S06 - A0005 - Attachment 12 - AE501 - PLAN DETAILS AND DOOR SCHEDULE - Add 1.pdf

PDF 325 KB Posted

Attached to
J041--603-20-201 Replace SPS Air Handler Robley Rex VA; Louisville Kentucky
Solicitation number
36C24921R0108
Issued by

View the file

Other files

File Type Posted
S06 - Amendment 0007 - Final SPS Air Handler.pdf PDF
S05 - Amendment 0007 - Attachment 1 - Questions and Answers.pdf PDF
S06 - A0006 - Amendment 6 - Extension - SPS Air Handler.pdf PDF
S06 - A0005 - Attachment 18 - H-01-0B-Bsmt Flr Full Size.pdf PDF
S06 - A0005 - Attachment 3 - 087100 Door Hardware- Add 1.pdf PDF
S06 - A0005 - Attachment 5- 099659 - Resinous Wall Coating - Add 1.pdf PDF
S06 - Amendment A0005 - SPS Air Handler.pdf PDF
S06 - A0005 - Attachment 8 - AD141 - DEMOLITON REFLECTED CEILING PLAN - Add 1 (1).pdf PDF
S06 - A0005 - Attachment 17 - H-01-_SB-Sub-Basement Floor.pdf PDF
S06 - A0005 - Attachment 14 - E-01-0B Bsmt Flr Full Size (1).pdf PDF
S06 - A0005 - Attachment 2 - 081400 Interior Wood Doors - Add 1.pdf PDF
S06 - A0005 - Attachment 10 - AE101 - BASEMENT FLOOR PLAN - Add 1.pdf PDF
S06 - A0005 - Attachment 6 - 230923 Direct-Digital Control System for HVAC - Add 1.pdf PDF
S06 - A0005 - Attachment 11 - AE141 - REFLECTED CEILING PLAN - Add 1.pdf PDF
S06 - A0005 - QUESTIONS AND ANSWERS.pdf PDF
S06 - A0005 - Attachment 1 - 000110 Table of Contents - Add 1.pdf PDF
S06 - A0005 - Attachment 15 - E500 - SCHEDULES - Add 1.pdf PDF
S06 - A0005 - Attachment 13 - E-01-_SB-Sub-Basement Floor.pdf PDF
S06 - A0005 - Attachment 7 - 283100 Fire Alarm - Add 1.pdf PDF
S06 - A0005 - Attachment 9 - AD141 - DEMOLITON REFLECTED CEILING PLAN - Add 1.pdf PDF
S06 - A0005 - Attachment 16 - EP101 - BASEMENT and SUB-BASEMENT POWER AND TECHNOLOGY PLAN -Add 1.pdf PDF
S06 - A0005 - Attachment 4 - 093013 Ceramic Tile - Add 1.pdf PDF
S06 - Amendment 0004.pdf PDF
36C24921R0108 0004.docx DOCX document
S06 - Site Visit Sign in Sheet.pdf PDF
S06 - A0004 - Attachment 1 - Site Visit Sign in Sheet.pdf PDF
S06 - Amendment 0003.pdf PDF
Amendment 0003 - Questions and Answers.pdf PDF
S06 - Amendment 0002.pdf PDF
S02 - Attachment 1 - Price Schedule - SPS Air Handler.xlsx XLSX spreadsheet
S02 - Attachment 3 - Specs SPS AHU.pdf PDF
S02 - Attachment 2 - Drawings SPS AHU.pdf PDF
S02 - Attachment 5 - Past Performance.pdf PDF
S02 - Solicitation.pdf PDF
S02 - Attachment 4 - Wage Determination.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HOLLOW METAL FRAME

CAULK FRAME PERIMETER

BOTH SIDES. PROVIDE

ANCHORS AS SPECIFIED

-GROUT FRAME SOLID

/2

/4

/4

EXISTING CMU

CORNER BLOCK

/2

HOLLOW METAL FRAME

CAULK FRAME PERIMETER

BOTH SIDES - GROUT

FRAME SOLID

STEEL FLAT PLATE AT HEAD

/4

2" 3 1/4" 1 1/2"

6 3/4"

EXISTING WALL CONSTRUCTION

2" X 36" TYPE 304 STAINLESS

STEEL PANEL WITH SATIN FINISH

STAINLESS STEEL FLATHEAD

SCREWS @ 8" O.C.

CONTINUOUS FIRE RETARDANT TREATED

2X WOOD BLOCKING - EXPANSION

ANCHOR INTO EXISTING WALL.

RUBBER BASE TO MATCH

ADJACENT WALL CONSTRUCTION

STAINLESS STEEL FLATHEAD

SCREWS @ 8" O.C.

1" COVE STICK

URETHANE FLOORING RES-1

EXISTING WALL CONSTRUCTION.

PREPARE SUBSTRATE TO RECEIVE

NEW FINISH.

DEMOLISHED 2" HOLLOW

METAL FRAME

NEW HOLLOW METAL NARROW

FACE FRAME

EXISTING WALL

CONSTRUCTION TO REMAIN

EXISTING ALUMINUM TRIM AND

BLOCKING TO REMAIN

EXISTING ALUMINUM TRIM AND

BLOCKING TO REMAIN

NEW DOOR PANEL ACCORDING

TO SCHEDULE

1"

2"

NOTE: CONTRACTOR SHALL VERIFY JAMB

CONSTRUCTION IN FIELD PRIOR TO START

OF NEW WORK.

EXISTING WALL CONSTRUCTION TO REMAIN

EXISTING STEEL LINTEL AND ALUMINUM

FLASHING TO REMAIN

NEW HOLLOW METAL DOOR FRAME

AND BLOCKING AS SCHEDULED IN

SAME LOCATION AS DEMOLISHED

NOTE: CONTRACTOR SHALL VERIFY HEAD

CONSTRUCTION IN FIELD PRIOR TO START

OF NEW WORK.

F - STANDARD FLUSHNL - NARROW LITE

PER SCHEDULE

P E

R S

C H

E D

U L E

PER SCHEDULE

6"

4"

TEMPERED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% BID DOCUMENTSROBLEY

REX

VA MEDICAL

CENTER

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

603-20-201

800 Zorn Ave., Louisville, KY

REPLACE SPS AIR HANDLER

ARCHITECT/ENGINEER OF RECORDCONSULTANT

C U s e rs

\c ra ig \D o c u m e n ts

\F F

E

L o u is v ill e

R e p la c e S

P S

A H

U c ra ig .l ie g ib e l@ ff e -s e rv

.c o m

.r v t

/2

/2

:4

:4

A

M

AE501

PLAN DETAILS, DOOR SCHEDULE,

AND FINISH LEGEND

06/29/2021 Checker Author

DOOR SCHEDULE

DOOR #

DOOR PANEL

FRAME

MATERIAL HEAD JAMB

HARDWARE

SET COMMENTSTYPE MATERIAL

SIZE

W H T

01 NL WD 3' - 8" 7' - 0" 1 3/4" HM 3/AE501 2/AE501 1.0 1

02 NL WD 3' - 8" 7' - 0" 1 3/4" HM 3/AE501 2/AE501 1.0 1

03 ETR ETR 3' - 6" 7' - 0" 1 3/4" HM ETR ETR 2.0 2

04 F HM 4' - 0" 8' - 0" 1 3/4" HM 1/AE501 6/AE501 3.0 3

3" = 1'-0"

BUTTED FRAME - 6" WALL - JAMB DETAIL

3" = 1'-0"

BUTTED FRAME - 6" WALL STEEL LINTEL - HEAD

DETAIL

D O O R S C H E D U L E C O M M E N T S

1: PROVIDE NEW LINTEL AS SHOWN IN DOOR HEAD DETAIL.

2: PROVIDE "EMERGENCY EXIT ONLY" SIGN. SEE ARCHITECTURE PLAN.

3: MATCH EXISTING LOCKSET FUNCTIONALITY AND HARDWARE.

4: PAINT ALL NEW DOOR FRAMES P-1.

1 1/2" = 1'-0"

WALL PROTECTION DETAIL

1 1/2" = 1'-0"

INTEGRAL RESINOUS BASE

3" = 1'-0"

EXTERIOR DOOR JAMB

3" = 1'-0"

EXTERIOR DOOR HEAD

1616637 Exp:12/31/2021

PATRICK R. QUINN

Revisions: Date:

100% BID DOCUMENTS 07/13/2021

ADDENDUM #1 09/20/2021

1/2" = 1'-0"

DOOR ELEVATIONS

FINISH LEGEND

CODE FINISH TYPE MANUFACTURER PRODUCT/COLOR

WALLS

RES-W RESINOUS COATING STONHARD STONGLAZE VSE, WHITE

FLOOR

RB-1

RES-1

RUBBER BASE JOHNSONITE

STONHARD

4", MATCH EXISTING ADJACENT

STONCLAD UR W/ HT4 STONKOTE - COLOR TBD

CT-1 CERAMIC WALL TILE DALTILE 4X4, MATCH EXISTING WHITE

CEILING

STONHARD STONGLAZE VSE, WHITERES-W

RESINOUS COATING

RESINOUS COATING

HM DOORS AND FRAMES

COLOR TBDP-1 SEMI-GLOSS PAINT SHERWIN WILLIAMS

Sheets
AD141 - DEMOLITON REFLECTED CEILING PLAN
AE101 - BASEMENT FLOOR PLAN
AE141 - REFLECTED CEILING PLAN
AE501 - PLAN DETAILS, DOOR SCHEDULE, AND FINISH LEGEND

File details come from the government source that posted it. Updated .