36. 552-19-103 Drawing - FX101.pdf

PDF 982 KB Posted

Attached to
Y1DA--552-19-103: Improve Sub-Specialty Waiting Area - Bldg. 310 (VA-20-00027638)
Solicitation number
36C25020B0069
Issued by

About this file

This solicitation package describes a federal construction contract opportunity for the Improve Sub-Specialty Waiting Area - Bldg. 310 project at the Dayton VA Medical Center in Dayton, Ohio. The project scope involves fully renovating approximately 4,000 square feet of a 20,000 square foot suite on the first floor of Building 310, including creating ten new exam rooms in an adjoining 2,080 square feet of unfinished area. Additional areas will receive new finishes and plumbing. The work will increase privacy for patients and comfort, and includes updating approximately 27 existing exam rooms with new sinks and upgrades to fire alarm and nurse call systems. Corridors in the scope area will be abated and receive finish upgrades, and most areas will get new LED light fixtures. The estimated contract value is between $2-5 million. The NAICS code is 236220. Responses are due approximately 30 days after the July 29, 2020 solicitation posting at FBO.gov. The 220-calendar day performance period starts at NTP. This is a 100% SDVOSB set-aside requiring the awardee to perform a minimum of 15% of construction work. Bonds will be required.

View the file

Other files

File Type Posted
Revised 552-19-103 Drawing - AE101.pdf PDF
36C25020B0069 0002.docx DOCX document
Revised 552-19-103 Drawing - AD101.pdf PDF
552-19-103 - RFI Tracker with Responses (Updated 09102020).pdf PDF
36C25020B0069 0001.pdf PDF
552-10-103 - Site-Visit Sign-In Roster.pdf PDF
552-19-103 - RFI Tracker with Responses (Updated 09032020).pdf PDF
20. 552-19-103 Drawing - AE502.pdf PDF
14. 552-19-103 Drawing - AE102.pdf PDF
4. 552-19-103 Drawing - GI102.pdf PDF
49. 552-19-103 Drawing - E-901.pdf PDF
3. 552-19-103 Drawing - GI101.pdf PDF
42. 552-19-103 Drawing - MP101.pdf PDF
44. 552-19-103 Drawing - PL101.pdf PDF
60. 552-19-103 Drawing - EY101.pdf PDF
53. 552-19-103 Drawing - EL502.pdf PDF
8. 552-19-103 Drawing - S002.pdf PDF
34. 552-19-103 Drawing - FA101.pdf PDF
68. Wage Determination OH20200093 07-31-2020.pdf PDF
54. 552-19-103 Drawing - EP101.pdf PDF
66. 552-19-103 Sole Source - Rauland Reponder IV Nurse Call_Redacted.pdf PDF
61. 552-19-103 Sole Source - 2020 Chicago Faucets_Redacted.pdf PDF
10. 552-19-103 Drawing - S301.pdf PDF
12. 552-19-103 Drawing - AD101.pdf PDF
26. 552-19-103 Drawing - AI101.pdf PDF
45. 552-19-103 Drawing - PP101.pdf PDF
33. 552-19-103 Drawing - FA001.pdf PDF
31. 552-19-103 Drawing - AI601.pdf PDF
1. 552-19-103 Specifications.pdf PDF
17. 552-19-103 Drawing - AE105.pdf PDF
35. 552-19-103 Drawing - FA102.pdf PDF
29. 552-19-103 Drawing - AI301.pdf PDF
5. 552-19-103 Drawing - GI103.pdf PDF
41. 552-19-103 Drawing - M-601.pdf PDF
21. 552-19-103 Drawing - AE601.pdf PDF
28. 552-19-103 Drawing - AI300.pdf PDF
46. 552-19-103 Drawing - P-501.pdf PDF
13. 552-19-103 Drawing - AE101.pdf PDF
67. 552-19-103 Sole Source - Tridium Network Controls_Redacted.pdf PDF
15. 552-19-103 Drawing - AE103.pdf PDF
38. 552-19-103 Drawing - MH101.pdf PDF
9. 552-19-103 Drawing - S101.pdf PDF
62. 552-19-103 Sole Source - Colors and Finishes_Redacted.pdf PDF
55. 552-19-103 Drawing - EP601.pdf PDF
43. 552-19-103 Drawing - PD101.pdf PDF
37. 552-19-103 Drawing - MD101.pdf PDF
11. 552-19-103 Drawing - S302.pdf PDF
59. 552-19-103 Drawing - ET501.pdf PDF
18. 552-19-103 Drawing - AE201.pdf PDF
22. 552-19-103 Drawing - AE701.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CAST RM.

1E-115C

CAST RM.

1E-115C

EXAM

1E-115D

EXAM

1E-115E

EXAM

1E-115F

EXAM

1E-116

STORAGE RM.

1E-115B

EXAM

1E-115A

EXAM

1E-115

EXAM

1E-114

EXAM

1E-113

VITALS

1E-117

EXAM

1E-118

EXAM

1E-119

EXAM

1E-120

TOILET

1E-123

EXAM

1E-121

EXAM

1E-122

PHOTO -THERAPY

1E-160D

EXAM

1E-124

EXAM

1E-126

EXAM 8

1E-127

EXAM 7

1E-128

TECHICIAN 6

1E-129

EXAM 5

1E-130

EXAM 4

1E-131

EXAM 3

1E-132

EXAM 2

1E-133

EXAM 1

1E-134

EXAM 1a

1E-134A

TOILET

1E-136H

STORAGE

1E-136G

EXAM

1E-136C

EXAM

1E-136D

EXAM

1E-136E

EXAM

1E-136F

TELE/CLOSET

1E-175

STAIRS

SWD

RELEASE OF

INFORMATION

1E-174

CHECK-IN

1E-170e

PRINTER / COPY

SUPERVISOR

1E-170d

OFFICE

1E-170c

OFFICE

1E-170b

OFFICE

1E-170a

STEAM MECH RM.

1E-171

STAIRS

SWF

TRAVEL AND

ELIGIBILITY

1E-170

WAITING AREA

1E-135

CHECK-IN

1E-142

AGENT CASHIER

1E-173

OFFICE

1E-173a

WORKROOM

1E-143

CHECK OUT

C1-21A

VITALS

C1-21

ELEVATOR

ELEVATOR

TELE/DATA

CLOSET

1E-172

TRAVEL OFFICE

1E-146

EXAM ROOM

1E-109a

EXAM ROOM

1E-109b

EXAM ROOM

1E-109c

EXAM ROOM

1E-109e

EXAM ROOM

1E-109d

ELECT. RM

1E-147

EXAM

1E-148

EXAM

1E-150

EXAM

1E-152

EXAM

1E-153

EXAM

1E-154

EXAM

1E-155

MENS

1E-158A

OUTPATIENT

NURSE MGR.

1E-161

CLEAN UTILITY

1E-162

EXAM

1E-163

EXAM

1E-164

EXAM

1E-165

EXAM

1E-166

EXAM

1E-167

EXAM

1E-168

SOILED UTILITY

1E-159

NURSE CHECK-IN

1E-160

EXAM

1E-160A

EXAM

1E-160B

EXAM

1E-160C

EXAM

1E-124A

EXAM

1E-124B

EXAM

1E-124C

TELE CLOSET

1E-176

EXAM

1E-104

EXAM

1E-105

EXAM

1E-106

ONCOLOGY

1E-156

HAC

1E-157

WOMENS

1E-158

EXAM

1E-109

EXAM /

EDUCATION

1E-109A

OFFICE

1E-109B

EXAM

1E-110

ORTHOPEDIC

1E-111

STOR

1E-111A

BREAK RM.

1E-112

STAFF LOUNGE

1E-112A

OUTPATIENT

WAITING AREA

C1-13

STAIRS

SWC

CORRIDOR

C1-31

CORRIDOR

C1-2C

C O

R R

I D

O R

CORRIDOR

C1-19

C O

R R

I D

O R

C

CORRIDOR

C1-6

CORRIDOR

C1-24

CORRIDOR

C1-25

CORRIDOR

C1-14

CORRIDOR

C1-9

CORRIDOR

C1-11

CORRIDOR

C1-15

CORRIDOR

C1-12

CORRIDOR

C1-28

COMM

1E-107A

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT

321 4 5 6 7 8 9 10

Project Director

Revisions: Date:

Architecture Engineering Design-Build paradigm

AutoCAD SHX Text

SWB

AutoCAD SHX Text

DN.

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN.

AutoCAD SHX Text

UP

AutoCAD SHX Text

RAMP

AutoCAD SHX Text

UP

AutoCAD SHX Text

UP

AutoCAD SHX Text 1A-100

AutoCAD SHX Text D.F.

AutoCAD SHX Text

UP

http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com http://www.ketiv.com AutoCAD SHX Text

DN.

AutoCAD SHX Text

UP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

FEC EX.

AutoCAD SHX Text

FEC EX.

AutoCAD SHX Text

FEC EX.

AutoCAD SHX Text

FEC EX.

AutoCAD SHX Text

FEC

AutoCAD SHX Text

FEC EX.

AutoCAD SHX Text 200 Envoy Circle, Suite 201, Louisville, KY 40299 www.paradigmusa.com

AutoCAD SHX Text

BID DOCUMENTS FOR CONSTRUCTION

AutoCAD SHX Text

FULLY SPRINKLERED

AutoCAD SHX Text

IMPROVE SUB-SPECIALTY WAITING AREA B310

AutoCAD SHX Text 552-19-103

AutoCAD SHX Text 03-20-2020

AutoCAD SHX Text

4100 W THIRD ST, DAYTON, OH 45428

AutoCAD SHX Text

DAYTON VA MEDICAL CENTER

AutoCAD SHX Text

AutoCAD SHX Text N

AutoCAD SHX Text G

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text E

AutoCAD SHX Text T

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text C

AutoCAD SHX Text A

AutoCAD SHX Text F

AutoCAD SHX Text I

AutoCAD SHX Text Exp. 6-30-21

AutoCAD SHX Text No. M 35425

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text G

AutoCAD SHX Text S

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text R

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text P

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text D

AutoCAD SHX Text R

AutoCAD SHX Text E

AutoCAD SHX Text P

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text H

AutoCAD SHX Text L.

AutoCAD SHX Text L

AutoCAD SHX Text E

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text

DH

AutoCAD SHX Text

RN

AutoCAD SHX Text FIRE PROTECTION GENERAL NOTES 1. DESIGN DRAWINGS ARE DIAGRAMMATIC AND APPROXIMATE, ONLY FOR PIPE DESIGN DRAWINGS ARE DIAGRAMMATIC AND APPROXIMATE, ONLY FOR PIPE SIZING, GENERAL ROUTING, LAYOUT AND BASIC SYSTEM CONFIGURATION. 2. THE CONTRACTOR SHALL PROVIDE A COMPLETE SHOP DRAWING SUBMITTAL THE CONTRACTOR SHALL PROVIDE A COMPLETE SHOP DRAWING SUBMITTAL INCLUDING ALL INFORMATION REQUIRED BY NFPA 13, (2019 EDITION). 2019 EDITION). EDITION). 3. THE CONTRACTOR SHALL FIELD VERIFY ALL PIPE ROUTING PRIOR TO SUBMITTAL THE CONTRACTOR SHALL FIELD VERIFY ALL PIPE ROUTING PRIOR TO SUBMITTAL OF SHOP DRAWINGS OR COMMENCING SYSTEM FABRICATION. 4. THE CONTRACTOR IS TO PROVIDE A COMPLETE AS-BUILT DRAWING SUBMITTAL, THE CONTRACTOR IS TO PROVIDE A COMPLETE AS-BUILT DRAWING SUBMITTAL, INCLUDING ALL PIPE LENGTHS, ELEVATIONS, HANGER LOCATIONS, HANGER DETAILS, AND OFFSETS AS COORDINATED WITH THE BUILDING STRUCTURE AND OTHER BUILDING TRADES. THE AS-BUILT DRAWINGS SHALL BE +0'-6”. +0'-6”. 0'-6”. . 5. ANY MATERIALS AND ACCESSORIES NECESSARY SHALL BE INSTALLED IN ANY MATERIALS AND ACCESSORIES NECESSARY SHALL BE INSTALLED IN ACCORDANCE WITH NFPA 13 (2019 EDITION). 2019 EDITION). EDITION). 6. PIPING SHALL BE RUN ON A LEVEL HORIZONTAL PLANE. IF TRAPPED PIPING PIPING SHALL BE RUN ON A LEVEL HORIZONTAL PLANE. IF TRAPPED PIPING OVER 5 GALLONS OCCURS, A MINIMUM OF A 3/4” BALL VALVE SHALL BE BALL VALVE SHALL BE PROVIDED. 7. ALL SYSTEMS SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH THE ALL SYSTEMS SHALL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH THE PROVISIONS PUT FORTH BY NFPA 13 (2010 EDITION), THE VA DESIGN STANDARDS, THE PROJECT TECHNICAL SPECIFICATIONS, AND ALL APPLICABLE LOCAL AND STATE LAWS AND REGULATIONS. 8. ALL ABOVE GROUND PIPING 2-1/2” AND LARGER SHALL BE SCHEDULE 10 ALL ABOVE GROUND PIPING 2-1/2” AND LARGER SHALL BE SCHEDULE 10 AND LARGER SHALL BE SCHEDULE 10 BLACK STEEL WITH ROLL GROOVED ENDS AND GROOVED FITTINGS UNLESS NOTED OTHERWISE. 9. ALL ABOVE GROUND PIPING 2" AND SMALLER SHALL BE SCHEDULE 40 WITH ALL ABOVE GROUND PIPING 2" AND SMALLER SHALL BE SCHEDULE 40 WITH THREADED CAST IRON FITTINGS. 10. ALL SPRINKLERS SHALL BE NEW UL LISTED, FM APPROVED, QUICK RESPONSE, ALL SPRINKLERS SHALL BE NEW UL LISTED, FM APPROVED, QUICK RESPONSE, SEMI-RECESSED, CHROME FINISH, UNLESS NOTED OTHERWISE. REFERENCE SPECIFICATIONS FOR SPECIFIC SPRINKLER APPLICATIONS AND TEMPERATURES. 11. ALL CONTROL VALVES SHALL BE SUPERVISED BY THE BUILDING FIRE ALARM ALL CONTROL VALVES SHALL BE SUPERVISED BY THE BUILDING FIRE ALARM SYSTEM. 12. ALL VALVES (DRAINS, INSPECTOR'S TEST, CONTROL) SHALL BE IDENTIFIED AS ALL VALVES (DRAINS, INSPECTOR'S TEST, CONTROL) SHALL BE IDENTIFIED AS REQUIRED BY NFPA 13 (2019 EDITION). 2019 EDITION). EDITION). 13. ALL VALVES AND WATER FLOW SWITCHES SHALL BE LOCATED IN ACCESSIBLE ALL VALVES AND WATER FLOW SWITCHES SHALL BE LOCATED IN ACCESSIBLE LOCATIONS. 14. SPRINKLER PROTECTION SHALL BE PROVIDED BENEATH ALL CONTINUOUS SPRINKLER PROTECTION SHALL BE PROVIDED BENEATH ALL CONTINUOUS OBSTRUCTIONS 4'-0” AND GREATER IN WIDTH AS REQUIRED BY NFPA 13 AND GREATER IN WIDTH AS REQUIRED BY NFPA 13 (2019 EDITION). 2019 EDITION). EDITION). 15. SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE SOME WORK UNDER THIS CONTRACT WILL REQUIRE WORK DUTIES TO BE PERFORMED AFTER NORMAL WORKING HOURS. DETERMINATION OF SPECIFIC WORK DUTIES TO BE PERFORMED AFTER HOURS SHALL BE MADE BY VA STAFF AT THEIR CONVENIENCE. POSSIBLE WORK REQUIRING AFTER HOURS APPROVAL INCLUDES, BUT IS NOT LIMITED TO: POWER OUTAGES AND DISRUPTION OF SERVICES, EXTREME NOISE AND/OR VIBRATION, CUTTING AND PATCHING OF CONCRETE, AND DELIVERIES OF EQUIPMENT. 16. FIRE ALARM AND SPRINKLER SYSTEMS SHALL REMAIN IN OPERATION FIRE ALARM AND SPRINKLER SYSTEMS SHALL REMAIN IN OPERATION THROUGHOUT PERIOD OF WORK. WHERE CONSTRUCTION PROHIBITS THIS FOR ANY REASON, PROVIDE FIRE WATCH OR 2-HOUR FIRE BARRIERS AROUND THE CONSTRUCTION SITE AS REQUIRED BY SPECIFICATION SECTION 21 13 13. THE FIRE PROTECTION CONTRACTOR SHALL ENSURE THAT NO DAMAGE IS DONE TO THE EXISTING SPRINKLER SYSTEM - I.E. PROTECTIVE CAGES SHALL BE INSTALLED OVER SPRINKLER HEADS DURING RENOVATION, ETC. 17. FIRE AND SMOKE PARTITIONS SHALL BE PER REQUIRED CODES. FIRE AND SMOKE PARTITIONS SHALL BE PER REQUIRED CODES. 18. NOT USED. NOT USED. 19. CONTRACTOR TO PROVIDE A NEW FLOW TEST. CONTRACTOR TO PROVIDE A NEW FLOW TEST. 20. NOT USED. NOT USED. 21. PROVIDE UPRIGHT SPRINKLERS IN AREAS WITHOUT CEILINGS. PROVIDE UPRIGHT SPRINKLERS IN AREAS WITHOUT CEILINGS. 22. INCLUDE 250 GPM HOSE STREAM ALLOWANCE IN HYDRAULIC CALCULATIONS.INCLUDE 250 GPM HOSE STREAM ALLOWANCE IN HYDRAULIC CALCULATIONS.

AutoCAD SHX Text ORDINARY HAZARD GROUP 2 0.20 GPM/SQ.FT. OVER 1,500 SQ.FT. GPM/SQ.FT. OVER 1,500 SQ.FT.1,500 SQ.FT. SQ.FT.

AutoCAD SHX Text ORDINARY HAZARD GROUP 1 0.15 GPM/SQ.FT. OVER 1,500 SQ.FT. GPM/SQ.FT. OVER 1,500 SQ.FT.1,500 SQ.FT. SQ.FT.

AutoCAD SHX Text LIGHT HAZARD 0.10 GPM/SQ.FT. OVER 1,500 SQ.FT.GPM/SQ.FT. OVER 1,500 SQ.FT.1,500 SQ.FT. SQ.FT.

AutoCAD SHX Text

(NO HATCH)

AutoCAD SHX Text

%%UFIRE PROTECTION HATCH AREAS

AutoCAD SHX Text

%%U(NOT ALL SYMBOLS WILL APPLY TO THIS WORK)

AutoCAD SHX Text

AREA NOT IN CONTRACT (NIC)

AutoCAD SHX Text N

AutoCAD SHX Text P

AutoCAD SHX Text M

AutoCAD SHX Text L

AutoCAD SHX Text K

AutoCAD SHX Text J

AutoCAD SHX Text H

AutoCAD SHX Text G

AutoCAD SHX Text F

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SCALE 1/8'' = 1'-0''

AutoCAD SHX Text F1

AutoCAD SHX Text

FIRE PROTECTION PLAN FIRST FLOOR

AutoCAD SHX Text

FIRE PROTECTION PLAN FIRST FLOOR

AutoCAD SHX Text

FX101

Sheets and Views
FX101

File details come from the government source that posted it. Updated .