S06 - Bid Schedule.pdf

PDF 190 KB Posted

Attached to
Y1DZ--Replace Electrical-Building 19 607-19-107 Federal contract opportunity
Solicitation number
36C25220B0026
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12

About this file

This document contains a bid schedule and related federal contract opportunity notice for project 607-19-107 to replace Electrical Building 18 at the William S. Middleton Memorial Veterans Hospital in Madison, Wisconsin. The project scope involves constructing approximately 1,089 square feet of new building space and related site work, utilities, electrical, structural, mechanical and fire protection systems. The bid schedule specifies a base bid cost range of $2,000,000 to $5,000,000 and includes an alternate bid to delete work associated with a new UPS building. The contract completion time for the base bid is 425 calendar days. The federal contract opportunity notice indicates this is a set-aside for Service-Disabled Veteran-Owned Small Businesses and the North American Industry Classification code is 236220 with a size standard of $39.5 million. The solicitation will be issued on August 19th, 2020 with a bid opening on September 18th, 2020. The project completion time is 425 calendar days from notice to proceed. The Department of Veterans Affairs Veterans Health Administration VISN 12 is the contracting agency.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DZ--Replace Electrical-Building 19 607-19-107, newest first.
File Type Posted
36C25220B0026 0005.docx DOCX document
S06 - SF 1442 - Revised 10-7-20.pdf PDF
36C25220B0026 0004.docx DOCX document
S06 - SF 1442 - Revised.pdf PDF
S06 - Spec Section 23 81 00.pdf PDF
36C25220B0026 0003.docx DOCX document
36C25220B0026 0002.docx DOCX document
S06 - Electrical Power Dist Sys - Reference Drawing Only.pdf PDF
S06 - Wage Determination.pdf PDF
S06 - 19244 VA Hospital Building 18 - Geotech.pdf PDF
36C25220B0026 0001.docx DOCX document
S06 - CE100 Rev 1.pdf PDF
S06 - Pre-Bid Attendance List.pdf PDF
S06 - ES100 rev 1.pdf PDF
S06 - SF 1442.pdf PDF
S02 - 607-19-107 Drawings VOL1.pdf PDF
S02 - 607-19-107 Drawings VOL 2B.pdf PDF
S02 - 607-19-107 Drawings VOL 2A.pdf PDF
S02 - 607-19-107 Drawings VOL 2C.pdf PDF
S02 - Specifications Volume 1.pdf PDF
36C25220B0026_1.docx DOCX document
P07 - Wage Determination.pdf PDF
S02 - Specifications Volume 2.pdf PDF
Show all 23

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C25220B0026

“ACCOMPANYING AMENDMENT 36C25220B0026 – 0001”

Bid Schedule

Replace Electrical Bldg. 18 VA Project Number: 607-19-107

Cost Range: $2,000,000 to $5,000,000

0001 - All Inclusive Base Bid: Furnish all labor, materials, equipment and supervision to complete Project 607-19-107 Replace Electrical Bldg. 18. This project involves approximately 1089 SF of new space to be located adjacent to the main hospital Building 1. The project scope includes all necessary general construction, site work, underground utilities, electrical systems, structural, mechanical and fire protection systems, architectural and all equipment and distribution systems necessary to support the construction of the new Building 18. at the William S. Middleton Memorial Veterans Hospital, Madison, WI.

Contract Completion time is 425 Calendar Days $____________

0002 – Alternate Bid Item #1: Furnish and install all work as described in the All Inclusive Base Bid except:

DELETE all labor and materials associated with; The new UPS Building and its contents: new UPS battery compartment, new manual transfer switches MTS-C125-UPS & MTS-C125 EQ, new switchboard EQ & 1A and new CRAC1 & CRAC2.

The existing UPS all its associated components are to remain in place. Contractor to maintain power to the existing switchboards EQ & 1A, provide temporary power during cut overs, provide all conduit, conductors & accessories required from the new Switchboard 1(N-MDS-1) in new Building 18 to Switchboard 1A in old Building 18. Provide all conduit, conductors and accessories required from new ATS-EQ-3 in new Building 18 to existing Switchboard EQ in old Building 18.

DELETE all labor and materials to provide and construct the new UPS Precast Building as shown on Drawings A101, Detail 3, A103, Details 1 & 2, CS100, Detail 1 and ES100.

DELETE the demolition associated with the installation of the new contract pad shown on drawing CD100, Detail 1.

DELETE the concrete extension pad shown on Drawing CS500, Detail 3 & Drawing S100, Detail 1.

DELETE the relocation of the existing condensers shown on MH100 Details 1 & 2.

DELETE from Drawing MH600 the two CRAC Units from the UPS Building CRACC Schedule.

CRAC-1 and CRAC-2.

36C25220B0026

“ACCOMPANYING AMENDMENT 36C25220B0026 – 0001”

DELETE all labor and materials associated with the UPS Building on Drawing E100, Detail 1 and Keyed Notes: 1, 2, 3 & 4.

DELETE all labor and materials associated with the UPS Building on Drawing E101, Detail 1 and Keyed Notes: 1 & 2.

DELETE all labor and materials associated with Detail 2 on drawing E700, Key Notes: 7 through 14.

Contractor refeed power to existing Switchboard 1A in old Building 18 from new Switchboard 1 in new Building 18.

Contractor to refeed power to existing Switchboard 1A in old Building 18 from new ATS-3 in new Building 18.

Contract Completion time is 400 Calendar Days $____________

NOTICE TO BIDDERS:

Award will be made to the responsible bidder who submitted the lowest responsive bid.

A single award will be made on Item 0001 Base Bid, subject to available funding. In the event bids on Item 0001 Base Bid exceed available funding, a single award will be made exclusively on the amount of funding available for Item 0002, Alternate Bid Item #1. Award will be made to the lowest priced, responsive and responsible bidder.

For Alternate Bid Items, bidders should ensure that the all-inclusive price after the deductions are subtracted has been entered. Do not enter the amount of the deduction.

Replace Electrical Bldg. 18
VA Project Number: 607-19-107
Cost Range: $2,000,000 to $5,000,000