36C25018B0807-0004000.docx
DOCX document 26 KB Posted
- Solicitation number
- 36C25018B0807
About this file
36C25018B0807 0004 36C25018B0807 0004.docx
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25018B0807-0005007.pdf | ||
| 36C25018B0807-0005006.pdf | ||
| 36C25018B0807-0005004.docx | DOCX document | |
| 36C25018B0807-0005005.pdf | ||
| 36C25018B0807-0004001.pdf | ||
| 36C25018B0807-0004002.pdf | ||
| 36C25018B0807-0003001.docx | DOCX document | |
| 36C25018B0807-0002004.docx | DOCX document | |
| 36C25018B0807-0002005.pdf | ||
| 36C25018B0807-014.docx | DOCX document | |
| 36C25018B0807-0001001.pdf | ||
| 36C25018B0807-0001002.pdf | ||
| 36C25018B0807-0001000.docx | DOCX document | |
| 36C25018B0807-013.docx | DOCX document | |
| 36C25018B0807-011.pdf | ||
| 36C25018B0807-005.pdf | ||
| 36C25018B0807-004.pdf | ||
| 36C25018B0807-009.pdf | ||
| 36C25018B0807-012.pdf | ||
| 36C25018B0807-002.pdf | ||
| 36C25018B0807-006.docx | DOCX document | |
| 36C25018B0807-003.pdf | ||
| 36C25018B0807-001.docx | DOCX document | |
| 36C25018B0807-010.pdf | ||
| 36C25018B0807-007.docx | DOCX document | |
| 36C25018B0807-008.pdf | ||
| 36C25018B0807-000.docx | DOCX document |
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2.
AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE
OF PAGES
10A. MODIFICATION OF
CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV.
11/2016) is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:
Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITE M 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES
SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR
43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS
ENTERED INTO
PURSUANT TO AUTHORITY OF:
D. OTHER
BY
Contractor
16C. DATE SIGNED
14.
DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME
AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS
OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 09-10-2018 539-17-102 Department of Veterans Affairs Network Contracting Office (NCO) 10 3140 Govenor's Place Blvd, Suite 210 Kettering OH 45409 Department of Veterans Affairs Network Contracting Office (NCO) 10 3140 Governor's Place Blvd, Suite 210 Kettering OH 45409 To all Offerors/Bidders
36C25018B0807
X X X 20 Sept 18, 2:30 PM EST The purpose of this amendment is to post answers to contractor questions, to replace, in their entirety, the specifications and drawings, and to change the opening time.
1. See next page for the answers to contractor questions.
2. The Specifications and Drawings are replaced in their entirety. An index of changes are below.
3. The bid opening TIME is changed to 2:30 PM EST on 20 Sept 2018.
QUESTIONS AND ANSWERS
Q1. There’s an aluminum framed entrances and storefronts spec section that has been issued but there are no aluminum doors/storefront listed on the door schedule except for Door #0107C which is existing to remain. IS THIS CORRECT?
A1. There are no aluminum framed storefront entrances. Main suite entry door #0107A was changed in the final design to be hollow metal and wood door to align with the rest of the facility at similar locations.
Q2. Door # 0107A is elevation 9/2.3A517 and are called out as wood doors and HM frame on the door schedule. IS THIS CORRECT?
A2. Yes. See above.
Q3. Is the glass with decorative film shown on 4/2.3A511 by the millwork sub or glazing contractor?
A3. The general contractor can assign who they want to provide and install the decorative film. We do typically see this product provided by the glazing companies but not always.
CHANGES TO THE SPECIFICATIONS
00 01 10 INDEX
Revised to add new specifications noted below
| 01 91 00 | GENERAL COMMISSIONING REQUIREMENTS | |
| Added new specification |
| 23 05 11 | COMMON WORK RESULTS FOR HVAC - | |
| Revised paragraph 1.4 E to add the word “systems” |
| 23 05 12 | GENERAL MOTOR REQUIREMENTS FOR HVAC AND STEAM GENERATION EQUIPMENT | |
| Deleted paragraphs 1.2 E and 1.2 F |
| 23 05 41 | NOISE AND VIBRATION CONTROL FOR HVAC PIPING AND EQUIPMENT | |
| Added to table in paragraph 1.3 B – Kitchens at NFC 50 |
| 23 05 93 | TESTING, ADJUSTING, AND BALANCING FOR HVAC | |
| Part 1 – 1.1 Paragraph B added Control Valves | ||
| Added Performance Paragraph | ||
| 2.9 A – added have | ||
| 2.9 A – revised recommendation to recommended | ||
| Part 3 – 3.1 E – inserted unit |
| 23 09 23 | DIRECT-DIGITAL CONTROL SYSTEM FOR HVAC | |
| Added control valves | ||
| Added paragraph 1.5 Performance |
| 23 21 13 | HYDRONIC PIPING | |
| Added entirely new specification |
| 23 36 00 | AIR TERMINAL UNITS | |
| Added entirely new specification |
| 23 37 00 | AIR OUTLETS AND INLETS | |
| Revised reference in 1.3 to read COMMON WORK RESULTS FOR HVAC |
23 82 00 CONVECTION HEATING AND COOLING UNITS
Deleted paragraph A. Section 13 05 41, SEISMIC RESTRAINT REQUIREMENTS FOR NON-STRUCTURAL COMPONENTS: Seismic restraints for equipment.
26 08 00 COMMISSIONING OF ELECTRICAL SYSTEMS
Added new specification
CHANGES TO THE DRAWINGS
MH 601 Revised control sequence and added HVAC Design Data schedule
ATTACHMENTS
See attached document: 10 Sept 2018 539-17-102 Specifications Revised.
See attached document: 10 Sept 2018 539-17-102 Drawings.