36C25018B0807-0004002.pdf
PDF 14 MB Posted
- Solicitation number
- 36C25018B0807
About this file
36C25018B0807 0004 10 Sept 2018 539-17-102 Drawings.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25018B0807-0005007.pdf | ||
| 36C25018B0807-0005006.pdf | ||
| 36C25018B0807-0005004.docx | DOCX document | |
| 36C25018B0807-0005005.pdf | ||
| 36C25018B0807-0004001.pdf | ||
| 36C25018B0807-0004000.docx | DOCX document | |
| 36C25018B0807-0003001.docx | DOCX document | |
| 36C25018B0807-0002004.docx | DOCX document | |
| 36C25018B0807-0002005.pdf | ||
| 36C25018B0807-014.docx | DOCX document | |
| 36C25018B0807-0001001.pdf | ||
| 36C25018B0807-0001002.pdf | ||
| 36C25018B0807-0001000.docx | DOCX document | |
| 36C25018B0807-013.docx | DOCX document | |
| 36C25018B0807-011.pdf | ||
| 36C25018B0807-005.pdf | ||
| 36C25018B0807-004.pdf | ||
| 36C25018B0807-009.pdf | ||
| 36C25018B0807-012.pdf | ||
| 36C25018B0807-002.pdf | ||
| 36C25018B0807-006.docx | DOCX document | |
| 36C25018B0807-003.pdf | ||
| 36C25018B0807-001.docx | DOCX document | |
| 36C25018B0807-010.pdf | ||
| 36C25018B0807-007.docx | DOCX document | |
| 36C25018B0807-008.pdf | ||
| 36C25018B0807-000.docx | DOCX document |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ludlow Ave.
C lif to n
Av e.
CINCINNATI
STATE
TECH.
Hopple St.
M.L.K. Dr.
McMillan St.
UNIV. OF
CINCINNATI
W.H.T Rd.
VAMC
3200 VINE ST.
M.L.K. Dr.
Vine St.
ZOO
Jefferson Ave.
UNIV.
HOSPITAL
Mitchell Ave.
Re ad ing R d.
Vi cto ry
P kw
y. XAVIER
UNIV.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne f oo t on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
Champlin Project No.
ARCHITECT/ENGINEERS: CONSULTANTS:
Office of Construction and Facilities Management
F E
D C
B A
539-17-102
PHASE 3
thinkchamplin.com
720 E Pete Rose Way Cincinnati, OH 45202
T. 513.241.4474 F 513.241.0081
1/
/2
1:
:2
PM
RELOCATE SHORT TERM REHAB
COMMUNITY LIVING CENTER - RELOCATE
P.M.&R. TO BASEMENT OF BUILDING #2
11/04/16
COVER SHEET
2.3A000 DesignerApprover
177-5668
Cincinnati, Ohio
RELOCATE SHORT TERM REHAB
COMMUNITY LIVING CENTER - RELOCATE
P.M.&R. TO BASEMENT OF BUILDING #2
DEPARTMENT OF VETERANS AFFAIRS
3200 VINE STREET
CINCINNATI, OHIO 45220
DRAWING LIST
WTWT Discipline
SHEET
NUMBER SHEET NAME ISSUED
FIRE SUPPRESSION
05 - Fire Suppression
FIRE
SUPPRESSION
FX 101 FIRE PROTECTION BASEMENT PLAN - FIRE SUPPRESSION YES
PLUMBING
06 - Plumbing PLUMBING PL101 PLUMBING UNDERGROUND PLANS YES 06 - Plumbing PLUMBING PL102 PLUMBING BASEMENT PLAN YES 06 - Plumbing PLUMBING PL601 PLUMBING SCHEDULES, DETAILS AND ISOMETRICS YES
HVAC
07 - HVAC HVAC MH001 INDEX, LEGEND AND GENERAL NOTES YES
07 - HVAC HVAC MH101 BASEMENT FLOOR PLAN – DUCT WORK YES
07 - HVAC HVAC MH501 DETAILS YES
07 - HVAC HVAC MH502 DETAILS YES
07 - HVAC HVAC MH601 CONTROLS AND AUTOMATION YES
07 - HVAC HVAC MH602 SCHEDULES YES
07 - HVAC HVAC MP101 BASEMENT FLOOR PLAN – PIPING YES
ELECTRICAL
08 - Electrical ELECTRICAL E1 SYMBOLS YES 08 - Electrical ELECTRICAL E2 LIGHTING FIXTURE DESCRIPTION YES 08 - Electrical ELECTRICAL E3 ELECTRICAL DISTRIBUTION SCHEDULES YES 08 - Electrical ELECTRICAL E4 ELECTRICAL SINGLE LINE - SECONDARY ELECTRIC YES 08 - Electrical ELECTRICAL E5 TECHNOLOGY DETAILS YES 08 - Electrical ELECTRICAL E6 TECHNOLOGY DETAILS YES 08 - Electrical ELECTRICAL E7 PANELBOARD SCHEDULES YES 08 - Electrical ELECTRICAL E8 ELECTRICAL DETAILS YES 08 - Electrical ELECTRICAL 1-E1 BASEMENT FLOOR PLAN - REMOVALS YES 08 - Electrical ELECTRICAL 2-E1 BASEMENT FLOOR PLAN - LIGHTING YES 08 - Electrical ELECTRICAL 2-E2 BASEMENT FLOOR PLAN - POWER YES 08 - Electrical ELECTRICAL 2-E3 BASEMENT FLOOR PLAN - SIGNALS YES
DRAWING LIST
WTWT Discipline
SHEET
NUMBER SHEET NAME ISSUED
COVER SHEET, GENERAL INFO, CODE INFO, SITE PLAN
00 - Cover Sheet
COVER SHEET,
GENERAL INFO,
CODE INFO, SITE
PLAN
2.3A000 COVER SHEET YES
00 - Cover Sheet
COVER SHEET,
GENERAL INFO,
CODE INFO, SITE
PLAN
2.3A001 PROJECT GENERAL NOTES, ABBREVIATIONS AND SYMBOLS YES
00 - Cover Sheet
COVER SHEET,
GENERAL INFO,
CODE INFO, SITE
PLAN
2.3A002 CODE INFORMATION, LIFE SAFETY PLANS YES
00 - Cover Sheet
COVER SHEET,
GENERAL INFO,
CODE INFO, SITE
PLAN
2.3A003 CAMPUS PLAN / SITE LOGISTICS YES
ARCHITECTURAL
03 - Architectural
ARCHITECTURAL 2.3A010 AXONOMETRIC VIEW YES
03 - Architectural
ARCHITECTURAL 2.3A050 BASEMENT DEDUCT ALTERNATES PLAN YES
03 - Architectural
ARCHITECTURAL 2.3A200 BASEMENT - NEW WORK PLAN YES
03 - Architectural
ARCHITECTURAL 2.3A210 BASEMENT - NEW WORK RCP YES
03 - Architectural
ARCHITECTURAL 2.3A502 ENLARGED PLANS & ELEVATIONS YES
03 - Architectural
ARCHITECTURAL 2.3A510 INTERIOR ELEVATIONS YES
03 - Architectural
ARCHITECTURAL 2.3A511 INTERIOR ELEVATIONS YES
03 - Architectural
ARCHITECTURAL 2.3A512 INTERIOR ELEVATIONS YES
03 - Architectural
ARCHITECTURAL 2.3A517 INTERIOR ELEVATIONS YES
03 - Architectural
ARCHITECTURAL 2.3A518 INTERIOR ELEVATIONS YES
03 - Architectural
ARCHITECTURAL 2.3A610 DOOR SCHEDULE AND DOOR DETAILS YES
03 - Architectural
ARCHITECTURAL 2.3A620 PARTITION TYPES AND DETAILS YES
03 - Architectural
ARCHITECTURAL 2.3A711 CASEWORK SECTIONS & DETAILS YES
03 - Architectural
ARCHITECTURAL 2.3A900 FINISH SCHEDULE YES
03 - Architectural
ARCHITECTURAL 2.3A901 FINISH LEGEND YES
03 - Architectural
ARCHITECTURAL 2.3A902 FINISH PLAN - BASEMENT LEVEL YES
03 - Architectural
ARCHITECTURAL 2.3A904 BASEMENT - FURNITURE & EQUIPMENT PLAN YES
CHAMPLIN ARCHITECTURE
ARCHITECTURE, PLANNING, INTERIOR DESIGN
720 E PETE ROSE WAY
CINCINNATI, OHIO 45202
513.241.4474 P
513.241.0081 F
VICINITY MAP
FFE ENGINEERING & TECHNICAL SERVICES
420 SPRINGFIELD PIKE, SUITE F
CINCINNATI, OH 45215
513.522.0956 P
513.522.2107 F
HEAPY ENGINEERING
1400 WEST DOROTHY LANE
DAYTON, OHIO 45409-1310
937.224.0861 P
937.224.5777 F
Revisions
1 USER MEETING ADJUSTMENTS 7.26.16
2 OWNER REVIEW 11.4.16
3 OWNER REVIEW 10.18.17
4 OWNER REVIEW 11.20.17
5 FINAL BID SET 01.26.18
FACE OF BUILDINGF.O.B.
CONTRACTOR FURNISHC.F.O.I.
OWNER INSTALL
CONTRACTOR INSTALL
C.F.C.I. CONTRACTOR FURNISH
OWNER FURNISHO.F.C.I.
CONTRACTOR INSTALL
OWNER INSTALL
O.F.O.I. OWNER FURNISH
PLASTIC LAMINATEP.LAM.
O.H.W.S.
SCREW
OVAL HEAD WOOD TONGUE AND GROOVE
DRAWINGS
APPROVAL)
ABBREVIATIONS
PAPER TOWEL DISPENSER
PAPER TOWEL
PARTITION
DOUGLAS FIR
PRESSURE TREATED
CEILING
RADIUS
RUBBER BASE
QUARRY TILE
POLYVINYL-CHLORIDE
RECEPTACLE
FIXTURE
FACE OF CONCRETE
FLOOR
FLOOR JOIST
FLOOR LINE
FLASHING
FACE NAIL
GAUGE
FOOTING
FUTURE
FACE OF STUD
FIRE RETARDANT
FACE OF MASONRY
FACE OF FINISH
F.O.S.
F.R.
FTG.
FUT.
GA.
FIXT.
F.J.
F.L.
FLASH.
FLR.
F.N.
F.O.C.
F.O.F.
F.O.M.
R.C.P.
Q.T.
RAD.
R.B.
P.T.D.
PTN.
P.T.R.
P.V.C.
P.T.D.F.
A.D.
AC.T.
ACOUS.
A/C
A.C.P.
A.B.
AREA DRAIN
ACOUSTICAL TILE/PANEL
ACOUSTIC
AIR CONDITIONING
ASPHALT CONCRETE
ANCHOR BOLT
PAVING
POUND OR NUMBER
PROPERTY LINE
FLOOR LINE
ANGLE
DIAMETER
CENTERLINE
AT
AND
REDWOOD
REFERENCE
REINFORCING
ROOF HATCH
ROUND HEAD METAL
RESILIENT
REFRIGERATOR
ROOF DRAIN
SCREW
ROOM
RAIN WATER LEADER
SOUTH
ROUGH OPENING
ROUND HEAD WOOD
SCREW
SEE CIVIL DRAWINGS
STORM DRAIN
SOLID CORE
DRAWINGS
SHEET
SIMILAR
SLIDING
SHEATHING
SHOWER
SECTION
SEALANT
SEE ELECTRICAL
SOLID BLOCKING
SOAP DISPENSER
SEE ARCHITECTURAL
BEAM
GLASS
GLUE LAMINATED
GALVANIZED IRON
GRATE ELEVATION
GRAB BAR
GARBAGE DISPOSAL
GRADE
HOSE BIB
SHEET METAL
GYPSUM BOARD
HANDICAPPED
GALVANIZED
GROUND
H.C.
GYP.BD.
H.B.
G.B.
G.D.
G.S.M.
GR.
GND.
GLB.
GL.
G.I.
G.E.
HEIGHT
HOUR
HEATING
HIGH POINT
HORIZONTAL
HOLLOW METAL
HARDWARE
HARDWOOD
INTERIOR
INVERT
HOT WATER
INSULATION
INSIDE DIAMETER
& AIR CONDITIONING
HEATING, VENTILATION
H.W.
INV.
INT.
INSUL.
I.D.
HDWE.
HDWD.
H.V.A.C.
HTG.
HR.
H.P.
HORIZ.
H.M.
HGT.
HDR. HEADER
S.E.D.
SHR.
SHT.
SIM.
SL.
SHTG.
RDWD.
S.BLKG.
RH.W.S.
S.A.D.
S.
R.W.L.
R.O.
RM.
RH.M.S.
R.H.
RESIL.
REINF.
REFR.
REF.
R.D.
SECT.
SEAL.
S.DISP.
S.D.
S.C.D.
S.C.
SQUARE
DRAWINGS
SPECIFICATION
SOUNDPROOF
DRAWINGS
STATION
STEEL
STORAGE
STANDARD
SUSPENDED
STRUCTURAL
DRAWINGS
STAINLESS STEEL
SEE MECHANICAL
SANITARY SEWER
SEE STRUCTURAL
SQUARE FOOT (FEET)
THICK
TEMPERED
TELEPHONE
TERRAZZO
TACKBOARD
TOP OF CURB
TRANSOM
TOP OF PLATE
TOP OF WALL
TOILET PAPER DISPENSER
TOE NAIL
TOOL JOINT
TOP OF PAVEMENT
TOP AND BOTTOM
JOIST
JANITOR
KITCHEN
JOINT
LABORATORY
JOIST HANGER
LIGHT
MATERIAL
LOW POINT
LIVE LOAD
LEFT HAND
LAG BOLT
LAVATORY
LAMINATE
MAT.
LT.
L.P.
L.L.
L.H.
J.H.
JAN.
L.B.LAV.
LAM.
LAB.
KIT.
JT.
JST.
MANHOLE
MINIMUM
MEDIUM
MANUFACTURER
MEMBRANE
MECHANICAL
MEDICINE CABINET
MACHINE BOLT
METAL
MASONRY OPENING
METAL THRESHOLD
MISCELLANEOUS
MODULAR
MOISTURE RESISTANT
MIRROR
M.C.
M.B.
MIN.
MH.
MFG.
MEMB.
MED.
MECH.
MIR.
MISC.
M.O.
MOD.
M.R.
M.T.
MTL.
MAX. MAXIMUM
T.O.C.
T.O.P.
T.O.PL.
T.O.W.
T.P.D.
TRN.
S.M.D.
SPEC.
S.P.
SQ.
S.S.D.
S. STL.
STO.
STL.
STD.
STA.
S.S.
SQ. FT.
T.B.
T&BOT.
TEL.
TEMP.
TER.
T&G.
SUSP.
T.J.
T.N.
THK.
STRUC.
S.L.D. SEE LANDSCAPE
BD.
APPROX.
ARCH.
ASPH.
ALT.
AL.
AGG.
BLDG.
BLK.
BLKG.
BM.
BRG.
BRK.
BOT.
BITUM.
CEM.
C.B.
CARP.
CAB.
B.U.R.
BTWN.
CLKG.
CLG.J.
CLG.
C.J.
CIR.
C.I.
CER.T.
CER.
BRZ.
COMB.
COL.
C.O.
CNTR.
C.M.U.
CLS.
CLR.
C.W.
CTR.
CONV.O.
CONT.
CONST.
CONN.
CONC.
COMP.
DF.
D.F.
DIAG.
DIA.
DIM.
DISP.
DET.
DN.
D.O.
DR.
D.S.
D.T.
D.W.
DWR.
DIV.
CLO.
DOUGLAS FIR
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
DIMENSION
DISPOSAL
DIVISION
DOWN
DOOR OPENING
DOOR
DOWN SPOUT
DRAIN TILE
DISHWASHER
DRAWER
DETAIL
COLD WATER
CENTER
CONVECTION OVEN
CONTINUOUS
CONSTRUCTION
CONNECTION
CONCRETE
COMPOSITION
BENCH MARK or BEAM
BOARD
BITUMINOUS
BUILDING
BLOCK
BLOCKING
APPROXIMATE
ARCHITECT
ASPHALT
CONCRETE MASONRY
COMBINATION
COLUMN
CLEAN OUT
COUNTER
CLOSURE
CLEAR
CLOSET
CAULKING
CEILING JOIST
UNIT
CEILING
BRICK
BEARING
CONSTRUCTION JOINT
CIRCLE
CAST IRON
CERAMIC TILE
CERAMIC
CEMENT
CATCH BASIN
CARPET
CABINET
BUILT-UP ROOFING
BETWEEN
BRONZE
BOTTOM
ALTERNATE
ALUMINUM
AGGREGATE
TYPICAL
UNLESS OTHERWISE
URINAL
NOTED
UNFINISHED
TELEVISION
VENT TO ROOF
VERTICAL
VESTIBULE
VERIFY IN FIELD
VINYL TILE
VINYL COMPOSITION
TILE
VERTICAL GRAIN
WEST
WITH
WINDOW
WOOD
WATER CLOSET
VINYL WALL COVERING
WITHOUT
WEIGHT
YARD
WATER PROOF
WATER HEATER
WATER COOLER
WELDED WIRE FABRIC
WATER RESISTANT
NORTH
NATURAL
OVER
NUMBER
NOMINAL
NOT TO SCALE
NOT IN CONTRACT
OBSCURE
OUTSIDE DIAMETER
STUD
OFFICE
OUTSIDE FACE OF
ON CENTER
OVERFLOW
OVERALL
N.T.S.
O/ O.A.
OBS.
O.C.
O.D.
O.F.
OFF.
O.F.S.
(NOT PART OF OSA
N.
NAT.
N.I.C.
NO.
NOM.
PAINT
PLATE
PERFORATED
FOOT
POUNDS PER CUBIC
PANEL EDGE NAILING
PRESSED METAL
PAIR
FRAME
FOOT
POUNDS PER LINEAR
PLYWOOD
POUNDS PER SQUARE
PROPERTY
PLASTER
P.
P.C.F.
P.E.N.
PERF.
PL.
PLAS.
P.L.F.
PLYWD.
P.M.F.
PR.
P.S.F.
PROP.
OPP. OPPOSITE
W/O
W.W.F.
W.P.
W.R.
WT.
YD.
T.V.
TYP.
UNF.
U.O.N.
V.C.T.
VERT.
VEST.
V.G.
V.I.F.
UR.
V.W.C.
W.
W/
W.C.
V.T.R.
W.F.
W.H
WDW.
WD.
V.T.
POINT
PULL STATION
POUNDS PER SQUARE
INCH
P.STA.
PT.
P.S.I.
FOOT
E.EA.
E.E.
E.F.
E.J.
ELEC.
ELEV.
E.N.
EQUIV.
E.S.
E.W.
EXP.
EXP.B.
EXPO.
EXT.
F.
ENCL.
F.B.
F.BD.
F.BELL
F.B.O.
F.D.
FDN.
F.E.
FH.M.S.
F.HORN
F.F.
F.G.
FGL.
F.H.
F.E.C.
F.A.
FH.W.S.
FIN.
F.H.S.
EXISTING
EACH
EACH END
EXHAUST FAN
EXPANSION JOINT
ELECTRICAL
ELEVATION
EDGE NAIL
ENCLOSURE
EQUIVALENT
EACH SIDE
EACH WAY
EXPANSION
EXPANSION BOLT
EXPOSURE
EXTERIOR
FLAT HEAD MACHINE
SCREW
SCREW
FIRE HORN
FIRE HOSE STATION
FLAT HEAD WOOD
FINISH
FLOOR DRAIN
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER
FINISH FLOOR
FINISH GRADE
FIBERGLASS
FIRE HYDRANT
CABINET
FIRE ALARM
FACE BRICK
FIREBOARD
FIRE BELL
FURNISHED BY OTHERS
FACE
(E)
(N) NEW
T.S. TUBE STEEL
ADJUSTABLEADJ.
GALV. GALVANIZED
PIN
LP
LC
LF
HOLLOW STRUC. STL.H.S.S.
SELF ADHERED SHEET MEMBRANES.A.S.M.
SELF ADHERED FLEXIBLE FLASHINGS.A.F.F.
WITHINW/IN
UNDERSIDEU/S
REQUIREDREQD.
NON-COMBUSTIBLENON/COM
FLUORESCENTFLOUR.
ABOVE FINISH FLOORAFF.
1i (1' - 0")
A101
SIM
Room name
150 SF
A101
SIM
1 View Name 1/8" = 1'-0"A101
Name Elevation
LEVELS
GRID HEAD
CALL OUT HEAD
ROOM TAG W/ AREA
BUILDING SECTION
A101
SIM WALL SECTION
DOOR TAG
1i
WALL TAG
WINDOW TAG
VIEW TITLE
ADDENDUM TAG
CEILING TAG W/ HEIGHT
DETAIL SECTION
NORTH ARROW
A101
SIM
A
NOTE:
METAL BLOCKING ANCHORED TO WALL STUDS AND TERMINATE AT ONE STUD
PAST EACH END OF UNIT TO BE MOUNTED. SECURE BLOCKING ENDS (TYPICAL).
ONLY WOOD BLOCKING TO BE USED AT TOILET GRAB BARS AND WALL RAILS.
ALL SHEET METAL BLOCKING IS TO BE 20 GA. GALV.
WOOD BLOCKING ATTACHED TO STUDS.
BLOCKING SHOWN DASHED FOR CLARITY.
EXTEND LENGTH OF BLOCKING TO
NEAREST STUD BEYOND END OF UNIT.
(LENGTH VARIES SEE SCHEDULED TOILET
ACCESSORIES.)
TYPICAL 20GA METAL
BLOCKING, SEE
CASEWORK SECTIONS FOR
TYPICAL WOOD BLOCKING.
PROVIDE BLOCKING FOR
VENDOR
FURNITURE AND EQUIPMENT.
USE OF 20GA METAL
BLOCKING SHOWN.
FILE
CL
CLOCK LIGHT
SWITCH
ELECTRICAL
CABINETCOUNTER
30" HIGH
OUTLET ABOVE
ELECTRICAL
OUTLET ABOVE
36" HIGH BASE
THERMOSTATPAPER
TOWEL
DISPENSER
COAT
HOOK
ELECTRICAL
OUTLET
NURSE CALL
ROBE
HOOK
MEDICAL
GASES
CODE RED
CODE BLUE
NURSE CALL
(3 GANG
BOX)
SHARPS
CONTAINER
WALL
PHONE/
INTERCOM
TYPICAL BLOCKING LOCATIONS
FIRE
EXTINGUISHER
CABINET
NOTE: TYPICAL MOUNTING HEIGHTS, UNLESS NOTED OTHERWISE
NOTE:
NON-COMB. WOOD BLOCKING MAY BE SUBSTITUTED
ONLY WOOD BLOCKING TO BE USED AT TOILET GRAB BARS AND WALL RAILS.
7' -0
4' -6
CL
4' -8
4' -8
/1
6"
3' -4
" TY
P.
4' -6
1' -6
3' -2
/1
6"
3' -2
3' -8
4' -0
4' -0
4' -6
4' -2
5" 5" 5" 5"
4' -2
2' -9
3' -0
2'
-0
2' -0
2'-0" 2'-0" 2'-0"
NOTE:
A. THE FOLLOWING OUTLINES THE GENERAL QUALITY OF WORK EXPECTED. ALL MATERIALS USED ARE REQUIRED TO BE NEW UNLESS OTHERWISE NOTED AND OR A QUALITY TO MEET OR EXCEED ALL APPLICABLE
INDUSTRY STANDARDS. WHERE SPECIFIED PRODUCTS OR MANUFACTURERS ARE NOT NOTED, THE
CONTRACTOR IS REQUIRED TO NOTIFY THE ARCHITECT TO OBTAIN A STANDARD OF QUALITY.
B. GENERAL CONTRACTOR IS RESPONSIBLE FOR VERIFYING ALL EXISTING SALVAGED STOCK BEFORE ORDERING
NEW MATERIAL, UNLESS OTHERWISE NOTED.
C. LAYOUT AND VERIFY ALL PARTITION LOCATIONS PRIOR TO CONSTRUCTION FOR CLEARANCES AND
DIMENSIONS. NOTIFY ARCHITECT OF ANY DISCREPANCIES.
D. COORDINATE ALL WORK WITH MECHANICAL, ELECTRICAL, FIRE PROTECTION & PLUMBING DRAWINGS.
E. REFER TO APPROPRIATE MECHANICAL AND ELECTRICAL DRAWINGS FOR THIS FACILITY TO DETERMINE SIZE AND LOCATION OF NEW PENETRATIONS IN THE NEW PARTITIONS. COORDINATE AND PROVIDE ALL OPENINGS.
SEAL DRYWALL TIGHT TO ALL PENETRATIONS AND CAULK.
F. WITHIN ALL NEW PARTITIONS GENERAL CONTRACTOR TO PROVIDE ALL BLOCKING FOR NEW MECHANICAL, ELECTRICAL EQUIPMENT, AND WALL MOUNTED ACCESSORIES. PLASTIC ANCHORS AND INSERTS TO BE AVOIDED. COORDINATE WITH MECHANICAL AND ELECTRICAL CONTRACTORS FOR FINAL MECHANICAL AND ELECTRICAL EQUIPMENT LOCATIONS AND SIZES. COORDINATE WITH OWNER ON FINAL EQUIPMENT LOCATIONS.
G. BLOCKING TO BE CONTINUOUS 12"H. X 18 GAUGE SHEET METAL OR NON-COM. WOOD BLOCKING SECURED TO
STUDS. SHEET METAL BLOCKING IS TO EXTEND ONE STUD BEYOND EACH END OF FIXTURE TO BE MOUNTED.
WOOD BLOCKING TO BE NON-COMBUSTIBLE AND SECURED TO STUDS. ONLY WOOD BLOCKING TO BE USED AT
TOILET GRAB BARS AND WALL RAILS.
H. DO NOT SCALE DRAWINGS, DIMENSIONS GOVERN. ALL PLAN DIMENSIONS ARE TAKEN TO FINISH FACE OF
CONSTRUCTION U.O.N.
I. ALL EQUIPMENT LOCATIONS, MOUNTING HEIGHTS AND BLOCKING REQUIREMENTS SHOWN HEREON ARE GIVEN FOR GENERAL INFORMATION ONLY AND ARE SUBJECT TO APPROVAL BY THE EQUIPMENT SUPPLIER.
CONTRACTOR TO COORDINATE INSTALLATION WITH EQUIPMENT SUPPLIER.
J. ALL WOOD BLOCKING SHOWN ON DRAWINGS TO BE FIRE RETARDANT TREATED WOOD. WHEN MOUNTING ITEMS AND ACCESSORIES TO PARTITIONS, PROVIDE WOOD BLOCKING IN STUD SPACE. ALL ANCHORS SHALL EXTEND THROUGH WALL FINISH INTO BLOCKING. AVOID USE OF PLASTIC TYPE ANCHOR DEVICES.
K. ALL BLOCKING SHOWN ON DRAWINGS TO BE NON-COMBUSTIBLE. REINFORCE WALL FOR ALL WALL MOUNTED ITEMS INCLUDING BUT NOT LIMITED TO CASEWORK, WALL PROTECTION, MISCELLANEOUS EQUIPMENT AND ALL OTHER OWNER FURNISHED ITEMS. ONLY WOOD BLOCKING TO BE USED AT TOILET GRAB BARS AND WALL RAILS.
N. CONTRACTOR TO REFER TO MECHANICAL/ELECTRICAL/PLUMBING DOCUMENTS FOR PROPER COORDINATION OF ALL REMOVALS AND NEW WORK, ALSO TO VERIFY AND BE RESPONSIBLE FOR ALL DIMENSIONS. SEAL
DRYWALL TIGHT TO ALL PENETRATIONS AND CAULK.
Q. CONTRACTOR IS RESPONSIBLE FOR COORDINATING ALL EQUIPMENT INSTALLATION AND CONFIRMING ALL REQUIRED ROUGH OPENING, AND ROUGH-IN DIMENSIONS PRIOR TO CONSTRUCTION WITH EQUIPMENT
MANUFACTURER, OWNER AND ARCHITECT.
R. CONTRACTOR TO BE RESPONSIBLE FOR PROTECTION OF EXISTING ITEMS TO REMAIN DURING DEMOLITION AND CONSTRUCTION, INCLUDING ALL CONSTRUCTION ROUTES BEYOND THE AREAS OF WORK. CONTRACTOR
IS TO RETURN CONSTRUCTION ROUTES BACK TO ORIGINAL CONDITION AT END OF PROJECT.
S. ALL EXISTING SERVICES AND UTILITIES SHALL BE MAINTAINED TO ADJACENT DEPARTMENTS OR AREAS THAT ARE IN OPERATION AND SERVE BY THESE UTILITIES AND SERVICES. COORDINATE ALL DISRUPTIONS OR
DISCONTINUATIONS OF UTILITIES AND SERVICES WITH OWNER.
T. GENERAL TRADES CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO PREVENT DAMAGE TO OWNER'S OCCUPIED AREAS ADJACENT TO NEW CONSTRUCTION OR OCCUPIED AREAS WHERE VARIOUS SYSTEM CONNECTIONS OR EXTENSIONS ARE REQUIRED, AND IS RESPONSIBLE FOR DAMAGE CAUSED BY
WEATHER.
U. IT IS THE GENERAL CONTRACTORS RESPONSIBILITY TO PATCH ALL SPRAY-ON FIRE PROTECTION AT REMOVALS AND ANY EXISTING LOCATIONS VOID OF PROTECTION WITHIN AREA OF WORK, AND NEW CONSTRUCTION WHICH DISTURBS EXISTING FIRE PROTECTION. FIREPROOFING SHOULD BE CONTINUOUS AND UNOBSTRUCTED.
V. PROVIDE CONTROL JOINTS IN GYPSUM WALLBOARD INTERIOR PARTITIONS WHERE REQUIRED, LOCATE ABOVE DOOR
AND/OR WALL OPENINGS, AS INDICATED IN TYPICAL DETAIL SHEET 3W-A600.
W. JOINTS MADE WITHIN OR BETWEEN FIRE RESISTANCE-RATED ASSEMBLIES SHALL BE PROTECTED WITH A JOINT SYSTEM THAT IS DESIGNED AND TESTED TO PREVENT THE SPREAD OF FIRE FOR A TIME PERIOD EQUAL TO THAT
OF THE ASSEMBLY IN WHICH THE JOINT IS LOCATED.
X. USE CEMENTITIOUS BACKER BOARD (CBB) WHERE CERAMIC TILE IS SCHEDULED IN BOTH "WET" AND "DRY" AREAS.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne f oo t on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
Champlin Project No.
ARCHITECT/ENGINEERS: CONSULTANTS:
Office of Construction and Facilities Management
F E
D C
B A
539-17-102
PHASE 3
thinkchamplin.com
720 E Pete Rose Way Cincinnati, OH 45202
T. 513.241.4474 F 513.241.0081
1/
/2
1:
:2
PM
RELOCATE SHORT TERM REHAB
COMMUNITY LIVING CENTER - RELOCATE
P.M.&R. TO BASEMENT OF BUILDING #2
11/04/16
PROJECT GENERAL NOTES,
ABBREVIATIONS AND SYMBOLS
2.3A001 DesignerApprover
177-5668
Cincinnati, Ohio
ABBREVIATIONS SYMBOLS & ANNOTATIONSTYP. MOUNTING HEIGHTS
GENERAL PROJECT NOTES
Revisions
1 USER MEETING ADJUSTMENTS 7.26.16
2 OWNER REVIEW 11.4.16
3 OWNER REVIEW 10.18.17
UP
C T1
.6
0N
64 64
64 64
DN
FUTURE TUNNEL
SMOKE
COMPARTMENT
19,102 SF
EXISTING SMOKE
BARRIER
EXISTING
SMOKE
COMPARTMENT
EXISTING AMBULATORY
HEALTH CARE
OCCUPANCY
SMOKE PARTITION
ENCLOSURE PER NFPA
101, 8.7.1.2
SMOKE PARTITION
ENCLOSURE PER NFPA
101, 8.7.1.2
1-HR ENCLOSURE
2-HR
ENCLOSURE
1-HR
ENCLOSURE
FUTURE SMOKE
PARTITION
FUTURE SMOKE PARTITION
F.E.C.
F.E.C.
SMOKE
COMPARTMENT
14,035 SF
EXISTING FIRE
BARRIER
EXISTING
SMOKE
COMPARTMENT EXISTING HEALTH CARE
OCCUPANCY
EXISTING
SMOKE
COMPARTMENT
EXISTING
SMOKE
COMPARTMENT
EXISTING
NEW
2-HR SHAFT 2-HR SHAFT
2-HR ENCLOSURE
2-HR SHAFT
1-HR ENCLOSURE
1-HR ENCLOSURE
F.E.C.
F.E.C.
2-HR SHAFT
SMOKE PARTITION - IBC 710, NFPA 101-8.4
1-HR SMOKE BARRIER - IBC 709, NFPA 101-8.5
1-HR FIRE BARRIER - IBC 706, NFPA 101-8.3
2-HR FIRE BARRIER - IBC 706, NFPA 101-8.3
MEANS OF EGRESS
EXISTING BUILDING
NEW CONSTRUCTION
LIMITS OF NEW CONSTRUCTION
CODE LEGEND
NFPA 101 2012 Code Review Chapter 4 – General
• 4.4.2.2 – Prescriptive-based life safety design meeting the requirements of Chapters 1 thru 3, Sections 4.5 thru 4.8, and Chapters 6 thru 43 of this Code shall satisfy Sections 4.1 and 4.2.
• 4.4.2.3 – Where req’ts in Chapters 11 thru 43 differ from req’ts in Chapters 1 thru 4 and 6 thru 10, the req’ts of Chapters 11 thru 43 shall govern.
• 4.6.1.1 – The authority having jurisdiction (AHJ) shall determine whether the provisions of this Code are met.
Chapter 6 – Classification of Occupancy and Hazard of Contents
• 6.1.5 adf - New Health Care (Chap.18) – First Floor.
• 6.1.6 - New Ambulatory Health Care (Chap.20) – Basement Floor
• 6.2.2. – Hazard classif.: Ordinary (high hazard areas protected per 18.3.2.1)
Chapter 7 – Means of Egress
• 7.1.3.2.1 – Exit Separation
(1) Connecting 3 or fewer stories: 1-hr fire rating req’d. [2-hr provided].
(7) Openings in separation wall: fire doors with closers per 7.2.1.8.
• 7.2.2.2.1.2 – Minimum new stair width: <2000 occup load = 44” min width.
• 7.2.4.3 – Fire Barriers – Minimum 2-Hr. fire rating.
• 7.3.1 – Occupant Load:
Basement:
Mechanical 2,950 s.f. @ 300 s.f./occ = 10 occup.
Business 11,516 s.f. @ 100 s.f./occ = 116 occup.
Total occupants = 126 occup.
1st Floor:
Healthcare-sleeping depts. 4,524 s.f. @ 120 s.f./occ. = 38 occup.
Healthcare-Inpatient treatment 9,891 s.f. @ 240 s.f./occ. = 42 occup.
Total occupants = 80 occup.
• 7.3.3.1 – Egress capacity (Health care, sprinkled):
• Stairs - .3” per occup; Level components and ramps - .2” per occup.
• 7.4.1.1 – Min. number of means of egress from any story = 2.
Chapter 8 – Features of Fire Protection
• 8.3.4.2 – Min Fire Protection for Openings in Fire-rated Assemblies:
Component Walls Fire Drs Fire Window Vert. shafts (stairs, exits): 2 hr 1-1/2 hr NP
1 hr 1 hr NP Fire Barriers: 2 hr 1-1/2 hr NP
1 hr ¾ hr NP Horiz. Exits: 2 hr 1-1/2 hr NP Smoke Barriers: 1 hr 1/3 hr ¾ hr
• 8.3.5.1 – Firestop Systems – Penetrations that pass thru a barrier shall be protected by a firestop system or device.
• 8.3.5.7 – Openings thru fire barriers for air-handling ductwork shall be protected per 9.2.1.
• 8.4.3.5 – Smoke Partition doors shall be self or auto-closing per 7.2.1.8. Exception: see 18.3.6.3.11 and 20.3.6.1.
• 8.5.3 – A Fire Barrier shall be permitted to be used as Smoke Barrier per Section 8.5.
• 8.6.1 - Floor Smoke Barriers – Every floor that separates stories in a bldg. shall be constructed as a smoke barrier per 8.5 and shall be permitted opg’s. per
8.6.6 thru 8.6.8.
• 8.6.5 – Shafts- Req’d Fire Rating:
Connecting 4 or more stories: 2-hr Fire Barrier.
Other new shaft enclosures: 1-hr Fire Barrier.
• 8.7.1.1 – Protection from any degree of hazard shall be provided by one of the following means:
(2) Protecting an area with an AFSS per 9.7.
• 8.7.1.3 – Special Hazard Protection – Doors: min. ¾ hr fire rated, self or auto-closing per 7.2.1.8
Chapter 9 – Building Service and Fire Protection Equipment
• 9.6.1.3 – Fire Alarm System req’d for life safety shall be per NFPA 70 and 72.
• 9.6.3.1 – Occupant notification shall be provided per 9.6.3, 18.3.4.3.1, and 20.3.4.3.1.
• 9.6.3.4 – Where permitted by Chapters 11 thru 43, a positive alarm sequence shall be permitted per NFPA 72 (See 20.4.3).
• 9.6.4.1 – Emergency Forces notification req’d per 9.6.4, 18.3.4.3.2.1, and 20.3.4.3.2.1.
• 9.6.5.1 – Fire safety functions shall be installed per NFPA 72 as req’d per 9.6.5, 18.3.4.4, and 20.3.4.4.
• 9.6.7.1 – Alarm annunciation is required per 9.6.7 and 18.3.4.3.3.
• 9.7.1.1 – Supervised automatic sprinkler system as req’d by 9.7.1, 18.3.5.1, and 38.2.5 shall comply with NFPA 13.
Chapter 18 – New Health Care Occupancies
• 18.1.6.1 – Construction Type: II (222), Sprinkled (noncombustible)
Allowable number of stories: ≥4 Actual number of stories: 1 (current phase)
• 18.1.6.4 – Interior nonbearing walls shall be constructed of non-combustible or limited-combustible materials.
• 18.1.6.6 – Fire-retardant-treated wood that serves as supports for installation of fixtures and equipment shall be permitted behind non-comb.sheathing.
• 18.2.2.2.4 – Doors within means of egress shall not be equipped with latches or locks that requires the use of a tool or key from egress side (see exceptions).
• 18.2.2.2.7 – Doors in Exit passageways, stairway enclosures, horiz. exits, smoke barriers, or hazardous area enclosures (except mech. equip. rms.) shall be permitted to be held open only by an auto release device. They shall interface with AFSS, Fire alarm, and systems per 7.2.1.8.2.
• 18.2.2.5.1.1 – Minimum of 30 s.f. per patient in nursing home shall be provided within the aggregated areas of corridors, patient rms, treatment rms., lounge or
• 18.2.3.4 – Min. corridor width for exit access (nursing home) – 8’ min., exceptions:
(1) Aisles, corridors, ramps in adjunct areas not intended for patients: 44” min. clear.
(2) Where corridor width is 6’ min: 6” max projections above handrail hgt. permitted for hand-rub units per 18.3.2.6.
(3) Where corridor width is 6’ min: projections permitted on both sides:
a. Each projection 6” max. depth.
b. Each projection 36” max. length.
c. Each projection 40” min. above the floor.
d. Each projection 48” min. horiz separation from adj. projections.
• 18.2.3.6 – Min clear door width @ means of egress from sleeping rms., treatment rms. in Hospitals and Nursing Homes: 41-1/2”
• 18.2.3.7 – Req’ts of 18.2.3.6 shall not apply as follows:
1. Doors not subject to use by any health care occupant: 32” min clear.
2. Doors in exit enclosures: 32” min clear.
3. NA
4. Where pair of doors is provided, the following criteria shall be met:
a. 1 door min. = 32” min. clear opening.
b. Each projection 36” max. length.
c. Rabbet, bevel, or astragal at meeting edge.
d. Inactive leaf shall have automatic flush bolt for positive latching.
• 18.2.4.1 – Min. 2 exits provided on every story.
• 18.2.4.2 – Min 2 separate exits shall be accessible from every part of every story.
• 18.2.4.3 – Min 2 accessible exits from ea. smoke compartment, and egress shall be permitted thru an adjacent compartment, but shall not require return through the compartment of origin.
• 18.2.5.2 – Dead-end corridors: 30’ max.
• 18.2.5.3 – Common path of travel: 100’ max.
• 18.2.5.7.1.2 – Suite Separation – Suites shall be separated from remainder of the building by walls and doors per 18.3.6.2 thru 18.3.6.5 (0-hr smoke partitions).
• 18.2.5.7.4 – Non-patient-care Suites: Egress in accord w/ primary use and occupancy of space, except max travel distance to an exit from within a suite = 200’.
• 18.2.6.2.1 – Max travel distance between any point in a room and an exit = 200’.
• 18.2.6.2.3 – Max travel distance between any point in healthcare sleeping room and exit access door in that room = 50’ max.
• 18.3.2.1 – Hazardous Area Protection per 8.7 and 18.3.2.1.
Soiled Linen rms w/ volume >64 gal = 1-hr.
Storage Rms w/ comb. mat’ls >50 s.f. and ≤100 s.f. = 18.3.6.3.11 Storage Rms w/ comb. mat’ls >100 s.f. = 1-hr.
• 18.3.4.1 – Health care occupancies shall be provided with a Fire Alarm system per 9.6.
• 18.3.4.2.2 – Manual fire alarm boxes in patient sleeping areas not req’d at exits if located at all nurses’ control stations.
• 18.3.4.5.3 – Nursing Home detection – An automatic smoke detection system shall be installed in corridors throughout smoke compartments containing patient sleeping rooms and in spaces open to corridors per 18.3.6.1.
• 18.3.5.1 – Buildings containing healthcare occupancies shall be protected throughout by a supervised automatic sprinkler system per 9.7.
• 18.3.5.6 – Quick-response sprinklers shall be used throughout smoke compartments containing patient sleeping rooms.
• 18.3.5.11 – Portable fire extinguishers shall be provided in all health care occupancies per 9.7.4.1.
• 18.3.6.1 – Corridors shall be separated from all other areas by partitions per 18.3.6.2 thru 18.3.6.5, except as permitted as follows:
(1) Spaces shall be permitted to be unlimited in area and open to corridor if:
a. The spaces are not used for patient sleeping, treatment or hazardous storage areas.
b. Corridors onto which spaces open in same smoke compartment are protected by an auto. smoke detection system
c. Open space is protected by auto smoke detection system.
d. Space does not obstruct access to req’d exits.
• 18.3.6.2.2 – No fire resistance rating shall be required for corridor walls.
• 18.3.6.2.3 – Corridor walls shall form a barrier to limit the transfer of smoke.
• 18.3.6.3.1 – Doors protecting corridor opg’s shall resist passage of smoke and:
(1) Comply with NFPA 80
(2) 1” max. undercut
(3) Doors to toilet rms, shower rms, and sim auxiliary spaces that do not contain combustible materials: smoke resist not req’d..
• 18.3.6.3.5 – Corridor doors shall be self-latching and provided with positive-latching hardware.
• 18.3.6.3.11 – Door closing devices not req’d on corridor doors other than those serving req’d exits, smoke barriers, or enclosures of vertical openings.
• 18.3.7.1 – Heath care facilities shall be subdivided by Smoke Barriers as follows:
(1) Divide every story used by inpatients for sleeping or treatment into a minimum of 2 smoke compartments.
(2) Divide every story having occup. load >50, regardless of use into a minimum of 2 smoke compartments.
(3) Size of each smoke compartment = 22,500 s.f. max. (unless the area is an atrium separated per 8.6.7).
(4) Max. travel from any point in smoke compartment to door in smoke barrier = 200’ max.
Chapter 20 – New Ambulatory Health Care Occupancies
• 20.1.1.1.2 – Ambulatory health care facilities shall comply with provisions of Chapter 38 and this chapter, whichever are more stringent.
• 20.1.6.1 – Construction Type: II (222), Sprinkled (noncombustible)
Allowable number of stories: ≥2 Actual number of stories: 1 Basement (current phase)
• 20.2.2.4 – Doors req’d to be self-closing permitted to be held open only by an auto release device per 7.2.1.8.2. They shall interface with AFSS and Fire alarm.
• 20.2.3.2 – Min corridor width req’d for exit access = 44” min.
• 20.2.3.3 - Min. corridor width = 6’-0”, max wall projection = 6”, for hand-rub dispensing per 20.3.2.6.
• 20.2.3.4 – Min door size in means of egress from diagn. or treatment areas = 32” clear.
• 20.2.4.1 - Min 2 exits per 38.2.2 remotely located shall be provided for ea. floor or fire section of the building.
• 20.2.4.3 – Min 2 exits per 38.2.2 shall be accessible from each smoke compartment.
• 20.2.4.4 – Egress from smoke compartment per 20.2.4.3 shall be permitted through adjacent compartment, but shall not require return through the compartment of origin.
• 20.2.6.2 – Max travel distance as follows:
(1) Room door req’d for exit access and an exit = 150’ max. (w/AFSS).
(2) Any point in room and an exit = 200’ max. (w/ AFSS).
• 20.3.2 – Protection from Hazards – See 38.3.2.
• 20.3.2.1 – Doors to hazardous areas shall be self-closing or auto-closing per 20.2.2.4.
• 20.3.3 – Interior finish per 38.3.3.
• 20.3.4.1 – Ambulatory health care occupancies shall be provided with a Fire Alarm system per 9.6, except as modified by 20.3.4.2 thru 20.3.4.4.
• 20.3.4.2 – Initiation of the required AFSS shall be by manual means per 9.6.2 and by any detection devices or systems required.
• 20.3.4.3 – Notification: Positive alarm sequence per 9.6.3.4 is permitted.
• 20.3.4.3.1 – Occupant notification shall be automatic without delay per 9.6.3 upon operation of any fire alarm activating device.
• 20.3.4.4 – Fire Safety Functions: Operation of any activating device in the req’d fire alarm system shall be arranged to accomplish automatically, without delay, any control functions req’d to be performed by that device (See 9.6.5).
• 20.3.5.3 – Portable fire extinguishers shall be provided in ambulatory health care facilities per 9.7.4.1.
• 20.3.6.1 – Corridors-General: See 38.3.6.
• 20.3.7.2 – Every story of an ambulatory heath care facility shall be divided into not less the two smoke compartments.
• 20.3.7.3 – Smoke compartments shall not exceed an area of 22,500 s.f. and a max travel distance from any point to a smoke barrier of 200 ft.
• 20.3.7.5 – Required Smoke Barriers per 8.5 = 1-hr fire-rating.
• 20.3.7.6 – Smoke dampers not req’d in duct penetrations of smoke barriers if fully ducted HVAC systems for buildings with AFSS per 9.7.
Chapter 38 – New Business Occupancies
• 38.2.5.2.1 – Dead-End Corridors = 50’ max. in buildings protected by supervised AFSS per 9.7.1.1(1).
• 38.2.5.3.1 – Common Path of Travel = 100’ max. in buildings protected by supervised AFSS per 9.7.1.1(1).
• 38.3.2.1 – Protection from Hazards, General: hazardous areas including areas for general storage shall be protected per 8.7. (Note contents in storage areas in this project are classified as “ordinary” per 6.2)
• 38.3.6.1 – Exit access corridor = 1-hr. Fire Barriers per 8.7. Exceptions (one of the following):
(2) Within a space occupied by a single tenant.
(3) Within buildings protected by AFSS.
(No fire resistance rating shall be required for corridor walls.)
• 18.3.7.3 – Any Smoke Barrier shall be per 8.5 and min.1-hr fire-rating, unless:
(1) NA
(2) Smoke dampers not req’d in duct penetrations of smoke barriers in fully ducted heating, ventilating, and air-conditioning systems.
• 18.3.7.6 - Doors in Smoke Barriers- min 1/3 hr fire-rated and as follows:
(1) Non-rated protective plates allowed.
(2) Cross-corridor openings – pair of swinging doors per 7.2.1.14
(3) Cross-corridor pairs of doors must be opposite swinging.
(4) Min clear ea. swinging doors @ Hosp., nursing homes = 41-1/2” clear.
(5) Min clear ea. sliding doors @ Hosp., nursing homes = 6’-11” clear.
(6) Max clearance under door = ¾” max.
• 18.3.7.8 –Doors in Smoke Barriers shall comply with 8.5.4 and shall be self-closing or auto-closing per 18.2.2.2.7.
• 18.3.7.9. – Vision panels w/ fire-rated glazing or wired glass shall be provided in each cross-corridor swinging door.
• 18.3.7.11 – Smoke Barrier doors:
Rabbets, bevels, or astragals at meeting edges and stops – Required Positive latching – Not Required Center mullions – Prohibited.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne f oo t on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
Champlin Project No.
ARCHITECT/ENGINEERS: CONSULTANTS:
Office of Construction and Facilities Management
F E
D C
B A
539-17-102
PHASE 3
thinkchamplin.com
720 E Pete Rose Way Cincinnati, OH 45202
T. 513.241.4474 F 513.241.0081
1/
/2
9:
:4
AM
RELOCATE SHORT TERM REHAB
COMMUNITY LIVING CENTER - RELOCATE
P.M.&R. TO BASEMENT OF BUILDING #2
11/04/16
CODE INFORMATION, LIFE SAFETY
PLANS
2.3A002 DesignerApprover
177-5668
Cincinnati, Ohio
1/16" = 1'-0"2.3A002
1 BASEMENT - LIFE SAFETY PLAN
1/16" = 1'-0"2.3A002
2 FIRST FLOOR - LIFE SAFETY PLAN
LIFE SAFETY LEGENDCODE INFORMATION
INCLUDED FOR REFERENCE ONLY
Revisions
1 USER MEETING ADJUSTMENTS 7.26.16
2 OWNER REVIEW 11.4.16
3 OWNER REVIEW 10.18.17
POLICE
VA
POLICE
VA
C O
E
W
E
E
S
E
C O
E
E S S
W
E
STO
P
STO
P
STOP
STOP
STO
P
STO
P
STOP
STOP
STO
P
MER
GE
S
S
S
60"
BR
0" B R
60"
BR
60"
BR
60"
BR
60"
BR
0" B R
BUILDING #1
CLC
PHASE 1
SHORT TERM
REHAB CLC
PHASE 2
#3
PARKING GARAGE
#13
#8
FISHER
HOUSE
G
OO
DM
AN
D
RI
VE
VINE STREET
E
SH
IE
LD
S
ST
R
EE
T
X X
X X
X X
X
VINE STREET
3 4
X X
X
CONSTRUCTION
ENTRANCE
X X
X X
X X
X
BUILDING #2
PHASE 3
BASEMENT
FITOUT
LOCATION
1 CONTRACTOR STAGING AREA - THE LEAD CONTRACTOR IS RESPONSIBLE TO COORDINATE
REQUIRED SPACE NEEDED BY OTHER CONTRACTORS, AND SHALL KEEP ALL WORK AREAS NEAT
AND ORDERLY THROUGHOUT DEMOLITION AND CONSTRUCTION. RESTORE TO ORIGINAL
CONDITIONS.
2 TEMPORARY CONSTRUCTION FENCING BY GENERAL CONTRACTOR. THE GENERAL CONTRACTOR
IS RESPONSIBLE TO PROTECT EXISTING SURFACES SCHEDULED TO REMAIN AND/OR RESTORE TO
PREVIOUS CONDITION AFTER COMPLETION OF WORK.
3 CONSTRUCTION DUMPSTER LOCATIONS - GENERAL CONTRACTOR TO PROVIDE AND MAINTAIN
AREA IN A CLEAN ORDERLY MANNER. GENERAL CONTRACTOR RESPONSIBLE FOR ANY
DAMAGE THE DUMPSTER(S), TRUCKS OR ANY EQUIPMENT MAY CAUSE, AND SHALL
REPAIR OR REPLACE ANY SITE PAVING OR CONCRETE SURFACES BACK TO THEIR
ORIGINAL CONDITION, OR BETTER. COORDINATE FINAL DUMPSTER LOCATIONS AND
COORIDNATE REQUIREMENTS WITH CONSTRUCTION WASTE MANAGEMENT PLAN PER THE
SPECIFICATIONS. LOCATIONS AS DETERMINED BY CONTRACTOR.
4 MAINTAIN TWO WAY TRAFFIC FLOW THROUGH THIS AREA. GENERAL CONTRACTOR
SHALL COORDINATE WITH THE OWNER ANY REQUIRED USE OF THIS AREA TO PERFORM
WORK AS WELL AS FOR CONSTRUCTION DELIVERIES. SHUT-DOWNS SHALL OCCUR ONE
LANE AT A TIME, KEEPING OTHER LANE(S) OPEN AND USABLE. GENERAL CONTRACTOR
SHALL PROVIDE TWO WEEKS NOTICE IN WRITING TO THE OWNER PRIOR TO SHUT-DOWN.
5 CONTRACTORS' CONSTRUCTION TRAILER. FINAL LOCATION AS DETERMINED BY CONTRACTOR.
6 CONTRACTORS ACCESS TO BUILDING AND BASEMENT PROJECT SITE TO BE THROUGH
STAIRWELL. EMERGENCY EXIT TO BE MAINTAINED AT ALL TIMES. BUILDING ELEVATORS MAY NOT
BE UTILIZED BY ANY CONTRACTORS WITHOUT PRIOR WRITTEN AUTHORIZATION BY OWNER.
# DESCRIPTION
A NEGATIVE PRESSURE MACHINES TO BE USED WITH HEPA FILTRATION FOR DURATION OF
CONSTRUCTION. SEE GENERAL REQUIREMENTS SPECIFICATION SECTION FOR MORE
INFORMATION REGARDING INFECTION PREVENTION MEASURES.
B NO CONTRACTOR PARKING ON VA CINCINNATI CAMPUS.
C GENERAL CONTRACTOR IS RESPONSIBLE FOR SECURING CONSTRUCTION SITE. THIS
INCLUDES FULL HEIGHT BARRICADE TO DECK AT INTERIOR AND SECURE FENCE WITH GATE
THAT IS KEPT CLOSED AT ALL TIMES AND LOCKED AT NIGHT AT EXTERIOR.
D GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL SAFETY SIGNAGE.
E INTERIOR CONSTRUCTION BARRIER TO INCLUDE NEGATIVE PRESSURE MONITOR.
CONSTRUCTION SITE ENTRANCE DOOR, WHICH IS PART OF THE TEMPORARY
BARRIER, SHALL BE LATCHING, SELF-CLOSING, AND FITTED WITH A CORBIN RUSSWIN LOCK
WHICH CAN BE KEYED TO A CONTRACTOR'S KEY BY THE VA LOCKSMITH.
FINAL LOCATION PER OWNER.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne f oo t on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
Champlin Project No.
ARCHITECT/ENGINEERS: CONSULTANTS:
Office of Construction and Facilities Management
F E
D C
B A
539-17-102
PHASE 3
thinkchamplin.com
720 E Pete Rose Way Cincinnati, OH 45202
T. 513.241.4474 F 513.241.0081
1/
/2
2:
:2
PM
RELOCATE SHORT TERM REHAB
COMMUNITY LIVING CENTER - RELOCATE
P.M.&R. TO BASEMENT OF BUILDING #2
11/04/16
CAMPUS PLAN / SITE LOGISTICS
2.3A003 DesignerApprover
177-5668
Cincinnati, Ohio
1" = 40'-0"2.3A003
1 CAMPUS PLAN / SITE LOGISTICS
SITE LOGISTICS PLAN NOTES
SITE LOGISTICS GENERAL NOTES
Revisions
1 USER MEETING ADJUSTMENTS 7.26.16
2 OWNER REVIEW 11.4.16
3 OWNER REVIEW 10.18.17
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne f oo t on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
Champlin Project No.
ARCHITECT/ENGINEERS: CONSULTANTS:
Office of Construction and Facilities Management
F E
D C
B A
539-17-102
PHASE 3
thinkchamplin.com
720 E Pete Rose Way Cincinnati, OH 45202
T. 513.241.4474 F 513.241.0081
1/
/2
2:
:3
PM
RELOCATE SHORT TERM REHAB
COMMUNITY LIVING CENTER - RELOCATE
P.M.&R. TO BASEMENT OF BUILDING #2
11/04/16
AXONOMETRIC VIEW
2.3A010 DesignerApprover
177-5668
Cincinnati, Ohio
2.3A010
1 AXON VIEW - BASEMENT
THIS SHEET IS FOR
INFORMATION ONLY
Revisions
1 USER MEETING ADJUSTMENTS 7.26.16
2 OWNER REVIEW 11.4.16
3 OWNER REVIEW 10.18.17
REF.
A1.0
A1.0
A2.0 A5.1 A6.0
AA.0AA.0
AB.0
AB.2
AD.0
BA.0
BB.0
BB.0
B2.0
B3.0
B4.0
B5.0
AE.0
AA.1AA.1
AB.1AB.1
A3.1A1.1 A5.2A4.1
AF.0
AC.0
A3.0 A4.0 A5.0
B6.0
BA.2
AC.2
AC.2
AC.1
B1.0
BC.0
BC.0
B2.1
BA.1
A0.1
RECREATION
GROUP ROOM
MECHANICAL
(EXISTING)
OFFICE -
PROGRAM
SUPPORT
REHAB
0112A
PT OFFICE
KILN ROOM
OCCUPATIONAL
THERAPY
PHYSICAL
THERAPY GYM
MEDIA CENTER
OT OFFICE
SOILED LINEN
HOUSEKEEPING
CLOSET
PMR
EXAM/TREATMENT
RT OFFICE
STAFF TOILET
PMR
EXAM/TREATMENT
DISH MACHINE
RCL OFFICE
RT STORAGE
PATIENT MEN'S
PATIENT
WOMEN'S
CLEAN LINEN
ELECTRICAL
(EXISTING)
ACTIVITIES FOR
DAILY LIVING -
KITCHEN
0117A
HORTICULTURE
THERAPY
PMR
EXAM/TREATMENT
RECEPTION /
CHECK-IN
TECH.
(EXISTING)
MAT / PRIVATE
RM
REHAB
COORDINATOR
OFFICE
EXERCISE
RCL OFFICE
TELEHEALTH /
PMR
EXAM/TREATMENT
PT/OT
SUPERVISOR
OFFICE
PATIENT CARE
STORAGE
CORRIDOR
WAITING
0107A
STAIR
(EXISTING)
S1.0
CORRIDOR
ACTIVITIES FOR
DAILY LIVING -
BATH
0117B
CLOSET
0123A
DEDUCT ALTERNATE #1
DEDUCT ALTERNATE #1
B5.1
BA.3
BA.3
NOTE: BASE BID WORK IN THIS AREA TO INCLUDE ADJUSTED PLUMBING ROUGH-IN BELOW SLAB AND SLAB REPAIR. SEE
PLUMBING DRAWINGS.
PT/OT
CONDENSED
STORAGE
PMR
EXAM/TREATMENT
PMR
EXAM/TREATMENT
PMR
EXAM/TREATMENT
AREA OF DEDUCT ALTERNATE #1
AREA EXCLUDED FROM DEDUCT ALTERNATES.
SUMMARY:
DEDUCT ALTERNATE #1:
DEDUCT ALTERNATE #1 AREAS TO BE UNFINISHED SHELL SPACE
WITH PLUMBING REQUIRED ROUGHED-IN WITH TEMPORARY FLUSH
H.M. DOOR AND FRAME WITH HARDWARE SET WITH LOCK TO
MATCH PROJECT. DRYWALL PARTITION TO CLOSE FINISHES.
CORRIDOR AREA TO MATCH SURROUNDING PARTITIONS.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne f oo t on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
Champlin Project No.
ARCHITECT/ENGINEERS: CONSULTANTS:
Office of Construction and Facilities Management
F E
D C
B A
539-17-102
PHASE 3
thinkchamplin.com
720 E Pete Rose Way Cincinnati, OH 45202
T. 513.241.4474 F 513.241.0081
1/
/2
9:
:0
AM
RELOCATE SHORT TERM REHAB
COMMUNITY LIVING CENTER - RELOCATE
P.M.&R. TO BASEMENT OF BUILDING #2
11/04/16
BASEMENT DEDUCT ALTERNATES
PLAN
2.3A050 DesignerApprover
177-5668
Cincinnati, Ohio
DEDUCT ALTERNATE LEGEND
Revisions
1 USER MEETING ADJUSTMENTS 7.26.16
2 OWNER REVIEW 11.4.16
3 OWNER REVIEW 10.18.17
REF.
A1.0
A1.0
A2.0 A5.1 A6.0
AA.0AA.0
AB.0
AB.2
AD.0
BA.0
BB.0
BB.0
B2.0
B3.0
B4.0
B5.0
AE.0
AA.1AA.1
AB.1AB.1
A3.1A1.1 A5.2A4.1
AF.0
AC.0
A3.0 A4.0 A5.0
B6.0
BA.2
AC.2
AC.2
AC.1
B1.0
RECREATION
GROUP ROOM
MECHANICAL
(EXISTING)
OFFICE -
PROGRAM
SUPPORT
REHAB
0112A
PT OFFICE
KILN ROOM
OCCUPATIONAL
THERAPY
PHYSICAL
THERAPY GYM
MEDIA CENTER
OT OFFICE
SOILED LINEN
HOUSEKEEPING
CLOSET
PMR
EXAM/TREATMENT
RT OFFICE
STAFF TOILET
PMR
EXAM/TREATMENT
DISH MACHINE
RCL OFFICE
PMR
EXAM/TREATMENT
RT STORAGE
PATIENT MEN'S
PATIENT
WOMEN'S
CLEAN LINEN
ELECTRICAL
(EXISTING)
ACTIVITIES FOR
DAILY LIVING -
KITCHEN
0117A
FUTURE TUNNEL
TO PARKING GARAGE
FUTURE
CORRIDOR
CONNECTING
TO FUTURE
TUNNEL
760 SF
COURTYARD
(EXISTING)
EXISTING RAMP DN @ 5%
HORTICULTURE
THERAPY
PMR
EXAM/TREATMENT
01210119 0123A
0123B
0117A
RECEPTION /
CHECK-IN
TECH.
(EXISTING)
MAT / PRIVATE
RM
0125B
REHAB
COORDINATOR
OFFICE
EXERCISE
RCL OFFICE
TELEHEALTH /
PMR
EXAM/TREATMENT
PT/OT
SUPERVISOR
OFFICE
0117B
PATIENT CARE
STORAGE
SUB-WAITING
FUTURE
CORRIDOR
WALL
BC.0
BC.0
B2.1
19'-1 1/8"
10'-4 1/2"
10'-0"
8'-2 3/8"
BA.1
2' -1
'-4
/8
'-6
/8
'-1
1/ 8"
1' -1
1/
2"
A0.1
S1.0
CORRIDOR
WAITING
0107A
STAIR
(EXISTING)
S1.0
CORRIDOR
ACTIVITIES FOR
DAILY LIVING -
BATH
0117B
0107B
0125A
0107A
0107C
2.3A512
2.3A511 11
2.3A510
2.3A510
2.3A510 4
2.3A511
2.3A511
2.3A511
2.3A511 4
2.3A511
2.3A511
2.3A51112
2.3A511
2.3A51114
2.3A502
2.3A512
2.3A512
2.3A502
2.3A502
25'-1 7/16"
17'-10 7/8"
5'-7 5/8"
26'-8 1/2"
18'-1 1/8"
9'-1 1/16"
14'-10 9/16"
16'-6 1/2"
9'-1"
5'-0"
1'-10 1/2"
4 1/2"
1'-10 1/2"
'-8
9'
-5
/4
1' -1
1/
2"
15'-4 1/2" 1'-10 1/2" 11'-10 1/8" 10'-2 1/2" 7'-3 5/8" 14'-7 1/2" 16'-4 1/2" 19'-10 1/4" 6'-6 3/4" 7'-3 5/8" 10'-2 1/2" 11'-10 1/8" 1'-10 1/2"
7'-0"
21'-9 3/4" VIF
7'-0" 8'-3" 17'-1 5/8" 5'-0" 9'-0" 13'-0" 2'-2 3/8" 13'-3 7/8" 8'-0"
1'-0"
4'-1" 15'-5 1/4" 12'-0"
13'-11 3/4" 1'-0"
2'-0" 1'-0" 7'-9" 9'-3 3/4" 6'-0" 8'-11 3/8" 2'-0"
13'-3 7/8"
0123C
2.3A517
2.3A5176
2.3A517
2.3A517
2.3A517 5
D1
D1 D1
D1
D1
F1
D1
D1
D1
D1
F1
D1
D1
R 22' - 1 1/2"
7'-0"
'-1
3/
4" V
IF
'-6
/8
6'
-0
8' -0
'-2
9'
-0
6' -0
'-0
'-0
8'-0"
6'-10 1/8" 6'-6"
8'-0"
10'-0"
7 1/8"
1'-9 3/8"
4'-0" 9'-7 1/4"
2 1/4"
5'-4 1/4"
9'-10"
8'-0"
135.00°
/8
/2
/8
6'
5/
8"
3/
8" 6'
5/ 8"
7'
5/
8"
/2
1/
8" 1'
/2
7'
0"
/8
6'
/8
A
CLOSET
0123A
7'-0"
3' -8
2.3A517
2.3A517
2.3A517
TYP.
2.3A517 1
2.3A518
PT/OT
CONDENSED
STORAGE
2.3A518 5TYP.
2.3A502
14'-1"
F1
F1
F1
F1
B5.1
'-3
/4
1'-0" 13'-3 7/8"
1'-3 1/2" 7'-6" 7'-1 1/2"
7'-4 5/8"
9'-8"
9'-3 3/8"
8'-0 5/8"
1'-6"
9'-0 5/8"
4'-8" 1'-5"
5'-9"
5'-6 5/8"
8'-2 1/2"
5'-11 3/8"
7'-1"
13'-9"
20'-1 1/2"
5 1/4"
9'-2"
9'-7 1/4" 18'-8 1/4"
BA.3
BA.3
1'-10 1/2"
PMR
EXAM/TREATMENT
PMR
EXAM/TREATMENT
D1
D1
D1
9' -2
5/
2.3A511
10 Sim
2.3A511
11 Sim
2.3A511
10 Sim
58 58
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
C1
D1
C1
60 58
5'-3 1/4"
58 58
60 58
60 60
60 60
C1 58
C1
58 58
58 5858
END
CAP
END
CAP END
CAP
END
CAP
END
CAP
END
CAP
END
CAP
END
CAP
END
CAP
STOP HANDRAIL
AND WALL
PROTECTION AT
CORNER.
STOP HANDRAIL
AND WALL
PROTECTION AT
DOOR FRAME.
1 NOT USED.
2 NOT USED.
3 SEMI-RECESSED FIRE EXTINGUISHER CABINET.
4 STAINLESS STEEL SOILED TABLE WITH DISPOSER AND RINSE. REFER TO MEP DRAWINGS.
5 ROLLER WINDOW SHADE.
6 NOT USED.
7 NOT USED.
8 WATER COOLERS. SEE PLUMBING DRAWINGS.
9 NOT USED.
10 NOT USED.
11 NOT USED.
12 ADJUSTABLE SHELVING UNIT. SEE CASEWORK DETAILS.
PROVIDE BLOCKING AS REQUIRED. SEE 2.3A001.
13 CASEWORK. SEE INTERIOR ELEVATIONS. PROVIDE BLOCKING AS REQUIRED. SEE 2.3A001.
14 SEE ENLARGED PLANS FOR TYPICAL NOTES, DIMENSIONS, ETC.
15 NOT USED.
16 NOT USED.
17 NOT USED.
18 NOT USED.
19 NOT USED.
20 NOT USED.
21 THREE 12" DEEP SHELVES W/ PLASTIC LAMINATE FINISH ON HEAVY DUTY ADJUSTABLE
STANDARDS AND BRACKETS.
22 SHELF AND COAT HANGING ROD. SEE CASEWORK DETAILS.
23 CARD READER ACCESS.
24 NOT USED.
25 NOT USED.
26 EXPANSION JOINT. REFER TO 2/2.3A200 FOR DETAILS.
27 CARD READER AND PUSH PLATE FOR AUTOMATIC DOOR OPERATOR. SEE HARDWARE AND
ELECTRICAL SPECS.
28 PUSH PLATE LOCATION FOR AUTOMATIC OPERATORS. SEE ELECTRICAL.
29 NOT USED.
30 NOT USED.
31 MODULAR FURNITURE SYSTEM, SEE FURNITURE PLAN.
PROVIDE BLOCKING AS REQUIRED. SEE 2.3A001.
32 DECORATIVE SCREEN WALL.
33 NOT USED.
34 LOCKABLE CABINETS.
35 NOT USED.
36 NOT USED.
37 NOT USED.
38 NOT USED.
39 NOT USED.
40 NOT USED.
41 CRASH CART BY OWNER.
42 6' X 12" SHELVES. SEE INTERIOR ELEVATIONS.
43 NOT USED.
44 NOT USED.
45 NOT USED.
46 NOT USED.
47 KILN - SEE EQUIPMENT PLAN.
48 NOT USED.
49 NOT USED.
50 NOT USED.
51 NOT USED.
52 PATCH FLOOR FINISH TO MATCH EXISTING.
53 PROVIDE BLOCKING IN EXISTING WALL FOR RAILINGS/FURNITURE SYSTEMS/EQUIPMENT/ETC.
54 TEMPORARY METAL STUD DRYWALL PARTITION WITH TEMPORARY DOUBLE DOOR 6'-0" WIDE TO
REMAIN FOR CONSTRUCTION ACCESS. REMOVE AT END OF CONSTRUCTION TO COMPLETE ALL
WORK AND FINISHES TO ALIGN WITH EXISTING CONDITION. (V.I.F)
55 NEW PARTITION AT EXISTING CONCRETE RAMP TO BE BUILT AT EDGE OF SLAB WITH TRACK ON
LOWER FLAT SLAB.
56 FINISH NEW DRYWALL PARTITION/FURRING TO ALIGN FLUSH WITH EXISTING - PROVIDE BASE, PAINT WALL AND PATCH ACT.
57 INFILL SLAB DEPRESSION TO ALIGN FLUSH WITH MAIN SLAB TO ALLOW FOR NEW FLOORING.
(V.I.F)
58 CORNER GUARD-CG-1. FULL HEIGHT UNLESS NOTED. STAINLESS STEEL.
59 HANDRAIL WITH CHAIR RAIL (WOOD) PER DETAIL 4/3A711.
60 HANDRAIL WITHOUT WOOD CHAIR RAIL - SIMILAR TO DETAIL 4/3A711. WALL PROTECTION BELOW
WP-1 UNLESS NOTED.
61 FLOOR SINK AND HAND SINK - SEE PLUMBING DRAWINGS
# DESCRIPTION
A REMOVE EXISTING WALL AND DOORS @ THIS AREA AT COMPLETION OF CONSTRUCTION TO TIE
IN ALL WORK AND NEW FINISHES, TO ALIGN WITH EXISTING (V.I.F).
Z DESCRIPTION
TYPE A1 (UNLESS NOTED
OTHERWISE)
ONE LAYER OF 5/8"
GYPSUM WALLBOARD ON
EACH SIDE OF 3-5/8" 20 GA.
METAL STUDS @ 16" O.C.
WITH 3" SOUND
ATTENUATION BLANKETS
IN STUD SPACE. EXTEND
STUDS, BOARD, AND
BLANKETS FULL HEIGHT TO
DECK ABOVE.
5/8" 3 5/8" 5/8"
4 7/8"
SEE PARTITION TYPES
SHEET FOR NOTES AND
OTHER PARTITION TYPES
4"
4 7/8"
1"
3"
2 5/8"2 5/8" 2"
3"
GROUT
FLOOR FINISH
ANCHORS @ 20" O.C.
CONCRETE
STRUCTURE
CONCRETE
STRUCTURE
ALUMINUM BASE
ALUMINUM PLATE W/
BEVEL EDGES
1/
2" M
IN
2 HR. RATED FIRE
BARRIER SYSTEM.
TEST REFERENCE:
UL LISTING: FF-D-0063
EPDM MEMBRANE. TYP.
IN ALL WET AREAS.
FOIL FLANGE
FOIL FLANGE
NOTE: THIS DRAWING IS DIAGRAMMATIC ONLY. MFR. OF
FIRESTOP MATERIAL SHALL PROVIDE FINAL DESIGN AND
APPLICABLE UL DESIGN NUMBERS.
Drawing Title
Approved: Project Director
Location
Building Number
Project Title
Checked DrawnDate
Project No.
Drawing Number on e-ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne f oo t on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
F E
D C
B A
VA Project No.
Champlin Project No.
ARCHITECT/ENGINEERS: CONSULTANTS:
Office of Construction and Facilities Management
F E
D C
B A
539-17-102
PHASE 3
thinkchamplin.com
720 E Pete Rose Way Cincinnati, OH 45202
T. 513.241.4474 F 513.241.0081
1/
/2
9:
:2
AM
RELOCATE SHORT TERM REHAB
COMMUNITY LIVING CENTER - RELOCATE
P.M.&R. TO BASEMENT OF BUILDING #2
11/04/16
BASEMENT - NEW WORK PLAN
2.3A200 DesignerApprover
177-5668
Cincinnati, Ohio
1/8" = 1'-0"2.3A200
1 BASEMENT - NEW WORK PLAN
PLAN NOTES
DEMOLITION NOTES
PLAN LEGEND
EQUIPMENT / FURNITURE. SEE 2.3A904 FOR EQUIPMENT AND FURNITURE PLAN AND LIST.
TYPICAL PARTITION TYPE
WINDOW ELEVATION
6" = 1'-0"2.3A200
2 FLOOR EXPANSION JOINT DETAIL
Revisions
1 USER MEETING ADJUSTMENTS 7.26.16
2 OWNER REVIEW 11.4.16
3 OWNER REVIEW 10.18.17
A1.0
A1.0
A2.0 A5.1 A6.0
AA.0AA.0
AB.0
AB.2
AD.0
BA.0
BB.0
BB.0
B2.0
B3.0
B4.0
B5.0
AE.0
AA.1AA.1
AB.1AB.1
A3.1A1.1 A5.2A4.1
AF.0
AC.0
A3.0 A4.0 A5.0
B6.0
BA.2
AC.2
AC.2
AC.1
B1.0
BC.0
BC.0
B2.1
BA.1
A0.1
ACT-1
(9' - 2")
RECREATION
GROUP ROOM
MECHANICAL
(EXISTING)
OFFICE -
PROGRAM
SUPPORT
REHAB
0112A
PT OFFICE
KILN ROOM
OCCUPATIONAL
THERAPY
PHYSICAL
THERAPY GYM
MEDIA CENTER
OT OFFICE
PMR
EXAM/TREATMENT
SOILED LINEN
HOUSEKEEPING
CLOSET
PMR
EXAM/TREATMENT
RT OFFICE
STAFF TOILET
PT/OT
CONDENSED
STORAGE
PMR
EXAM/TREATMENT
DISH MACHINE
RCL OFFICE
PATIENT MEN'S
PATIENT
WOMEN'S
CLEAN LINEN
ELECTRICAL
(EXISTING)
ACTIVITIES FOR
DAILY LIVING -
KITCHEN
0117A
COURTYARD
(EXISTING)
CY0
HORTICULTURE
THERAPY
PMR
EXAM/TREATMENT
RECEPTION /
CHECK-IN
TECH.
(EXISTING)
MAT / PRIVATE
RM
REHAB
COORDINATOR
OFFICE
EXERCISE
RCL OFFICE
TELEHEALTH /
PMR
EXAM/TREATMENT
PT/OT
SUPERVISOR
OFFICE
PATIENT CARE
STORAGE
CORRIDOR
WAITING
0107A
STAIR
(EXISTING)
S1.0
CORRIDOR
ACTIVITIES FOR
DAILY LIVING -
BATH
0117B
ACT-1
(9' - 0")
ACT-1
(9' - 0") C2
(9' - 0")
C2 (9' - 0")
C2 (9' - 0")
ACT-1
(9' - 0")
ACT-1
(9' - 0")
ACT-1
(9' - 0")
ACT-1
(9' - 0")
ACT-1
(9' - 0")
C4 (9' - 0")
ACT-1
(9' - 0")
ACT-1
(9' - 0")ACT-1
(9' - 0")
ACT-1
(9' - 0")
ACT-1
(9' - 0")
ACT-1
(9' - 0")
ACT-1
(9' - 0")
ACT-1
(9' - 0")
C3 (9' - 0")
C1 (8' - 8")
C1 (8' - 0")
C1 (8' - 0")
ACT-1
(9' - 0")
C1 (7' - 0")
C4 (9' - 0")
C4 (9' - 0")
ACT-1
(9' - 0")
ACT-1
(9' - 0")
ACT-1
(9' - 0") ACT-1
(9' - 0")
C1 (8' - 8")
C1 (7' - 0")
ACT-1
(9' - 0")
ACT-1
(9' - 0")
ACT-1
(9' - 0")
ACT-1
(9' - 0")
ACT-1
(9' - 0")
ACT-1
(9' - 0")
ACT-1
(9' - 0")
ACT-1
(9' - 0")
2 2
ACT-1
(9' - 0")
C1 (9' - 0")
C1 (8' - 8")
C1 (7' - 0")
C1 (8' - 0")
ACT-1
(9' - 0") ACT-1
(9' - 0")
ACT-1
(9' - 0")
ACT-1
(9' - 0")
ACT-1
(9' - 0")
2 2
B5.1
ACT-1
(8' - 0")
BA.3
BA.3
PMR
EXAM/TREATMENT
PMR
EXAM/TREATMENT
ACT-1
(9' - 0")
ACT-1
(9' - 0")
ACT-1
(9' - 0")
C1 (8' - 8")
ACT-1
(9' - 0")
ACT-1
(9' - 0")
C1 (7' - 0")
C1 (8' - 8")
C1 (8' - 8")
ACT-1
(9' - 0")
C1 (8' - 8")
C1 (8' - 8")
ACT-1
(8' - 8")
C1 (7' - 4")
NEW GYPSUM WALLBOARD CEILING CONSTRUCTION , SOFFIT OR BULKHEAD
NEW 2x2 ACOUSTICAL CEILING SYSTEM; PER SPECIFICATION.
2x4 5-WAY EXAM/MULTIFUNCTION LIGHT (LOCATION SHALL BE ON CENTERLINE OF
BED AND 12-18" FROM HEADWALL) PER ELECTRICAL DOCUMENTS
2x2 DIRECT-INDIRECT LIGHT FIXTURE, PER ELECTRICAL DOCUMENTS
2x2 EMERGENCY DIRECT-INDIRECT LIGHT FIXTURE, PER ELECTRICAL DOCUMENTS
RECESSED DIMABLE INCANDESCENT OR FLUORESCENT DOWNLIGHT FIXTURE; REFER TO
ELECTRICAL DOCUMENTS
DECORATIVE RECESSED DIMABLE DOWNLIGHT FIXTURE; REFER TO ELECTRICAL
DOCUMENTS
SURFACE MOUNTED PENDANT LIGHT FIXTURE PER ELECTRICAL DOCUMENTS
WALL MOUNTED LIGHT SCONCE PER ELECTRICAL DOCUMENTS; TYP. MOUNTING HEIGHT
SHALL BE 6'-6" U.N.O.
SPRINKLER HEAD - COORDINATE WITH FIRE SUPPRESSION DOCUMENTS
MECHANICAL 2x2 SUPPLY AIR DEVICE; COORDINATE WITH MECHANICAL DOCUMENTS
MECHANICAL 1x1 RETURN AIR DEVICE; COORDINATE WITH MECHANICAL DOCUMENTS
X'-X" NOTE REPRESENTS THE FINISH CEILING HEIGHT FROM FINISH FLOOR;
TYPICALLY 8'-0"AFF. UNO
NURSE CALL ZONE LIGHT; REFER TO ELECTRICAL DOCUMENTS
SD SMOKE DETECTOR LED PLATE - REFER TO M.E.P. DOCUMENTS
EXIT SIGN - REFER TO ELECTRICAL DOCUMENTS
2x2 PRISMATIC LENS LIGHT FIXTURE, PER ELECTRICAL DOCUMENTS
NEW CEILING MOUNTED NURSE CALL DOME LIGHT - REFER TO ELECTRICAL
DOCUMENTS
COVE LIGHT FIXTURE, PER ELECTRICAL DOCUMENTS
COVE LIGHT FIXTURE, PER ELECTRICAL DOCUMENTS
BATHROOM WALL MOUNTED LIGHT SCONCE PER ELECTRICAL DOCUMENTS; TYP.
MOUNTI…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.