36C25018B0807-0002005.pdf

PDF 302 KB Posted

Attached to
Relocate PM&R to Basement of Building #2 Project 539-17-102
Solicitation number
36C25018B0807
Issued by

About this file

36C25018B0807 0002 27 Aug 2018 Staging Drawings 01-30-2018.pdf

View the file

Other files

File Type Posted
36C25018B0807-0005007.pdf PDF
36C25018B0807-0005006.pdf PDF
36C25018B0807-0005004.docx DOCX document
36C25018B0807-0005005.pdf PDF
36C25018B0807-0004001.pdf PDF
36C25018B0807-0004000.docx DOCX document
36C25018B0807-0004002.pdf PDF
36C25018B0807-0003001.docx DOCX document
36C25018B0807-0002004.docx DOCX document
36C25018B0807-014.docx DOCX document
36C25018B0807-0001001.pdf PDF
36C25018B0807-0001002.pdf PDF
36C25018B0807-0001000.docx DOCX document
36C25018B0807-013.docx DOCX document
36C25018B0807-011.pdf PDF
36C25018B0807-005.pdf PDF
36C25018B0807-004.pdf PDF
36C25018B0807-009.pdf PDF
36C25018B0807-012.pdf PDF
36C25018B0807-002.pdf PDF
36C25018B0807-006.docx DOCX document
36C25018B0807-003.pdf PDF
36C25018B0807-001.docx DOCX document
36C25018B0807-010.pdf PDF
36C25018B0807-007.docx DOCX document
36C25018B0807-008.pdf PDF
36C25018B0807-000.docx DOCX document
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

POLICE

VA

POLICE

VA

C O

E

W

E

E

S

E

C O

E

E S S

W

E

STO

P

STO

P

STOP

STOP

STO

P

STO

P

STOP

STOP

STO

P

MER

GE

S

S

S

60"

BR

0" B R

60"

BR

60"

BR

60"

BR

60"

BR

0" B R

BUILDING #1

CLC

PHASE 1

SHORT TERM

REHAB CLC

PHASE 2

#3

PARKING GARAGE

#13

#8

FISHER

HOUSE

G

OO

DM

AN

D

RI

VE

VINE STREET

E

SH

IE

LD

S

ST

R

EE

T

X X

X X

X X

X

VINE STREET

3 4

X X

X

CONSTRUCTION

ENTRANCE

X X

X X

X X

X

BUILDING #2

PHASE 3

BASEMENT

FITOUT

LOCATION

1 CONTRACTOR STAGING AREA - THE LEAD CONTRACTOR IS RESPONSIBLE TO COORDINATE

REQUIRED SPACE NEEDED BY OTHER CONTRACTORS, AND SHALL KEEP ALL WORK AREAS NEAT

AND ORDERLY THROUGHOUT DEMOLITION AND CONSTRUCTION. RESTORE TO ORIGINAL

CONDITIONS.

2 TEMPORARY CONSTRUCTION FENCING BY GENERAL CONTRACTOR. THE GENERAL CONTRACTOR

IS RESPONSIBLE TO PROTECT EXISTING SURFACES SCHEDULED TO REMAIN AND/OR RESTORE TO

PREVIOUS CONDITION AFTER COMPLETION OF WORK.

3 CONSTRUCTION DUMPSTER LOCATIONS - GENERAL CONTRACTOR TO PROVIDE AND MAINTAIN

AREA IN A CLEAN ORDERLY MANNER. GENERAL CONTRACTOR RESPONSIBLE FOR ANY

DAMAGE THE DUMPSTER(S), TRUCKS OR ANY EQUIPMENT MAY CAUSE, AND SHALL

REPAIR OR REPLACE ANY SITE PAVING OR CONCRETE SURFACES BACK TO THEIR

ORIGINAL CONDITION, OR BETTER. COORDINATE FINAL DUMPSTER LOCATIONS AND

COORIDNATE REQUIREMENTS WITH CONSTRUCTION WASTE MANAGEMENT PLAN PER THE

SPECIFICATIONS. LOCATIONS AS DETERMINED BY CONTRACTOR.

4 MAINTAIN TWO WAY TRAFFIC FLOW THROUGH THIS AREA. GENERAL CONTRACTOR

SHALL COORDINATE WITH THE OWNER ANY REQUIRED USE OF THIS AREA TO PERFORM

WORK AS WELL AS FOR CONSTRUCTION DELIVERIES. SHUT-DOWNS SHALL OCCUR ONE

LANE AT A TIME, KEEPING OTHER LANE(S) OPEN AND USABLE. GENERAL CONTRACTOR

SHALL PROVIDE TWO WEEKS NOTICE IN WRITING TO THE OWNER PRIOR TO SHUT-DOWN.

5 CONTRACTORS' CONSTRUCTION TRAILER. FINAL LOCATION AS DETERMINED BY CONTRACTOR.

6 CONTRACTORS ACCESS TO BUILDING AND BASEMENT PROJECT SITE TO BE THROUGH

STAIRWELL. EMERGENCY EXIT TO BE MAINTAINED AT ALL TIMES. BUILDING ELEVATORS MAY NOT

BE UTILIZED BY ANY CONTRACTORS WITHOUT PRIOR WRITTEN AUTHORIZATION BY OWNER.

# DESCRIPTION

A NEGATIVE PRESSURE MACHINES TO BE USED WITH HEPA FILTRATION FOR DURATION OF

CONSTRUCTION. SEE GENERAL REQUIREMENTS SPECIFICATION SECTION FOR MORE

INFORMATION REGARDING INFECTION PREVENTION MEASURES.

B NO CONTRACTOR PARKING ON VA CINCINNATI CAMPUS.

C GENERAL CONTRACTOR IS RESPONSIBLE FOR SECURING CONSTRUCTION SITE. THIS

INCLUDES FULL HEIGHT BARRICADE TO DECK AT INTERIOR AND SECURE FENCE WITH GATE

THAT IS KEPT CLOSED AT ALL TIMES AND LOCKED AT NIGHT AT EXTERIOR.

D GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL SAFETY SIGNAGE.

E INTERIOR CONSTRUCTION BARRIER TO INCLUDE NEGATIVE PRESSURE MONITOR.

CONSTRUCTION SITE ENTRANCE DOOR, WHICH IS PART OF THE TEMPORARY

BARRIER, SHALL BE LATCHING, SELF-CLOSING, AND FITTED WITH A CORBIN RUSSWIN LOCK

WHICH CAN BE KEYED TO A CONTRACTOR'S KEY BY THE VA LOCKSMITH.

FINAL LOCATION PER OWNER.

Drawing Title

Approved: Project Director

Location

Building Number

Project Title

Checked DrawnDate

Project No.

Drawing Number on e-ei gh th i nc h o ne f oo t on e-qu ar te r in ch o ne f oo t th re e-ei gh th s in ch o ne f oo t on e-ha lf in ch o ne f oo t th re e-qu ar te rs i nc h o ne f oo t on e in ch o ne f oo t on e an d on e-ha lf in ch es o ne f oo t th re e in ch es o ne f oo t

1 2 3 4 5 6 7 8 9

1 2 3 4 5 6 7 8 9

F E

D C

B A

VA Project No.

Champlin Project No.

ARCHITECT/ENGINEERS: CONSULTANTS:

Office of Construction and Facilities Management

F E

D C

B A

539-17-102

PHASE 3

thinkchamplin.com

720 E Pete Rose Way Cincinnati, OH 45202

T. 513.241.4474 F 513.241.0081

1/

/2

2:

:2

PM

RELOCATE SHORT TERM REHAB

COMMUNITY LIVING CENTER - RELOCATE

P.M.&R. TO BASEMENT OF BUILDING #2

11/04/16

CAMPUS PLAN / SITE LOGISTICS

2.3A003 DesignerApprover

177-5668

Cincinnati, Ohio

1" = 40'-0"2.3A003

1 CAMPUS PLAN / SITE LOGISTICS

SITE LOGISTICS PLAN NOTES

SITE LOGISTICS GENERAL NOTES

Revisions

1 USER MEETING ADJUSTMENTS 7.26.16

2 OWNER REVIEW 11.4.16

3 OWNER REVIEW 10.18.17

4 OWNER REVIEW 11.20.17

5 FINAL BID SET 01.26.18

VHACINBowerJ Rectangle

VHACINBowerJ Line

File details come from the government source that posted it.