S06 - Wage Determination.pdf

PDF 124 KB Posted

Attached to
Y1DZ--Replace Electrical-Building 19 607-19-107 Federal contract opportunity
Solicitation number
36C25220B0026
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

This document contains a wage determination and federal contract opportunity notice. The wage determination provides prevailing wage rates for various construction crafts such as electricians, carpenters, plumbers, and laborers for a building construction project in Dane County, Wisconsin. The minimum hourly wage is $10.80 per hour in 2020.

The federal contract opportunity is a presolicitation notice for project number 607-19-107 to replace electrical systems in Building 19 at the William S. Middleton Memorial Veterans Hospital in Madison, Wisconsin. The scope of work includes general construction, site work, underground utilities, electrical, structural, mechanical and fire protection systems. The solicitation will be issued on August 19th, 2020 with bids due by September 18th, 2020. The project value is estimated between $2-5 million. The NAICS code is 236220 and the size standard is $39.5 million. The completion deadline is 425 calendar days from notice to proceed. The opportunity is set aside for Service-Disabled Veteran-Owned Small Businesses.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DZ--Replace Electrical-Building 19 607-19-107, newest first.
File Type Posted
S06 - SF 1442 - Revised 10-7-20.pdf PDF
36C25220B0026 0005.docx DOCX document
36C25220B0026 0004.docx DOCX document
S06 - Spec Section 23 81 00.pdf PDF
S06 - SF 1442 - Revised.pdf PDF
36C25220B0026 0003.docx DOCX document
36C25220B0026 0002.docx DOCX document
S06 - Electrical Power Dist Sys - Reference Drawing Only.pdf PDF
S06 - Bid Schedule.pdf PDF
S06 - 19244 VA Hospital Building 18 - Geotech.pdf PDF
36C25220B0026 0001.docx DOCX document
S06 - CE100 Rev 1.pdf PDF
S06 - ES100 rev 1.pdf PDF
S06 - SF 1442.pdf PDF
S06 - Pre-Bid Attendance List.pdf PDF
S02 - 607-19-107 Drawings VOL 2A.pdf PDF
S02 - 607-19-107 Drawings VOL 2C.pdf PDF
S02 - 607-19-107 Drawings VOL1.pdf PDF
S02 - 607-19-107 Drawings VOL 2B.pdf PDF
S02 - Specifications Volume 1.pdf PDF
36C25220B0026_1.docx DOCX document
P07 - Wage Determination.pdf PDF
S02 - Specifications Volume 2.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ACCOMPANYING AMENDMENT – 36C25220B0026 - 0002

"General Decision Number: WI20200005 09/18/2020

Superseded General Decision Number: WI20190005

State: Wisconsin

Construction Type: Building

County: Dane County in Wisconsin.

BUILDING CONSTRUCTION PROJECTS (does not include residential construction consisting of single family homes and apartments up to and including 4 stories)

Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.80 for calendar year 2020 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January

1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.80 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year

2020. If this contract is covered by the EO and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must pay workers in that classification at least the wage rate determined through the conformance process set forth in 29 CFR 5.5(a)(1)(ii) (or the EO minimum wage rate,if it is higher than the conformed wage rate). The EO minimum wage rate will be adjusted annually. Please note that this EO applies to the above-mentioned types of contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but it does not apply to contracts subject only to the

Davis-Bacon Related Acts, including those set forth at 29 CFR

5.1(a)(2)-(60). Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Modification Number Publication Date

0 01/03/2020

1 01/31/2020

2 03/06/2020

3 04/17/2020

4 06/19/2020

5 07/17/2020

6 07/24/2020

7 08/28/2020

8 09/18/2020

ASBE0205-001 06/01/2001

Rates Fringes

Asbestos Removal worker/hazardous material handler

Includes preparation, wetting, stripping, removal, scrapping, vacuuming, bagging and disposing of all insulation materials from mechanical systems, whether they contain asbestos or not.............$ 17.90 4.45

BOIL0107-001 01/01/2017

BOILERMAKER

Boilermaker.................$ 35.65 29.89

Small Boiler Repair (under

25,000 lbs/hr)..............$ 26.91 16.00

BRWI0013-001 06/03/2019

BRICKLAYER

Bricklayer..................$ 35.56 24.23

Terrazzo Finisher...........$ 29.78 23.22

Terrazzo Worker.............$ 37.23 23.22

Tile Finisher...............$ 26.98 23.22

Tile Layer..................$ 33.73 23.22

CARP0252-007 06/01/2016

CARPENTER (Including

Acoustical work and Drywall hanging; Excluding Batt

Insulation)

CARPENTER & SOFT FLOOR

LAYER.......................$ 33.56 18.00

MILLWRIGHT..................$ 35.08 18.35

PILEDRIVERMAN...............$ 34.12 18.00

ELEC0014-005 07/05/2020

Teledata System Installer

Installer/Technician........$ 27.75 15.14

Low voltage construction, installation, maintenance and removal of teledata facilities (voice, data, and video) including outside plant, telephone and data inside wire, interconnect, terminal equipment, central offices, PABX, fiber optic cable and equipment, micro waves, V-SAT, bypass, CATV, WAN (wide area networks), LAN (local area networks), and ISDN (integrated systems digital network).

* ELEC0159-002 08/02/2020

ELECTRICIAN......................$ 41.86 22.67

ELEV0132-001 01/01/2020

ELEVATOR MECHANIC................$ 53.80 34.765+a+b

FOOTNOTE:

a. PAID VACATION: Employer contributes 8% of basic hourly rate as vacation pay for employees with more than 5 years or more of service, and 6% for less than 5 years of service.

b. PAID HOLIDAYS: New Years Day, Memorial Day, Independence

Day, Labor Day, Veterans Day, Thanksgiving Day, Friday after Thanksgiving, and Christmas Day.

ENGI0139-002 06/01/2020

OPERATOR: Power Equipment

Group 1.....................$ 42.92 23.15

Group 2.....................$ 41.67 23.15

Group 3.....................$ 39.97 23.15

Group 4.....................$ 39.44 23.15

Group 5.....................$ 37.37 23.15

Group 6.....................$ 35.84 23.15

HAZARDOUS WASTE PREMIUMS:

EPA Level ""A"" Protection: $3.00 per hour

EPA Level ""B"" Protection: $2.00 per hour

EPA Level ""C"" Protection: $1.00 per hour

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1: Cranes, Tower Cranes and Derricks with or without attachments with a lifting capacity of over 100 tons;

Cranes, Tower Cranes, and Derricks with boom, leads and/or jib lengths 176 ft or longer.

GROUP 2: Backhoes (Excavators) weighing 130,000 lbs & over;

Cranes, Tower Cranes and Derricks with or without attachments with a lifting capacity of 100 tons or less;

Cranes, Tower Cranes, and Derricks with boom, leads, and/or jib lengths 175 ft or less; Caisson Rigs; Pile Driver

GROUP 3: Backhoes (Excavators) weighing under 130,000 lbs;

Travelling Crane (bridge type); Milling Machine; Concrete

Paver over 27 E; Concrete Spreader and Distributor;

Concrete Laser Screed; Concrete Grinder and Planing

Machine; Slipform Curb and Gutter Machine; Boring Machine

(Directional); Dredge Operator; Skid Rigs; Over 46 meter

Concrete Pump.

GROUP 4: Hydraulic Backhoe (tractor or truck mounted);

Hydraulic Crane, 10 tons or less; Tractor, Bulldozer, or

End Loader (over 40 hp); Motor Patrol; Scraper Operator;

Bituminous Plant and Paver Operator; Screed-Milling

Machine; Roller over 5 tons; Concrete Pumps 46 meter & under; Grout Pumps; Rotec Type Machine; Hydro Blaster, 10,000 psi and over; Rotary Drill Operator; Percussion

Drilling Machine; Air Track Drill with or without integral hammer; Blaster; Boring Machine (vertical or horizontal);

Side Boom; Trencher, wheel type or chain type having 8 inch or larger bucket; Rail Leveling Machine (Railroad); Tie

Placer; Tie Extractor; Tie Tamper; Stone Leveler; Straddle

Carrier; Material Hoists; Stack Hoist; Man Hoists; Mechanic and Welder; Off Road Maaerial Haulers

GROUP 5: Tractor, Bulldozer, or Endloader (under 40 hp);

Tampers -Compactors, riding type; Stump Chipper, large;

Roller, Rubber Tire; Backfiller; Trencher, chain type

(bucket under 8 inch); Concrete Auto Breaker, large;

Concrete Finishing Machine (road type); Concrete Batch

Hopper; Concrete Conveyor Systems; Concrete Mixers, 14S or over; Pumps, Screw Type and Gypsum); Hydrohammers, small;

Brooms and Sweeeprs; Lift Slab Machine; Roller under 5 tons; Industrial Locomotives; Fireman (Pile Drivers and

Derricks); Pumps (well points); Hoists, automatic; A-Frames and Winch Trucks; Hoists (tuggers); Boats (Tug, Safety, Work Barges and Launches); Assistant Engineer

GROUP 6: Shouldering Machine Operator; Farm or Industrial

Tractor mounted equipment; Post Hole Digger; Auger

(vertical and horizontal); Skid Steer Loader with or without attachments; Robotic Tool Carrier with or without attachments; Power Pack Vibratory/Ultra Sound Driver and

Extractor; Fireman (Asphalt Plants); Screed Operator; Stone

Crushers and Screening Plants; Air, Electric, Hydraulic

Jacks (Slip Form); Prestress Machines; Air Compressor, 400

CFM or over; Refrigeration Plant/Freese Machine; Boiler

Operators (temporary heat); Forklifts; Welding Machines;

Generators; Pumps over 3""; Compressors, under 400 CFM;

Heaters, Mechanical; Combination small equipment operator;

Winches, small electric; Oiler; Greaser; Rotary Drill

Tender; Conveyor; Elevator Operator

IRON0383-002 06/01/2020

IRONWORKER.......................$ 37.10 27.06

LABO0464-001 06/01/2020

Laborer, General.................$ 30.05 17.88

Laborer: Asbestos/hazardous material remover

(Preparation, removal, and encapsulation of hazardous materials from non-mechanical systems).........................$ 29.00 17.88

PAIN0802-001 06/01/2019

PAINTER (Brush and Roller

Only)............................$ 30.93 18.44

PREMIUM RATES [Add to Basic Hourly Rate]

Sandblaster $1.00 per hour

Drywall Taper & Applicator $1.30 per hour

PAIN0941-001 06/01/2019

GLAZIER..........................$ 39.92 19.07

PLAS0599-001 06/01/2017

CEMENT MASON/CONCRETE FINISHER...$ 34.43 19.93

PLASTERER........................$ 33.70 23.13

PLUM0075-007 06/01/2015

PLUMBER (Including HVAC work)....$ 38.82 20.12

PLUM0601-007 06/04/2017

PIPEFITTER (Including HVAC work)............................$ 47.08 20.89

SFWI0669-002 04/01/2020

SPRINKLER FITTER.................$ 42.38 24.89

SHEE0018-009 06/02/2019

Sheet Metal Worker (Including

HVAC Duct work and

Technicians).....................$ 40.02 28.35

TEAM0662-003 06/01/2020

TRUCK DRIVER

1 & 2 Axles.................$ 31.07 22.94

3 or more Axles.............$ 31.22 22.94

SUWI2002-011 01/23/2002

Asbestos Worker/Heat and

Frost Insulator..................$ 25.36 8.37

Laborers:

Concrete Worker.............$ 16.34 3.59

Landscape...................$ 8.73 4.90

ROOFER...........................$ 18.01 3.28

Tile & Marble Finisher...........$ 13.89 7.58

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the

Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses

(29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate

(weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or

""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010

08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour

Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the

Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.)

and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the

Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations

Wage and Hour Division

U.S. Department of Labor

200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator

(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator

U.S. Department of Labor

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative

Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board

U.S. Department of Labor

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

File details come from the government source that posted it. Updated .