36C25018B0807-0004001.pdf
PDF 5 MB Posted
- Solicitation number
- 36C25018B0807
About this file
36C25018B0807 0004 10 Sept 2018 539-17-102 Specifications Revised.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25018B0807-0005007.pdf | ||
| 36C25018B0807-0005006.pdf | ||
| 36C25018B0807-0005004.docx | DOCX document | |
| 36C25018B0807-0005005.pdf | ||
| 36C25018B0807-0004000.docx | DOCX document | |
| 36C25018B0807-0004002.pdf | ||
| 36C25018B0807-0003001.docx | DOCX document | |
| 36C25018B0807-0002004.docx | DOCX document | |
| 36C25018B0807-0002005.pdf | ||
| 36C25018B0807-014.docx | DOCX document | |
| 36C25018B0807-0001001.pdf | ||
| 36C25018B0807-0001002.pdf | ||
| 36C25018B0807-0001000.docx | DOCX document | |
| 36C25018B0807-013.docx | DOCX document | |
| 36C25018B0807-011.pdf | ||
| 36C25018B0807-005.pdf | ||
| 36C25018B0807-004.pdf | ||
| 36C25018B0807-009.pdf | ||
| 36C25018B0807-012.pdf | ||
| 36C25018B0807-002.pdf | ||
| 36C25018B0807-006.docx | DOCX document | |
| 36C25018B0807-003.pdf | ||
| 36C25018B0807-001.docx | DOCX document | |
| 36C25018B0807-010.pdf | ||
| 36C25018B0807-007.docx | DOCX document | |
| 36C25018B0807-008.pdf | ||
| 36C25018B0807-000.docx | DOCX document |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATIONS
03/27/18
Relocate PM&R to
Basement of Building #2
Project No. 539-17-102
Cincinnati VAMC
Cincinnati, OH
Prepared by
VA250-16-R-0247 539-17-102
RELOCATE PM&R TO BASEMENT OF BLDG. #2
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
DIVISION 00 - SPECIAL SECTIONS DATE
00 01 15 List of Drawing Sheets 07-15
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 10-17 01 32 16.17 Project Schedules (Small Projects – Des ign/Build) 04-11 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 02-17 Sample ICRA document Above Ceiling Permit sample document 01 42 19 Reference Standards 05-16 01 45 29 Testing Laboratory Services 08-17 01 74 19 Construction Waste Management 09-13
01 91 00 General Commissioning Requirements 10-15
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
DIVISION 03 – CONCRETE
03 30 53 (Short-Form) Cast-in-Place Concrete 02-16
DIVISION 04 – MASONRY
Not used
DIVISION 05 – METALS
05 50 00 Metal Fabrications 07-14
DIVISION 06 – WOOD,PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17 06 20 00 Finish Carpentry 08-16
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 81 00 Applied Fireproofing 10-17 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-17
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 08-16
00 01 10-2
08 14 00 Interior Wood Doors 02-16 08 31 13 Access Doors and Frames 02-16 08 41 13 Aluminum-Framed Entrances and Storefronts 08-16 08 71 00 Door Hardware 01-16 08 71 13 Automatic Door Operators 02-16 08 80 00 Glazing 10-15
DIVISION 09 – FINISHES
09 06 00 Schedule for Finishes – on drawings 04-15 09 22 16 Non-Structural Metal Framing 05-16 09 29 00 Gypsum Board 11-14 09 30 13 Ceramic/Porcelain Tiling 09-15 09 51 00 Acoustical Ceilings 12-16 09 65 13 Resilient Base and Accessories 02-16 09 65 16 Resilient Sheet Flooring 02-16 09 65 19 Resilient Tile Flooring 12-15 09 68 00 Carpeting 10-15
09 72 16 VINYL-COATED FABRIC WALL COVERINGS
09 91 00 Painting 01-16 09 96 59 High-Build Glazed Coatings 07-14
DIVISION 10 – SPECIALTIES
10 11 23 Tackboards 10-15 10 14 00 Signage 10-15 10 21 23 Cubicle Curtain Tracks 05-15 10 26 00 Wall and Door Protection 10-15 10 28 00 Toilet, Bath, and Laundry Accessories 02-1 6 10 44 13 Fire Extinguisher Cabinets 08-14
DIVISION 11 – EQUIPMENT
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades 08-17 12 36 00 Countertops 12-15
DIVISION 13 - SPECIAL CONSTRUCTION
Not used
DIVISION 14– CONVEYING EQUIPEMENT
Not used
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression System 11-16 21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
00 01 10-3
22 05 11 Common Work Results for Plumbing 07-16 22 05 23 General-Duty Valves for Plumbing Piping 09 -15 22 07 11 Plumbing Insulation 09-15 22 08 00 Commissioning of Plumbing Systems 11-16 22 11 00 Facility Water Distribution 09-15 22 13 00 Facility Sanitary and Vent Piping 09-15 22 40 00 Plumbing Fixtures 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 08-17 23 05 12 General Motor Requirements for HVAC and St eam
Generation Equipment 08-17
23 05 41 Noise and Vibration Control for HVAC Pipin g and Equipment
02-15
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15 23 07 11 HVAC and Boiler Plant Insulation 02-15 23 08 00 Commissioning of HVAC Systems 11-16 23 09 23 Direct-Digital Control System for HVAC 09- 11 23 11 23 Facility Natural-Gas Piping 08-17 23 31 00 HVAC Ducts and Casings 03-13 23 37 00 Air Outlets and Inlets 02-15 23 82 00 Convection Heating and Cooling Units 04-11
DIVISION 25 – INTEGRATED AUTOMATION
25 10 10 Advanced Utility Metering System 02-10
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors an d Cables 01-17 26 05 26 Grounding and Bonding for Electrical Syste ms 01-17 26 05 33 Raceway and Boxes for Electrical Systems 0 5-14 26 08 00 Commissioning of Electrical Systems 11-16 26 09 23 Lighting Controls 05-14 26 27 26 Wiring Devices 01-16 26 51 00 Interior Lighting 08-14
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installati ons 06-15 27 05 26 Grounding and Bonding for Communications S ystems 06-15 27 05 33 Raceways and Boxes for Communications Syst ems 06-15 27 10 00 Control, Communication and Signal Wiring 0 6-15 27 11 00 Communications Equipment Room Fittings 06- 15 27 15 00 Communications Structured Cabling 01-16 27 41 31 Master Antenna Television Equipment and Sy stems 06-15 27 51 16 Public Address and Mass Notification Syste ms 10-15
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
00 01 10-4
28 13 00 Physical Access Control System 10-11 28 23 00 Video Surveillance 09-11 28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
Not used
DIVISION 32 – EXTERIOR IMPROVEMENTS
Not used
DIVISION 33 – UTILITIES
Not used
DIVISION 34 – TRANSPORTATION
Not used
DIVISION 48 – Electrical Power Generation Not used
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
2-3A000 COVER SHEET
2-3A001 PROJECT GENERAL NOTES, ABBREVIATIONS AND SYMBOLS
2-3A002 CODE INFORMATION LIFE SAFETY PLANS
2-3A003 CAMPUS PLAN – SITE LOGISTICS
2-3A010 AXONOMETRIC VIEW
2-3A050 BASEMENT DEDUCT ALTERNATES PLAN
2-3A200 BASEMENT NEW WORK PLAN
2-3A210 BASEMENT NEW WORK RCP
2-3A502 ENLARGED PLANS & ELEVATIONS
2-3A510 INTERIOR ELEVATIONS
2-3A511 INTERIOR ELEVATIONS
2-3A512 INTERIOR ELEVATIONS
2-3A517 INTERIOR ELEVATIONS
2-3A518 INTERIOR ELEVATIONS
2-3A610 DOOR SCHEDULE AND DOOR DETAILS
2-3A620 PARTITION TYPES AND DETAILS
2-3A711 CASEWORK SECTIONS & DETAILS
2-3A900 FINISH SCHEDULE
2-3A901 FINISH LEGEND
2-3A902 FINISH PLAN
2-3A904 BASEMENT – FURNITURE & EQUIPMENT PLAN
FX101 FIRE PROTECTION BASEMENT PLAN – FIRE SUPPRESSION
PL101 PLUMBING UNDERGROUND PLANS
PL102 PLUMBING BASEMENT PLAN
PL601 PLUMBING SCHEDULES, DETAILS AND ISOMETRICS
MH001 INDEX, LEGEND & GENERAL NOTES
MH101 BASEMENT FLOOR PLAN – DUCTWORK
MH501 DETAILS
MH502 DETAILS
MH601 CONTROLS AND AUTOMATION
MH602 SCHEDULES
MP101 BASEMENT FLOOR PLAN - PIPING
E1 SYMBOLS
E2 LIGHTING FIXTURE DESCRIPTION
E3 ELECTRICAL DISTRIBUTION SCHEDULES
E4 ELECTRIC SINGLE LINE -SECONDARY ELECTRIC
E5 TECHNOLOGY DETAILS
00 01 15 - 2
E6 TECHNOLOGY DETAILS
E7 PANELBOARD SCHEDULES
E8 ELECTRICAL DETAILS
1-E1 BASEMENT FLOOR PLAN -REMOVALS
1-E2 BUILDING 1 - BASEMENT FLOOR PLAN
2-E1 BASEMENT FLOOR PLAN - LIGHTING
2-E2 BASEMENT FLOOR PLAN - POWER
2-E3 BASEMENT FLOOR PLAN - SIGNALS
- - - END - - -
00 01 15 - 3
(SAMPLE LIST OF DRAWINGS)
VAMC (NAME) (SPEC No.)
SECTION 00 01 15
LIST OF DRAWINGS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
SITE PLANNING
L1 Site Plan
L2 Planting Plan
L3 Site and Planting Details
ARCHITECTURAL
30-1 Ground Floor Plan
30-2 Elevations
30-3 Wall Sections and Details
30-4 Industrial Stair, Dock Leveler, Areaway
Sections and Details
30-5 Reflected Ceiling Plan
30-6 Schedules
- - - E N D - - -i
SECTION 01 00 00
GENERAL REQUIREMENTS
TABLE OF CONTENTS
1.1 SAFETY REQUIREMENTS
1.2 GENERAL INTENTION
1.3 STATEMENT OF BID ITEM(S)
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
1.5 CONSTRUCTION SECURITY REQUIREMENTS
1.6 OPERATIONS AND STORAGE AREAS
1.7 ALTERATIONS
1.8 DISPOSAL AND RETENTION
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUI PMENT, UTILITIES,
AND IMPROVEMENTS
1.10 RESTORATION
1.11 AS-BUILT DRAWINGS
1.12 TEMPORARY USE OF EXISTING ELEVATORS
1.13 TOILETS
1.14 AVAILABILITY AND USE OF UTILITY SERVICES
1.15 TESTS
1.16 INSTRUCTIONS
ATTACHMENTS
ABOVE-THE-CEILING WORK PERMIT PROGRAM
ABOVE-THE-CEILING WORK PERMIT
VA250-15-J-1722 539-16-101
FCA – Replace Cooling Equipment and Devices, Bldg 1
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
Additionally, the general contractor is required to obtain an “Above –
The Ceiling Work Permit” from the project engineer for this project and must be responsible for all that it requires. A cop y of the permit and policy is attached at the end of this specification section.
1.2 GENERAL INTENTION
A. Contractor shall completely prepare site for buildi ng operations, including demolition and removal of existing struct ures, and furnish labor and materials and perform work for VA Project 539-16-101, as required by drawings and specifications.
B. Offices of FFE Inc., as Architect-Engineers, will r ender certain technical services during construction. Such servic es shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
C. All employees of general contractor and subcontract ors shall comply with VA security management program and obtain perm ission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. BID ITEM 1, REPLACE COOLING EQUIPMENT AND DEVICES, BLDG 2: Work includes general construction, alterations, necessa ry removal of existing structures and construction and certain ot her items.
Demolish existing items as required to install new work as shown.
Convert the existing space into PM&R Cinic, in acco rdance with the design drawings and specifications. All work shall be completed in
365 calendar days from notice to proceed.
B. BID ITEM 2: All work in Bid Item 1 except delete wo rk outlined in areas shown on sheet 2.3A050. All work shall be com pleted in 365 calendar days from notice to proceed.
01 00 00 -2
1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and admi nistrative security procedures that will remain effective for the entir e duration of the project.
2. The General Contractor is responsible for assuri ng that all sub-contractors working on the project and their employ ees also comply with these regulations.
B. Security Procedures:
1. General Contractor’s employees shall not enter t he project site without appropriate badge. They may also be subjec t to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shal l give one week’s notice to the Contracting Officer so that security escort arrangements can be provided for the employees. Th is notice is separate from any notices required for utility shut down described later in this section.
3. No photography of VA premises is allowed without written permission of the Contracting Officer.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the pr emises in the event of a national emergency. The General Contrac tor may return to the site only with the written approval of the Cont racting Officer.
C. Key Control:
1. The General Contractor shall provide duplicate k eys and lock combinations to the Project Engineer for the purpos e of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
01 00 00 -3
2. The General Contractor shall turn over all perma nent lock cylinders to the VA locksmith for permanent installation. See Section 08 71
00, DOOR HARDWARE and coordinate.
D. Document Control:
1. Before starting any work, the General Contractor /Sub Contractors shall submit an electronic security memorandum desc ribing the approach to following goals and maintaining confide ntiality of
“sensitive information”.
2. The General Contractor is responsible for safeke eping of all drawings, project manual and other project informat ion. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photograp hs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.
Secure such information in separate containers and limit the access to only those who will need it for the project. Re turn the information to the Contracting Officer upon request .
4. These security documents shall not be removed or transmitted from the project site without the written approval of Co ntracting
Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Off icer immediately when there is a loss or compromise of “sensitive in formation”.
7. All electronic information shall be stored in sp ecified location following VA standards and procedures using an Engi neering Document
Management Software (EDMS).
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and track ed through the
EDMS system.
b. “Sensitive information” including drawings and o ther documents may be attached to e-mail provided all VA encryptio n procedures are followed.
01 00 00 -4
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitt ed 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
F. Smoking:
1. Smoking is prohibited on VA campuses except in desi gnated smoking rest areas.
1.6 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (includ ing storage of materials) on Government premises to areas authoriz ed or approved by the Contracting Officer. The Contractor shall hold and save the
Government, its officers and agents, free and harml ess from liability of any nature occasioned by the Contractor's perfor mance.
B. Temporary buildings (e.g., storage sheds, shops, of fices) and utilities may be erected by the Contractor only with the appr oval of the
Contracting Officer and shall be built with labor a nd materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the
Contractor and shall be removed by the Contractor a t its expense upon completion of the work. With the written consent of the Contracting
Officer, the buildings and utilities may be abandon ed and need not be removed.
C. The Contractor shall, under regulations prescribed by the Contracting
Officer, use only established roadways, or use temp orary roadways constructed by the Contractor when and as authorize d by the Contracting
Officer. When materials are transported in prosecut ing the work, vehicles shall not be loaded beyond the loading cap acity recommended by the manufacturer of the vehicle or prescribed by an y Federal, State, or local law or regulation. When it is necessary to cr oss curbs or sidewalks, the Contractor shall protect them from d amage. The
Contractor shall repair or pay for the repair of an y damaged curbs, sidewalks, or roads.
(FAR 52.236-10)
01 00 00 -5
D. Working space and space available for storing mater ials shall be as determined by the Project Engineer.
E. Workmen are subject to rules of Medical Center appl icable to their conduct.
F. Execute work so as to interfere as little as possib le with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any e xisting equipment, and with work being done by others.
1. Do not store materials and equipment in other th an assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of
Veterans Affairs in quantities sufficient for not m ore than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vaca ted portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and saf ety requirements.
G. Phasing:
The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses i n operation occur.
It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim lif e safety measure to be used during the work, and a schedule defining th e duration of the work with milestone subtasks. The work to be outli ned shall include, but not be limited to:
To insure such executions, Contractor shall furnis h the Project
Engineer with a schedule of approximate dates on wh ich the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall noti fy the Project
Engineer two weeks in advance of the proposed date of starting work in each specific area of site, building or portion the reof. Arrange such dates to insure accomplishment of this work in succ essive phases
01 00 00 -6 mutually agreeable to Medical Center Director, Proj ect Engineer and
Contractor, as shown on the design drawings.
H. Building No. 1 will be occupied during performance of work.
Contractor shall take all measures and provide all material necessary for protecting existing equipment and pro perty in affected areas of construction against dust and debris, so t hat equipment and affected areas to be used in the Medical Centers op erations will not be hindered. Contractor shall permit access to Depa rtment of
Veterans Affairs personnel and patients through oth er construction areas which serve as routes of access to such affec ted areas and equipment. These routes whether access or egress s hall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc to facilitate patient and st aff access.
Coordinate alteration work in areas occupied by Dep artment of
Veterans Affairs so that Medical Center operations will continue during the construction period.
2. Access to IT closets and Computer Network Room A 437C requires an escort from the IT Department. No more than one CR AC may be down at a time. Existing IT equipment must be protected and maintained in operation during the project.
I. Utilities Services: Maintain existing utility servi ces for Medical
Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uni nterrupted services.
Where necessary to cut existing water, steam, gases , sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (incl uding telephone), they shall be cut and capped at suitable places whe re shown; or, in absence of such indication, where directed by Proje ct Engineer.
1. No utility service such as water, gas, steam, sewer s, electricity, or fire protection systems and communications syste ms may be interrupted without prior approval of Project Engin eer. Electrical work shall be accomplished with all affected circui ts or equipment de-energized. When an electrical outage cannot be a ccomplished, work on any energized circuits or equipment shall not co mmence without a detailed work plan, the Medical Center Director’s p rior knowledge and written approval. Refer to specification Sectio n 26 05 11, 01 00 00 -7
REQUIREMENTS FOR ELECTRICAL INSTALLATIONS for addit ional requirements.
2. Contractor shall submit a request to interrupt any such services to
Project Engineer, in writing, 14 days in advance of proposed interruption. Request shall state reason, date, exa ct time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption w ill cause least inconvenience to operations of Medical Center. Inte rruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. In case of a contract construction emergency, servi ce will be interrupted on approval of Project Engineer. Such a pproval will be confirmed in writing as soon as practical.
5. Whenever it is required that a connection fee be pa id to a public utility provider for new permanent service to the c onstruction project, for such items as water, sewer, electricit y, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
J. Abandoned Lines: All service lines such as wires, c ables, conduits, ducts, pipes and the like, and their hangers or sup ports, which are to be abandoned but are not required to be entirely re moved, shall be sealed, capped or plugged at the main, branch or pa nel they originate from. The lines shall not be capped in finished are as, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or par titions; so that they are completely behind the finished surfaces.
K. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to p arking and to occupied areas of buildings clear of construction m aterials, debris and standing construction equipment and vehicles.
L. Coordinate the work for this contract with other co nstruction operations as directed by Project Engineer. This in cludes the
01 00 00 -8 scheduling of traffic and the use of roadways, as s pecified in Article, USE OF ROADWAYS.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contract or shall make a thorough survey with the Project Engineer, of areas of buildings in which alterations occur and areas which are anticip ated routes of access, and furnish a report, signed by both, to th e Contracting
Officer. This report shall list by rooms and spaces :
1. Existing condition and types of resilient floori ng, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2. Existence and conditions of items such as plumbi ng fixtures and accessories, electrical fixtures, equipment, veneti an blinds, shades, etc., required by drawings to be either reu sed or relocated, or both.
3. Shall note any discrepancies between drawings an d existing conditions at site.
4. Shall designate areas for working space, materia ls storage and routes of access to areas within buildings where al terations occur and which have been agreed upon by Contractor and P roject Engineer.
B. Any items required by drawings to be either reus ed or relocated or both, found during this survey to be nonexistent, o r in opinion of
Project Engineer, to be in such condition that thei r use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which w ill be furnished by
Government. Provided the contract work is changed b y reason of this subparagraph B, the contract will be modified accor dingly, under provisions of clause entitled "DIFFERING SITE CONDI TIONS" (FAR 52.236-
2) and "CHANGES" (FAR 52.243-4 and VAAR 852.236-88) .
C. Re-Survey: Thirty days before expected partial o r final inspection date, the Contractor and Project Engineer together shall make a thorough re-survey of the areas of buildings involv ed. They shall furnish a report on conditions then existing, of re silient flooring, doors, windows, walls and other surfaces as compare d with conditions of same as noted in first condition survey report:
01 00 00 -9
1. Re-survey report shall also list any damage caus ed by Contractor to such flooring and other surfaces, despite protectio n measures; and, will form basis for determining extent of repair wo rk required of
Contractor to restore damage caused by Contractor's workmen in executing work of this contract.
D. Protection: Provide the following protective mea sures:
1. Wherever existing roof surfaces are disturbed th ey shall be protected against water infiltration. In case of le aks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, ma terials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protecti on shall be maintained intact until all work in the area is com pleted.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work remov ed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of t he Government are noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be rem oved or dislodged from present locations in such a manner as to preve nt damage which would be detrimental to re-installation and reuse. Store such items where directed by Project Engineer.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
3. Items of portable equipment and furnishings loca ted in rooms and spaces in which work is to be done under this contr act shall remain the property of the Government. When rooms and spac es are vacated by the Department of Veterans Affairs during the alter ation period, such items which are NOT required by drawings and s pecifications to
01 00 00 -10 be either relocated or reused will be removed by th e Government in advance of work to avoid interfering with Contracto r's operation.
1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,
AND IMPROVEMENTS
A. The Contractor shall preserve and protect all st ructures, equipment, and vegetation (such as trees, shrubs, and grass) o n or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contrac t. If any limbs or branches of trees are broken during contract perfor mance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and p aint the cut with a tree-pruning compound as directed by the Contractin g Officer.
B. The Contractor shall protect from damage all exi sting improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any dam age to those facilities, including those that are the property o f a third party, resulting from failure to comply with the requireme nts of this contract or failure to exercise reasonable care in performin g the work. If the
Contractor fails or refuses to repair the damage pr omptly, the
Contracting Officer may have the necessary work per formed and charge the cost to the Contractor.
(FAR 52.236-9)
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENT AL CONTROLS, for additional requirements on protecting vegetation, s oils and the environment. Refer to Articles, "Alterations", "Res toration", and
"Operations and Storage Areas" for additional instr uctions concerning repair of damage to structures and site improvement s.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair ex isting work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, an d do not disturb any ducts, plumbing, steam, gas, or electric work witho ut approval of the
Project Engineer. Existing work to be altered or ex tended and that is found to be defective in any way, shall be reported to the Project
Engineer before it is disturbed. Materials and work manship used in
01 00 00 -11 restoring work, shall conform in type and quality t o that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work comple te and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work , shall be patched, repaired, reinstalled, or replaced with new work, a nd refinished and left in as good condition as existed before commenc ing work.
C. At Contractor's own expense, Contractor shall im mediately restore to service and repair any damage caused by Contractor' s workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications sy stems (including telephone) which are not scheduled for discontinuan ce or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered b y adjustment to contract time and price in accordance with clause e ntitled "CHANGES"
(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING S ITE CONDITIONS" (FAR
52.236-2).
1.11 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of t he project, to include all contract changes, modifications and cla rifications.
B. All variations shall be shown in the same genera l detail as used in the contract drawings. To insure compliance, as-built d rawings shall be made available for the Project Engineer's review, a s often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the Project
Engineer within 15 calendar days after each complet ed phase and after the acceptance of the project by the Project Engine er.
D. Paragraphs A, B, & C shall also apply to all sho p drawings.
01 00 00 -12
1.12 TEMPORARY USE OF EXISTING ELEVATORS
A. Use of existing elevators for handling building materials and
Contractor's personnel will be permitted subject to following provisions:
1. Contractor makes all arrangements with the Proje ct Engineer for use of elevators. The Project Engineer will ascertain t hat elevators are in proper condition. Contractor may use service ele vators in
Building No. 1 for daily use between the hours of 8 :00 AM and 5:00
PM and for special nonrecurring time intervals when permission is granted. Personnel for operating elevators will not be provided by the Department of Veterans Affairs.
2. Contractor covers and provides maximum protectio n of following elevator components:
a. Entrance jambs, heads soffits and threshold plat es.
b. Entrance columns, canopy, return panels and insi de surfaces of car enclosure walls.
c. Finish flooring.
1.13 TOILETS
A. Contractor personnel may utilize the existing fa cility toilets, provided the facilities are kept in good condition.
1.14 AVAILABILITY AND USE OF UTILITY SERVICES
A. The Government shall make all reasonably required a mounts of utilities available to the Contractor from existing outlets a nd supplies, as specified in the contract. The Contractor shall car efully conserve any utilities furnished without charge.
B. The Contractor, at Contractor's expense and in a wo rkmanlike manner, in compliance with code and as satisfactory to the Con tracting Officer, shall install and maintain all necessary temporary connections and distribution lines. Before final acceptance of the work by the
Government, the Contractor shall remove all the tem porary connections, distribution lines, and associated paraphernalia an d restore the infrastructure as required.
C. Heat: Furnish temporary heat necessary to prevent i njury to work and materials through dampness and cold. Use of open sa lamanders or any
01 00 00 -13 temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted. Mainta in minimum temperatures as specified for various materials.
D. Electricity (for Construction and Testing):
1. Obtain electricity by connecting to the Medical Center electrical distribution system.
E. Water (for Construction and Testing):
1. Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection as per code. Water is available at no co st to the
Contractor.
2. Maintain connections, pipe, fittings and fixture s and conserve water-use so none is wasted. Failure to stop leakag e or other wastes will be cause for revocation (at Project Engineer's discretion) of use of water from Medical Center's system.
1.15 TESTS
A. As per specification section 23 05 93 the contra ctor shall provide a written testing and commissioning plan complete wit h component level, equipment level, sub-system level and system level breakdowns. The plan will provide a schedule and a written sequence of what will be tested, how and what the expected outcome will be. This document will be submitted for approval prior to commencing work. The contractor shall document the results of the approved plan and submit for approval with the as built documentation.
B. Pre-test mechanical and electrical equipment and systems and make corrections required for proper operation of such s ystems before requesting final tests. Final test will not be cond ucted unless pre-tested.
C. Conduct final tests required in various sections of specifications in presence of an authorized representative of the Con tracting Officer.
Contractor shall furnish all labor, materials, equi pment, instruments, and forms, to conduct and record such tests.
D. Mechanical and electrical systems shall be balan ced, controlled and coordinated. A system is defined as the entire syst em which must be
01 00 00 -14 coordinated to work together during normal operatio n to produce results for which the system is designed. For example, air conditioning supply air is only one part of entire system which provide s comfort conditions for a building. Other related components are return air, exhaust air, steam, chilled water, refrigerant, hot water, contr ols and electricity, etc. Another example of a system which involves sev eral components of different disciplines is a boiler installation. Eff icient and acceptable boiler operation depends upon the coordi nation and proper operation of fuel, combustion air, controls, steam, feedwater, condensate and other related components.
E. All related components as defined above shall be functioning when any system component is tested. Tests shall be complete d within a reasonable period of time during which operating an d environmental conditions remain reasonably constant and are typic al of the design conditions.
F. Individual test result of any component, where r equired, will only be accepted when submitted with the test results of re lated components and of the entire system.
1.16 INSTRUCTIONS
A. Contractor shall furnish Maintenance and Operati ng manuals (hard copies and electronic) and verbal instructions when requir ed by the various sections of the specifications and as hereinafter s pecified.
B. Contractor shall provide laminated lockout/tagou t placards with each piece of equipment that is capable of being energiz ed. The lockout/tagout placards shall be in a format approv ed by the COR.
C. Manuals: Maintenance and operating manuals and o ne compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the Project Enginee r coincidental with the delivery of the equipment to the job site. Manu als shall be complete, detailed guides for the maintenance and o peration of equipment. They shall include complete information necessary for starting, adjusting, maintaining in continuous oper ation for long periods of time and dismantling and reassembling of the complete units and sub-assembly components. Manuals shall include an index covering all component parts clearly cross-referenced to dia grams and illustrations. Illustrations shall include "explode d" views showing and
01 00 00 -15 identifying each separate item. Emphasis shall be p laced on the use of special tools and instruments. The function of each piece of equipment, component, accessory and control shall be clearly a nd thoroughly explained. All necessary precautions for the operat ion of the equipment and the reason for each precaution shall be clearly set forth. Manuals must reference the exact model, style and size of t he piece of equipment and system being furnished. Manuals refer encing equipment similar to but of a different model, style, and siz e than that furnished will not be accepted.
D. Instructions: Contractor shall provide qualified , factory-trained manufacturers' representatives to give detailed tra ining to assigned
Department of Veterans Affairs personnel in the ope ration and complete maintenance for each piece of equipment. All such t raining will be at the job site. These requirements are more specifica lly detailed in the various technical sections. Instructions for differ ent items of equipment that are component parts of a complete sy stem, shall be given in an integrated, progressive manner. All instructo rs for every piece of component equipment in a system shall be availab le until instructions for all items included in the system h ave been completed.
This is to assure proper instruction in the operati on of inter-related systems. All instruction periods shall be at such t imes as scheduled by the Project Engineer and shall be considered conclu ded only when the
Project Engineer is satisfied in regard to complete and thorough coverage. The contractor shall submit a course outl ine with associated material to the COR for review and approval prior t o scheduling training to ensure the subject matter covers the ex pectations of the VA and the contractual requirements. The Department o f Veterans Affairs reserves the right to request the removal of, and s ubstitution for, any instructor who, in the opinion of the Project Engin eer, does not demonstrate sufficient qualifications in accordance with requirements for instructors above.
ATTACHMENTS
1. ABOVE-THE-CEILING WORK PERMIT PROGRAM
2. ABOVE-THE-CEILING WORK PERMIT
DEPARTMENT OF VETERANS AFFAIRS MEDICAL CENTER
Cincinnati – Fort Thomas Divisions
3200 Vine Street
Cincinnati, Ohio 45220
MEMORANDUM NO. 138-30
September 2010
ABOVE-THE-CEILING WORK PERMIT PROGRAM
1. PURPOSE: - To describe the policy and procedure for scheduling, and inspecting all work performed above acoustical tile suspended ceiling and gypsum wallboard or plaster ceiling systems in buildings owned by the Cincinnati/FTD VAMC. The walls and floors are to maintain their fire-resistance. Every opening, penetration, and joint must be properly sealed as applicable (see SOC life safety drawings to determine applicable rating) to prevent the escape of fire and smoke from the compartment.
2. POLICY: - All construction, maintenance, repair, installation, utility, and telecommunications work performed above the finished ceiling in any Cincinnati/FTD owned building will be completed and installed such that all building components and structural elements (i.e. walls, floor slabs, interstitial space decking, etc.) are restored to original smoke-tight or fire-rated condition in order to maintain compartmentalization.
To monitor and control this type of work, no such work will be performed in
Cincinnati/FTD-owned buildings until an Above-The-Ceiling Work Permit is issued to the person(s) coordinating the work activity.
3. RESPONSIBILITIES:
a. Service Chiefs must be aware of the requirements of this policy with respect to equipment installations that are coordinated within their assigned building space.
They shall be aware that anyone performing work that would result penetrations above ceiling should have an above-the-ceiling work permit.
b. Contracting Officer’s Technical Representatives (COTRs), Engineering Shops, Information Resource Management Service (IRMS) and other staff coordinating or performing work above the finished ceiling are responsible for implementation of the policy requirements.
c. Engineering Technician will issue permits and inspect all work performed above the finished ceiling in all VAMC-owned buildings at their respective facilities.
When Engineering Technician is unavailable, appropriate designee (Engineering
COTR, Industrial Hygiene and Safety (IH&S) staff, or Competent Person) shall complete the Engineering Technician responsibilities.
d. IH&S Staff will provide training and technical consultation as needed for the successful implementation of this program and use this program as a process to monitor the life safety status of any VAMC-owned building.
4. ACTIONS:
a. The COTR, Engineering Service Supervisor, IRMS Supervisor, or other staff coordinating and construction, maintenance, repair, installation, utility, and telecommunications work above the finished ceiling in any VAMC-owned building will contact the Engineering Technician prior to performing any such work. Applicable work may include, but is not limited to, phone/data cabling, signal and control cabling, cabling for networked medical equipment, electrical cabling/wiring, lighting systems, and heating, ventilation, and air conditioning
(HVAC).
b. The Engineering Technician will meet with the person(s) coordinating the work to review the location and scope of the work, and review any planned penetration(s) of horizontal and/or vertical building fire or smoke partition/barrier. This includes assuring that any planned penetrations(s) of a fire or smoke partition/barrier will be properly sleeved and/or fires-topped with Underwriters
Laboratories, Inc. (UL) approved system.
c. The Engineering Technician will issue an Above-The-Ceiling Work Permit (see
Attachment) upon approval of the planned work method.
d. Person(s) performing the above-the ceiling work will contact the Engineering
Technician Engineer when all work is concluded. The individual will remain in the area and accompany the Engineering Technician on an inspection to ensure that all work was completed according to plan and that no further fire safety deficiencies or hazards exist.
f. All permits will be maintained on file by the Engineering Technician.
5. REFERENCES:
a. The Joint Commission (TJC) Manual.
b. National Fire Protection Association NFPA 101.
6. RESPONSIBLE OFFICE: - The Chief, Facilities and Engineering Service (138/ENG) is responsible for the contents of this memorandum.
7. RESCISSIONS: - None.
8. REISSUE DATE: September 2013
LINDA. SMITH, FACHE
Medical Center Director
Attachment: Above-the-Ceiling Work Permit
Attachment
ABOVE-THE-CEILING WORK PERMIT
Contractor/Dept./Service:_____________________________________________________
Responsible Person: __________________________________________________________
Location of Penetrations: ____________________________________________________
Work Narrative:
Before issuing a Fire/Smoke Barrier Penetration Permit, the Engineering Technician will review the following Checklist with the responsible person.
Check List Items Yes No N/A Did the responsible person obtain prints from Engin eering Service Supervisor/Project Section detailing hourly-rated w alls and identifying the scope of work for fire stop?
Is manufacturer’s product (fire sealant) applicatio n guide containing UL-listed fire stop systems available an d approved?
Are trained individuals actually performing work?
Has the responsible person prepared an itemized sch edule/marked up drawings of fire/smoke walls to be penetrated?
Materials utilized in repair:
Firestopping _________________________________ Wall Board _________________________________ Other _________________________________
Engineering Technician: ____________________________ Issue Date: ____________________________________________________
After penetrations are sealed, the Engineering Technician along with the responsible person will inspect to ensure compliance with the required standards.
Inspected By: __________________________________________________________________
Signature: _____________________________________________________________________
Signature: ___________________________________ Inspection Date: ________________
01 32 16.17 - 1
SECTION 01 32 16.17
PROJECT SCHEDULES
(SMALL PROJECTS – DESIGN/BUILD)
PART 1- GENERAL
1.1 DESCRIPTION:
A. The Contractor shall develop a Critical Path Met hod (CPM) plan and schedule demonstrating fulfillment of the contract requirements (Project
Schedule), and shall keep the Project Schedule up-t o-date in accordance with the requirements of this section and shall uti lize the plan for scheduling, coordinating and monitoring work under this contract
(including all activities of subcontractors, equipm ent vendors and suppliers). Conventional Critical Path Method (CPM) technique shall be utilized to satisfy both time and cost applications .
1.2 CONTRACTOR'S REPRESENTATIVE:
A. The Contractor shall designate an authorized rep resentative responsible for the Project Schedule including preparation, rev iew and progress reporting with and to the Contracting Officer's Rep resentative (COTR).
B. The Contractor's representative shall have direc t project control and complete authority to act on behalf of the Contract or in fulfilling the requirements of this specification section.
C. The Contractor’s representative shall have the o ption of developing the project schedule within their organization or to en gage the services of an outside consultant. If an outside scheduling co nsultant is utilized, Section 1.3 of this specification will apply.
1.3 CONTRACTOR'S CONSULTANT:
A. The Contractor shall submit a qualification prop osal to the COTR, within
10 days of bid acceptance. The qualification propos al shall include:
1. The name and address of the proposed consultant.
2. Information to show that the proposed consultant has the qualifications to meet the requirements specified i n the preceding paragraph.
3. A representative sample of prior construction pr ojects, which the proposed consultant has performed complete project scheduling services. These representative samples shall be of similar size and scope.
B. The Contracting Officer has the right to approve or disapprove the proposed consultant, and will notify the Contractor of the VA decision within seven calendar days from receipt of the qual ification proposal.
In case of disapproval, the Contractor shall resubm it another consultant
01 32 16.17 - 2 within 10 calendar days for renewed consideration. The Contractor shall have their scheduling consultant approved prior to submitting any schedule for approval.
1.4 COMPUTER PRODUCED SCHEDULES
A. The contractor shall provide monthly, to the Dep artment of Veterans
Affairs (VA), all computer-produced time/cost sched ules and reports generated from monthly project updates. This monthl y computer service will include: three copies of up to five different reports (inclusive of all pages) available within the user defined report s of the scheduling software approved by the Contracting Officer; a har d copy listing of all project schedule changes, and associated data, made at the update and an electronic file of this data; and the resulting mon thly updated schedule in PDM format. These must be submitted with and su bstantively support the contractor’s monthly payment request and the si gned look ahead report. The COTR shall identify the five different report formats that the contractor shall provide.
B. The contractor shall be responsible for the corr ectness and timeliness of the computer-produced reports. The Contractor sh all also responsible for the accurate and timely submittal of the update d project schedule and all CPM data necessary to produce the computer reports and payment request that is specified.
C. The VA will report errors in computer-produced r eports to the
Contractor’s representative within ten calendar day s from receipt of reports. The Contractor shall reprocess the compute r-produced reports and associated diskette(s), when requested by the C ontracting Officer’s representative, to correct errors which affect the payment and schedule for the project.
1.5 THE INTERIM AND FINAL PROJECT SCHEDULE SUBMITTA L
A. Interim Schedule Submittal: Within 21 calendar d ays after receipt of
Notice to Proceed, the Contractor shall submit for the Contracting
Officer's review; three blue line copies of the int erim schedule on sheets of paper 765 x 1070 mm (30 x 42 inches) and an electronic file in the previously approved CPM schedule program. Each activity/event on the computer-produced schedule shall contain as a minim um, but not limited to, activity/event ID, activity/event description, duration, budget amount, early start date, early finish date, late s tart date, late finish date and total float. Work activity/event re lationships shall be restricted to finish-to-start and start-to-start wi thout lead or lag constraints. Activity/event date constraints, not r equired by the contract, will not be accepted unless submitted to and approved by the
01 32 16.17 - 3
Contracting Officer. The contractor shall make a se parate written detailed request to the Contracting Officer identif ying these date constraints and secure the Contracting Officer’s wr itten approval before incorporating them into the Project Schedule. The C ontracting Officer’s separate approval of the interim schedule shall not excuse the contractor of this requirement. Logic events (non-w ork) will be permitted where necessary to reflect proper logic a mong work events, but must have zero duration. The complete working inter im Project Schedule shall reflect the Contractor's approach to scheduli ng the complete project and shall include at a minimum, the followi ng activities:
1. All phasing described in Section 01 00 00, GENER AL REQUIREMENTS-
OPERATIONS AND STORAGE AREAS- Paragraph “Phasing”
2. Procurement- Submittals, review and approvals, f abrication and delivery, of all key and long lead time procurement items.
3. Design- All design submissions listed in the RFP solicitation, including the specified meeting and review activiti es.
4. Detailed design and…