Price Proposal Template.xlsx

XLSX spreadsheet 121 KB Posted

Attached to
Y1LZ--Project 621-332- Expand Parking Garage & Add OH Walkway
Solicitation number
36C24921R0057
Issued by

About this file

This document contains a price proposal template and details of a federal contract opportunity for construction services. The template provides an example of how offerors should break down pricing for a project to expand parking and add an overhead walkway at a VA medical center in Tennessee. Offerors must list detailed pricing for each construction division and category. The contract opportunity notice seeks an experienced contractor to complete the construction work according to specifications and drawings. The project is estimated to cost between $5-10 million and will take place at a medical facility, requiring consideration of infection control and other specialized requirements. The NAICS code is 236220 and small business size standard is $39.5 million. The agency is the Department of Veterans Affairs VISN 9 and the procurement will use LPTA selection with evaluation of technical factors. The solicitation number is 36C24921R0057 and is a 100% SDVOSB set-aside. The response due date is January 15, 2021.

View the file

Other files

File Type Posted
S02 - CALCULATION OF SELF PERFORMED WORK.pdf PDF
010000 General Requirements revised 02252021.pdf PDF
082_S212.pdf PDF
076_S105.pdf PDF
083_S220.pdf PDF
078_S107.pdf PDF
072_S101.pdf PDF
075_S104.pdf PDF
093013 added.pdf PDF
002_G002_revised_02252021.pdf PDF
095423 added.pdf PDF
Signature Sheet PN 621-332 Parking Garage Site Visit 1-25-2021.pdf PDF
080_S210.pdf PDF
General Conditions Breakout.xlsx XLSX spreadsheet
081_S211.pdf PDF
079_S108.pdf PDF
074_S103.pdf PDF
36C24921R0057 0004.pdf PDF
073_S102.pdf PDF
36C24921R0057 0003.pdf PDF
36C24921R0057 0002.pdf PDF
36C24921R0057 0001.pdf PDF
064_AG102.pdf PDF
093_S511.pdf PDF
052_A410.pdf PDF
Final Reissue CD Specifications Vol I.pdf PDF
137_E302.pdf PDF
Final Reissue 04 - S2 CD Drawings.pdf PDF
029_L101.pdf PDF
063_AG101.pdf PDF
131_E205.pdf PDF
Final Reissue CD Specifications Vol II.pdf PDF
118_F204.pdf PDF
126_E200.pdf PDF
005_G102.pdf PDF
107_P202.pdf PDF
042_A110.pdf PDF
014_C200.pdf PDF
004_G101.pdf PDF
035_A106.pdf PDF
132_E211.pdf PDF
039_A107.pdf PDF
034_A105.pdf PDF
049_A301.pdf PDF
044_A202.pdf PDF
017_C220.pdf PDF
136_E301.pdf PDF
006_G103.pdf PDF
043_A201.pdf PDF
112_P700.pdf PDF
Show 40 more

Latest 50 of 174 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Breakdown

JOB NAME: LOCATION: TBD PROPOSAL DATE: 01/01/1900Solicitation NumberProject NumberProject TitleProposal Date
36C24921R0057621-332Expand Parking

SPEC/COST CODE DESCRIPTION LABOR MATERIAL EQUIPMENT DIVISION TOTALS

DIVISION 1GENERAL REQUIREMENTS$0.00
01 32 16.5Project Schedules (Small Projects - Design/Bid/Build)
01 33 23Shop Drawings, Product Data, and Samples
01 35 26Safety Requirements
01 42 19Reference Standards
01 45 00Quality Control
01 45 29Testing Laboratory Services
01 45 35Special Inspections
01 57 19Temporary Environmental Controls
01 74 19Construction Waste Management
01 81 13Sustainable Construction Requirements
DIVISION 2Existing Conditions$0.00
02 21 13Site Surveys
02 41 00Demolition
DIVISION 3CONCRETE$0.00
03 30 00Cast in Place Concrete
03 41 33Precast Structural Pretensioned Concrete
DIVISION 4MASONRY
04 05 13Masonry Mortaring
04 05 16Masonry Grouting
04 20 00Unit Masonry
DIVISION 5Metals$0.00
05 12 00Structrural Steel Framing
05 31 00Steel Decking
05 50 00Metal Fabrications
DIVISION 6Wood, plastics and Composites$0.00
06 10 00Rough Carpentry
DIVISION 7THERMAL AND MOISTURE PROTECTION$0.00
07 11 13Bituminous Dampproofing
07 17 00Bentonite Waterproofing
07 18 00Vehicular Traffic Coating
07 18 13Pedestrian Traffic Coatings
07 19 00Water Repellents
07 22 00Roof and Deck Insulation
07 41 13Metal Roof Panels
07 51 00Built up Bituminous Roofing
07 60 00Flashing and Sheet Metal
07 81 00Applied Fireproofing
07 84 00Firestopping
07 92 00Joint Sealants
07 95 13Expansion Joint Cover Assemblies
DIVISION 8Openings$0.00
08 11 13Hollow Metal Doors & Frames
08 33 00Coiling Doors and Grilles
08 41 13Aluminum Freamed Entrances and Storefronts
08 42 29.23Sliding Automatic Entrances
08 71 00Door Hardware
08 80 00Glazing
08 90 00Louvers and Vents
DIVISION 9FINISHES$0.00
09 06 00Schedule for Finishes
09 24 00Portland Cement Plastering
09 91 00Painting
DIVISION 10Specialties$0.00
10 14 00Signage
10 44 13Fire Extinguisher Cabinets
DIVISION 11EQUIPMENT
DIVISION 12Furnishings$0.00
DIVISION 13Special Construction$0.00
13 05 41Seismic Restraint Requirements for Non- Structural Components
DIVISION 14Conveying Equipment$0.00
14 21 00Traction Gearless Machine Room - less Elevators
DIVISION 21Fire Suppression$0.00
21 05 11Common Work Results for Fire Suppression
21 12 00Manual Dry Standpipe Systems
21 13 13Wet-Pipe Sprinkler Systems
DIVISION 22Plumbing$0.00
22 05 11Common Work Results for Plumbing
22 05 23General Duty Valves for Plumbing Piping
22 05 33Heat Tracing for Plumbing Piping
22 11 00Facility Water Distribution
22 13 00Facility Sanitary and Vent Piping
22 14 00Facility Storm Drainage
22 40 00Plumbing Fixtures
DIVISION 23Heating, Ventilating and Air Conditioning HVAC$0.00
23 05 11Common Work Results for HVAC
23 07 11HVAC and Boiler Plant Insulation
23 23 00Refrigerant Piping
23 81 43Air-Source Unitary Heat Pumps
DIVISION 26ELECTRICAL$0.00
26 05 11Requirements for Electrical Installations
26 05 19Low-Voltage Electrical Power Conductors and Cables
26 05 26Grounding and Bonding for Electrical Systems
26 05 33Raceway & Boxes for Electrical Systems
26 05 41Underground Electrical Construction
26 05 73Overcurrent Protective Device Coordination Study
26 09 23Lighting Controls
26 24 16Panelboards
26 27 26Wiring Devices
26 29 21Enclosed Switches and Circuit Breakers
26 36 23Automatic Transfer Switches
26 41 00Facility Lightning Protection
26 43 13Surge Protective Devices
26 51 00Interior Lighting
26 56 00Exterior Lighting
DIVISION 27COMMUNICATIONS$0.00
27 05 11Requirements for Communications Installations
27 05 26Grounding and Bonding for Communication Systems
27 05 33Raceways and Boxers for Communication Systems
27 10 00Control, Communication and Signal Wiring
DIVISION 28ELECTRONIC SAFETY AND SECURITY$0.00
28 05 00Common Work Results for Electronic Safety and Security
28 05 13Conductors and Cables for Electronic Safety and Security
28 05 26Grounding and Bonding for Electronic Safety and Security
28 05 28.33Conduits and Backboxes for Electronic Safety and Security
28 13 00Physical Access Control System
28 31 00Fire Detection and Alarm
DIVISION 31EARTHWORK$0.00
31 20 00Earthwork
31 23 19Dewatering
31 31 16Soil Treatment for Subterranean Termites
31 63 26Drilled Caissons
DIVISION 32EXTERIOR IMPROVEMENTS$0.00
32 05 23Cement and Concrete for Exterior Improvements
32 12 16Asphalt Paving
32 17 23Pavement Markings
32 31 13Chain Link Fences and Gates
32 31 20Ornamental Steel Fences and Gates
32 84 00Planting Irrigation
32 90 00Planting
DIVISION 33UTIILITIES$0.00
33 10 00Water Utilities
33 30 00Sanitary Sewer Utilities
31 31 16Soil Treatment for Subterranean Termites
33 40 00Storm Sewer Utilities
TOTALS
$0.00
TOTAL LABOR
$0.00
TOTAL MATERIALS
6%$0.00
TAX FOR MATERIALS
$0.00
TOTAL EQUIPMENT
DIVISION GRAND TOTALS$0.00
$0INSTRUCTIONS
DIVISION GRAND TOTALS$0
TAX FOR MATERIALS1. Contract breakdowns must include the applicable VA Medical Center, the date the proposal was provided to the VA, the job title, project number, and the solicitation number;
SUBTOTAL$0
OVERHEAD10%$0
PROFIT10%$02. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division or subdivision when each division or subdivision can be broken down by price to a greater degree;
$0
SUBTOTAL
BOND/FEE3%$03. Divisions must still be listed even if not applicable to the construction requirement;
PERMITS/LICENSES

GRAND TOTAL $0 4. The template above does not include all possible divisions or subdivisions needed for the fictitious requirement referenced above. It is only provided as an example of what would be acceptable to the VA Network Contracting Office 9 -Construction Team as of 6-30-2016. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept any subsequent price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown. Therefore, it is in the Governments and contractor’s best interest to provide a thorough price breakdown initially; and

5. This template, or another template that would be provide the same kind of information referenced above, is required for all proposals provided to the VA Network Contracting Office 9 - Construction as of 6-30-2016.

Sheet3