Breakdown
| JOB NAME: LOCATION: TBD PROPOSAL DATE: 01/01/1900 | Solicitation Number | Project Number | Project Title | Proposal Date |
| 36C24921R0057 | 621-332 | Expand Parking | |
SPEC/COST CODE DESCRIPTION LABOR MATERIAL EQUIPMENT DIVISION TOTALS
| DIVISION 1 | GENERAL REQUIREMENTS | $0.00 |
| 01 32 16.5 | Project Schedules (Small Projects - Design/Bid/Build) | |
| 01 33 23 | Shop Drawings, Product Data, and Samples | |
| 01 35 26 | Safety Requirements | |
| 01 42 19 | Reference Standards | |
| 01 45 00 | Quality Control | |
| 01 45 29 | Testing Laboratory Services | |
| 01 45 35 | Special Inspections | |
| 01 57 19 | Temporary Environmental Controls | |
| 01 74 19 | Construction Waste Management | |
| 01 81 13 | Sustainable Construction Requirements | |
| DIVISION 2 | Existing Conditions | $0.00 |
| 02 21 13 | Site Surveys | |
| 02 41 00 | Demolition | |
| DIVISION 3 | CONCRETE | $0.00 |
| 03 30 00 | Cast in Place Concrete | |
| 03 41 33 | Precast Structural Pretensioned Concrete | |
| DIVISION 4 | MASONRY | |
| 04 05 13 | Masonry Mortaring | |
| 04 05 16 | Masonry Grouting | |
| 04 20 00 | Unit Masonry | |
| DIVISION 5 | Metals | $0.00 |
| 05 12 00 | Structrural Steel Framing | |
| 05 31 00 | Steel Decking | |
| 05 50 00 | Metal Fabrications | |
| DIVISION 6 | Wood, plastics and Composites | $0.00 |
| 06 10 00 | Rough Carpentry | |
| DIVISION 7 | THERMAL AND MOISTURE PROTECTION | $0.00 |
| 07 11 13 | Bituminous Dampproofing | |
| 07 17 00 | Bentonite Waterproofing | |
| 07 18 00 | Vehicular Traffic Coating | |
| 07 18 13 | Pedestrian Traffic Coatings | |
| 07 19 00 | Water Repellents | |
| 07 22 00 | Roof and Deck Insulation | |
| 07 41 13 | Metal Roof Panels | |
| 07 51 00 | Built up Bituminous Roofing | |
| 07 60 00 | Flashing and Sheet Metal | |
| 07 81 00 | Applied Fireproofing | |
| 07 84 00 | Firestopping | |
| 07 92 00 | Joint Sealants | |
| 07 95 13 | Expansion Joint Cover Assemblies | |
| DIVISION 8 | Openings | $0.00 |
| 08 11 13 | Hollow Metal Doors & Frames | |
| 08 33 00 | Coiling Doors and Grilles | |
| 08 41 13 | Aluminum Freamed Entrances and Storefronts | |
| 08 42 29.23 | Sliding Automatic Entrances | |
| 08 71 00 | Door Hardware | |
| 08 80 00 | Glazing | |
| 08 90 00 | Louvers and Vents | |
| DIVISION 9 | FINISHES | $0.00 |
| 09 06 00 | Schedule for Finishes | |
| 09 24 00 | Portland Cement Plastering | |
| 09 91 00 | Painting | |
| DIVISION 10 | Specialties | $0.00 |
| 10 14 00 | Signage | |
| 10 44 13 | Fire Extinguisher Cabinets | |
| DIVISION 11 | EQUIPMENT | |
| DIVISION 12 | Furnishings | $0.00 |
| DIVISION 13 | Special Construction | $0.00 |
| 13 05 41 | Seismic Restraint Requirements for Non- Structural Components | |
| DIVISION 14 | Conveying Equipment | $0.00 |
| 14 21 00 | Traction Gearless Machine Room - less Elevators | |
| DIVISION 21 | Fire Suppression | $0.00 |
| 21 05 11 | Common Work Results for Fire Suppression | |
| 21 12 00 | Manual Dry Standpipe Systems | |
| 21 13 13 | Wet-Pipe Sprinkler Systems | |
| DIVISION 22 | Plumbing | $0.00 |
| 22 05 11 | Common Work Results for Plumbing | |
| 22 05 23 | General Duty Valves for Plumbing Piping | |
| 22 05 33 | Heat Tracing for Plumbing Piping | |
| 22 11 00 | Facility Water Distribution | |
| 22 13 00 | Facility Sanitary and Vent Piping | |
| 22 14 00 | Facility Storm Drainage | |
| 22 40 00 | Plumbing Fixtures | |
| DIVISION 23 | Heating, Ventilating and Air Conditioning HVAC | $0.00 |
| 23 05 11 | Common Work Results for HVAC | |
| 23 07 11 | HVAC and Boiler Plant Insulation | |
| 23 23 00 | Refrigerant Piping | |
| 23 81 43 | Air-Source Unitary Heat Pumps | |
| DIVISION 26 | ELECTRICAL | $0.00 |
| 26 05 11 | Requirements for Electrical Installations | |
| 26 05 19 | Low-Voltage Electrical Power Conductors and Cables | |
| 26 05 26 | Grounding and Bonding for Electrical Systems | |
| 26 05 33 | Raceway & Boxes for Electrical Systems | |
| 26 05 41 | Underground Electrical Construction | |
| 26 05 73 | Overcurrent Protective Device Coordination Study | |
| 26 09 23 | Lighting Controls | |
| 26 24 16 | Panelboards | |
| 26 27 26 | Wiring Devices | |
| 26 29 21 | Enclosed Switches and Circuit Breakers | |
| 26 36 23 | Automatic Transfer Switches | |
| 26 41 00 | Facility Lightning Protection | |
| 26 43 13 | Surge Protective Devices | |
| 26 51 00 | Interior Lighting | |
| 26 56 00 | Exterior Lighting | |
| DIVISION 27 | COMMUNICATIONS | $0.00 |
| 27 05 11 | Requirements for Communications Installations | |
| 27 05 26 | Grounding and Bonding for Communication Systems | |
| 27 05 33 | Raceways and Boxers for Communication Systems | |
| 27 10 00 | Control, Communication and Signal Wiring | |
| DIVISION 28 | ELECTRONIC SAFETY AND SECURITY | $0.00 |
| 28 05 00 | Common Work Results for Electronic Safety and Security | |
| 28 05 13 | Conductors and Cables for Electronic Safety and Security | |
| 28 05 26 | Grounding and Bonding for Electronic Safety and Security | |
| 28 05 28.33 | Conduits and Backboxes for Electronic Safety and Security | |
| 28 13 00 | Physical Access Control System | |
| 28 31 00 | Fire Detection and Alarm | |
| DIVISION 31 | EARTHWORK | $0.00 |
| 31 20 00 | Earthwork | |
| 31 23 19 | Dewatering | |
| 31 31 16 | Soil Treatment for Subterranean Termites | |
| 31 63 26 | Drilled Caissons | |
| DIVISION 32 | EXTERIOR IMPROVEMENTS | $0.00 |
| 32 05 23 | Cement and Concrete for Exterior Improvements | |
| 32 12 16 | Asphalt Paving | |
| 32 17 23 | Pavement Markings | |
| 32 31 13 | Chain Link Fences and Gates | |
| 32 31 20 | Ornamental Steel Fences and Gates | |
| 32 84 00 | Planting Irrigation | |
| 32 90 00 | Planting | |
| DIVISION 33 | UTIILITIES | $0.00 |
| 33 10 00 | Water Utilities | |
| 33 30 00 | Sanitary Sewer Utilities | |
| 31 31 16 | Soil Treatment for Subterranean Termites | |
| 33 40 00 | Storm Sewer Utilities | |
| TOTALS | | | | |
| $0.00 | | | |
| TOTAL LABOR | | | | |
| | $0.00 | | |
| TOTAL MATERIALS | | | | |
| 6% | $0.00 | | |
| TAX FOR MATERIALS | | | | |
| | | $0.00 | |
| TOTAL EQUIPMENT | | | | |
| DIVISION GRAND TOTALS | | | | $0.00 |
| $0 | INSTRUCTIONS |
| DIVISION GRAND TOTALS | $0 | |
| TAX FOR MATERIALS | | 1. Contract breakdowns must include the applicable VA Medical Center, the date the proposal was provided to the VA, the job title, project number, and the solicitation number; |
| SUBTOTAL | $0 | |
| OVERHEAD | 10% | $0 | |
| PROFIT | 10% | $0 | 2. Lump sum price breakdowns will not be accepted. Lump sum price breakdowns are defined as a single price provided by the contractor for one division or subdivision when each division or subdivision can be broken down by price to a greater degree; |
| BOND/FEE | 3% | $0 | 3. Divisions must still be listed even if not applicable to the construction requirement; |
| PERMITS/LICENSES | | | |
GRAND TOTAL $0 4. The template above does not include all possible divisions or subdivisions needed for the fictitious requirement referenced above. It is only provided as an example of what would be acceptable to the VA Network Contracting Office 9 -Construction Team as of 6-30-2016. Contractors shall provide all prices for each categorical column above and break down each specific division to the greatest degree possible, similar to what is referenced above. Utilizing this template in the contractor's proposal does not in any way require the Government to accept any subsequent price breakdown that is provided by the contractor or prevent the Government from requesting a further price breakdown. Therefore, it is in the Governments and contractor’s best interest to provide a thorough price breakdown initially; and
5. This template, or another template that would be provide the same kind of information referenced above, is required for all proposals provided to the VA Network Contracting Office 9 - Construction as of 6-30-2016.