S06 - A0005 - Attachment 10 - AE101 - BASEMENT FLOOR PLAN - Add 1.pdf

PDF 371 KB Posted

Attached to
J041--603-20-201 Replace SPS Air Handler Robley Rex VA; Louisville Kentucky
Solicitation number
36C24921R0108
Issued by

View the file

Other files

File Type Posted
S06 - Amendment 0007 - Final SPS Air Handler.pdf PDF
S05 - Amendment 0007 - Attachment 1 - Questions and Answers.pdf PDF
S06 - A0006 - Amendment 6 - Extension - SPS Air Handler.pdf PDF
S06 - A0005 - Attachment 18 - H-01-0B-Bsmt Flr Full Size.pdf PDF
S06 - A0005 - Attachment 3 - 087100 Door Hardware- Add 1.pdf PDF
S06 - A0005 - Attachment 5- 099659 - Resinous Wall Coating - Add 1.pdf PDF
S06 - Amendment A0005 - SPS Air Handler.pdf PDF
S06 - A0005 - Attachment 8 - AD141 - DEMOLITON REFLECTED CEILING PLAN - Add 1 (1).pdf PDF
S06 - A0005 - Attachment 17 - H-01-_SB-Sub-Basement Floor.pdf PDF
S06 - A0005 - Attachment 12 - AE501 - PLAN DETAILS AND DOOR SCHEDULE - Add 1.pdf PDF
S06 - A0005 - Attachment 14 - E-01-0B Bsmt Flr Full Size (1).pdf PDF
S06 - A0005 - Attachment 2 - 081400 Interior Wood Doors - Add 1.pdf PDF
S06 - A0005 - Attachment 6 - 230923 Direct-Digital Control System for HVAC - Add 1.pdf PDF
S06 - A0005 - Attachment 11 - AE141 - REFLECTED CEILING PLAN - Add 1.pdf PDF
S06 - A0005 - QUESTIONS AND ANSWERS.pdf PDF
S06 - A0005 - Attachment 1 - 000110 Table of Contents - Add 1.pdf PDF
S06 - A0005 - Attachment 15 - E500 - SCHEDULES - Add 1.pdf PDF
S06 - A0005 - Attachment 13 - E-01-_SB-Sub-Basement Floor.pdf PDF
S06 - A0005 - Attachment 7 - 283100 Fire Alarm - Add 1.pdf PDF
S06 - A0005 - Attachment 9 - AD141 - DEMOLITON REFLECTED CEILING PLAN - Add 1.pdf PDF
S06 - A0005 - Attachment 16 - EP101 - BASEMENT and SUB-BASEMENT POWER AND TECHNOLOGY PLAN -Add 1.pdf PDF
S06 - A0005 - Attachment 4 - 093013 Ceramic Tile - Add 1.pdf PDF
S06 - Amendment 0004.pdf PDF
36C24921R0108 0004.docx DOCX document
S06 - Site Visit Sign in Sheet.pdf PDF
S06 - A0004 - Attachment 1 - Site Visit Sign in Sheet.pdf PDF
S06 - Amendment 0003.pdf PDF
Amendment 0003 - Questions and Answers.pdf PDF
S06 - Amendment 0002.pdf PDF
S02 - Attachment 1 - Price Schedule - SPS Air Handler.xlsx XLSX spreadsheet
S02 - Attachment 3 - Specs SPS AHU.pdf PDF
S02 - Attachment 2 - Drawings SPS AHU.pdf PDF
S02 - Attachment 5 - Past Performance.pdf PDF
S02 - Solicitation.pdf PDF
S02 - Attachment 4 - Wage Determination.pdf PDF
Show all 35

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

O

N

M

L

K

K.1

7 8 9 10

11 12 13 14

P

AE202

INSTRUMENT

PREP ROOM

B-039

LOGISTICS

CLEAN SUPPLY

STORAGE

A-019b

MATERIAL

MANAGEMENT

STORAGE

A-019

DECONTAMINATION

ROOM

A-018

CART WASH

A-018b

EQUIP

A-019a

BREAK ROOM

B-040

SPD OFFICE

B-039a

INCOMING

INSPECTION

A023E

STERILIZERS

B-039c

CART WASH

CORRIDOR

A-018C

± 5' - 5 1/2" 6

/4

/4

8 8

AREA FLOOR NOT IN SCOPE

AREA FLOOR NOT IN SCOPE

WAREHOUSE

A023

OFFICE

A023D

WAREHOUSE

A023

BREAKDOWN

AREA

A023C

OFFICE

A023B

PHASE II

T1

15 G E N E R A L N O T E S

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

100% BID DOCUMENTS

ROBLEY

REX

VA MEDICAL

CENTER

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

STAMP

321 4 5 6 7 8 9 10

603-20-201

800 Zorn Ave., Louisville, KY

REPLACE SPS AIR HANDLER

ARCHITECT/ENGINEER OF RECORDCONSULTANT

C U s e rs

\c ra ig \D o c u m e n ts

\F F

E

L o u is v ill e

R e p la c e S

P S

A H

U c ra ig .l ie g ib e l@ ff e -s e rv

.c o m

.r v t

/2

/2

:4

:1

A

M

AE101

BASEMENT FLOOR PLAN

06/29/2021 PRQ CJD

K E Y N O T E S

1 PROTECT EXISTING CORNER GUARDS. LOCATE WALL ADJACENT TO EXISTING CORNER

GUARD. VERIFY DIMENSION IN FIELD.

2 INSTALL NEW STAINLESS STEEL WALL PROTECTION. SEE DETAIL 5/AE501.

3 PROVIDE HEAVY DUTY RESINOUS URETHANE MORTAR FLOORING (RES-1) SYSTEM

WITH INTEGRAL BASE. NEW FINISH FLOOR ELEVATION SHALL MATCH EXISTING

4 PROVIDE FLOOR TRANSITION BETWEEN RESINOUS FLOORING AND EXISTING FLOOR

FINISH.

5 PROVIDE "EMERGENCY EXIT ONLY" SIGN WHERE INDICATED.

6 NEW WALL TO STRUCTURE CONSTRUCTED OF 3 5/8" METAL STUD WITH ONE LAYER OF

5/8" GYPSUM BOARD ON EACH SIDE. PATCH AND REPAIR ADJACENT WALLS AT

INTERSECTION OF NEW CONSTRUCTION INCLUDING FLOORS AND WALLS. PROVIDE

RUBBER BASE (RB-1) TO MATCH ADJACENT WALL CONSTRUCTION. PAINT NEW WALLS

WITH RES-W.

7 INFILL WALL TO BE CONSTRUCTED OF METAL STUD WITH GYP BOARD, GROUT AND

TILE (CT-1) ON BOTH SIDES. INFILL TO BE FLUSH WITH ADJACENT EXISTING

CONSTRUCTION. PATCH AND PAINT FINISHES TO MATCH ADJACENT SURFACE

FINISHES.

8 RE-INSTALL STAINLESS STEEL EQUIPMENT RE-LOCATED PRIOR TO BEGINNING OF NEW

WORK. RE-CONNECT ALL ASSOCIATED SUPPLY AND DRAIN CONNECTIONS.

9 PROTECT FLOOR DRAIN DURING CONSTRUCTION AND PROVIDE FLUSH TRANSITION AT

CONCLUSION OF WORK.

10 PROTECT FLOOR DRAIN AND EYEWASH STATION DURING CONSTRUCTION AND

PROVIDE FLUSH TRANSITION AT CONCLUSION OF WORK.

11 PROTECT DUMBWAITER ENTRY DOOR DURING NEW WORK. PROVIDE FLUSH

STAINLESS STEEL TRANSITION FROM NEW FLOORING LEVEL AT CONCLUSION OF

WORK.

12 RE-LOCATE EXISTING STAINLESS STEEL CART WASH RAMP TO A STORAGE LOCATION

ON CAMPUS IN COORDINATION WITH THE C.O.R. COORDINATE WITH NEW WORK

PLANS FOR RE-INSTALLATION IN PREVIOUS LOCATION.

13 REMOVE 46" DOOR PANEL AND ASSOCIATED FRAME ACCORDING TO SCHEDULED

DETAILS. ENLARGE OPENING TO RECEIVE NEW DOOR AS SCHEDULED.

14 PROVIDE PREFABRICATED TEMPORARY CONSTRUCTION SMOKE PARTITION WALL TO

TERMINATE AT EXISTING CEILING - EXISTING CEILING SHALL REMAIN - SEE ICRA

REQUIREMENTS IN SPECIFICATIONS FOR INSTRUCTIONS AT PARTITION AND DOOR -

REMOVE AT COMPLETION OF WORK - IF ADJACENT SURFACES ARE DISTURBED,

CONTRACTOR SHALL PATCH AND REPAIR TO MATCH EXISTING.

15 PROVIDE TEMPORARY SIGN - "CONSTRUCTION ZONE - AUTHORIZED PERSONNEL

ONLY".

N.T.S.Scale:

KEY PLAN

A. PROTECT / REPAIR EXISTING WALLS DURING ENTIRETY OF CONSTRUCTION

B. SEE ELECTRICAL DRAWINGS FOR CEILING-MOUNTED ELECTRICAL ITEMS

C. ANYTHING MENTIONED IN THE SPECIFICATIONS AND NOT SHOWN IN THE DRAWINGS, OR

SHOWN ON THE DRAWINGS AND NOT MENTIONED IN THE SPECIFICATIOSN SHALL BE OF LIKE

EFFECT AS IF SHOWN OR MENTIONED IN BOTH. REVIEW ALL DRAWINGS AND SPECIFICATIONS

FOR THE COMPLETE SCOPE OF WORK.

D. CONTRACTOR SHALL CONFIRM ALL EXISTING CONDITIONS PRIOR TO COMMENCING WORK. IF

INCONSISTENCIES, CONTRADICTIONS OR OMISSIONS ARE DISCOVERED, SUBMIT REQUEST FOR

INFORMATION (RFI) TO THE VA C.O.R.

E. DO NOT SCALE DRAWINGS, IF DIMENSIONAL INFORMATION IS REQUIRED AND NOT FOUND,

SUBMIT REQUEST FOR INFORMATION TO THE VA C.O.R.

F. CONTRACTOR SHALL COORDINATE EXTENT OF DEMOLITION WORK REQUIRED WITH WORK

SHOWN ON NEW WORK DRAWINGS AND ACROSS ALL TRADES.

G. CONTRACTOR SHALL PROTECT ALL EXISTING TO REMAIN AND REPAIR DAMAGED AREAS TO

MATCH EXISTING ADJACENT SURFACES UNLESS NOTED OTHERWISE.

H. CONTRACTOR SHALL COORDINATE DEMOLITION ACTIVITIES WITH C.O.R. TO MAINTAIN FULL

FUNCTIONALITY OF ADJACENT OCCUPIED SPACES.

J. CONTRACTOR SHALL MAINTAIN MEANS OF EGRESS PATHWAYS AT ALL TIMES. COORDINATE

ALTERNATE PROVISIONS AND OBTAIN APPROVAL FROM VA C.O.R. IF EXISTING MEANS OF EGRESS

MUST BE COMPROMISED.

K. COORDINATE ALL DEMOLITION / CONSTRUCTION DEBRIS PATH OF TRAVEL AND INTERIM LIFE SAFETY MEASURES (ILSM) WITH THE VA C.O.R. ALL DOORS THAT LEAD TO THE CONSTRUCTION

SITE SHALL BE POSTED AS PER THE ILSM PLAN.

L. WHERE EXISTING FINISHES ARE TO BE REMOVED, PATCH AND PREPARE SUBSTRATE TO

RECEIVE NEW FINISHES IN ACCORDANCE WITH NEW FINISH MATERIAL MANUFACTURER'S

RECOMMENDATIONS AND INSTALLATION INSTRUCTIONS.

M. CONTRACTOR SHALL PROTECT ALL EXISTING VA FURNISHINGS AND EQUIPMENT DURING

CONSTRUCTION. VA FURNISHINGS AND EQUIPMENT IN PHASE II WORK WILL REMAIN IN PLACE

DURING CONSTRUCTION.

1616637 Exp:12/31/2021

PATRICK R. QUINN

Revisions: Date:

100% BID DOCUMENTS 07/13/2021

ADDENDUM #1 09/20/2021

Sheets
AE101 - BASEMENT FLOOR PLAN