Revised 552-19-103 Drawing - AD101.pdf

PDF 546 KB Posted

Attached to
Y1DA--552-19-103: Improve Sub-Specialty Waiting Area - Bldg. 310 (VA-20-00027638)
Solicitation number
36C25020B0069
Issued by

About this file

This solicitation is for project number 552-19-103 to improve a sub-specialty waiting area at building 310 of the Dayton VA Medical Center located at 4100 W Third Street in Dayton, Ohio. The project scope includes fully renovating approximately 4,000 square feet of a 20,000 square foot first floor suite and additional areas to receive new finishes and plumbing. Ten new exam rooms will be created and approximately 27 existing exam rooms will receive upgrades to sinks, fire alarm, and nurse call systems. Corridors will be abated and receive finish upgrades, and most areas will get new LED light fixtures. The estimated value is between $2-5 million and the NAICS code is 236220 with a size standard of $39.5 million. The solicitation is a 100% set-aside for SDVOSBs registered in the Vendor Information Pages and SAM.gov databases. The SDVOSB must perform a minimum of 15% of construction work. The duration shall not exceed 220 calendar days from notice to proceed and bonds are required. A site visit will be scheduled and the solicitation issued on July 29, 2020 with bids due approximately 30 days later. The agency is the Department of Veterans Affairs Veterans Health Administration VISN 10.

View the file

Other files

File Type Posted
Revised 552-19-103 Drawing - AE101.pdf PDF
36C25020B0069 0002.docx DOCX document
552-19-103 - RFI Tracker with Responses (Updated 09102020).pdf PDF
36C25020B0069 0001.pdf PDF
552-10-103 - Site-Visit Sign-In Roster.pdf PDF
552-19-103 - RFI Tracker with Responses (Updated 09032020).pdf PDF
20. 552-19-103 Drawing - AE502.pdf PDF
14. 552-19-103 Drawing - AE102.pdf PDF
4. 552-19-103 Drawing - GI102.pdf PDF
49. 552-19-103 Drawing - E-901.pdf PDF
3. 552-19-103 Drawing - GI101.pdf PDF
42. 552-19-103 Drawing - MP101.pdf PDF
44. 552-19-103 Drawing - PL101.pdf PDF
60. 552-19-103 Drawing - EY101.pdf PDF
53. 552-19-103 Drawing - EL502.pdf PDF
8. 552-19-103 Drawing - S002.pdf PDF
34. 552-19-103 Drawing - FA101.pdf PDF
68. Wage Determination OH20200093 07-31-2020.pdf PDF
54. 552-19-103 Drawing - EP101.pdf PDF
66. 552-19-103 Sole Source - Rauland Reponder IV Nurse Call_Redacted.pdf PDF
36. 552-19-103 Drawing - FX101.pdf PDF
61. 552-19-103 Sole Source - 2020 Chicago Faucets_Redacted.pdf PDF
10. 552-19-103 Drawing - S301.pdf PDF
12. 552-19-103 Drawing - AD101.pdf PDF
26. 552-19-103 Drawing - AI101.pdf PDF
45. 552-19-103 Drawing - PP101.pdf PDF
33. 552-19-103 Drawing - FA001.pdf PDF
31. 552-19-103 Drawing - AI601.pdf PDF
1. 552-19-103 Specifications.pdf PDF
17. 552-19-103 Drawing - AE105.pdf PDF
35. 552-19-103 Drawing - FA102.pdf PDF
29. 552-19-103 Drawing - AI301.pdf PDF
5. 552-19-103 Drawing - GI103.pdf PDF
41. 552-19-103 Drawing - M-601.pdf PDF
21. 552-19-103 Drawing - AE601.pdf PDF
28. 552-19-103 Drawing - AI300.pdf PDF
46. 552-19-103 Drawing - P-501.pdf PDF
13. 552-19-103 Drawing - AE101.pdf PDF
67. 552-19-103 Sole Source - Tridium Network Controls_Redacted.pdf PDF
15. 552-19-103 Drawing - AE103.pdf PDF
38. 552-19-103 Drawing - MH101.pdf PDF
9. 552-19-103 Drawing - S101.pdf PDF
62. 552-19-103 Sole Source - Colors and Finishes_Redacted.pdf PDF
55. 552-19-103 Drawing - EP601.pdf PDF
43. 552-19-103 Drawing - PD101.pdf PDF
37. 552-19-103 Drawing - MD101.pdf PDF
11. 552-19-103 Drawing - S302.pdf PDF
59. 552-19-103 Drawing - ET501.pdf PDF
18. 552-19-103 Drawing - AE201.pdf PDF
22. 552-19-103 Drawing - AE701.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4 4

H J K L M N

GE F

P

1 7

1 7

7 7

1 1

7 7

7 7

1 1

1 71

EXISTING

NEW

WOMENS

1E-158

BREAK ROOM

1E-112

STAFF LOUNGE

1E-112A

MENS

1E-158A

EXAM

1E-153

EXAM

1E-154

EXAM

1E-148

EXAM

1E-150

EXAM

1E-155

NEURO CHECK-IN

1E-152

SOILED UTILITY

1E-159

NURSE CHECK-IN

1E-160

CORRIDOR

C1-28

CLEAN UTILITY

1E-162

OUTPATIENT NURSE MGR

1E-161

DERM-MINOR SURGERY

1E-160A

ANESTHISIA CONSULTANT

1E-124B

PHOTOTHERAPY

1E-160B

DERM CHECK-IN

1E-160C

BLOOD DRAW

1E-124A

NURSE CHECK-IN

1E-160D

EXAM

1E-124

EXAM

1E-122

EXAM

1E-121

CAST ROOM

1E-115C

EXAM

1E-115D

EXAM

1E-115E

EXAM

1E-115F

EXAM

1E-116

VITALS

1E-117

EXAM

1E-118

EXAM

1E-119

EXAM

1E-120

STAIRS

SWC

TOILET

1E-123

CORRIDOR

C1-19

CORRIDOR

C1-17

EXAM 7

1E-128

TECHNICIAN 6

1E-129

EXAM 5

1E-130

EXAM 4

1E-131

EXAM 3

1E-132

PHYSICIAN

1E-136E

MANAGER

1E-136D

EXAM 2

1E-133

NURSE

1E-136F

OFFICE

1E-136C

EXAM

1E-164

EXAM

1E-163

EXAM

1E-165

EXAM

1E-166

EXAM

1E-167

EXAM

1E-168

ELECT. ROOM

1E-147

EXAM

1E-115

EXAM

1E-114

EXAM

1E-113

EXAM

1E-115A

STORAGE ROOM

1E-115B

STORAGE

1E-111A

ORTHOPEDIC CHECK-IN

1E-111

PROCEDURE ROOM

1E-109

EXAM

1E-109A

PRODECURE ROOM

1E-109

EXAM 1

1E-134

CORRIDOR

C1-20

WAITING AREA

1E-136

CORRIDOR

CDR

RECEPTION

1E-136G

EXAM

1E-149

EXAM

1E-151

OFFICE

1E-142

OFFICE

1E-143

LACTATION

1E-145

TRAVEL OFFICE

1E-146

TELE/DATA CLOSET

1E-172

ELEVATOR

ELEVATOR

AGENT CASHIER

1E-173

RELEASE OF INFORMATION

1E-174

STAIRS

SWD

SUPERVISOR

1E-170D

OFFICE

1E-170C

OFFICE

1E-170B

OFFICE

1E-170A

STEAM MECH ROOM

1E-171

STAIRS

SWF

TRAVEL AND ELEGEBILITY

1E-170

CHECK-IN

1E-170E

WAITING AREA

1E-135

KIOSKS

1E-169

TOILET

1E-104

EXAM ROOM

1E-105

EXAM ROOM

1E-106

ONCOLOGY CONSULT

1E-156

HAC

1E-157

EXAM

1E-110

PRE-OP CHECK-IN

1E-126

EXAM 8

1E-127

CORRIDOR

CC

WAITING AREA

C1-22

PATIENT SCREENING

C1-26

CORRIDOR

C1-25

CORRIDOR

C1-14

TELE CLO

1E-176

CORRIDOR

C1-24

CORRIDOR

C1-29

CORRIDOR

C1-15

CORRIDOR

C1-12

CORRIDOR

C1--11

CORRIDOR

C1-9

OUTPATIENT WAITING AREA 1

C1-13

EXAM 10

1E-125

OUTPATIENT WAITING AREA 2

C1-21

OFFICE

1G-133

COMM

1E-107A

ALCOVE

1E-146B

CORRIDOR

C1-7

ELEVATOR LOBBY

CORRIDOR

C1-31

TELE/CLO

1E-175

CORRIDOR

C1-19

200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

BID DOCUMENTS

FOR CONSTRUCTION

FULLY SPRINKLERED

IMPROVE SUB-SPECIALTY

WAITING

AREA B310

552-19-103

03-20-2020

4100 W THIRD ST, DAYTON, OH 45428

DAYTON VA MEDICAL CENTER

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date

Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

U.S. Department of Veterans Affairs

FIRST FLOOR DEMOLITION PLAN

AD101

DML WOS

GENERAL DEMOLITION PLAN NOTES

N

NTS

KEY PLAN - FIRST FLOOR

DEMOLITION PLAN LEGEND

EXISTING PARTITION TO

REMAIN

EXISTING PARTITION TO BE

REMOVED

EXISTING DOOR & FRAME

TO REMAIN

EXISTING DOOR, FRAME &

PARTITION TO BE REMOVED

EXISTING DOOR & FRAME

TO BE REMOVED

EXISTING WINDOW TO REMAIN

EXISTING MILLWORK TO

REMAIN

EXISTING FIXTURES TO

REMAIN

AREA NOT IN CONTRACT

EXISTING MILLWORK TO BE

REMOVED

EXISTING FIXTURES TO BE

REMOVED

EXISTING WINDOW TO BE

REMOVED

DESCRIPTIVE NOTE FOR

AREA TO BE REMOVED

DEMOLITION PLAN NOTES

1. REMOVE EXISTING VINYL COMPOSITION TILE FLOORING, VINYL BASE AND

ADHESIVE TO BARE SUBSTRATE. PREP FOR NEW FLOOR FINISH. REFER

TO INTERIOR FINISHES SCHEDULE FOR MORE INFORMATION.

2. REMOVE SECTION OF PLASTER AND/OR GYPSUM PARTITION AS REQUIRED

FOR NEW WORK. REMOVAL OF SUCH PARTITION REQUIRES THAT ITEMS

SUCH AS CONDUIT, OUTLETS, RAILING, WALL BASES, PIPING, ETC ARE TO

BE REMOVED AND REROUTED. REFER TO MEP DRAWINGS FOR

ADDITIONAL INFORMATION. COORDINATE WITH NEW CONSTRUCTION.

3. REMOVE EXISTING PLUMBING FIXTURES AND RELATED ACCESSORIES

COMPLETE. COORDINATE WITH PLUMBING DRAWINGS.

4. REMOVE EXISTING DOOR, FRAME AND RELATED HARDWARE IN IT'S

ENTIRETY.

5. REMOVE EXISTING CASEWORK (UPPER AND/OR LOWER) IN ITS ENTIRETY,

INCLUDING, BUT NOT LIMITED TO ALL ACCESSORIES AND PLUMBING.

REFER TO PLUMBING DRAWINGS FOR ADDITIONAL INFORMATION.

6. REMOVE EXISTING STORAGE CABINET OR LOCKERS IN THEIR ENTIRETY.

7. REMOVE EXISTING ACOUSTICAL CEILING SYSTEM IN ITS ENTIRETY.

A. SCOPE OF WORK INCLUDES THE CUTTING, PATCHING AND INTERIOR FINISH

REPLACEMENT REQUIRED TO ACCOMMODATE THE ADDITION OF NEW

PLUMBING WORK INDICATED BY (PRIMARILY) PLUMBING PLANS.

B. CONTRACTOR SHALL COORDINATE DEMOLITION WORK WITH ALL TRADES,

FOR ITEMS SHOWN TO BE REMOVED ON THIS PLAN. GENERAL

CONTRACTOR SHALL ALSO COORDINATE WITH ALL TRADES, THE REMOVAL

REINSTALLATION, AND/OR REWORKING OF THE EXISTING FINISHES AS

REQUIRED FOR THE ROUTING OF EXISTING/NEW SERVICES INTO THE

PROJECT AREA.

C. COORDINATE WORK WITH MECHANICAL, ELECTRICAL AND PLUMBING (M.E.P.)

CONSTRUCTION DOCUMENTS AND THEIR RESPECTIVE TRADES.

D. PRIOR TO THE START OF DEMOLITION, CONTRACTOR SHALL WALK TO

SPACE WITH THE C.O.R. TO IDENTIFY ANY ITEMS TO BE TURNED OVER TO

THE GOVERNMENT.

E. PROVIDE 2 HR. FIRE STOPPING WHEREVER NEW PIPING, CONDUIT, TUBING,

CABLE OR DUCTWORK PENETRATES EXISTING FLOOR CONSTRUCTION

UNLESS PENETRATION IS FULLY ENCLOSED WITHIN UL APPROVED 2-HR.

RATED SHAFT CONSTRUCTION. (REFER TO SPECIFICATION SECTION 07 84

00; FIRE STOPPING.)

F. ALL WORK IN CORRIDORS OF GROUND AND FIRST FLOOR LEVELS WILL BE

ALLOWED ONLY DURING WEEKENDS OR AFTER NORMAL VAMC HOURS OF

OPERATION. RETURN CORRIDOR CEILING FINISH TO SUBSTANTIALLY

ORIGINAL CONDITION PRIOR TO BEGINNING OF WORK WEEK OR BEGINNING

OF NORMAL WORK HOURS FOR VAMC.

G. CONTRACTOR SHALL THOROUGHLY CLEAN ALL WORK AREAS BEFORE

TURNING SITE OVER TO VAMC FOLLOWING CONTRACTOR'S PERFORMANCE

OF 'OFF-HOURS' WORK.

H. WORK SCHEDULE WITHIN EXISTING ROOMS SHALL BE SCHEDULED AND

COORDINATED WITH THE VAMC COR.

I. WHERE CUTTING AND PATCHING EXISTING CEILING SYSTEMS IS REQUIRED:

I.A. TEMPORARILY SUSPEND ALL ELECTRICAL LIGHTING FIXTURES,

ELECTRICAL DEVICES, MECHANICAL DIFFUSERS AND OTHER CEILING

MOUNTED SYSTEMS.

I.B. ONCE EXISTING CEILING SYSTEM IS REPLACED - OR NEW SYSTEM IS

INSTALLED - RE-INSTALL EXISTING CEILING MOUNTED DEVICES TO

MATCH ORIGINAL ASSEMBLY.

J. CONTRACTOR IS STRONGLY ENCOURAGED TO VERIFY IN FIELD THE EXISTING

CEILING SYSTEM TYPE LOCATED IN EACH AREA SHOWN FOR NEW WORK.

MATCH ANY NEW REPLACEMENT FINISHES TO EXISTING FINISHES.

K. WHERE ROOMS ARE INDICATED TO HAVE THE ENTIRE CEILING SYSTEM

REMOVED FOR INSTALLATION OF NEW WORK - CONTRACTOR TO INSTALL

NEW CEILING SYSTEM MATCHING EXISTING AT COMPLETION OF M.E.P.

WORK. (REFER TO SPECIFICATION SECTION 09 51 00.)

L. REMOVE ALL WALL MOUNTED ACCESSORIES, WALL PROTECTION, INCLUDING

BUT NOT LIMITED TO WALL MOUNTED HAND SANITIZER DISPENSERS,

BOX DISPENSERS SHARPS CONTAINERS, PAPER TOWEL HOLDERS, GRAB BARS,

SOAP DISPENSERS, ETC IN THEIR ENTIRETY. TURN OVER TO VA.

M. REMOVE ALL WALL PAPER AND WALL PROTECTION AS NECESSARY.

N. ANY ITEMS DAMAGED BY THE CONTRACTOR OR BY PERSONS UNDER THE

SUPERVISION OF THE CONTRACTOR THAT ARE NOT INDICATED TO BE

REMOVED OR DEMOLISHED SHALL BE REPAIRED/REPLACED TO LIKE NEW

CONDITION AT THE CONTRACTORS EXPENSE.

O. CONTRACTOR SHALL MAINTAIN THE EXISTING BUILDING IN A WATERTIGHT

STATE THROUGHOUT CONSTRUCTION. ANY DAMAGE CAUSED BY THE

CONTRACTOR SHALL BE REPAIRED TO BE LIKE NEW AND SHALL MATCH

NEW CONSTRUCTION.

P. CONTRACTOR SHALL MAINTAIN A FULLY SEALED ENTRY POINTS TO THE

ROOMS AND/OR AREAS BEING RENOVATED. ROOMS MUST BE SEALED TO

PREVENT THE TRANSFER OF DUST AND DEBRIS TO ADJACENT SPACES.

Q. EXISTING SPRINKLER SYSTEM SHALL REMAIN LIVE AND FUNCTIONAL DURING

ALL PHASES OF CONSTRUCTION. CONTRACTOR SHALL TAKE GREAT CARE

TO NOT DAMAGE ANY EXISTING HEADS OR PIPING, UNLESS OTHERWISE

INDICATED ON FIRE PROTECTION DRAWINGS.

R. WORK THAT GENERATES LEVELS OF NOISE OR VIBRATION THAT IS

DISRUPTIVE TO PATIENTS, VISITORS, AND/OR STAFF WILL BE SCHEDULED

FOR OFF-SHIFTS AND/OR WEEKENDS.

2 HOUR FIRE RATED

PARTITION (90 MIN. DOOR)

8. EXISTING FINISHES TO REMAIN, PATCH AND REPAIR AS NECESSARY.

AREA OF FLOOR TO BE

REMOVED FOR TRENCH

DRAIN

9. REMOVE EXISTING DOORS AND FRAME, RETAIN FOR REINSTALLATION.

10. AREA OF SLAB EXCAVATION, CONTRACTOR SHALL COORDINATE NECESSARY

EXTENTS OF DEMOLITION WITH PD101 AND PP101.

11. REMOVE EXISTING WALL PROTECTION.

12. REMOVE DRYWALL AS NECESSARY TO PERMIT NEW PIPING, COORDINATE

WITH PD101 & PP101.

13. EXISTING 1500LB. SAFES. CONTRACTOR TO COORDINATE REMOVABLE &

RELOCATION W/ VAMC.

14. REMOVE & RETAIN EXISTING DOOR, FRAME & HARDWARE (INCLUDING

KEYPAD) FOR REINSTALLATION.

15. TEMPORARILY REMOVE CEILING TILIES TO ACCOMMODATE ABOVE CEILING

MECHANICAL WORK.

FIRST FLOOR DEMOLITION PLAN

1/4'' = 1'-0''

F1

Sheets and Views
AD101

File details come from the government source that posted it. Updated .