This solicitation is for project #552-19-103 to fully renovate approximately 4,000 square feet and provide additional finishes and plumbing upgrades in approximately 20,000 square feet at the Dayton VA Medical Center in Dayton, Ohio. The scope of work includes upgrading 27 exam rooms, updating finishes, abating corridors, and providing new LED lighting. The project value is between $2-5 million and has a 220 calendar day performance period from notice to proceed. A site visit will be scheduled and questions are due by a specified cutoff date. This is a 100% set-aside for service-disabled veteran-owned small businesses, who must be verified in the websites listed and have a minimum of 15% self-performance. Bids are due approximately 30 days from July 29, 2020 posting on FBO.gov. Amendments will be posted to beta.SAM.gov and it is the bidder's responsibility to obtain all amendments.

The related document provides responses to contractor questions on clarifying the existing BAS system, providing existing condition photos, confirming the first floor is slab on grade, and approving the use of propress fittings for copper piping.

View the file

Other files

File Type Posted
Revised 552-19-103 Drawing - AE101.pdf PDF
36C25020B0069 0002.docx DOCX document
Revised 552-19-103 Drawing - AD101.pdf PDF
36C25020B0069 0001.pdf PDF
552-10-103 - Site-Visit Sign-In Roster.pdf PDF
552-19-103 - RFI Tracker with Responses (Updated 09032020).pdf PDF
20. 552-19-103 Drawing - AE502.pdf PDF
14. 552-19-103 Drawing - AE102.pdf PDF
4. 552-19-103 Drawing - GI102.pdf PDF
49. 552-19-103 Drawing - E-901.pdf PDF
3. 552-19-103 Drawing - GI101.pdf PDF
42. 552-19-103 Drawing - MP101.pdf PDF
44. 552-19-103 Drawing - PL101.pdf PDF
60. 552-19-103 Drawing - EY101.pdf PDF
53. 552-19-103 Drawing - EL502.pdf PDF
8. 552-19-103 Drawing - S002.pdf PDF
34. 552-19-103 Drawing - FA101.pdf PDF
68. Wage Determination OH20200093 07-31-2020.pdf PDF
54. 552-19-103 Drawing - EP101.pdf PDF
66. 552-19-103 Sole Source - Rauland Reponder IV Nurse Call_Redacted.pdf PDF
36. 552-19-103 Drawing - FX101.pdf PDF
61. 552-19-103 Sole Source - 2020 Chicago Faucets_Redacted.pdf PDF
10. 552-19-103 Drawing - S301.pdf PDF
12. 552-19-103 Drawing - AD101.pdf PDF
26. 552-19-103 Drawing - AI101.pdf PDF
45. 552-19-103 Drawing - PP101.pdf PDF
33. 552-19-103 Drawing - FA001.pdf PDF
31. 552-19-103 Drawing - AI601.pdf PDF
1. 552-19-103 Specifications.pdf PDF
17. 552-19-103 Drawing - AE105.pdf PDF
35. 552-19-103 Drawing - FA102.pdf PDF
29. 552-19-103 Drawing - AI301.pdf PDF
5. 552-19-103 Drawing - GI103.pdf PDF
41. 552-19-103 Drawing - M-601.pdf PDF
21. 552-19-103 Drawing - AE601.pdf PDF
28. 552-19-103 Drawing - AI300.pdf PDF
46. 552-19-103 Drawing - P-501.pdf PDF
13. 552-19-103 Drawing - AE101.pdf PDF
67. 552-19-103 Sole Source - Tridium Network Controls_Redacted.pdf PDF
15. 552-19-103 Drawing - AE103.pdf PDF
38. 552-19-103 Drawing - MH101.pdf PDF
9. 552-19-103 Drawing - S101.pdf PDF
62. 552-19-103 Sole Source - Colors and Finishes_Redacted.pdf PDF
55. 552-19-103 Drawing - EP601.pdf PDF
43. 552-19-103 Drawing - PD101.pdf PDF
37. 552-19-103 Drawing - MD101.pdf PDF
11. 552-19-103 Drawing - S302.pdf PDF
59. 552-19-103 Drawing - ET501.pdf PDF
18. 552-19-103 Drawing - AE201.pdf PDF
22. 552-19-103 Drawing - AE701.pdf PDF
Show 40 more

Latest 50 of 75 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation - 36C25020B0069 Project 552-19-103 - Improve Sub-Specialty Waiting Area B310

RFI Tracker with Responses (Updated 09/10/2020)

KEY: RFI = Black; VA Response = Purple

RFIs

RFI - “ Division 23 09 23 Specification read “This facility's existing direct -digital control system ismanufactured by Johnson Controls, and its ECC is located at Building 128 HVAC Shop. The existing system's top -end communications is via combination of ANDOVER and Johnson Controls. The existing system's ECC and top -end controllers were installed in 2011. The contractor administered by this

Section of the technical specifications shall observe the capabilities, communication network, services, spare capacity of the existing control system and its ECC prior to beginning work.” Please verify the existing controls system. Based on previous bid activity at this site, it appears the BAS is a Tridium AX based controls system. To avoid confusion, what is the correct existing BAS?”

2. Can you please send photos of the unrenovated spaces associated with this project?

VA Response – Please note the photos reflect the existing conditions on 01/24/2019.

Pic 1 Exam Room 1E-105

VA Response - Correct, the BAS is a Tridium AX based controls system with BAC NET Comm.

1.

Pic 2 Exam Room 1E-106

Pic 3 Exam 1E-106

Pic 4 Exam Rm 1E-106

Pic 5 Exam Rm 1E-106

Pic 6 Door to Corr C1-25

Pic 7 1E-100 and 1E-102

Pic 8 Toilet 1E-104

Pic 9 Toilet 1E-104

Pic 10 1E-109

Pic 11 Exam Rm 1E-105

Pic 12 Fire Extinguisher E1-109

Pic 13 Exam Rm 1E-106

Pic 14 Door to Comm 1E-107A

Pic 15 View of Ceiling in 1E-109

Pic 16 1E-109

Pic 17 Double Doors in 1E-109

Pic 18 1E-109

Pic 19 1E-109

Pic 20 1E-109

3. Is this first floor slab on grade or is there a basement?

VA Response – It is slab on grade at the construction area.

A. After tests have been successfully completed, thoroughly flush and sterilize the interior domestic water distribution system in accordance with AWWA C651.

B. Use liquid chlorine or hypochlorite for sterilization.

4. Does disinfecting need to be figured into the cost of this project?

VA Response – Add the following paragraph to Specification Section 22 11 00.

Paragraph 3.3 STERILIZATION

5. General Phasing Plan Note L. on drawing GI102 states "Night and Weekend Work", but Note L.

cannot be located on the floor plan of this drawing. Please clarify what portions of the project will require night and weekend work.

VA Response – The intent of the project is for the suite to remain operational during construction. The Contractor shall coordinate construction plan with VAMC prior to install to confirm acceptable working hours in all areas. Corridors which are shown to be operational throughout construction shall require night and weekend work.

6. For the domestic water piping is L copper with propress fittings approved? (Didn't see propress approved in the specs)

VA Response – Add the following paragraphs to Specification Section 22 11 00.

Paragraph 2.3.B.4. - Mechanical press-connect fittings for copper pipe and tube shall conform to the material and sizing requirements of ASME B16.51, NSF 61 approved, 50 mm (2 inch) size and smaller mechanical press-connect fittings, double pressed type, with EPDM (ethylene propylene diene monomer) non-toxic synthetic rubber sealing elements and un-pressed fitting identification feature.

Paragraph 3.A.8. - Mechanical press-connect fitting connections shall be made in accordance with the manufacturer’s installation instructions. The tubing shall be fully inserted into the fitting and the tubing marked at the shoulder of the fitting. The fitting alignment shall be checked against the mark on the tubing to assure the tubing is fully engaged (inserted) in the fitting. Ensure the tube is completely inserted to the fitting stop (appropriate depth) and squared with the fitting prior to applying the pressing jaws onto the fitting. The joints shall be pressed using the tool(s) approved by the manufacturer. Minimum distance between fittings shall be in accordance with the manufacturer’s requirements. When the pressing cycle is complete, visually inspect the joint to ensure the tube has remained fully inserted, as evidenced by the visible insertion mark.