Amendment 0003 - Questions and Answers.pdf

PDF 92 KB Posted

Attached to
J041--603-20-201 Replace SPS Air Handler Robley Rex VA; Louisville Kentucky
Solicitation number
36C24921R0108
Issued by

View the file

Other files

File Type Posted
S06 - Amendment 0007 - Final SPS Air Handler.pdf PDF
S05 - Amendment 0007 - Attachment 1 - Questions and Answers.pdf PDF
S06 - A0006 - Amendment 6 - Extension - SPS Air Handler.pdf PDF
S06 - A0005 - Attachment 18 - H-01-0B-Bsmt Flr Full Size.pdf PDF
S06 - A0005 - Attachment 3 - 087100 Door Hardware- Add 1.pdf PDF
S06 - A0005 - Attachment 5- 099659 - Resinous Wall Coating - Add 1.pdf PDF
S06 - Amendment A0005 - SPS Air Handler.pdf PDF
S06 - A0005 - Attachment 8 - AD141 - DEMOLITON REFLECTED CEILING PLAN - Add 1 (1).pdf PDF
S06 - A0005 - Attachment 17 - H-01-_SB-Sub-Basement Floor.pdf PDF
S06 - A0005 - Attachment 12 - AE501 - PLAN DETAILS AND DOOR SCHEDULE - Add 1.pdf PDF
S06 - A0005 - Attachment 14 - E-01-0B Bsmt Flr Full Size (1).pdf PDF
S06 - A0005 - Attachment 2 - 081400 Interior Wood Doors - Add 1.pdf PDF
S06 - A0005 - Attachment 10 - AE101 - BASEMENT FLOOR PLAN - Add 1.pdf PDF
S06 - A0005 - Attachment 6 - 230923 Direct-Digital Control System for HVAC - Add 1.pdf PDF
S06 - A0005 - Attachment 11 - AE141 - REFLECTED CEILING PLAN - Add 1.pdf PDF
S06 - A0005 - QUESTIONS AND ANSWERS.pdf PDF
S06 - A0005 - Attachment 1 - 000110 Table of Contents - Add 1.pdf PDF
S06 - A0005 - Attachment 15 - E500 - SCHEDULES - Add 1.pdf PDF
S06 - A0005 - Attachment 13 - E-01-_SB-Sub-Basement Floor.pdf PDF
S06 - A0005 - Attachment 7 - 283100 Fire Alarm - Add 1.pdf PDF
S06 - A0005 - Attachment 9 - AD141 - DEMOLITON REFLECTED CEILING PLAN - Add 1.pdf PDF
S06 - A0005 - Attachment 16 - EP101 - BASEMENT and SUB-BASEMENT POWER AND TECHNOLOGY PLAN -Add 1.pdf PDF
S06 - A0005 - Attachment 4 - 093013 Ceramic Tile - Add 1.pdf PDF
S06 - Amendment 0004.pdf PDF
36C24921R0108 0004.docx DOCX document
S06 - Site Visit Sign in Sheet.pdf PDF
S06 - A0004 - Attachment 1 - Site Visit Sign in Sheet.pdf PDF
S06 - Amendment 0003.pdf PDF
S06 - Amendment 0002.pdf PDF
S02 - Attachment 1 - Price Schedule - SPS Air Handler.xlsx XLSX spreadsheet
S02 - Attachment 3 - Specs SPS AHU.pdf PDF
S02 - Attachment 2 - Drawings SPS AHU.pdf PDF
S02 - Attachment 5 - Past Performance.pdf PDF
S02 - Solicitation.pdf PDF
S02 - Attachment 4 - Wage Determination.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS AND ANSWERS

A0003

1. The RFP states the site visit is to occur on Sept 4, 2021. Sept 4 is a Saturday. Please provide a correct site visit date.

Answer – This is the correct site visit date. There are areas above the ceiling that will need to be accessed and this is the only day this can occur.

2. The amount of time currently set between the site visit 9/4/21, the RFI due date 9/8/21 and the bid due date 9/13/21 does not provide adequate time for any of those milestones (including GOV review and response to RFI’s) to occur. Please provide more time between these three milestones.

Answer –

The date of the site visit will remain September 4, 2021 at 10:00am EDT.

RFI due date has been extended until 9/13/2021 1:00pm EDT.

Bid due date has been extended until 9/20/2021 1:00pm EDT.

3. The RFP states that PPQ’s are due 2 weeks prior to the bid due date. Can the deadline for PPQ’s be changed to be closer to the bid deadline to allow adequate time for CO’s to complete and submit these documents?

Answer – PPQ’s will be due on September 13, 2021 Close of Business.

4. Is it acceptable to submit CPARS in lieu of PPQ’s?

Answer - Yes

File details come from the government source that posted it. Updated .