AND ASSOCIATED APPURTENANCES. DEMOLISH SANITARY PIPING DOWN BELOW

FLOOR TO ACTIVE MAIN IN CRAWL SPACE AND CAP. REMOVE DOMESTIC AND VENT

PIPING UP TO ABOVE CEILING TO ACTIVE MAIN AND CAP.

9 EXISTING FLOOR DRAIN TO BE DEMOLISHED. REMOVE EXISTING FIXTURE AND

SANITARY PIPING DOWN BELOW FLOOR TO CRAWL SPACE BELOW AND CAP.

DEMOLISH VENT PIPING THROUGH FLOOR AND UP TO ACTIVE MAIN AND CAP.

10 EXISTING MEDICAL AIR, OXYGEN AND/OR VACUUM OUTLET IN THIS LOCATION TO

BE DEMOLISHED. REMOVE EXISTING PIPING BACK TO ACTIVE MAIN AND CAP.

11 EXISTING MEDICAL GAS VALVE BOX TO BE RELOCATED.

12 EXISTING MEDICAL GAS ALARM PANELS TO BE RELOCATED.

0 2' 4' 8'1/4" = 1'-0"

1 PLUMBING BASEMENT DEMOLITION PLAN PHASE 1

Revisions Date

60% Submittal (Design Development) 6/19/20

Issued for 90% Review 8/24/20

Issued for 100% Pricing 02/02/21

Issued for 100% Design 3/23/21

Scott Rectangle

Sheets
FP001 - FIRE PROTECTION SYMBOLS AND ABBREVIATIONS
FP501 - FIRE PROTECTION DETAILS
FP 101 P1 - FIRE PROTECTION BASEMENT PLAN PHASE 1
FP 101 P2 - FIRE PROTECTION BASEMENT PLAN PHASE 2
FPD 101 P1 - FIRE PROTECTION BASEMENT DEMOLITION PLAN PHASE 1
FPD 101 P2 - FIRE PROTECTION BASEMENT PLAN PHASE 2
P001 - PLUMBING SYMBOLS AND ABBREVIATIONS
P501 - PLUMBING DETAILS
P601 - PLUMBING SCHEDULES
PD 101 P1 - PLUMBING BASEMENT DEMOLITION PLAN PHASE 1
PD 101 P2 - PLUMBING BASEMENT DEMOLITION PLAN PHASE 2
PD 101 P3 - PLUMBING BASEMENT DEMOLITION PLAN PHASE 3
PP 101 P1 - PLUMBING BASEMENT PIPING PLAN PHASE 1
PP 101 P2 - PLUMBING BASEMENT PIPING PLAN PHASE 2
PW 101 P1 - PLUMBING BASEMENT WASTE & VENT PLAN PHASE 1
PW 101 P2 - PLUMBING BASEMENT WASTE & VENT PLAN PHASE 2

File details come from the government source that posted it. Updated .