This pre-solicitation notice and project specifications document requests construction services for Project 621-332 to expand an existing parking garage and add an overhead walkway at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The expansion includes adding two new levels to the parking garage and constructing an overhead walkway in accordance with the included statement of work, specifications, and drawings. The estimated value of construction is between $5 million and $10 million. The solicitation is anticipated for release on or by January 15, 2021 and will utilize the LPTA source selection process with evaluation factors to be provided in the solicitation. This requirement is a 100% SDVOSB set-aside to be awarded under FAR Part 15 and the contractor must be listed in CVE and SAM databases and submit evidence of VETS4212 enrollment. The NAICS code is 236220 and size standard is $39.5 million. Questions must be submitted in writing to the contracting officer by the specified date.

View the file

Other files

File Type Posted
S02 - CALCULATION OF SELF PERFORMED WORK.pdf PDF
010000 General Requirements revised 02252021.pdf PDF
082_S212.pdf PDF
Price Proposal Template.xlsx XLSX spreadsheet
076_S105.pdf PDF
083_S220.pdf PDF
078_S107.pdf PDF
072_S101.pdf PDF
075_S104.pdf PDF
093013 added.pdf PDF
002_G002_revised_02252021.pdf PDF
095423 added.pdf PDF
Signature Sheet PN 621-332 Parking Garage Site Visit 1-25-2021.pdf PDF
080_S210.pdf PDF
General Conditions Breakout.xlsx XLSX spreadsheet
081_S211.pdf PDF
079_S108.pdf PDF
074_S103.pdf PDF
36C24921R0057 0004.pdf PDF
073_S102.pdf PDF
36C24921R0057 0003.pdf PDF
36C24921R0057 0002.pdf PDF
36C24921R0057 0001.pdf PDF
064_AG102.pdf PDF
093_S511.pdf PDF
052_A410.pdf PDF
Final Reissue CD Specifications Vol I.pdf PDF
137_E302.pdf PDF
Final Reissue 04 - S2 CD Drawings.pdf PDF
029_L101.pdf PDF
063_AG101.pdf PDF
131_E205.pdf PDF
Final Reissue CD Specifications Vol II.pdf PDF
118_F204.pdf PDF
126_E200.pdf PDF
005_G102.pdf PDF
107_P202.pdf PDF
042_A110.pdf PDF
014_C200.pdf PDF
004_G101.pdf PDF
035_A106.pdf PDF
132_E211.pdf PDF
039_A107.pdf PDF
034_A105.pdf PDF
049_A301.pdf PDF
044_A202.pdf PDF
017_C220.pdf PDF
136_E301.pdf PDF
006_G103.pdf PDF
043_A201.pdf PDF
Show 40 more

Latest 50 of 174 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIFICATION 01 00 00 GENERAL REQUIREMENTS

1.3 STATEMENT OF BID ITEM(S)

A. BASE BID ITEM, Construct Expansion of Existing Parking Garage, which includes general construction; fourth level and fifth level of garage with fourth level extended over Bradford Pear Lane; installed elevators and controls in existing towers; new Stair #4 / Elevator #4 on north side; pedestrian control grilles on all garage levels as indicated; overhead walkway with security screening from third level to Building 160 Domiciliary; all alterations, paving, grading, structural, mechanical, architectural, civil/site, utility, electrical work, necessary removal of existing structures, and certain other items. Estimated completion time 365 days.

B. ALTERNATE NO.1: Construct Expansion of Existing Parking Garage, which includes general construction; fourth level and fifth level of garage with fourth level extended over Bradford Pear Lane; installed Elevators #2 and controls in existing towers; new Stair #4 / Elevator #4 on north side; pedestrian control grilles on all garage levels as indicated; overhead walkway with security screening from third level to Building 160 Domiciliary; all alterations, paving, grading, structural, mechanical, architectural, civil/site, utility, electrical work, necessary removal of existing structures, and certain other items. EXCEPT DEDUCT pedestrian control grilles on garage structure. Estimated completion time 365 days.

C. ALTERNATE NO. 2: Construct Expansion of Existing Parking Garage, which includes general construction; fourth level and fifth level of garage with fourth level extended over Bradford Pear Lane; installed Elevators #2 and controls in existing towers; new Stair #4 / Elevator #4 on north side; pedestrian control grills on all garage levels as indicated; overhead walkway with security screening from third level to Building 160 Domiciliary; all alterations, paving, grading, structural, mechanical, architectural, civil/site, utility, electrical work, necessary removal of existing structures, and certain other items. EXCEPT DEDUCT pedestrian control grilles on garage structure, and DEDUCT Stair #4 / Elevator #4. Estimated completion time 335 days.

D. ALTERNATE NO. 3: Construct Expansion of Existing Parking Garage, which includes general construction; fourth level and fifth level of garage with fourth level extended over Bradford Pear Lane; installed Elevators #2 and controls in existing towers; new Stair #4 / Elevator #4 on north side; pedestrian control grilles on all garage levels as indicated; overhead walkway with security screening from third level to Building 160 Domiciliary; all alterations, paving, grading, structural, mechanical, architectural, civil/site, utility, electrical work, necessary removal of existing structures, and certain other items. EXCEPT DEDUCT pedestrian control grilles on garage structure, and DEDUCT Stair #4 / Elevator #4, and DEDUCT Overhead walkway from third level to Building 160 Domiciliary First Level. Estimated completion time 240 days.

DOCUMENTS INCORPORATED BY REFERENCE IN DRAWINGS AND SPECS:

THE FOLLOWING MATERIALS MAKE UP PART OF THE CONTRACT DOCUMENTS.

FULL DOCUMENTS ARE ATTACHED/INCLUDED WITH SPECIFICATIONS; AND

ARE AVAILABLE UPON REQUEST FROM THE CONTRACTING OFFICE:

(1) Topographic Survey, James H. Quillen VAMC, Mountain Home, Tennessee, Littlejohn, Inc., July 11, 2014

(2) Verification Survey, James H. Quillen VAMC, Mountain Home, Tennessee, Alley & Associates, Inc., November 21, 2019

(3) Final Report of Geotechnical Exploration, New Parking Garage, James H.

Quillen VAMC, Mountain Home, Tennessee, S&ME, Inc., August 20, 2014

(4) Report of Geotechnical Exploration, Elevated Walkway, James H. Quillen VAMC, Mountain Home, Tennessee, S&ME, Inc., October 18, 2019

(5) Environmental Assessment and Finding of No Significant Impact, Construct 525 Space Above Ground Parking Garage, prepared by AKEA, Inc. and Raptor Environmental Consulting, Inc. (March 2015)

(6) Letter Report - GPR Survey Summary - Jmaes H. Quillen VAMC Hospital, Mountain Home, Tennessee, CHD Environmental, Inc., June 24, 2020

APPROVED FOR CONSTRUCTION

FINAL CONSTRUCTION DRAWINGS

ARCHITECT/ENGINEERS: CONSULTANTS:

CONSULTANTS

WALKERDesign, Inc.

REISSUED

INDEX OF DRAWINGS AND

SUMMARY OF BID ALTERNATES

G002STATE OF

P

R

O

F

E

S

S

I

O

N A

L

E

N

G

I

N

E

E

R

M

I

C

H

A

E

L

D

T

O

O

T

L

E

No. 67818

L

I

C

E N

S

E

F

L

O

R I

D

A

OF 1432PAGE

AutoCAD SHX Text one-quarter inch = one foot

AutoCAD SHX Text Revisions

AutoCAD SHX Text Date

AutoCAD SHX Text one-eighth inch = one foot

AutoCAD SHX Text

VA FORM 08-6231, DEC 1989

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text three-eighths inch = one foot

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one-half inch = one foot

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text one and one-half inches = one foot

AutoCAD SHX Text one inch = one foot

AutoCAD SHX Text three-quarters inch = one foot

AutoCAD SHX Text D

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text three inches = one foot

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Approved: Chief, Engineering Service

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C.O.T.R.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Engineering Planning & Analysis

AutoCAD SHX Text Engineering Health & Safety

AutoCAD SHX Text Engineering Operation Foreman

AutoCAD SHX Text Engineering Bldg. Maint. Foreman

AutoCAD SHX Text Asst. Chief, Engineering Service

AutoCAD SHX Text Approved:

AutoCAD SHX Text Approved: Service Chief

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

VAMC MOUNTAIN HOME, TENNESSEE

AutoCAD SHX Text Location

AutoCAD SHX Text Project Title

AutoCAD SHX Text Building Number

AutoCAD SHX Text Checked

AutoCAD SHX Text

ADD OVERHEAD WALKWAY

AutoCAD SHX Text

DRAWING NO.

AutoCAD SHX Text Drawn

AutoCAD SHX Text Date

AutoCAD SHX Text 621-332

AutoCAD SHX Text

AUGUST 10, 2020

AutoCAD SHX Text Department of

AutoCAD SHX Text Veterans Affairs

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A

AutoCAD SHX Text Dwg. File

AutoCAD SHX Text

EXPAND PARKING GARAGE &

AutoCAD SHX Text

AutoCAD SHX Text 4904 Eisenhower Blvd Suite 150 Tampa, FL 33634 PH: (813) 888-5800 FAX: (813) 502-5726 BE-0003840 www.walkerconsultants.com

AutoCAD SHX Text

PH: (850) 433-3023

AutoCAD SHX Text

FAX: (850) 433-3025

AutoCAD SHX Text

FRANK DAUGHTRY

AutoCAD SHX Text a r c h i t e c t

AutoCAD SHX Text Pensacola, FL 32502

AutoCAD SHX Text email: frank@frankda.com

AutoCAD SHX Text 200 E. Government Street

AutoCAD SHX Text Suite 240-A

AutoCAD SHX Text Project No.

AutoCAD SHX Text CONTRACT No. 36C249-19-C-0168

AutoCAD SHX Text P.O. No. 621Z90002

AutoCAD SHX Text

SEAL

AutoCAD SHX Text

MICHAEL D. TOOTLE, PE FLORIDA P.E. NO. 67818

AutoCAD SHX Text

AKEA DESIGN, INC.

AutoCAD SHX Text 3603 NW 98TH ST., SUITE B GAINESVILLE, FLORIDA 32606 PH: (352) 474-6124 FAX: (352) 553-4437 CERT OF AUTH: FL #29758 AKEA Design Project No. AD177-19

AutoCAD SHX Text This item has been electronically signed and sealed by the individual named at right. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.

AutoCAD SHX Text

FINAL CONSTRUCTION DOCUMENTS

AutoCAD SHX Text 07/20/20

AutoCAD SHX Text ADDENDUM: REISSUE FINAL CDs

AutoCAD SHX Text 08/10/20

AutoCAD SHX Text

MDT

AutoCAD SHX Text

MDT

AutoCAD SHX Text NOTE: SEAL ON THIS G-SERIES G002 SHEET SHALL ONLY APPLY TO PREPARATION OF THIS INDEX SHEET. ALL OTHER SHEETS ARE SIGNED/SEALED BY THE RESPECTIVE ARCHITECT AND ENGINEER DISCIPLINE.

2020-08-10T13:54:53-0400
Michael D Tootle

File details come from the government source that posted it. Updated .