General Conditions Breakout.xlsx

XLSX spreadsheet 13 KB Posted

Attached to
Y1LZ--Project 621-332- Expand Parking Garage & Add OH Walkway
Solicitation number
36C24921R0057
Issued by

About this file

This document contains a general conditions breakdown template and information on a federal contract opportunity for construction services. The James H. Quillen VA Medical Center is seeking a contractor to expand an existing parking garage and add an overhead walkway. The estimated value is between $5-10 million. The work includes two additional levels to the garage and connecting walkway and must consider medical environment specifications. The NAICS code is 236220 with a $39.5 million size standard. The procurement method will be LPTA and the solicitation is anticipated for release on January 15, 2021. This is a 100% SDVOSB set-aside and offerors must be listed on beta.SAM.gov and VETS4212 enrolled. The contact is Diana Grube at diana.grube@va.gov and the agency is the VA Veterans Health Administration VISN 9.

View the file

Other files

File Type Posted
S02 - CALCULATION OF SELF PERFORMED WORK.pdf PDF
010000 General Requirements revised 02252021.pdf PDF
082_S212.pdf PDF
Price Proposal Template.xlsx XLSX spreadsheet
076_S105.pdf PDF
083_S220.pdf PDF
078_S107.pdf PDF
072_S101.pdf PDF
075_S104.pdf PDF
093013 added.pdf PDF
002_G002_revised_02252021.pdf PDF
095423 added.pdf PDF
Signature Sheet PN 621-332 Parking Garage Site Visit 1-25-2021.pdf PDF
080_S210.pdf PDF
081_S211.pdf PDF
079_S108.pdf PDF
074_S103.pdf PDF
36C24921R0057 0004.pdf PDF
073_S102.pdf PDF
36C24921R0057 0003.pdf PDF
36C24921R0057 0002.pdf PDF
36C24921R0057 0001.pdf PDF
064_AG102.pdf PDF
093_S511.pdf PDF
052_A410.pdf PDF
Final Reissue CD Specifications Vol I.pdf PDF
137_E302.pdf PDF
Final Reissue 04 - S2 CD Drawings.pdf PDF
029_L101.pdf PDF
063_AG101.pdf PDF
131_E205.pdf PDF
Final Reissue CD Specifications Vol II.pdf PDF
118_F204.pdf PDF
126_E200.pdf PDF
005_G102.pdf PDF
107_P202.pdf PDF
042_A110.pdf PDF
014_C200.pdf PDF
004_G101.pdf PDF
035_A106.pdf PDF
132_E211.pdf PDF
039_A107.pdf PDF
034_A105.pdf PDF
049_A301.pdf PDF
044_A202.pdf PDF
017_C220.pdf PDF
136_E301.pdf PDF
006_G103.pdf PDF
043_A201.pdf PDF
112_P700.pdf PDF
Show 40 more

Latest 50 of 174 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GC Breakout

GENERAL CONDITIONS BREAKOUT
When entering a line item for General Conditions costs on Schedule of Values, a breakout of the General Conditions costs must be provided. Per VAAR 852.243-70 Contract Changes-Supplement, the following contractual restrictions apply: Overhead and contractor’s fee percentages shall be considered to include insurance other than mentioned herein, field and office supervisors and assistants, security police, use of small tools, incidental job burdens, and general home office expenses and no separate allowance will be made therefore. Assistants to office supervisors include all clerical, stenographic and general office help. Incidental job burdens include, but are not necessarily limited to, office equipment and supplies, temporary toilets, telephone and conformance to OSHA requirements. Items such as, but not necessarily limited to, review and coordination, estimating and expediting relative to contract changes are associated with field and office supervision and are considered to be included in the contractor’s overhead and/or fee percentage.
General Condition DescriptionValue
Superintendent$ - 0
Project Manager$ - 0
Field Office Engineer$ - 0
Builder's Risk Insurance$ - 0
Other Project Specific Liability Insurance$ - 0
Site Maintenance and Protection$ - 0
Progress Photos (per contract specifications)$ - 0
Dumpsters$ - 0
Office Trailer$ - 0
Storage Trailer/POD/CONEX$ - 0
Telephone (Cell and/or Landline)$ - 0
Signage (per contract specifications and/or drawings)$ - 0
Travel (must comply with Federal Travel Regulations)$ - 0
Lodging (must comply with Federal Travel Regulations)$ - 0
Record Document Preparation$ - 0
As-builts (per contract specifications)$ - 0
Weather Protection (per contract specifications)$ - 0
Infection Control (per contract specifications)$ - 0
Information Technology (Internet, etc.)$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
$ - 0
General Conditions Total$ - 0

File details come from the government source that posted it. Updated .