S06 - A0005 - Attachment 9 - AD141 - DEMOLITON REFLECTED CEILING PLAN - Add 1.pdf

PDF 1 MB Posted

Attached to
J041--603-20-201 Replace SPS Air Handler Robley Rex VA; Louisville Kentucky
Solicitation number
36C24921R0108
Issued by

View the file

Other files

File Type Posted
S06 - Amendment 0007 - Final SPS Air Handler.pdf PDF
S05 - Amendment 0007 - Attachment 1 - Questions and Answers.pdf PDF
S06 - A0006 - Amendment 6 - Extension - SPS Air Handler.pdf PDF
S06 - A0005 - Attachment 18 - H-01-0B-Bsmt Flr Full Size.pdf PDF
S06 - A0005 - Attachment 3 - 087100 Door Hardware- Add 1.pdf PDF
S06 - A0005 - Attachment 5- 099659 - Resinous Wall Coating - Add 1.pdf PDF
S06 - Amendment A0005 - SPS Air Handler.pdf PDF
S06 - A0005 - Attachment 8 - AD141 - DEMOLITON REFLECTED CEILING PLAN - Add 1 (1).pdf PDF
S06 - A0005 - Attachment 17 - H-01-_SB-Sub-Basement Floor.pdf PDF
S06 - A0005 - Attachment 12 - AE501 - PLAN DETAILS AND DOOR SCHEDULE - Add 1.pdf PDF
S06 - A0005 - Attachment 14 - E-01-0B Bsmt Flr Full Size (1).pdf PDF
S06 - A0005 - Attachment 2 - 081400 Interior Wood Doors - Add 1.pdf PDF
S06 - A0005 - Attachment 10 - AE101 - BASEMENT FLOOR PLAN - Add 1.pdf PDF
S06 - A0005 - Attachment 6 - 230923 Direct-Digital Control System for HVAC - Add 1.pdf PDF
S06 - A0005 - Attachment 11 - AE141 - REFLECTED CEILING PLAN - Add 1.pdf PDF
S06 - A0005 - QUESTIONS AND ANSWERS.pdf PDF
S06 - A0005 - Attachment 1 - 000110 Table of Contents - Add 1.pdf PDF
S06 - A0005 - Attachment 15 - E500 - SCHEDULES - Add 1.pdf PDF
S06 - A0005 - Attachment 13 - E-01-_SB-Sub-Basement Floor.pdf PDF
S06 - A0005 - Attachment 7 - 283100 Fire Alarm - Add 1.pdf PDF
S06 - A0005 - Attachment 16 - EP101 - BASEMENT and SUB-BASEMENT POWER AND TECHNOLOGY PLAN -Add 1.pdf PDF
S06 - A0005 - Attachment 4 - 093013 Ceramic Tile - Add 1.pdf PDF
S06 - Amendment 0004.pdf PDF
36C24921R0108 0004.docx DOCX document
S06 - Site Visit Sign in Sheet.pdf PDF
S06 - A0004 - Attachment 1 - Site Visit Sign in Sheet.pdf PDF
S06 - Amendment 0003.pdf PDF
Amendment 0003 - Questions and Answers.pdf PDF
S06 - Amendment 0002.pdf PDF
S02 - Attachment 1 - Price Schedule - SPS Air Handler.xlsx XLSX spreadsheet
S02 - Attachment 3 - Specs SPS AHU.pdf PDF
S02 - Attachment 2 - Drawings SPS AHU.pdf PDF
S02 - Attachment 5 - Past Performance.pdf PDF
S02 - Solicitation.pdf PDF
S02 - Attachment 4 - Wage Determination.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OS

OS

OSOS

MM

MM

O

N

M

L

K

K.1

7 8 9 10 11 12 13 14 16

P

LOGISTICS

CLEAN SUPPLY

STORAGE

A-019b

INSTRUMENT

PREP ROOM

B-039

DECONTAMINATION

ROOM

A-018

MATERIAL

MANAGEMENT

STORAGE

A-019

TYP.

TYP.

TYP.

TYP.

TYP.

TYP.

SPD OFFICE

B-039a

WOMEN'S

SHOWER

B-041

MEN'S SHOWER

B-042

BREAK ROOM

B-040

VESTIBULE

B039

HOLDING

B-043

CART WASH

A-018b

EQUIP

A-019a

BREAKDOWN

AREA

A023C

OFFICE

A023B

WAREHOUSE

A023

OFFICE

A023DINCOMING

INSPECTION

A023E

TYP.

TYP.

/4

TYP.

1 1010

PHASE II

G E N E R A L N O T E S

2' X 4' LIGHT FIXTURE TO BE REMOVED.

ACCESS PANEL

GYPSUM BOARD CEILING

ACOUSTIC TILE CEILING

HVAC SUPPLY

EXIT SIGN

HVAC RETURN

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% BID DOCUMENTS

ROBLEY

REX

VA MEDICAL

CENTER

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

603-20-201

800 Zorn Ave., Louisville, KY

REPLACE SPS AIR HANDLER

ARCHITECT/ENGINEER OF RECORDCONSULTANT

C U s e rs

\c ra ig \D o c u m e n ts

\F F

E

L o u is v ill e

R e p la c e S

P S

A H

U c ra ig .l ie g ib e l@ ff e -s e rv

.c o m

.r v t

/2

/2

:4

:4

A

M

AD141

DEMOLITON REFLECTED CEILING

PLAN

06/29/2021 PQ DB

SCALE: 1/4" = 1'-0"

BASEMENT - DEMOLITION REFLECTED CEILING PLAN

D E M O L I T I O N N O T E S

1 REMOVE EXISTING GYPSUM BOARD CEILING AND ASSOCIATED FRAMING MEMBERS.

2 NO WORK IN THIS AREA. PROTECT AREAS DURING ALL PHASES OF CONSTRUCTION.

3 REMOVE EXISTING ACT CEILING AND ASSOCIATED CONSTRUCTION.

4 REMOVE EXISTING LIGHT FIXTURE.

5 EXISTING ACCESS PANEL TO BE REMOVED.

6 REMOVE EXISTING GYPSUM BOARD CEILING AS REQUIRED FOR INSTALLATION OF NEW SUPPLY

AND RETURN DIFFUSERS.

7 CEILING EXPOSED TO STRUCTURE - NO WORK NEEDED

8 REMOVE EXISTING SUPPORT POLES, ESCUTCHEON PLATES, AND ELECTRICAL OUTLET,

9 EXISTING SANITATION EQUIPMENT TO REMAIN.

10 REMOVE EXISTING SLOPED METAL CEILING.

11 PROVIDE PREFABRICATED TEMPORARY CONSTRUCTION SMOKE PARTITION WALL TO

TERMINATE AT EXISTING CEILING - EXISTING CEILING SHALL REMAIN - SEE ICRA REQUIREMENTS IN SPECIFICATIONS FOR INSTRUCTIONS AT PARTITION AND DOOR - REMOVE AT COMPLETION OF

WORK - IF ADJACENT SURFACES ARE DISTURBED, CONTRACTOR SHALL PATCH AND REPAIR TO

MATCH EXISTING.

RCP LEGEND

A. PROTECT / REPAIR EXISTING WALLS DURING ENTIRETY OF CONSTRUCTION

B. SEE ELECTRICAL DRAWINGS FOR CEILING-MOUNTED ELECTRICAL ITEMS

N.T.S.Scale:

KEY PLAN

1616637 Exp:12/31/2021

PATRICK R. QUINN

Revisions: Date:

100% BID DOCUMENTS 07/13/2021

ADDENDUM #1 09/20/20211

Sheets
AD141 - DEMOLITON REFLECTED CEILING PLAN
AE101 - BASEMENT FLOOR PLAN
AE141 - REFLECTED CEILING PLAN
AE501 - PLAN DETAILS, DOOR SCHEDULE, AND FINISH LEGEND

File details come from the government source that posted it. Updated .