This document contains a federal solicitation notice and related questions and answers for replacing the electrical systems in Building 18 at the William S. Middleton Memorial Veterans Hospital in Madison, Wisconsin. The solicitation involves furnishing all labor, materials, equipment, and supervision to complete the project, which includes new electrical systems, structural, mechanical and fire protection systems, and all necessary distribution systems. The project size is estimated between $2 million to $5 million. Responses are due on September 18, 2020 with a 425-day period of performance. The North American Industry Classification code is 236220 with a $39.5 million size standard. The solicitation is set aside for Service-Disabled Veteran-Owned Small Businesses. The document also provides clarification responses to questions on scope items including fireproofing and painting requirements, feeder routing, and definitions of work between contracts.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| S06 - SF 1442 - Revised 10-7-20.pdf | ||
| 36C25220B0026 0005.docx | DOCX document | |
| S06 - Spec Section 23 81 00.pdf | ||
| S06 - SF 1442 - Revised.pdf | ||
| 36C25220B0026 0003.docx | DOCX document | |
| 36C25220B0026 0002.docx | DOCX document | |
| S06 - Electrical Power Dist Sys - Reference Drawing Only.pdf | ||
| S06 - Wage Determination.pdf | ||
| S06 - Pre-Bid Attendance List.pdf | ||
| S06 - Bid Schedule.pdf | ||
| S06 - 19244 VA Hospital Building 18 - Geotech.pdf | ||
| 36C25220B0026 0001.docx | DOCX document | |
| S06 - CE100 Rev 1.pdf | ||
| S06 - ES100 rev 1.pdf | ||
| S06 - SF 1442.pdf | ||
| S02 - 607-19-107 Drawings VOL 2A.pdf | ||
| S02 - 607-19-107 Drawings VOL 2C.pdf | ||
| S02 - Specifications Volume 1.pdf | ||
| 36C25220B0026_1.docx | DOCX document | |
| P07 - Wage Determination.pdf | ||
| S02 - Specifications Volume 2.pdf | ||
| S02 - 607-19-107 Drawings VOL1.pdf | ||
| S02 - 607-19-107 Drawings VOL 2B.pdf |
Show all 23
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7.
ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF
PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE
OF YOUR
ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERE
D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED
STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF
CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF
SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 10-05-2020 607-21-1-6927-0001 607-19-107 36C252 Department of Veterans Affairs Great Lakes Acquisition Center (GLAC) 115 S 84th Street, Suite 101 Milwaukee WI 53214-1476 36C252 Department of Veterans Affairs Wm S. Middleton VA Hospital Attn: John Meyers (90C) 2500 Overlook Terrace Madison WI 53705-2254 To all Offerors/Bidders
36C25220B0026 09-17-2020
X X X
X
SEE ATTACHED SUMMARY OF CHANGES
The Bid Opening date remains unchanged at 8 Oct 2020 at 1:00 PM Local Time; reference page 2 for specifics.
ACCOMPANYING AMENDMENT – 36C25220B0026 - 0004
REPLACE ELECTRICAL BUILDING 18
WILLIAM S. MIDDLETON VA HOSPITAL, MADISON, WI
I. THERE ARE NO CHANGES TO THE BID OPENING INFORMATION; THE LINK AND INFORMATION ARE PROVIDED FOR INFORMATION ONLY:
a. VIRTUAL BID OPENING INFORMATION:
1) Due to the national COVID pandemic, the bid opening process is being changed from a public in-person activity to a public, virtual activity.
2) The virtual bid opening will be available to the public via Microsoft Teams at the following link and/or phone number;
a) https://teams.microsoft.com/l/meetup-join/19%3ameeting_MWY4ODQ1OWMtNzE2My00MDI2LTljYmEtYzgwNTM4YjI3YWVh%40thread.v2/0?context=%7b%22Tid%22%3a%22e95f1b23-abaf-45ee-821d-b7ab251ab3bf%22%2c%22Oid%22%3a%22db40ac6b-e89a-4034-95a3-75c57cde174a%22%7d
b) (Meeting will be available to be accessed 15 min prior to bid opening)
c) Meeting number (access code): 872-701-0185
d) Conference ID: 502 467 508#
3) IAW FAR 52.214-5 Submission of Bids and 14.202-8 Electronic Bids; Bids shall be provided via email to the Contracting Officer at john.meyers2@va.gov on or before the date and time specified for receipt of bids. A hard copy submission is not required. Any bids received after the date and time specified for receipt of bids will be processed in accordance with FAR 52.214-7 Late Submissions, Modifications, and Withdrawals of Bids (Nov 1999).
4) Ensure your complete bid including bid bond are provided in your submission. The successful low bidder is required to furnish their original bid bond within five (5) days after notification by the Contracting Officer.
5) It is highly recommended that Bidders submit their bid at least one hour prior to bid opening to avoid any transmission issues.
II. THE FOLLOWING QUESTIONS AND ANSWERS / CLARIFICATIONS ARE THE RESULT OF BIDDERS REQUEST(S) FOR INFORMATION:
Q75. Specifications were not provided for the air and vapor barrier shown behind the composite metal panels. Please issue a specification for this product.
0. A75. Provide Carlisle: Fire Resist Barritech Vapor Permeable fluid-applied membrane, or equal. Prior to application caulk panel joints in sheathing, tape joints over ¼” wide and wrap openings with a peal and stick detail membrane. Follow all manufacturers installation guidelines.
Q76. Please clarify the scope of work for painting.
a. The Steel specifications (05 50 00) state that all exposed and exterior metals are to be galvanized.
0. A76a. Paint the stair guard railings, handrails and stringers, stair support columns, bollards, ladder rungs and hardware where specified. Galvanized metal gratings are not required to be painted. See other governing specifications for structural steel to be painted or fireproofed.
1. Are we to paint the galvanized steel as noted in 09 06 00?
0. A76a.i. Paint only as indicted in 09 06 00 and clarified above.
1. The finish schedule spec section outlines specific steel components to be painted, which are exterior components
0. A76a.ii. Paint only as indicted in 09 06 00
b. The plans point at the exterior to remain handrail by the stairs. Are these existing rails to be painted under this contract?
A76b. No painting required
0. c. Are the interior drywall walls to be painted or just fire-taped?
0.
0. A76c. Paint as indicted in 099100- 3.9 – “White”
Q77. Please provide a reflected ceiling plan for the first-floor exposed structure (underside of 1st floor deck) See Detail 1/S101. Coordinate with architectural sections and details.
a. What are the extents of the metal panels wrapping the steel beams?
1. It appears in the cross sections that only perimeter beams are wrapped.
0. A77a.i. See note A300 and A400 for wrapping extents. Perimeter structure below exterior walls are wrapped in ACM material. The balance of the underside of the floor deck is exposed to view.
1. Will the beams that are wrapped in metal panels be fireproofed as well?
0. A77a.ii. Apply spray fireproofing where indicated on Architectural A400. The perimeter beams wrapped in ACM panels require intumescent fireproofing.
0.
b. What beams are to be painted vs fire proofed?
0. A77b. See 5. 76a. above and 7. A78 below.
Q78. Please clarify which components are to be fireproofed.
a. Are the exterior exposed columns to be fire proofed? Galvanized? Painted?
0. A78a. All structural steel enclosed in the building requires spray applied fire proofing, the metal roof deck requires spray applied fireproofing. All exterior structural steel support columns and all beams require intumescent fireproofing. The metal floor deck requires intumescent fireproofing. Color to be selected to match all other exposed metal work to be painted 0.
Q79. Spec. section 05 12 00 2.4.D.1 states that all structural steel framing installed at exterior locations is to be galvanized. However, Section 09 06 00 2.4.A calls for Exterior Steel to get intumescent fire proofing. Detail 3/A400 Shows intumescent paint at the floor structure metal deck and presumably at the adjacent beam. Please clarify the finish requirements for the exterior structural and miscellaneous steel.
A79. See answers to 5.A76, 6.A77 and 7.A78 Q80. Note 4 on drawing ES100 called out “New emergency generator feeder raceway and conductors (installed under a separate contract) to be routed on the roof of G-Wing to be terminated in pull box EPBX-11.” Question 3, part 1, on Amendment 1 response called to delete “(installed under a separate contract)”. The 2nd answer to question 3 calls to install the feeder from UT-11 to the new generator. We request some additional clarification on this.
a) Will this contract require the conduit to be installed from pull box EPBX-11 on roof parapet wall to the new generator? If so, how many and what size conduits should be installed from pull box EPBX-11 to the new generator?
b) If we are running new MV conductors from UT-11 to the new generator, do they need to be terminated in EPBX-11, or can the be continuous back to the new generator?
A80. The generator feeder to EPBX-11 should remain in the separate generator replacement project. The recommendation to remove the “installed under a separate contract” seems to have been done incorrectly. A separate generator replacement project, outside of the scope of this project, will provide the feeder to EPBX-11 for future extension to Building 18 UT-11
Q81. Question 3, part 5 on Amendment 1 asked “Please clarify this scope of work and confirm where new feed for UT-11 is to come from.” The answer said “Contractor will supply LV cable from MH-503 to new transformer.”
a. To confirm, the line side feeder of UT-11 (Medium Voltage Feeder) is to go directly back to the new generator, across the parapet wall and not through MH-503, correct?
A81a. The line side feeder will be intercepted in manhole per drawings
b. The load side of UT-11 is bus duct and is to go directly to ESES-1 and not through MH-503, correct?
A81b: Correct. Refer to section on E300.
c) There would then be no need for any low voltage cable between UT-11 and MH-503, correct?
A81c: Correct
Q82. Question 3, part 4 on Amendment 1
a. Question and response reference building 14. Please clarify that this is actually building 18, not building 14.
A82a. Building 14 is correct
b. The response to the question states “this cable will be intercepted”. If the new feeder for UT-11 is going to be installed back to the generator, will this cable need to be intercepted to feed UT-11?
A82b. Cable will be intercepted in EPBX-11
c. If this cable does not need to be intercepted, how far back will this cable need to be demoed?
A82c: A separate generator replacement project will remove the 5kV feeder from existing building 18 to existing switchgear in Building 14
There are no further changes.