002_G002_revised_02252021.pdf
PDF 1020 KB Posted
- Solicitation number
- 36C24921R0057
About this file
This document package includes specifications and drawings for a federal construction project to expand an existing parking garage and add an overhead walkway at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The project scope includes adding two new levels to the parking garage, installing new elevators and stairs, extending the fourth level over an adjacent lane, and constructing an overhead walkway between the garage and an adjacent building. The base bid and two deductive alternates are described. The construction value is estimated between $5-10 million. The solicitation is anticipated to be released on or by January 15, 2021 as a Lowest Price Technically Acceptable procurement under NAICS 236220 with a $39.5 million size standard. The requirement is reserved as a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. The awarded contractor must be verified in the CVE database and have an active SAM registration.
View the file
Other files
Show 40 more
Latest 50 of 174 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SPECIFICATION 01 00 00 GENERAL REQUIREMENTS
1.3 STATEMENT OF BID ITEM(S)
A. BASE BID ITEM, Construct Expansion of Existing Parking Garage, which includes general construction; fourth level and fifth level of garage with fourth level extended over Bradford Pear Lane; installed Elevators #2 and controls in existing towers; new Stair #4 / Elevator #4 on north side; pedestrian control grilles on all garage levels as indicated; Overhead Walkway with security screening from third level to Building 160 Domiciliary; all alterations, paving, grading, structural, mechanical, architectural, civil/site, utility, electrical work, necessary removal of existing structures, and certain other items. Estimated completion time 365 days.
B. ALTERNATE NO.1: Construct Expansion of Existing Parking Garage, which includes general construction; fourth level and fifth level of garage with fourth level extended over Bradford Pear Lane; installed Elevators #2 and controls in existing towers; new Stair #4 / Elevator #4 on north side; pedestrian control grilles on all garage levels as indicated; Overhead Walkway with security screening from third level to Building 160 Domiciliary; all alterations, paving, grading, structural, mechanical, architectural, civil/site, utility, electrical work, necessary removal of existing structures, and certain other items. EXCEPT DEDUCT Overhead Walkway from third level to Building 160 Domiciliary First Level and all courtyard alterations (paving, grading, structural, mechanical, architectural, civil/site, utility, electrical, necessary removal of existing structures, and certain other items). Estimated completion time 260 days.
C. ALTERNATE NO. 2: Construct Expansion of Existing Parking Garage, which includes general construction; fourth level and fifth level of garage with fourth level extended over Bradford Pear Lane; installed Elevators #2 and controls in existing towers; new Stair #4 / Elevator #4 on north side; pedestrian control grills on all garage levels as indicated; Overhead Walkway with security screening from third level to Building 160 Domiciliary; all alterations, paving, grading, structural, mechanical, architectural, civil/site, utility, electrical work, necessary removal of existing structures, and certain other items. EXCEPT DEDUCT Overhead Walkway from third level to Building 160 Domiciliary First Level and all courtyard alterations (paving, grading, structural, mechanical, architectural, civil/site, utility, electrical, necessary removal of existing structures, and certain other items), AND DEDUCT Stair #4 / Elevator #4. Estimated completion time 240 days.
DOCUMENTS INCORPORATED BY REFERENCE IN DRAWINGS AND SPECS:
THE FOLLOWING MATERIALS MAKE UP PART OF THE CONTRACT DOCUMENTS.
FULL DOCUMENTS ARE ATTACHED/INCLUDED WITH SPECIFICATIONS; AND
ARE AVAILABLE UPON REQUEST FROM THE CONTRACTING OFFICE:
(1) Topographic Survey, James H. Quillen VAMC, Mountain Home, Tennessee, Littlejohn, Inc., July 11, 2014
(2) Verification Survey, James H. Quillen VAMC, Mountain Home, Tennessee, Alley & Associates, Inc., November 21, 2019
(3) Final Report of Geotechnical Exploration, New Parking Garage, James H.
Quillen VAMC, Mountain Home, Tennessee, S&ME, Inc., August 20, 2014
(4) Report of Geotechnical Exploration, Elevated Walkway, James H. Quillen VAMC, Mountain Home, Tennessee, S&ME, Inc., October 18, 2019
(5) Environmental Assessment and Finding of No Significant Impact, Construct 525 Space Above Ground Parking Garage, prepared by AKEA, Inc. and Raptor Environmental Consulting, Inc. (March 2015)
(6) Letter Report - GPR Survey Summary - Jmaes H. Quillen VAMC Hospital, Mountain Home, Tennessee, CHD Environmental, Inc., June 24, 2020
APPROVED FOR CONSTRUCTION
FINAL CONSTRUCTION DRAWINGS
ARCHITECT/ENGINEERS: CONSULTANTS:
CONSULTANTS
WALKERDesign, Inc.
REISSUED
INDEX OF DRAWINGS AND
SUMMARY OF BID ALTERNATES
G002STATE OF
P R
O
FES S IO NA L ENGIN
E E
R
M
IC
HA EL D. T OOT LENo. 67818 L I C E N S E
F L O R I D A
OF 1432PAGE
REVISED DEDUCTIVE ALTERNATES
THE BID DOCUMENTS - BASE BID AND DEDUCTIVE
ALTERNATES FOR THIS SOLICITATION HAVE BEEN
REVISED ABOVE TO CHANGE THE ORDER AND DEDUCT
TASKS FOR DEDUCTIVE ALTERNATES.
THIS REVISED SHEET SUPERCEDES ANY REFERENCE
THROUGHOUT DRAWINGS TO DEDUCT ORDER. ALL
REFERENCE SHALL DEFER BACK TO THIS SHEET G002.
AutoCAD SHX Text one-quarter inch = one foot
AutoCAD SHX Text Revisions
AutoCAD SHX Text Date
AutoCAD SHX Text one-eighth inch = one foot
AutoCAD SHX Text
VA FORM 08-6231, DEC 1989
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text F
AutoCAD SHX Text three-eighths inch = one foot
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one-half inch = one foot
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text one and one-half inches = one foot
AutoCAD SHX Text one inch = one foot
AutoCAD SHX Text three-quarters inch = one foot
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text three inches = one foot
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Approved: Chief, Engineering Service
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C.O.T.R.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Engineering Planning & Analysis
AutoCAD SHX Text Engineering Health & Safety
AutoCAD SHX Text Engineering Operation Foreman
AutoCAD SHX Text Engineering Bldg. Maint. Foreman
AutoCAD SHX Text Asst. Chief, Engineering Service
AutoCAD SHX Text Approved:
AutoCAD SHX Text Approved: Service Chief
AutoCAD SHX Text Drawing Title
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
VAMC MOUNTAIN HOME, TENNESSEE
AutoCAD SHX Text Location
AutoCAD SHX Text Project Title
AutoCAD SHX Text Building Number
AutoCAD SHX Text Checked
AutoCAD SHX Text
ADD OVERHEAD WALKWAY
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text Drawn
AutoCAD SHX Text Date
AutoCAD SHX Text 621-332
AutoCAD SHX Text
AUGUST 10, 2020
AutoCAD SHX Text Department of
AutoCAD SHX Text Veterans Affairs
AutoCAD SHX Text F
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text D
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text Dwg. File
AutoCAD SHX Text
EXPAND PARKING GARAGE &
AutoCAD SHX Text
AutoCAD SHX Text 4904 Eisenhower Blvd Suite 150 Tampa, FL 33634 PH: (813) 888-5800 FAX: (813) 502-5726 BE-0003840 www.walkerconsultants.com
AutoCAD SHX Text
PH: (850) 433-3023
AutoCAD SHX Text
FAX: (850) 433-3025
AutoCAD SHX Text
FRANK DAUGHTRY
AutoCAD SHX Text a r c h i t e c t
AutoCAD SHX Text Pensacola, FL 32502
AutoCAD SHX Text email: frank@frankda.com
AutoCAD SHX Text 200 E. Government Street
AutoCAD SHX Text Suite 240-A
AutoCAD SHX Text Project No.
AutoCAD SHX Text CONTRACT No. 36C249-19-C-0168
AutoCAD SHX Text P.O. No. 621Z90002
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
MICHAEL D. TOOTLE, PE FLORIDA P.E. NO. 67818
AutoCAD SHX Text
AKEA DESIGN, INC.
AutoCAD SHX Text 3603 NW 98TH ST., SUITE B GAINESVILLE, FLORIDA 32606 PH: (352) 474-6124 FAX: (352) 553-4437 CERT OF AUTH: FL #29758 AKEA Design Project No. AD177-19
AutoCAD SHX Text
FINAL CONSTRUCTION DOCUMENTS
AutoCAD SHX Text 07/20/20
AutoCAD SHX Text ADDENDUM: REISSUE FINAL CDs
AutoCAD SHX Text 08/10/20
AutoCAD SHX Text This item has been digitally signed and sealed by Michael D. Tootle on the date adjacent to the seal. Printed copies of this document are not considered signed and sealed and the signature must be verified on any electronic copies.
AutoCAD SHX Text
MDT
AutoCAD SHX Text
MDT
AutoCAD SHX Text NOTE: SEAL ON THIS G-SERIES G002 SHEET SHALL ONLY APPLY TO PREPARATION OF THIS INDEX SHEET. ALL OTHER SHEETS ARE SIGNED/SEALED BY THE RESPECTIVE ARCHITECT AND ENGINEER DISCIPLINE.
AutoCAD SHX Text
G002 REISSUE DEDUCTIVE ALTERNATES
AutoCAD SHX Text 02/25/21
| Sheets and Views |
| 002_G002_revised |
File details come from the government source that posted it. Updated .