This notice describes a federal contract opportunity to correct environment and condition deficiencies at the administration building of the James H. Quillen VA Medical Center in Mountain Home, Tennessee. Work includes reconstructing space for police staff with offices, conference rooms, evidence processing areas, locker rooms, mechanical and electrical rooms, an armory, lounge areas, restrooms and corridors. Modifications to existing areas and demolition of structures and materials will be detailed in project drawings and specifications. The requirement has an estimated value between $1 million and $5 million. The solicitation is expected to post on October 20, 2021 and close on November 20, 2021, with award by sealed bidding. This is a 100% SDVOSB set-aside requiring active SAM and CVE registrations. The contracting officer will determine responsibility before award. Questions must be submitted in writing by email with the project number and name in the subject line until the solicitation releases on October 20, 2021.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COMPREHENSIVE ASBESTOS-CONTAINING MATERIALS
INSPECTION
For
James H. Quillen (Mountain Home) Veterans Administration Medical Center
Located At
The corner of Lamont and Veterans Way
Mountain Home, Tennessee 37684
Prepared For:
Mr. Jon E Doliana, Contract Specialist (90C) Acquisition Service Center VISN 9 (90C)
Department of Veterans Affairs 1639 Medical Center Parkway, Suite 400
Murfreesboro, TN 37129
Prepared By:
EFI GLOBAL, Inc.
8100 Professional Place, Suite 113
Landover, Maryland 20785
January 2010
Inspector: Reviewer:
FOR
Craig Miner, LEED AP Jonathan Schatz Senior Project Manager Senior Project Manager
EFI Global, Inc.
Veterans Administration November 24, 2009 Mountain Home-Asbestos Inspection -i- Project No.94515-00807
TABLE OF CONTENTS
Section Page
1.0 Executive Summary
2.0 Background
3.0 Sampling and Inspection Procedure
4.0 Applicable Regulations
5.0 Discussion of Findings
6.0 Cost Estimate
7.0 Recommendations
Appendices
Appendix A Asbestos Sampling Laboratory Reports Appendix B Homogenous Areas Summary Appendix C Sample Results Summary Appendix D Photographs Appendix E Certifications Appendix F Sample Location Drawings Appendix G Asbestos Containing Materials Locations Appendix H Previous Reports
Veterans Administration January 2010 Mountain Home-Asbestos Inspection -1- Project No.94515-00807
1.0 EXECUTIVE SUMMARY
EFI Global, Inc. (EFI) conducted a comprehensive asbestos-containing material inspection of several buildings at the James H. Quillen (Mountain Home) Veterans Administration Medical Center (Site) located at the corner of Lamont and Veterans Way in Mountain Home, Tennessee.
The site inspection was conducted from September 28, 2009 to October 2, 2009. The inspection was performed to determine the presence and extent of asbestos-containing materials found at the site prior to the preparation of an Asbestos Management Plan for the facility. Previous survey reports were reviewed and their results reconfirmed during the survey.
No roof sampling was performed during this survey due to access issues and condition of roof with one exception where a single sample was collected (Building 46).
Asbestos-containing materials were confirmed to exist within various buildings at the site. EFI recommends a budget of $1,357,300.00 to address the abatement of the presumed asbestos-containing materials identified in this inspection prior to any renovation or demolition activities which would disturb these materials. If these materials will not be disturbed, they may be managed in place through the implementation of the facility’s Asbestos Management Plan.
Asbestos Containing Materials
During the comprehensive asbestos-containing building inspection, EFI identified or confirmed the presence of the following asbestos-containing materials at the Site:
Building 2 - Basement
Non-friable materials:
Gray/Green 9”x9” Floor Tile All Roofing
Building 8
Friable materials:
Pipe Insulation Mastic Pipe Insulation Elevator Door Insulation Fire Door Insulation HVAC Duct Cloth
Window Caulk All Roofing
Building 13
Brown 9”x9” Floor Tile Gray/Green Floor Tile Stair Cover Mastic All Roofing
Mountain Home-Asbestos Inspection -2- Project No.94515-00807
Building 15
Brown vinyl Flooring Window Glazing Silver Porch Roofing All Roofing
Building 17
Pipe Insulation
Electrical Box Partitions Exterior Building Caulk All Roofing
Building 19
Building 20
Textured Wall Paint White Floor Tile – 2 Types Green Floor Tile Gray Floor Tile
Building 34
Mountain Home-Asbestos Inspection -3- Project No.94515-00807
White Floor Tile Brown Floor Tile Red Floor Tile Gray Floor Tile Beige Floor Tile All Roofing
Building 36
Fibrous Insulation
Blue Floor Tile Elevator Brake Shoe
Building 37
Pipe Insulation Elevator Door Insulation
Building 39
Window Glazing Off-White 12”x12” Floor Tile Green 9”x9” Floor Tile Sink Undercoating
Building 40
Gray Floor Tile Green Sheet Flooring Sink Undercoating Silver Porch Roofing
Building 41
Sink Undercoating Beige w/ Brown 12”x12” Floor Tile Gray Floor Tile Window Glazing
Mountain Home-Asbestos Inspection -4- Project No.94515-00807
Building 42
Tan/Orange Sheet Flooring Light Beige 12”x12” Floor Tile and Associated Mastic
Sink Undercoating Gray-Green 12”x12” Floor Tile
Building 43
Sink Undercoating Green 9”x9” Floor Tile Tan Sheet Flooring Silver Porch Roofing
Building 44
Silver Porch Roofing Tan Floor Tile Tan Sheet Flooring All Roofing
Building 45
Wall and Ceiling Plaster HVAC Duct Cloth
Brown Sheet Flooring and Associated Mastic
Green Floor Tile
Beige Floor Tile Silver Porch Roofing
Building 46
Mountain Home-Asbestos Inspection -5- Project No.94515-00807
Gray/Green Floor Tile Silver Porch Roofing Green Floor Tile and Associated
Mastic
Building 47
HVAC Duct Cloth Joint Compound and Associated Sheetrock
Tan Floor Tile Silver Porch Roofing
Building 69
Tan Floor Tile Green Floor Tile Beige Floor Tile Gray Floor Tile
Building 77
Tan Granular Flooring Black Flooring Mastic Tan Floor Tile Beige Floor Tile Brown Floor Tile All Roofing
Mountain Home-Asbestos Inspection -6- Project No.94515-00807
Based on this information, EFI makes the following recommendations:
The non-friable asbestos-containing materials shall be removed by a licensed abatement contractor prior to the start of any renovation activity that may disturb such materials.
It is recommended that technical specifications be developed to ensure that any scheduled asbestos abatement work is conducted in accordance with NESHAP, OSHA and State of Tennessee asbestos regulations. An asbestos abatement contractor, licensed in the State of Tennessee, is required to perform the removal of any ACM's.
EFI recommends that building management incorporate this asbestos-containing building material into the existing Asbestos Operations and Maintenance Plan for the facility.
Additionally, EFI recommends that any additional suspect materials that may be uncovered by any future construction or renovation activities, and which were not sampled as a part of this limited asbestos inspection should be considered asbestos-containing until sampling and analysis determines otherwise.
Mountain Home-Asbestos Inspection -7- Project No.94515-00807
2.0 Background
2.1 Scope of Work
EFI Global, Inc. (EFI) conducted a comprehensive asbestos-containing material inspection of Buildings 2 (basement only), 8, 13, 15, 17, 19, 20, 34, 36, 37, 39, 40, 41, 42, 43, 44, 45, 46, 47, 69 and 77 at the James H. Quillen (Mountain Home) Veterans Administration Medical Center (Site) located at the corner of Lamont and Veterans Way in Mountain Home, Tennessee. The site inspection was conducted from September 28, 2009 to October 2, 2009. The inspection was performed to determine the presence and extent of asbestos-containing materials found at the site prior to the preparation of an Asbestos Management Plan for the facility. Previous survey reports were reviewed and their results reconfirmed during the survey. No roof sampling was performed during this survey due to access issues and condition of roof with one exception where a single sample was collected (Building 46).
For the purpose of the scope of work for the comprehensive asbestos-containing material inspection of the Site, the following was performed:
Visual Inspection of all accessible spaces within the building.
Bulk sampling of suspect materials for the presence of asbestos.
Reconfirmation of previous inspection reports.
In addition, due to access issues, the following areas of the Site were not visually inspected and/or sampled:
The interior portions of all areas where destruction would be required for access (i.e., inside walls, under floors, etc.)
Access to the roof was limited due to access and safety issues. Although the roof was visually assessed, only a single sample of roofing material was collected.
2.2 Site description
The basement of Building 2 is approximately 5,800 square feet in size. It is primarily office space with associated mechanical spaces, a break room, storage and restrooms. Interior walls are plaster and sheetrock. Flooring systems are a mix of floor tile and carpeting over concrete.
Building 8
Building 8 is a four-story building approximately 49,391 square feet in size with a brick exterior.
It is primarily office and medical space with associated mechanical spaces, break rooms, laboratories, storage and restrooms. Interior walls are plaster and sheetrock with the flooring systems consisting of a mix of floor tile, linoleum, stone and carpeting over concrete. The majority of piping was observed to be uninsulated or to be insulated with fiberglass or rubber foam. There are limited amounts of asbestos-containing pipe insulation remaining in the building.
Mountain Home-Asbestos Inspection -8- Project No.94515-00807
Building 13 consists of two chapels and has a brick exterior. It is approximately 6,352 square feet in size and is primarily a single floor with choir and organ lofts plus a crawlspace and a bell tower. Limited amounts of vinyl sheet flooring and carpeting over hardwood floors are found within the building. Piping was observed to be uninsulated or to be insulated with fiberglass.
Building 15
Building 15 is a two-story building plus basement approximately 3,248 square feet in size, currently serving as the hospital’s guest house. Interior walls are plaster with flooring systems of vinyl sheet flooring and carpeting over hardwood flooring. The exterior of the building consists primarily of wood clapboard. Piping was observed to be uninsulated or to be insulated with fiberglass or rubber foam.
Building 17
Building 17 is a two-story former library with a partial basement and crawlspace approximately 5,380 square feet in size. Flooring systems are predominantly carpeting over plywood with non- ACM mastic applied to hardwood floors below the plywood. There is asbestos-containing pipe insulation in the attic. The exterior of the building is mainly comprised of brick.
Building 19
Building 19 is a two-story plus basement former residence approximately 7,226 square feet in size. Interior walls are plaster. Flooring systems are a mix of sheet flooring and carpeting over hardwood flooring and concrete. The exterior is wood clapboard. Piping was observed to be uninsulated or to be insulated with fiberglass or rubber foam.
Building 20
Building 20 is a two-story plus basement former residence approximately 6,544 square feet in size. It is primarily office space with associated mechanical spaces, a break room, storage and restrooms. Interior walls are plaster and sheetrock. Flooring systems are a mix of floor tile, linoleum and carpeting over hardwood flooring. The exterior is wood clapboard. Piping was observed to be uninsulated or to be insulated with fiberglass or rubber foam.
Building 34
Building 34 is a three-story building approximately 64,423 square feet in size with an exterior consisting mainly of brick. It is serves a variety of uses including maintenance shops, a museum, offices, laboratories, mechanical spaces, storage and restrooms. Interior walls are plaster and sheetrock. Flooring systems are a mix of floor tile, terrazzo flooring and carpeting over concrete or hardwood flooring. Piping was observed to be uninsulated or to be insulated with fiberglass or rubber foam.
Building 36
Building 36 is a one-story building plus basement approximately 3,000 square feet in size with an exterior constructed mainly of brick. In the past it was used as a chapel and a morgue. It was connected to the main hospital via an underground tunnel that has been bricked over.
Interior walls are constructed of plaster and sheetrock. Limited amounts of floor tile are installed in the building. Piping was observed to be insulated with fiberglass.
Mountain Home-Asbestos Inspection -9- Project No.94515-00807
Building 37 is a three-story building approximately 32,500 square feet in size. It is currently undergoing a total renovation and at the time of the walkthrough there were limited amounts of finish work installed in the building. Small amounts of plaster and sheetrock walls remain.
There is asbestos-containing pipe insulation in pipe chases but it has been removed in all exposed areas.
Building 39
Building 39 is a two-story plus basement, former residence (currently vacant) approximately 5,760 square feet in size. Interior walls consist primarily of plaster, with the flooring systems consisting of floor tile, linoleum and carpeting over hardwood flooring. The exterior of the building consists primarily of a wood clapboard. Piping was observed to be uninsulated or to be insulated with fiberglass or rubber foam.
Building 40
Building 40 is a two-story plus basement former residence approximately 5,760 square feet in size. It is primarily office space with associated mechanical spaces, a break room, storage and restrooms. Interior walls consist mainly of plaster and the exterior is primarily wood clapboard.
Flooring systems are a mix of floor tile, linoleum and carpeting over hardwood flooring. Piping was observed to be uninsulated or to be insulated with fiberglass or rubber foam.
Building 41
Building 41 is a two-story plus basement former residence approximately 5,760 square feet in size. It is primarily office space with associated mechanical spaces, a break room, storage and restrooms Interior walls consist mainly of plaster and the exterior is primarily wood clapboard.
Flooring systems are a mix of floor tile and carpeting over hardwood flooring. Piping was observed to be uninsulated or to be insulated with fiberglass or rubber foam.
Building 42
Building 42 is a two-story plus basement former residence approximately 5,760 square feet in size. It is primarily office space with associated mechanical spaces, a break room, storage and restrooms. Interior walls consist mainly of plaster, with the flooring systems being a mix of floor tile, linoleum and carpeting over hardwood flooring. The exterior is wood clapboard. Piping was observed to be uninsulated or to be insulated with fiberglass or rubber foam.
Building 43
Building 43 is a two-story plus basement former residence (currently vacant) approximately 5,760 square feet in size. Interior walls are plaster, with the flooring systems being a mix of floor tile, sheet flooring and carpeting over hardwood floors. The exterior is wood clapboard.
Piping was observed to be uninsulated or to be insulated with fiberglass or rubber foam.
Mountain Home-Asbestos Inspection -10- Project No.94515-00807
Building 44 is a two-story plus basement former residence approximately 4,389 square feet in size. It is primarily office space with associated mechanical spaces, a break room, storage and restrooms. Interior walls are plaster, and flooring systems are a mix of floor tile, linoleum and carpeting over hardwood floors. The exterior is wood clapboard. Piping was observed to be uninsulated or to be insulated with fiberglass or rubber foam.
Building 45
Building 45 is a two-story plus basement former residence approximately 4,389 square feet in size with exterior wood clapboard siding. It is primarily office space with associated mechanical spaces, a break room, storage and restrooms. Interior walls are plaster and flooring systems are a mix of floor tile, linoleum and carpeting over hardwood floors. Piping was observed to be uninsulated or to be insulated with fiberglass or rubber foam.
Building 46
Building 46 is a two-story plus basement former residence approximately 4,389 square feet in size with exterior wood clapboard siding. It is primarily office space with associated mechanical spaces, a break room, storage and restrooms. Interior walls are plaster and flooring systems are a mix of floor tile, linoleum and carpeting over hardwood floors. Piping was observed to be uninsulated or to be insulated with fiberglass or rubber foam.
Building 47
Building 47 is a two-story plus basement former residence approximately 4,389 square feet in size with exterior wood clapboard siding. It is primarily office space with associated mechanical spaces, a break room, storage and restrooms. Interior walls are plaster and flooring systems are a mix of floor tile, linoleum and carpeting over hardwood floors. Piping was observed to be uninsulated or to be insulated with fiberglass or rubber foam.
Building 69
Building 69 is a four-story building approximately 18,500 square feet in size with a brick exterior.
It is currently undergoing total renovation in the basement, second and third floors. Interior walls are plaster, with the flooring systems being a mix of floor tile, stone, linoleum and carpeting. Piping was observed to be uninsulated or to be insulated with fiberglass or rubber foam.
Building 77
Building 77 is a four-story building approximately 119,749 square feet in size with a brick exterior. It is primarily office and medical space with associated mechanical spaces, break rooms, laboratories, retail space, storage and restrooms. Interior walls are plaster and sheetrock. Flooring systems are a mix of floor tile, linoleum, stone and carpeting over concrete.
Spray-applied fireproofing has been applied to various structural members throughout the building. Piping was observed to be uninsulated or to be insulated with fiberglass or rubber foam.
2.3 Prior Environmental Reports
EFI was provided with an asbestos sampling report by the VA Medical Center staff for review.
Mountain Home-Asbestos Inspection -11- Project No.94515-00807
Alley and Associates, Inc. (Alley) performed asbestos sampling within Buildings 8, 13, 15, 17, 19, 20, 34, 35, 36, 37, 44, 45, 46, 47, 69 and 77 in December 2005. Alley primarily identified asbestos-containing flooring and pipe insulation in various buildings during their survey. Limited amounts of window glazing and plaster were identified as asbestos-containing materials.
A large quantity of asbestos-containing flooring and pipe insulation has since been removed from various buildings at the Site during the course of renovations. The Site staff has kept careful record of removed materials since the Alley survey. The previous survey report was reviewed and its results reconfirmed during EFI’s survey.
Additional or supplemental sampling was performed as needed. The previous report is attached as Appendix H.
Mountain Home-Asbestos Inspection -12- Project No.94515-00807
3.0 Sampling and Inspection Procedure
Representative bulk samples were collected of suspect materials found throughout the buildings on the James H. Quillen (Mountain Home) Veterans Administration Medical Center campus.
The materials sampled for this inspection included: plaster, ceiling tiles, gypsum wallboard and associated joint compound, exterior seam caulk, window caulking, window glazing, HVAC cloth, insulation, floor tile and associated mastic, textured skim coat, sheet flooring, sink undercoating, electrical box partition, stair tread mastic and spray-applied fireproofing.
All samples were collected in accordance with Environmental Protection Agency (EPA) recommendations, and transported to an independent laboratory, which is accredited by the National Institute of Standards and Technology (NIST) and successfully participates in the National Voluntary Laboratory Accreditation Program (NVLAP). Rigorous chain-of-custody guidelines were followed to ensure proper handling and delivery of the samples. Polarized Light Microscopy (PLM) techniques were used to analyze the samples. Asbestos samples were analyzed using the current EPA method EPA/600/R-93/116.
As needed, any samples that were identified to contain asbestos (>1% Asbestos), as per EPA/NESHAP sample guidelines any sample <10% asbestos is to re-analyzed by Dispersion Staining (PLM), 40 CFR Part 763, Appendix E To Subpart E, Point Count Protocol. All samples that were identified to contain <5% asbestos were re-analyzed using the Point Count Protocol.
The laboratory results for all suspected asbestos samples collected can be found in Appendix B, Asbestos-Containing Materials Laboratory Results are found in Appendix C.
Mountain Home-Asbestos Inspection -13- Project No.94515-00807
4.0 APPLICABLE REGULATIONS
4.1 Environmental Protection Agency (EPA)
The EPA defines asbestos-containing materials (ACM) as those, which contain greater than 1% asbestos. Friable materials are defined as those, which can be crumbled or reduced to powder by hand, pressure. EPA-Asbestos Hazard Emergency Response Act (AHERA-Asbestos Regulations, 40 CFR 763, Subpart E) defines asbestos-containing materials (ACM) when referring to buildings as any material or product, which contains more than 1 percent asbestos.
Under: EPA AHERA- asbestos Regulation, 40 CFR 763 Subpart E, defines “friable” “when referring to material in a building means that the material, when dry, may be crumbled, pulverized, or reduced to powder by hand pressure, and includes previously non-friable material after such material becomes damaged to the extent that when dry it may be crumbled, pulverized, or reduced to powder by hand pressure”. The latest revision of the National Emission Standards for Hazardous Air Pollutants (NESHAP, 40 CFR 61, Subpart M), dated November 1990, stipulates that any friable material identified as containing asbestos in any concentration must be considered asbestos-containing.
According to NESHAP Regulations, all regulated asbestos-containing materials (RACM) must be removed from a facility prior to the beginning of any activities that would break-up, dislodge, or similarly disturb the material. The definition for RACM includes the following:
1. Friable ACM,
2. Category I non-friable ACM (packing, gaskets, resilient floor coverings, or asphalt roofing products) that has become friable,
3. Category I non-friable ACM that will be or has been subjected to sanding, grinding, cutting, or abrading.
4. Category II non-friable ACM (other non-friable ACM) that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder by the forces expected to act on the material in the course of demolition of renovation operations.
4.2 Occupational Safety and Health Administration
The abatement of asbestos-containing materials is regulated by OSHA Asbestos in Construction Standard (29 CFR 1926.1101). This OSHA standard regulates asbestos exposure in all work, as defined in 29 CFR 1910.12(b), including but not limited to the following:
Demolition or salvage of structures where asbestos is present;
Removal or encapsulation of materials containing asbestos;
Construction, alteration, repair, maintenance, or renovation of structures, substrates, or portions thereof, that contain asbestos;
Installation of products containing asbestos;
Asbestos spill/emergency cleanup; and Transportation, disposal, storage, containment of and housekeeping activities involving asbestos or product containing asbestos, on the site or location at which construction activities are performed.
The coverage under the OSHA Standard is based on the category of asbestos work being performed. OSHA establishes four categories of asbestos work; these categories are referred to as Class I, II, III, and IV. OSHA defines Class I asbestos work activities involving the removal of thermal system insulation (TSI), surfacing ACM, and/or presumed ACM. Class II asbestos work
Mountain Home-Asbestos Inspection -14- Project No.94515-00807 is defined as activities involving the removal of ACM that is not TSI or surfacing material. This includes, but is not limited to, the removal of asbestos-containing wallboard, floor tile and sheeting, roofing and siding singles, construction mastics, and ceiling tile.
4.3 State of Tennessee
In accordance with the Tennessee Asbestos Accreditation Requirements (Chapter 1200-01-20), any organization or person which performs or intends to perform an asbestos project in Tennessee must be accredited by the State. The accreditation is valid for one year and must be renewed annually. Companies that provide asbestos training for individuals performing asbestos projects in Tennessee must also be accredited by the State. This accreditation is valid for one year and must be renewed annually.
The Tennessee Department of Environment and Conservation (TDEC) must be notified ten working days in advance of beginning an asbestos abatement project involving the removal of greater than or equal to 160-square feet, 260-linear feet, or 35-cubic feet of an asbestos-containing material (NESHAP-sized projects.)
Tennessee requires abatement containments on NESHAP-sized projects to be cleared by Transmission Electron Microscopy (TEM) or Phase Contrast Microscopy (PCM) as defined in the U.S. EPA AHERA regulation 40 CFR Part 763. Results of all PCM final samples must indicate fiber levels less than 0.01 fibers per cubic centimeter (<0.01 f/cc) in order to clear the containment. Abatement projects requiring clearance by Transmission Electron Microscopy (TEM) must follow federal AHERA sampling protocols.
Tennessee requires that all asbestos waste be transported to a State approved landfill for disposal and a copy of the disposal receipts must be provided to the owner within thirty-five days of the waste disposal.
Mountain Home-Asbestos Inspection -15- Project No.94515-00807
5.0 DISCUSSION OF FINDINGS
During the comprehensive inspection of the James H. Quillen (Mountain Home) Veterans Administration Medical Center, a total of 414 homogenous areas were identified, 368 bulk samples of suspect asbestos-containing building materials were collected submitted for laboratory analysis. All asbestos-containing information for this building consists of a visual inspection and sampling conducted during the inspection. Previous survey reports were reviewed and their results reconfirmed during the survey. A summary of all sample results is summarized in Appendix C, and is discussed in detail below. The laboratory analysis reports are provided in Appendix A. A summary of the homogenous areas identified during the inspection is provided in Appendix B.
Building 2 – Basement and Roof
Gray/Green 9”x9” Floor Tile (HA 3) was found throughout the space. The tile has been removed or was not installed in select areas including the break room and two closets. The tile was generally in good condition with the exception of some broken/cracked tiles in the mechanical room.
Roofing Materials (HA 13) were not sampled but should be assumed to be Asbestos- Containing Materials until sample results prove otherwise. The roofing is generally in a good condition.
Pipe Gaskets (HA 14) were not sampled but should be assumed to be Asbestos-Containing Materials until sample results prove otherwise. The material is generally in a good condition.
Asbestos was not detected in the following materials:
Plaster Skim Coat Plaster Base Coat Gray/Green 9”x9” Floor Tile Mastic White w/ blue 12”x12” Floor Tile and Associated Mastic White Floor Tile and Associated
Mastic Cove Base Mastic – 2 Types
2’x4’ Ceiling Tile
Building 8
White Pipe Insulation (HA 5) remains in limited locations within the building. Small quantities remain in Room 23, the men’s locker room, the medical library, Room 230, the 3rd floor women’s restroom, Room 321, Room 003 and near Room 129. Some of the material was observed in a damaged condition.
Window Caulk (HA 8) was identified throughout the buildings exterior. This material was noted to be in generally good condition with some cracking and delaminating.
Fire Door Insulation (HA 9) was assumed to exist in fire doors throughout the building in good condition within both wooden and metal doors.
HVAC Duct Cloth (HA’s 10 and 22) was identified in Room 003A and room 321. The duct cloth was found in very small quantities in good condition.
Mountain Home-Asbestos Inspection -16- Project No.94515-00807
Elevator Door Insulation (HA 11) was assumed to exist in elevator doors throughout the building in good condition inside metal doors.
Pipe Insulation Mastic (HA’s 19 and 20) was sampled and identified only in Room 21. This material was in a damaged condition.
Brown Pipe Insulation (HA 21) was observed within the men’s locker room in a limited quantity. This material was in a damaged condition.
Roofing Materials (HA 23) were not sampled but should be assumed to be Asbestos- Containing Materials until sample results prove otherwise. The roofing is generally in a good condition.
Pipe Gaskets (HA 24) were not sampled but should be assumed to be Asbestos-Containing Materials until sample results prove otherwise.
1’x1’ Ceiling Tiles and Associated
Glue Daubs (mounted to wall) Stair Tread Cover
Audiology Booth Insulation
Building 13
Brown 9”x9” Floor Tile (HA 7) was identified in rooms off the chapel. The flooring is generally in a damaged condition.
Gray/Green Floor Tile (HA 9) was identified in rooms off the chapel. The flooring is generally in a damaged condition.
Stair Cover Mastic (HA 16) was identified on the stairs of the chapel. The material is limited in quantity and in good condition.
Roofing Materials (HA 17) were not sampled but should be assumed to be Asbestos- Containing Materials until sample results prove otherwise. The roofing is generally in a good condition.
Paper under Flooring Sheetrock and Associated Joint
Compound
Building 15
Brown Vinyl Flooring (HA 5) was identified in the laundry room, bathroom, kitchen and north bathroom. The flooring is generally in good condition.
Mountain Home-Asbestos Inspection -17- Project No.94515-00807
Window Glazing (HA 11) was identified on the exterior of the building. This material is currently damaged with cracking and delaminating throughout.
Roofing Materials (HA 12) were not sampled but should be assumed to be Asbestos- Containing Materials until sample results prove otherwise. The roofing is generally in a good
Ceiling Texture
Electrical Box Partitions (HA 3) were identified in the hall outside the men’s room. The partitions are in a damaged condition.
Exterior Building Caulk (HA 7) was identified on the front of the building. Only two square feet of material was identified and it was observed to be in good condition.
Pipe Insulation (HA 17) was previously identified in the attic of the building. The pipe insulation is in a damaged condition.
Roofing Materials (HA 18) were not sampled but should be assumed to be Asbestos- Containing Materials until sample results prove otherwise. The roofing is generally in a good
Door Caulk Seam Caulk Tan Cove Base Mastic Exterior Window Caulk
HVAC Duct Cloth (HA 1) was identified in the basement storage. The cloth appeared to have mostly been removed in the past with a small amount remaining in damaged condition.
Roofing Materials (HA 9) were not sampled but should be assumed to be Asbestos-Containing Materials until sample results prove otherwise. The roofing is generally in a good condition.
Ceiling Texture Joint Compound White Linoleum Gray Tile Grout
Textured Wall Paint (HA 1) was identified throughout the building. This material has been applied to plaster walls and is in good condition.
Mountain Home-Asbestos Inspection -18- Project No.94515-00807
Pipe Insulation (HA 8) was observed within the basement of the building and the exterior. This material was observed to be in a damaged condition.
White Floor Tile (HA 9), Green Floor Tile (HA 11), White Floor Tile (HA 14) and Gray Floor Tile (HA 24) were found within the building. These tiles have been applied throughout the first and second floors. All floor tiles were observed to be in good condition.
Roofing Materials (HA 25) were not sampled but should be assumed to be Asbestos- Containing Materials until sample results prove otherwise. The roofing is generally in a good
Fire Brick – 2 Types Door Caulk Exterior Seam Caulk
White Floor Tile (HA 2) was identified in the Museum. Approximately 3000 square feet of the tile was observed to be in good condition.
Fire Door Insulation (HA 8) was assumed to exist in fire doors throughout the building in good condition within both wooden and metal doors.
Elevator Door Insulation (HA 9) was assumed to exist in elevator doors throughout the building in good condition inside metal doors.
Brown Floor Tile (HA 17) was identified in the basement in the S-corridor and HVAC storage.
The tile was observed to be in generally good condition.
Red Floor Tile (HA 19) was observed in the basement in HVAC storage and the Tin Shop. The material was observed to be in good condition.
Gray Floor Tile (HA 20) was found in the HVAC shop storage in a small quantity and was observed to be in good condition.
Beige Floor Tile (HA 22) was identified in the basement canteen and food storage. The tile was observed to be in good condition.
Roofing Materials (HA 23) were not sampled but should be assumed to be Asbestos- Containing Materials until sample results prove otherwise. The roofing is generally in a good condition.
Pipe Gaskets (HA 24) were not sampled but should be assumed to be Asbestos-Containing Materials until sample results prove otherwise. The material is generally in a good condition.
Caulking on Plaster Plaster Skim Coat
Mountain Home-Asbestos Inspection -19- Project No.94515-00807
Cove Base Mastic White Joint Compound Tan Joint Compound Exterior Caulk on Masonry
Fire Door Insulation (HA 6) was assumed to exist in fire doors throughout the building in good condition within both wooden and metal doors.
Elevator Door Insulation (HA 7) was assumed to exist in elevator doors throughout the building in good condition inside metal doors.
Fibrous Insulation (HA 8) was observed in a wall chase in the main basement area. The material was in damaged condition.
The Elevator Brake Shoe (HA 9) was identified to be an asbestos-containing material. The brake shoes were in good condition at the time of the survey.
Blue Floor Tile (HA 10) was noted in a first floor storage room. The tile was in good condition.
Roofing Materials (HA 11) were not sampled but should be assumed to be Asbestos- Containing Materials until sample results prove otherwise. The roofing is generally in a good
Plaster Sheetrock Joint Compound Ceiling Texture Exterior Seam Caulk
Pipe Insulation (HA 5) was identified within the building in various pipe chases and in very small quantities at dividing walls. This building is currently undergoing a total renovation and pipe insulation is currently being removed as needed. There are currently no finishes installed within the building.
Elevator Door Insulation (HA 6) was assumed to exist in elevator doors throughout the building in good condition inside metal doors.
Roofing Materials (HA 7) were not sampled but should be assumed to be Asbestos-Containing Materials until sample results prove otherwise. The roofing is generally in a good condition.
Pipe Gaskets (HA 8) were not sampled but should be assumed to be Asbestos-Containing Materials until sample results prove otherwise. The material is generally in a good condition.
Building 39
Window Glazing (HA 3) was identified throughout the exterior of the building. The glazing is in a damaged condition.
Mountain Home-Asbestos Inspection -20- Project No.94515-00807
Off-White 12”x12” Floor Tile (HA 5) was found in the left kitchen of the home. The tile was in good condition at the time of the survey.
Green 9”x9” Floor Tile (HA 7) was identified in the left kitchen and left porch of the home. The green tile is underneath the white floor tile (HA 5) in the kitchen and is in good condition.
Sink Undercoating (HA 9) was found in both kitchens of the building and was in good condition.
Roofing Materials (HA 11) were not sampled but should be assumed to be Asbestos- Containing Materials until sample results prove otherwise. The roofing is generally in a good
Beige Linoleum Off-White 12”x12” Floor Tile
Mastic Green 9”x9” Floor Tile Mastic
Gray Floor Tile (HA 3) was observed in the left kitchen of the building. The tile was generally in good condition at the time of the survey.
Green Sheet Flooring (HA 6) was identified in the left porch of the building in good condition.
Sink Undercoating (HA 12) was observed in the left kitchen of the home in good condition.
Roofing Materials (HA 18) were not sampled but should be assumed to be Asbestos- Containing Materials until sample results prove otherwise. The roofing is generally in a good condition.
The right side of the duplex was not accessible at the time of the survey. Given the trend in construction of similar buildings, it should be assumed that any sink undercoating, floor tile and/or linoleum in the right side kitchen and/or porch should be assumed to be asbestos-containing until sample results prove otherwise.
Gray Floor Tile Mastic Mastic between Floorboards Yellow Carpet Mastic 1’x1’ Ceiling Tile – 2 Types Cove Base Mastic Black Carpet Mastic Window Glazing
Sink Undercoating (HA 5) was found in the kitchens of the building. Both are in good
Mountain Home-Asbestos Inspection -21- Project No.94515-00807
Beige w/ Brown 12”x12” Floor Tile (HA 6) was identified in the left kitchen. The tile was in a good condition.
Gray Floor Tile (HA 8) was identified in the right kitchen. The tile was in good condition.
Window Glazing (HA 13) was identified throughout the exterior of the building. The glazing is in a damaged condition.
Roofing Materials (HA 15) were not sampled but should be assumed to be Asbestos- Containing Materials until sample results prove otherwise. The roofing is generally in a good
Off-White 12”x12” Floor Tile and
Associated Mastic Beige w/ Brown 12”x12” Floor Tile
Mastic Gray Floor Tile Mastic Textured Ceiling Carpet Mastic 1’x1’ Ceiling Tile
Tan Sheet Flooring (HA 3) was identified in the left kitchen. The flooring was in good condition.
Light Beige 12”x12” Floor Tile and Associated Mastic (HA’s 5 and 6) were identified in the right kitchen. The tile and mastic were both in good condition.
Gray-Green 12”x12” Floor Tile (HA 7) was identified in the right rear porch. The tile was in good condition.
Sink Undercoating (HA 9) was found in the kitchens of the building. Both are in good condition.
Roofing Materials (HA 15) were not sampled but should be assumed to be Asbestos- Containing Materials until sample results prove otherwise. The roofing is generally in a good
1’x1’ Ceiling Tile Gray-Green 12”x12” Floor Tile
Mastic Carpet Mastic Black Stair Tread Mastic Brown Stair Tread Mastic Window Glazing
Sink Undercoating (HA 3) was found in the kitchens of the building. Both are in good
Mountain Home-Asbestos Inspection -22- Project No.94515-00807
Green 9”x9” Floor Tile (HA 11) was identified in the left kitchen. The tile was in good condition.
Tan/Orange Sheet Flooring (HA 14) was identified in the right kitchen. The flooring was in good condition. It is the bottom layer of three layers of flooring in the kitchen.
Roofing Materials (HA 18) were not sampled but should be assumed to be Asbestos- Containing Materials until sample results prove otherwise. The roofing is generally in a good
Whitish Sheet Flooring 2’x2’ Ceiling Tile 1’x1’ Ceiling Tile Light Beige 12”x12” Floor Tile and
Associated Mastic Dark Beige 12”x12” Floor Tile and
Associated Mastic Green 9”x9” Floor Tile Mastic
Green Sheet Flooring Carpet Mastic
HVAC Duct Paper (HA 2) was identified in the basement stairwell. The paper was in good condition. It appears that the paper was removed in the past and a small quantity remains.
Tan Floor Tile (HA 6) was found in the basement bathroom of the building. The tile was in good condition.
Tan Sheet Flooring (HA 9) was found in the upper bathroom of the building. The flooring was in good condition.
Roofing Materials (HA 10) were not sampled but should be assumed to be Asbestos- Containing Materials until sample results prove otherwise. The roofing is generally in a good
1’x1’ Ceiling Tile Brown Stair Tread Mastic
Wall and Ceiling Plaster (HA 1) throughout the building was identified as asbestos-containing.
The material was generally in good condition.
HVAC Duct Cloth (HA 4) was identified in the basement. The paper was in good condition. It appears that the paper was removed in the past and a small quantity remains.
Brown Sheet Flooring and Associated Mastic (HA ‘s 11 and 12) was found in the bathroom of the building. The flooring was in good condition.
Mountain Home-Asbestos Inspection -23- Project No.94515-00807
Green Floor Tile (HA’s 13 and 16) was found in the bathroom and kitchen of the building. The tile was in good condition.
Beige Vinyl Flooring (HA 15) was found in the breakfast room of the building. The flooring was in good condition.
Roofing Materials (HA 17) were not sampled but should be assumed to be Asbestos- Containing Materials until sample results prove otherwise. The roofing is generally in a good
Wire Insulation Textured Ceiling
HVAC Duct Cloth (HA 4) was identified in the basement. The paper was in good condition. It appears that most of the paper was removed in the past and a small quantity remains.
Silver Porch Roofing (HA 5) was identified on the exterior of the building. The roofing appeared to be in poor condition.
Green Floor Tile and Associated Mastic (HA’s 11 and 12) was found in the kitchen of the building. The tile was in good condition. The tile and mastic compose the bottom layer of flooring.
Gray/Green Floor Tile (HA 13) was identified in the second floor bathroom. The tile was noted to be in good condition.
Roofing Materials (HA 14) were not sampled but should be assumed to be Asbestos- Containing Materials until sample results prove otherwise. The roofing is generally in a good
HVAC Duct Cloth (HA 1) was identified in the basement. The paper was in good condition. It appears that most of the paper was removed in the past and a small quantity remains.
Joint Compound and Associated Sheetrock (HA 4) was identified throughout the building.
The system was in good condition at the time of the inspection. The sheetrock should be considered inseparable from the asbestos-containing joint compound and therefore treated as
ACM.
Green Floor Tile and Associated Mastic (HA 12) was found in the first and second floor bathrooms of the building. The material is limited in quantity and was in good condition.
Mountain Home-Asbestos Inspection -24- Project No.94515-00807
Roofing Materials (HA 13) were not sampled but should be assumed to be Asbestos- Containing Materials until sample results prove otherwise. The roofing is generally in a good
Plaster Skim and Base Coat
Fire Door Insulation (HA 3) was assumed to exist in fire doors throughout the building in good condition within both wooden and metal doors.
Elevator Door Insulation (HA 4) was assumed to exist in elevator doors throughout the building in good condition inside metal doors.
Tan Floor Tile (HA 5) was found throughout the building and was in good condition.
Green Floor Tile (HA 9) was identified in the basement of the building and was in good condition.
Pipe Insulation (HA 13) was identified throughout the basement and in the attic and was in damaged condition.
Beige Floor Tile (HA 18) was identified in Rooms H114, H115b and 117 and was in good condition.
Gray Floor Tile (HA 23) was identified in Room H102A and the second floor lobby and was in good condition.
Roofing Materials (HA 24) were not sampled but should be assumed to be Asbestos- Containing Materials until sample results prove otherwise. The roofing is generally in a good condition.
Pipe Gaskets (HA 25) were not sampled but should be assumed to be Asbestos-Containing Materials until sample results prove otherwise. The material is generally in a good condition.
Building 69 is currently undergoing major renovation. These materials are expected to be abated as renovation dictates. Floor Tile will remain in the first floor and pipe insulation will remain in the attic.
Building 77
Fire Door Insulation (HA 6) was assumed to exist in fire doors throughout the building in good condition within both wooden and metal doors.
Mountain Home-Asbestos Inspection -25- Project No.94515-00807
Elevator Door Insulation (HA 7) was assumed to exist in elevator doors throughout the building in good condition inside metal doors.
Tan Granular Flooring (HA 13) was identified throughout the building in good condition. This material has been abated in various locations at different points in time.
Black Flooring Mastic (HA’s 14 and 43) was identified throughout the building in good condition. This material has been abated in various locations at different points in time.
Tan Floor Tile (HA 21) was identified throughout the building in good condition. This material has been abated in various locations at different points in time.
Beige Floor Tile (HA 34) was identified throughout the building in good condition. This material has been abated in various locations at different points in time.
Brown Floor Tile (HA 38) was identified throughout the building in good condition. This material has been abated in various locations at different points in time.
Roofing Materials (HA 44) were not sampled but should be assumed to be Asbestos- Containing Materials until sample results prove otherwise. The roofing is generally in a good condition.
Pipe Gaskets (HA 45) were not sampled but should be assumed to be Asbestos-Containing Materials until sample results prove otherwise. The material is generally in a good condition.
All the flooring identified as asbestos-containing has been partially abated throughout the various renovations of the building. The flooring was observed to be in generally good condition. Please see attached drawings and summaries for locations.
Asbestos was not detected in the following materials
Spray-Applied Fireproofing Sheetrock Joint Compound
During the asbestos inspection of the Site, the metal elevator doors (and related door components) and the fire doors, were not sampled for asbestos, due to the potential for asbestos contamination during sampling. These materials were assumed to contain asbestos.
Although no other asbestos-containing materials were identified, additional suspect materials may be discovered during future renovation or demolition activities. It is recommended that any additional suspect material discovered during such activities be tested for the presence of asbestos-containing materials, unless information warrants otherwise.
Mountain Home-Asbestos Inspection -26- Project No.94515-00807
6.0 COST ESTIMATE
EFI has completed a comprehensive asbestos-containing materials inspection and evaluation of the James H. Quillen (Mountain Home) VA Medical Center. During the inspection, the following materials were identified or presumed to be asbestos-containing materials and shall be removed by a licensed abatement contractor prior to the start of any renovation or demolition activity that may disturb such materials:
Material Approx Qty Unit Price Estimated Cost
Gray/Green Floor Tile 5000 SF $3.5/SF $17,500.00 Roofing Materials 12,000 SF $6/SF $72,000.00 Pipe Gaskets 100 ea. $10 ea. $1,000.00
Sub Total $90,500.00
Building 8
Pipe Insulation - Various Locations 400 LF $15/LF $6,450.00 Window Glazing 157 systems $300/ea. $47,100.00 Fire Doors 40 ea. $250/ea. $10,000.00 HVAC Duct Cloth 4SF $100/SF $400.00 Elevator Doors 8 ea. $600/ea. $4,800.00 Pipe Insulation Mastic 50 LF $15/LF $750.00 Roofing Materials 12,000 SF $6/SF $72,000.00 Pipe Gaskets 300 ea. $10 ea. $3,000.00
SubTotal $144,500.00
Floor Tile, Stair Tread Cover 313 SF $3.5/SF $1,100.00 Roofing Materials 7,000 SF $6/SF $42,000.00
SubTotal $43,100.00
Building 15
Porch Roof 400 SF $6/SF $2,400.00 Vinyl Flooring 575 SF $3.5/SF $2,015.00 Window Glazing 35 ea. $300/ea. $10,500.00 Roofing Materials 1,800 SF $6/SF $10,800.00
SubTotal $25,715.00
Electrical Panel Partitions 2 SF $250 ea. $500.00 Exterior Seam Caulk 2 SF $200/ea. $200.00 Pipe Insulation – Attic 150 LF $15/LF $2,250.00 Roofing Materials 3,000 SF $6/SF $18,000.00
SubTotal $20,950.00
Mountain Home-Asbestos Inspection -27- Project No.94515-00807
HVAC Duct Cloth 4SF $100/SF $400.00 Porch Roof 400 SF $6/SF $2,400.00 Roofing Materials 4,000 SF $6/SF $24,000.00
SubTotal $26,800.00
Pipe Insulation – Basement and Exterior 30 LF $15/LF $450.00 Floor Tile 5000 SF $3.5/SF $17,500.00 Roofing Materials 3,400 SF $6/SF $20,400.00
SubTotal $38,350.00
Floor Tile 12,945 SF $3.5/SF $45,310.00 Elevator Doors 8 ea. $600/ea. $4,800.00 Fire Doors 40 ea. $250/ea. $10,000.00 Roofing Materials 22,000 SF $6/SF $132,000.00 Pipe Gaskets 400 ea. $10 ea. $4,000.00
SubTotal $196,110.00
Elevator Doors 4 ea. $600/ea. $2,400.00 Fire Doors 1 ea. $250/ea. $250.00 Fibrous Insulation 1 SF $200/ea. $200.00 Elevator Brake Shoe 2 SF $300/ea. $300.00 Floor Tile 200 SF $3.5/SF $700.00 Roofing Materials 3,000 SF $6/SF $18,000.00
SubTotal $21,850.00
Pipe Insulation - Various Locations 1000 LF $15/LF $15,000.00 Elevator Doors 12 ea. $600/ea. $7,200.00 Roofing Materials 14,000 SF $6/SF $84,000.00 Pipe Gaskets 225 ea. $10 ea. $2,250.00
SubTotal $108,450.00
Building 39
Floor Tile 590 SF $3.5/SF $2,065.00 Window Glazing 65 systems $300/ea. $19,500.00 Porch Roof 400 SF $6/SF $2,400.00 Sink Undercoating 2 ea. $200/ea. $400.00
Mountain Home-Asbestos Inspection -28- Project No.94515-00807
Roofing Materials 2,900 SF $6/SF $17,400.00
SubTotal $41,765.00
Floor Tile 604 SF $3.5/SF $2,115.00 Porch Roof 400 SF $6/SF $2,400.00 Sink Undercoating 2 ea. $200/ea. $400.00
SubTotal $22,315.00
Floor Tile 400 SF $3.5/SF $2,065.00 Window Glazing 65 systems $300/ea. $19,500.00 Porch Roof 400 SF $6/SF $2,400.00 Sink Undercoating 2 ea. $200/ea. $400.00
SubTotal $41,100.00
Floor Tile 460 SF $3.5/SF $1,610.00 Porch Roof 400 SF $6/SF $2,400.00 Sink Undercoating 2 ea. $200/ea. $400.00
SubTotal $21,810.00
Floor Tile 400 SF $3.5/SF $1,400.00 Porch Roof 400 SF $6/SF $2,400.00 Sink Undercoating 2 ea. $200/ea. $400.00
SubTotal $21,600.00
Floor Tile 170 SF $3.5/SF $595.00 Porch Roof 400 SF $6/SF $2,400.00 HVAC Duct Cloth 4SF $100/SF $400.00 Roofing Materials 2,000 SF $6/SF $12,000.00
SubTotal $15,395.00
Floor Tile 350 SF $3.5/SF $1,225.00 Porch Roof 400 SF $6/SF $2,400.00
Mountain Home-Asbestos Inspection -29- Project No.94515-00807
HVAC Duct Cloth 4SF $100/SF $400.00
SubTotal $15,825.00
Floor Tile 385 SF $3.5/SF $1,350.00 Porch Roof 400 SF $6/SF $2,400.00 HVAC Duct Cloth 4SF $100/SF $400.00
SubTotal $16,150.00
Floor Tile 50 SF $3.5/SF $175.00 Porch Roof 400 SF $6/SF $2,400.00 HVAC Duct Cloth 4SF $100/SF $400.00
SubTotal $14,775.00
Pipe Insulation – Attic Only 200 LF $15/LF $3,000.00 Fire Doors 20 ea. $250/ea. $5,000.